Search NASA⌕ Search

SEARCH · Search NASA

Results for “DEMOLITION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Annual Stormwater Report for the Y-12 National Security Complex Oak Ridge, Tennessee

This is the ninth annual stormwater report prepared in accordance with the modified National Pollutant Discharge Elimination System permit issued to the Y-12 National Security Complex (Y-12) on April 1, 2014. This modified permit removed the authorization to augment flow in East Fork Poplar Creek (EFPC) and thus removed the requirement to sample this effluent in conjunction with other major outfalls on EFPC. There are several construction and demolition activities currently in progress at Y-12. These include the construction of the Uranium Processing Facility (UPF), the Mercury Treatment Facility (MTF) on EFPC, the site-wide power grid upgrade, construction of an Emergency Operations Center, construction of a new Fire Station, Security Improvement Revitalization Program (SIRP), West End Protection Area Reduction (WEPAR) Project, and the demolition of the Biology Complex. Current stormwater protections have proven effective in 2021. However, moving forward, challenges to protect stormwater will continue from these projects. Therefore, oversight of these activities, and all other construction and demolition projects, will continue to be a priority in 2022. Y-12 will continue to implement appropriate Best Management Practices and reduce outside material storage areas where possible.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Damage Detection and Electrical Performance Impact of Flat-Flexible Circuits

Flat-flexible circuits or ‘flex circuits’ have varied applications in electronics and in explosive detonation systems. They pose advantages over conventional coaxial cables in their ability to fit into small mechanical envelopes and routings. A typical flex circuit is composed of a laminated assembly of multiple layers of conductor and dielectric materials. Copper, because of its high electrical conductivity, is one of the primary materials used in flex circuit conductors. The conductor must maintain structural integrity and electrical continuity when the flexible circuit is bent during processing or to fit an application envelope. Under some strain conditions a cable may have degraded electrical performance even though visible damage may not be evident. Dislocation density can increase by mechanisms such as dislocation forest hardening, where gliding dislocations in primary slip planes get pinned at obstacles and form Frank-Read sources. Dislocation density increases within the conductor layers may impact electrical resistivity but would not necessarily result in visible mechanical failure. In some detonation applications, such as for building implosion for demolition, the time for signal transmission and voltage used for firing detonators can be critical. If the resistance in a single flex cable within a building demolition array is too high, the resultant demolition shape may be asymmetric, leading to unplanned damage to nearby structures and potential hazards to public safety. This study will apply non-destructive evaluation techniques to evaluate the detectability of damage accumulation in flat, flexible copper-conductor cables and discuss potential implications to their practical use.

42 ENGINEERING↗

Area 6 Control Point: An Architectural Survey of the Area 6 Control Point, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO) proposes to demolish five buildings and five accessory resources in the Area 6 Control Point at the Nevada National Security Site (NNSS) in Nye County, Nevada. The demolition and removal of the buildings and accessories constitute an undertaking subject to review under Section 106 of the National Historic Preservation Act (NHPA) (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800. The buildings and accessories were recorded in Identification and Evaluation of 14 Architectural Resources Scheduled for Demolition, Area 6 Control Point and Vicinity, Nevada National Security Site, Nye County, Nevada (Menocal et al. 2020). The report found that the five buildings were not individually eligible for listing in the National Register of Historic Places (NRHP, National Register) but were potentially eligible as contributing elements to an unrecorded Area 6 Control Point district. The report also found that the five accessory resources were not individually eligible for the NRHP but they contributed to other historic properties, including the contributing elements to the unrecorded district. Finally, the report found that the undertaking would result in an adverse effect to historic properties. The State Historic Preservation Office (SHPO) concurred with the report’s findings regarding the eligibility of the buildings and structures in the Area of Potential Effect (APE) and that the undertaking would result in an adverse effect (Reed 2020). The NNSA/NFO, in consultation with the SHPO, then developed the Memorandum of Agreement DE-GM58-21NA25543 Between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Demolition of Fourteen Buildings and Structures in Area 6 of the Nevada National Security Site, Nye County, hereafter referred to as the MOA. The MOA stipulates that a district boundary be delineated with an accompanying boundary report and supporting photographs (Stipulation III.A) followed by an architectural survey of the potential historic district (Stipulation III.B). The SHPO reviewed and concurred with the proposed district boundary and accompanying boundary report and photographs (O’Neill et al. 2021) on August 23, 2021, in fulfillment of Stipulation III.A (Reed 2021). This architectural survey report has been prepared in accordance with Stipulation III.B. It includes an NRHP evaluation of the district, identifies contributing and non-contributing elements, and is accompanied by Architectural Resource Assessment (ARA) forms. The NRHP evaluation concludes that the Area 6 Control Point is recommended eligible as a historic district under the Secretary of the Interior’s Significance Criterion A at the national level as the location of the command center and various support facilities directly related to timing and firing operations for nuclear testing on the NNSS from 1951 to 1992. It is also recommended eligible under Significance Criterion C for embodying the distinctive characteristics of a nuclear command center in the context of the Cold War and as a significant and distinguishable entity. There are a total of 29 primary resources within the district boundary. Of these, 28 are recommended as contributing elements to the Area 6 Control Point Historic District and one is recommended as non-contributing.

