NASA to launch third NATO communications satellite
Launching of the third NATO communications satellite is discussed. The Delta launch vehicle is briefly described along with launch operations. Management of the Delta program is considered.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Launching of the third NATO communications satellite is discussed. The Delta launch vehicle is briefly described along with launch operations. Management of the Delta program is considered.
The Delta launch vehicle has played a significant role in spaceand airborne studies since its first launch in 1960, and a high volume period of service is planned for the 1980s. The historical role played by Delta in launching satellites from 1960 to the present is discussed, and vehicle modifications made during this period are summarized. It is shown that out of 154 launches, 143 proved successful for an overall reliability of 93%. The forecasted launch schedule through 1985 is also presented. Various modifications are now under way to provide spacecraft interchangeability with the Shuttle: a Payload Assist Module (PAM) is proposed to provide an orderly transition from the Delta expendable vehicle to the Shuttle reusable vehicle; the new Delta 3920 Improved Second Stage is the result of a need for improved Delta performance to meet 3910 payload capabilities; the firing sequence of the solid rocket motors was altered from five at liftoff and four during ascent to a sequence of six and three, thereby increasing spacecraft weight in geosynchronous transfer orbit. Potential future improvements discussed include the Delta 4920, 9-ft-diam fairing, booster engine performance, PAM solid motor performance, a universal second stage, a hydrogen-oxygen second stage, and large strap-on solids.
A discussion of the pogo phenomenon observed on the Delta launch vehicle second stage is presented. The pressure-fed engine and the high frequency of the oscillation (125 Hz) required unique analysis and extensive testing to support analysis detail. In addition, the need to continue a one vehicle per month launch rate required both an immediate interim and a timely long-term solution to the problem. The development and implementation of a program involving analysis, ground test, and flight instrumentation is described. An analytical model was developed and used to investigate both structural and propulsion system modifications. The factors which influenced the final suppression system selection, the analytical predictions for that system, and flight data which validate that system's effectiveness are presented.
Research and development of three stage Delta launch vehicle for scientific and applications satellites
Syncom c satellite and thrust augmented delta /tad/ launch vehicle
The LAWS phase 1 and phase 2 studies have been completed on schedule and have led to significant advances in CO2 laser development. The Phase 2 Design Definition Study has shown that a large scanning mirror/high pulse energy laser LAWS Instrument is feasible and within the existing technology. The capability to monitor wind velocities with backscatter ratios of 10(exp 11) m(exp -1) SR(exp -1) is feasible. The weight budget allocated for the baseline LAWS is adequate, and sufficient reserves exist with the potential downsized configuration. With the possible decrease in available power from the baseline of 2.2 kW guideline, power and shot management is critical for the baseline configuration (15 to 20 J). This is particularly true during the 100 day occultation period each year. With the downsized configurations (5 to 7 J), power management is still necessary during the occultation but is primarily limited to shot management over the polar regions. The breadboard effort has produced significant laser advances for a tight 18 month schedule and the minimum budgets available from NASA, Lockheed, and TDS. Using the NASA funds and Lockheed and TDS fixed assets budgets, the breadboard was designed, fabricated, and brought on-line with first laser light within 16 months after ATP. First laser beam was obtained on 21 April 1992 at a 5 J power level. Tests since then have been conducted at sustained, repetitive pulse levels of over 7 J and 20 Hz. This is an increase of over two or three times greater than any system previously developed from this type laser. Increased power levels and additional life tests will be accomplished in the next LAWS phase. The Lockheed LAWS design will operate in the gravity gradient mode on-orbit, and all possible instrument vibration and jitter modes have been considered. Adequate pointing stability and control is state-of-the-art technology for the critical time periods, frequency rates, and control responses required by LAWS. Lockheed recommends a 6-1/2 year phase C/D program for LAWS to provide adequate feedback from the engineering unit and the qualification unit to the final flight unit. Assuming a one year period for LAWS integration to the spacecraft, followed by a six-month period for launch vehicle integration, LAWS could be successfully developed and launched in eight years. Our baseline design or downsized design can be accommodated by either the Atlas 2AS or the Delta launch vehicles. Lockheed's recommendation is that, based on the successful phase 2 design study and breadboard program, a follow-on 18 month extended breadboard testing program and additional system engineering studies, primarily in interfacing with a to be defined platform, be initiated. This should be immediately followed by the phase C/D program, leading to a LAWS launch in late 2001 or early 2002.
The GOES mission profile used to achieve geostationary orbit following separation from the Delta launch vehicle is described. The mission profile was constrained by the solid-propellant apogee kick motor which was undersized relative to the spacecraft weight. The resulting deficiency in delivered delta-V had to be made up by the spacecraft hydrazine propulsion system. The mission profile which best utilizes the on-board hydrazine requires that the transfer orbit apogee height be biased 13,800 km above geosynchronous altitude. This maximizes the effectiveness of the apogee motor in performing the plane change necessary to achieve near-equatorial orbit. The highly eccentric drift orbit which results from the apogee motor firing has an average drift rate of 60 deg/day. Circularizing this orbit requires maneuvers designed to achieve geostationary position within a tightly constrained hydrazine allocation. The sequence takes advantage of the orbit changes resulting from attitude maneuvers and combined inplane/out-of-plane maneuvers to achieve hydrazine savings.
A summary of the constraints and requirements on the Earth Observatory Satellite (EOS-A) orbit and launch vehicle analysis is presented. The propulsion system (hydrazine) and the launch vehicle (Delta 2910) selected for EOS-A are examined. The rationale for the selection of the recommended orbital altitude of 418 nautical miles is explained. The original analysis was based on the EOS-A mission with the Thematic Mapper and the High Resolution Pointable Imager. The impact of the revised mission model is analyzed to show how the new mission model affects the previously defined propulsion system, launch vehicle, and orbit. A table is provided to show all aspects of the EOS multiple mission concepts. The subjects considered include the following: (1) mission orbit analysis, (2) spacecraft parametric performance analysis, (3) launch system performance analysis, and (4) orbits/launch vehicle selection.
The latest version of the NASCAP/LEO digital computer code used to simulate the PIX 2 experiment is discussed. NASCAP is a finite-element code and previous versions were restricted to a single fixed mesh size. As a consequence the resolution was dictated by the largest physical dimension to be modeled. The latest version of NASCAP/LEO can subdivide selected regions. This permitted the modeling of the overall Delta launch vehicle in the primary computational grid at a coarse resolution, with subdivided regions at finer resolution being used to pick up the details of the experiment module configuration. Langmuir probe data from the flight were used to estimate the space plasma density and temperature and the Delta ground potential relative to the space plasma. This information is needed for input to NASCAP. Because of the uncertainty or variability in the values of these parameters, it was necessary to explore a range around the nominal value in order to determine the variation in current collection. The flight data from PIX 2 were also compared with the results of the NASCAP simulation.
The evolution of capabilities and the current performance levels of the Delta launch vehicle are outlined. The first payload was the Echo I passive communications satellite, weighing 179 lb, and placed in GEO in 1960. Emphasis since then has been to use off-the-shelf hardware where feasible. The latest version in the 3924 first stage, 3920 second stage, and Pam D apogee kick motor third stage. The Delta is presently equipped to place 2800 lb in GEO, as was proven with the 2717 lb Anik-D1 satellite. The GEO payload placement performance matches the Shuttle's, and work is therefore under way to enhance the Delta performance to handle more massive payloads. Installation of the Castor-IV solid motor separation system, thereby saving mass by utilizing compressed nitrogen, rather than mechanical thrusters to remove the strap-on boosters, is indicated, together with use of a higher performance propellant and a wider nose fairing.
The results of a student project to design a lunar lander in the context of a specifically defined mission are presented. The Lunar Scout will be launched from Cape Canaveral, Florida onboard a Delta II launch vehicle. The Delta II will carry the lander and its payload to a 1367 km orbit. Once it reaches that altitude, a STAR 48A solid rocket motor will kick the spacecraft into a lunar trajectory. After burnout of the lunar insertion motor, it will be jettisoned from the spacecraft. The flight from the earth to the moon will take approximately 106.4 hours. During this time the battery, which was fully charged prior to launch, will provide all power to the spacecraft. Every hour, the spacecraft will use its sun sensors and star trackers to update its position, maintain some stabilization and relay it back to earth using the dipole antennas. At the start of its lunar trajectory, the spacecraft will fire one of its 1.5 N thrusters to spin in at a very small rate. The main reason for this is to prevent one side of the spacecraft from overheating in the sun. When the spacecraft nears the moon, it will orient itself for the main retro burn. At an altitude of 200 km, a 4400 N bipropellant liquid thruster will ignite to slow the spacecraft. During the burn, the radar altimeter will be turned on to guide the spacecraft. The main retro rocket will slow the lander to 10 m/s at an approximate altitude of 40 km above the moon. From there, the space craft will use four 4.5 N hydrazine vertical thrusters and 1.5 N horizontal thrusters to guide the spacecraft to a soft landing. Once on the ground, the lander will shutoff the radar and attitude control systems. After the debris from the impact has settled, the six solar panels will be deployed to begin recharging the batteries and to power up the payload. The feedhorn antenna will then rotate to fix itself on the earth. Once it moves, it will stay in that position for the spacecraft's lifetime. The payload will then be activated to begin the lunar mission.