54 ENVIRONMENTAL SCIENCES↗

Environmentally-Friendly Fixatives with Embedded Intelligence for Dust Management at Contaminated Sites – 21266

Wind or rain can potentially spread loose hazardous contaminants from piles of rubble and soil waiting to be trucked to a landfill site for disposal. Water, which is plentiful near remediation sites, is the traditional dust suppressant during demolition, post-demolition sizing and encapsulation as well as soil trucking activities. However, water can mobilize the toxic metal contaminants in the soil into the ground water. Ground water is highly regulated and contaminant removal is costly. InnoSense LLC (ISL) is developing DustSafe™ as a cost-effective alternative to water for various decontamination & decommissioning (D&D) applications. It is a sprayable dust abatement solution designed to actively trap, remediate, and aid in visualizing hazardous materials while preventing their dispersion by wind, water or impact. Aside from application as a dust suppressant to trap airborne toxic and radiological hazards during demolition activities, with customization DustSafe can be used to locate/characterize and remediate hazards prior to D&D activities.

54 ENVIRONMENTAL SCIENCES↗

Decommissioning of the V1 Nuclear Power Plant Jaslovske Bohunice - 20270

The paper focuses on introducing the approach and method applied for decommissioning of the V1 nuclear power plant (further the 'V1 NPP') located in Jaslovske Bohunice in the Slovak Republic, to the conference participants. The Paper outlines activities and steps necessary to comply with the requirements contained in the decision of the Slovak government from 1999 regarding the early shutdown of the V1 NPP. The company responsible for the V1 NPP decommissioning is Jadrova a vyradovacia spolocnost, a.s., (further JAVYS) with the State as a sole shareholder. On the basis of the V1 NPP Decommissioning Conceptual Plan, out of four assessed options, JAVYS selected the immediate decommissioning option (the 'IDO') for the V1 NPP. On the basis of multi-criteria analysis, the IDO specified the approach of immediate and continuous dismantling of equipment followed by demolition of buildings and preparation of the site for its further potential use. The IDO also included the summary of technical, environmental, legislative information as well as the determination of assumed costs for decommissioning of the V1 NPP. Prior to commencement of the V1 NPP decommissioning, within the process of termination of operation, activities connected with de-fuelling, monitoring, processing of historical waste and, not to forget, the process of obtaining the license for the V1 NPP decommissioning were executed. JAVYS decided to divide the decommissioning process into two stages. In 2011, JAVYS obtained a license for the first stage of the V1 NPP decommissioning. Within this stage, dismantling of inactive equipment, demolitions of inactive buildings, monitoring of systems and preparatory works for the upcoming stage of decommissioning were implemented. In 2015, in line with the license for the 2. stage of the V1 NPP decommissioning, the activities of decontamination and dismantling of contaminated and active equipment as well as demolitions of remaining buildings began. In this stage radioactive waste (RAW) produced during the decommissioning is to be processed. After decontamination, the material fulfilling the free release criteria is to be released into the environment, the site is to be cleared from the scope of the Atomic Act and released from the surveillance of the national regulators. Future application of certain methods and techniques for decontamination and dismantling in similar environments might bring an added value to the operators. Paper includes a description of best practices for Nuclear Power Plant VVER type reactors decommissioning. Schedule comparison is given to show how the critical path of certain projects is being managed. Application of the International Standard for Decommissioning Costing (ISDC) methodology provides a uniform method which enables comparison of cost estimates to other nuclear facilities under decommissioning. The cost estimate for the V1 NPP decommissioning has been continuously updated based on more advanced and detailed information on the decommissioning activities and projects. Monitoring of progress of the V1 NPP decommissioning is performed via four key-performance indicators. The Earned Value Management (EVM) methodology is used for evaluating time and cost aspect of decommissioning activities while waste conditioning index is calculated by comparing the actually produced waste to planned values of waste for a respective monitored period. Radiological safety index is assessed by comparison of the personnel records on the individual yearly doses received by each respective employee to the boundary value. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Architecture of Area 12 Camp - Nevada's Atomic Ghost Town. An Architectural Survey of Area 12 Camp, Nevada National Security Site, Nye County, Nevada