The past decade has brought about a radical transformation in NASA's planetary exploration program. At the beginning of this decade, NASA was focused on the Cassini mission to Saturn. Following on the heels of the successful Voyager and Galileo missions, Cassini represents the culmination of an evolution towards successively larger, more complex, and more expensive spacecraft. The Cassini spacecraft weighs in at over 5 metric tons, and carries an entry probe and a sophisticated suite of sensors supporting 27 different science investigations enabling a comprehensive scientific investigation of Saturn with a single spacecraft. The cost of this spacecraft exceeded $2B, including the cost of the large Titan IV launch vehicle. During Cassini development, NASA realized that it could no longer afford these "flagship" missions, and the agency moved aggressively towards a "faster, better, cheaper" design philosophy of focused science goals and simpler, rapidly-developed spacecraft, allowing much more frequent launches of smaller, lower-cost missions. The Mars Global Surveyor, launched in November 1996, is an example of this new paradigm. Developed in less than 3-years, MGS is only one-fifth the mass of Cassini, and only cost on the order of $220M. The reduced spacecraft mass allows use of the smaller, lower cost Delta launch vehicle. Currently in orbit about Mars, MGS carries a focused suite of six science instruments that are currently returning high-resolution remote sensing of the Martian surface. The future calls for continued even more aggressive mass and cost targets. Examples of these next-generation goals are embodied in the Mars Micromission spacecraft concept, targeted for launch in 2003. With a mass of only 200kg, this lightweight bus can be tailored to carry a variety of payloads to Mars or other inner-planet destinations. The design of the Micromission spacecraft enable them to be launched at extremely low cost as a secondary "piggyback" payload.
The Small Expendable-tether Deployer System (SEDS) is being built for a 1991 flight on a Delta launch vehicle. SEDS will deploy a 50 lb instrument satellite as an end mass at the end of a 20 km tether. The objective of the experiment is to test the SEDS design concept by demonstrating that the system will satisfactorily deploy the full 20 km tether without stopping prematurely, come to a smooth stop on application of the brake, and cut the tether at the proper time after it swings to the vertical. SEDS will also collect data that will be used to test the accuracy of tether dynamics models for this type of deployment. Radar tracking is planned. In addition, the SEDS on-board computer system will record, store, and continuously transmit data over the Delta II S-band telemetry channel. Initial testing of the software under simulated flight conditions was performed. These tests used both assembly language routines running on SEDS data systems and C-language routines on an IBM-PC. As the software now stands relatively few additions are needed before the entire set of flight software is complete.
TIROS weather satellite launch - flight plan, configuration, vidicon television system, polar synchronous orbit, stabilization and control, and Delta launch vehicle
Biosatellite A - weightlessness, radiation, and general biological experiments, Delta Launch Vehicle, tracking and recovery, and flight sequence
This document presents the development requirements, costs, and schedule for a high-energy upper-stage hybrid propulsion system. High energy is achieved through the use of a lithium fuel formulation (solid) and fluorinated oxidizer (liquid). The propulsion system contains 3 2OO lb of propellant and may be used as a terminal stage for Atlas/Centaur or DSV-3M Delta launch vehicle. A program to develop a fluorinated hybrid propulsion system could be initiated with little risk. An extensive investigation revealed that the technology required to develop most of the components has either been demonstrated or is in progress. Further, it was found that there were no areas of critical technology. The cost to develop a hybrid propulsion system to a status where it could be integrated into a flight-test stage is about $17 million. This cost does not include the development of the stage astrionics. Length of the total development program is 34 months. A total recurring cost of $381 600 was estimated for the first unit (less astrionics and fee). This includes purchased hard\rare, manufacturing, material, assembly, and test costs.
Compact pulse counter and serial encoder for use in third stage instrumentation system of Delta launch vehicle
Performance, constraints, configurations, and cost estimates on Delta and uprated Delta launch vehicles