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to demolish 10 buildings and one structure in Area 12 Camp at the Nevada National Security Site (NNSS) in Nye County, Nevada, to meet current and future National Weapons Science, Global and Homeland Security Program, and Environmental Management mission requirements and to reduce dangers to site workers from some of these resources. These demolitions constitute an undertaking subject to review under Title 54 U.S.C. § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 U.S.C. § 300101, et seq., and its implementing regulations, 36 C.F.R. Part 800. These resources were recorded and evaluated as individually ineligible for the National Register of Historic Places (National Register or NRHP) by Menocal and Shaw (2019). Upon review by the Nevada State Historic Preservation Office (SHPO) and internal review by Desert Research Institute (DRI) and NNSA/NFO staff, it was determined that these resources needed to be rerecorded and evaluated in relation to what appeared to be a National Register-eligible Historic District made up of the entirety of Area 12 Camp. Based on preliminary information, it appeared that all 11 resources would likely be contributing elements of that historic district. With that assumption in mind, recording of the entire proposed Area 12 Camp Historic District was done for three purposes. First, it would result in a definitive significance evaluation of the 11 resources in question. Second, recording of the entire camp would be offered as an appropriate mitigation measure for the demolition of these resources. Third, it would present an essential background for future management of resources within the district boundaries. Prior to the present survey, Area 12 Camp had not yet been systematically recorded; therefore, DRI surveyed an area of approximately 229 acres for architectural resources. This effort resulted in the identification, recording, and evaluation of the Area 12 Camp Historic District (SHPO Resource No. D372), including the identification of its contributing components. This district is recommended eligible for the National Register of Historic Places under Criteria A and C. It is unevaluated under Criteria B and D. The Area 12 Historic District contains 71 Principal Resources, which include landscapes, buildings, and structures. Of these resources, 69 (including 10 of the 11 resources to be removed) are recommended as contributing elements of the historic district during its period of significance corresponding to nuclear testing from 1960 through 1992. During most of the Cold War, the government reservation now called the NNSS was named the Nevada Test Site (NTS).

54 ENVIRONMENTAL SCIENCES↗

Life cycle Management of 324 Project High-Activity, Mixed/Low-Level Radioactive Waste - 20506

U.S. DOE contractor CH2M Hill Plateau Remediation Company (CHPRC) manages the 324 Building and is preparing to remotely excavate and disposition the radioactive soil beneath the building to allow further deactivation of the building. The 324 Building is a non-reactor Category 2 Nuclear Facility located in the 300 Area of the Hanford Site. Records indicate that in October 1986, approximately 516 liters of a concentrated liquid waste stream containing cesium-137 ({sup 137}Cs) and strontium-90 ({sup 90}Sr) spilled onto the floor of a hot cell, B-Cell, in the 324 Building. The spill contained an estimated 1.3 million curies (Ci) of radioactivity. A breach in the sump of B-Cell was discovered in November 2009 during characterization of the soil under the building. Exposure rates in excess of 10,000 R/hr were detected through a system of access pipes installed under the hot cell, and an estimated 1.557 E+05 Ci of {sup 137}Cs and 6.842 E+04 Ci of {sup 90}Sr are in the soil beneath B-Cell. The magnitude of the soil contamination below B-Cell represents one of the most challenging remediation activities in the DOE complex. The objective of CHPRC's 324 Project is to remotely excavate and disposition the highly contaminated soil under the hot cell so building deactivation and stabilization activities can resume. Depending on the volume and radioactivity of contaminated soil under B-Cell, the material will be dispositioned either at the Hanford Site's Environmental Restoration Disposal Facility (ERDF) or in grout monoliths that will be created in the hot cells (A, C and D) next to B-Cell during future building demolition activities. The current project scope includes installing structural supports under the walls of B-Cell and using remotely operated equipment to remove debris from the hot cell, remove debris mixed with grout on the floor, saw through and remove the cell floor and liner, and excavate contaminated soil under B-Cell to a depth of up to 3.66 meters (12 feet). Addition or removal of debris in A-Cell may be required to support B-Cell cleanout and excavation activities. The base approach is to disposition debris and soil bins in the Radiochemical Engineering Cell (REC) monoliths, and subsequently disposition the monoliths during building demolition. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Annual Storm Water Report for the Y-12 National Security Complex Oak Ridge, Tennessee

This is the seventh annual storm water report prepared in accordance with the modified National Pollutant Discharge Elimination System permit issued to the Y-12 National Security Complex (Y-12) on April 1, 2014. This modified permit removed the authorization to augment flow in East Fork Poplar Creek (EFPC) and thus removed the requirement to sample this effluent in conjunction with other major outfalls on EFPC. The general condition of the site continues to improve. The concentrations of Escherichia Coli (Es. coli) at the major outfalls and instream monitoring locations on EFPC are no longer elevated as they were in 2018. Follow-up samples indicated normal levels. Monitoring for this parameter will continue into 2020. The repair of Outfall 014 is nearing completion and will be sampled for storm water in 2020. This repair was expected to occur in 2019 but was delayed until 2020. There are several construction and demolition activities currently in progress at Y-12. These include the construction of the Uranium Processing Facility (UPF), the Mercury Treatment Facility (MTF) on EFPC and the impending demolition of the Biology Complex. These projects will present challenges for the protection of storm water. Oversight of these activities will be a priority in 2020. Y-12 will continue to implement appropriate Best Management Practices and reduce outside material storage areas where possible.

54 ENVIRONMENTAL SCIENCES↗

Report series: Evaluation, Finding of Effect, and Mitigation Documentation for the 1960s Dormitories and 1950s Quonset Hut Foundations, Mercury, Area 23, Nevada National Security Site, Nye County, Nevada [3 Reports Consolidated]

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office (NNSA/NFO) plans to modernize the town of Mercury at the Nevada National Security Site (NNSS) in Nye County, Nevada, to meet current and future National Weapons Science, Global and Homeland Security Programs, and Environmental Management mission requirements. These plans—including anticipated demolitions, consolidations, and rebuilding at Mercury—are considered an undertaking subject to review under Title 54 U.S.C. § 306108, commonly known as Section 106 of the National Historic Preservation Act, Title 54 U.S.C. § 300101, et seq., and its implementing regulations, 36 C.F.R. Part 800. Desert Research Institute (DRI) completed an architectural survey of Mercury in 2017. This effort resulted in the identification, recording, and evaluation of the Mercury Historic District, as well as the identification of its contributing components. This district was recommended eligible to the National Register of Historic Places (NRHP or National Register) under Criteria A and C, but was unevaluated under Criteria B and D at that time. The Mercury Historic District contains 153 individual landscapes, buildings, and structures. Of these resources, DRI recommends all except one as contributing elements of the historic district during its period of significance corresponding to nuclear testing from 1951 through 1992. During most of the Cold War, the land now called the NNSS was referred to as the Nevada Test Site (NTS). This report evaluates resources dating to the 1950s and 1960s between Jangle and Knothole Streets and south of Ranger Avenue in Mercury prior to the proposed demolition of all resources in that area between Sandstone and Greenhouse Avenues as a phase of the larger modernization program mentioned above. Although the Mercury Historic District as a whole is eligible to the National Register, further evaluation of these properties, as detailed in this report, indicates that none are individually eligible under any of the Secretary of Interior’s Significance Criteria, either at the national or local level.

54 ENVIRONMENTAL SCIENCES↗

Historic Significance and Current Condition Assessment of Building 06-CP-170, the Yucca Flat Weather Station, Area 6, Nevada National Security Site, Nye County, Nevada

This report was produced in partial fulfillment of the mitigation of adverse effects to Building 06-CP-170, the Yucca Flat Weather Station on the Nevada National Security Site (NNSS), and is intended to comply with the 2021 Memorandum of Agreement DE-GM58-21NA25543 Between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Demolition of Fourteen Buildings and Structures in Area 6 of the Nevada National Security Site, Nye County, Nevada (hereafter referred to as the MOA). This MOA was executed to resolve adverse effects from the U.S. Department of Energy (DOE) plan to demolish 14 architectural resources at the Control Point and in the vicinity in Area 6 of the NNSS. The management and operations contractor for the NNSS identified these 14 architectural resources as environmental hazards unsafe for human occupation due to deterioration and rodent infestation. Building 06-CP-170 is scheduled for demolition as part of this undertaking. Building 06-CP-170 was originally recorded in 2018 during a Section 106 cultural resources inventory for a proposed installation of a 138-kilovolt transmission line on the NNSS. The building was determined individually eligible by the DOE, in consultation with the Nevada State Historic Preservation Office, for inclusion in the National Register of Historic Places under the Secretary of the Interior’s Significance Criterion A because of its association with nuclear testing. Pursuant to Stipulation III.D.3 of the MOA, this report provides a summary of the historic significance of Building 06-CP-170 and a description of its current condition and accessory resources. In addition, an updated Architectural Resource Assessment (ARA) form with new information and photographs is included in the appendix in fulfillment of Stipulation III.D.2.

54 ENVIRONMENTAL SCIENCES↗

Historic Significance and Current Condition Assessment of Building 06-CP-10, Device Assembly Building, Area 6, Nevada National Security Site, Nye County, Nevada

This report was produced in partial fulfillment of the mitigation of adverse effects to Building 06-CP-10, the first device assembly building on the Nevada National Security Site (NNSS), and is intended to comply with the 2021 Memorandum of Agreement DE-GM58-21NA25543 Between the U.S. Department of Energy and the Nevada State Historic Preservation Officer Regarding Demolition of Fourteen Buildings and Structures in Area 6 of the Nevada National Security Site, Nye County (hereafter referred to as the MOA). This MOA was executed to resolve adverse effects from the U.S. Department of Energy (DOE) plan to demolish 14 architectural resources at the Control Point and in the vicinity in Area 6 of the NNSS. The management and operations contractor for the NNSS identified these 14 architectural resources as environmental hazards unsafe for human occupation due to deterioration and rodent infestation. Building 06-CP-10 and two small magazine bunkers (06-CP-10A and 06-CP-805) associated with Building 06-CP-10 are scheduled for demolition as part of this undertaking. Building 06-CP-10 was originally recorded in 2003 during a historical evaluation of four buildings in Area 6. In consultation with the Nevada State Historic Preservation Office, the building was determined individually eligible for inclusion in the NRHP under the Secretary of the Interior’s Significance Criterion A because of its association with nuclear testing and under Significance Criterion C as a distinct type of construction associated with the nuclear industry. Building 06-CP-10A, a munitions magazine, and 06- CP-805, a cap-and-fuse bunker, have been recorded as contributing accessory resources to 06-CP-10. Pursuant to Stipulation III.C.3 of the MOA, this report provides a summary of the historic significance of Building 06-CP-10 and a description of its current condition and accessory resources. In addition, an updated Architectural Resource Assessment (ARA) form with new information and photographs is included in the appendix in fulfillment of Stipulation III.C.2.

54 ENVIRONMENTAL SCIENCES↗

From Protection and Prevention to Research and Discovery: Eligibility Assessment of the Health Research Laboratory (TA-43) and Historic Documentation for TA-43-0001 - Volume 1

The U.S. Department of Energy National Nuclear Security Administration Los Alamos Field Office (NA-LA) requests the New Mexico State Historic Preservation Officer (SHPO) to concur with the National Register of Historic Places (NRHP)–eligibility determinations detailed in this report for the Health Research Laboratory (HRL) complex in Technical Area 43 (TA-43) at the Los Alamos National Laboratory (LANL). As part of the LANL Footprint Reduction Program’s Decommissioning and Demolition (D&D) process, all facilities of the HRL complex are scheduled for characterization and future demolition.

99 GENERAL AND MISCELLANEOUS↗

Record of Technical Change for Addendum to the Closure Report for Corrective Action Unit 113: Area 25 R-MAD Facility, Nevada National Security Site, Nevada

This addendum to the Closure Report for Corrective Action Unit 113: Area 25, Reactor Maintenance, Assembly, and Disassembly Facility, Building 3110, Nevada Test Site, Nevada, DOE/NV--891-VOL I-Rev. 1, dated July 2003, provides details of demolition, waste disposal, and use restriction (UR) modification for Corrective Action Unit 113, Area 25 R-MAD Facility. Demolition was completed on July 15, 2010, when the last of the building debris was disposed. Final field activities were concluded on August 30, 2010, after all equipment was demobilized and UR signs were posted. This work was funded by the American Recovery and Reinvestment Act.

54 ENVIRONMENTAL SCIENCES↗

An Architectural Survey of the Area 25 Nuclear Rocket Development Station, Nevada National Security Site, Nye County, Nevada (Volume 1 of 3)

The U.S. Department of Energy (DOE), National Nuclear Security Administration Nevada Field Office (NNSA/NFO), and the U.S. Department of Energy Environmental Management Nevada Program (EM NV) plan to implement corrective action activities (under the Federal Facility Agreement and Consent Order, agreed to by the State of Nevada) and demolition of the Engine Maintenance, Assembly, and Disassembly (E-MAD) facility and the Test Cell C Historic District. These are major components of the unrecorded Nuclear Rocket Development Station (NRDS) Historic District, which is eligible for inclusion in the National Register of Historic Places (NRHP, National Register). The NRDS is in Area 25 of the Nevada National Security Site (NNSS), formerly known as the Nevada Test Site, in Nye County, Nevada. Demolition and removal of the buildings and accessories constitutes an undertaking subject to review under Section 106 of the National Historic Preservation Act (54 United States Code [USC] § 306101) and its implementing regulations, 36 Code of Federal Regulations (CFR) Part 800.

54 ENVIRONMENTAL SCIENCES↗

3-D Radiological Data Acquisition, Visualization and Modeling - 20211

The U.S. Army Corps of Engineers (USACE) was tasked to investigate and remediate low activity radiological contamination from research and production of the nation's first nuclear weapons at the former DuPont Chambers Works Formerly Utilized Sites Remedial Action Program (FUSRAP) site (DuPont). The DuPont site had several buildings used for the Manhattan project that were demolished in the 1940's and 1950's apparently using heavy earthmoving equipment. Some of the contaminated rubble from the demolition appears to have been spread out by this equipment resulting in somewhat random scattering of radiologically contaminated soil and debris along with aqueous spills. Traditional investigative methods such as soil borings, test pits and 2-dimensional gamma walkovers were only partially successful in delineating the radiological contamination at the site. It was feared that even 'chasing' the contamination during remediation would miss contamination if the demolition resulted in discontinuous trails of radiologically contaminated soils. In evaluating the data generated over the interceding decades, the USACE determined that a better method to collect and process the remedial action radiological data was needed to enable the project team to optimize predictive planning and meet documentation expectations. The purpose of this paper is to provide an overview of the effort and progress to combine and organize radiological survey methods into a highly flexible sampling, modeling, and decision analysis approach that emphasizes the quality of decision-making during remediation. This innovative system blends multiple tools to develop a methodology that can extend MARRSIM [1] into the subsurface and provide tools that can be applied to other sites. (authors)

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Session 077 - Panel: Wednesday US DOE Featured Site: Lexington, KY Office (Portsmouth and Paducah Sites) (R1.14)

This panel featured the DoE's Portsmouth Paducah Project Office (PPPO), which is responsible for the management and cleanup of at the Portsmouth, Ohio and Paducah, Kentucky former Gaseous Diffusion Plant sites. Portsmouth is primed for the first major skyline change at the site the upcoming demolition of the X-326 process building and initial operations of the Onsite Waste Disposal Facility. The Paducah site is working on the C-400 city block initiative allowing DOE to tackle the main source of groundwater contamination at the site, in conjunction with deactivation and demolition of the C-400 Cleaning Building. PPPO's DUF6 conversion plants have 7 lines in continuous operation at both sites providing the opportunity to ramp up cylinder processing. Panelists with presentations: DOE PPO Update (Robert Edwards, Joel Bradburne); Portsmouth/Paducah Project Office (PPPO) (Joel Bradburne, Robert Edwards); PADUCAH (Jennifer Woodard, Myrna Espinosa Redfield); Depleted Uranium Hexafluoride Conversion Project (Reinhard Knerr, Zack Smith); Paducah Deactivation and Remediation Project (Myrna Espinosa Redfield); Mid-America Conversion Services - Seven Lines One Project (Zack Smith)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Is there a Perfect D and D Plan - 20100

Problems with many Deactivation and Demolition (D and D) projects arise not necessarily from the technical difficulty of the actions required in a given facility, but rather from lack of integration of the stove piped planning efforts; engineering, operations, environmental, radiological, human resources, etc. This paper will cover Polestar Technical Service, Inc. (Polestar) systems engineering approach to D and D planning based on the company's experience over the past 27 years. This systematic, four-pronged approach to planning is applicable to any D and D project and addresses several diverse topics in a cohesive and integrated manner. The four areas to be discussed are project scope, requirements, facility end state, work force and base operations. This approach progresses a facility through the typical DOE life-cycle from operations, through deactivation, into surveillance and maintenance (S and M) and to eventual demolition and site remediation. To achieve a final end state the approach brings together the efforts associated with identifying and managing the right set of requirements, detailing the scope of work, establishing the baseline, redefining the work processes, aligning the workforce resources with the work processes, and maintaining the base operations activities as the project progresses through the various life-cycle stages. Getting these building blocks right provides a solid framework for executing any D and D project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

BRE‐X Emissions Database for End‐of‐Life Scenarios of Selective Building Construction Materials to Enable Circular Economy in Construction

In the United States, construction and demolition debris predominately end up in landfills with minimal end‐of‐life Re‐X (recover, recycle, reuse, etc.) scenarios, resulting in large environmental impacts and lost opportunities for material recovery. Except for concrete and metals, which seem to have a few well‐defined end‐of‐life pathways, there seems to be a lack of well‐documented end‐of‐life scenarios for other construction materials, let alone their emissions data. Hence, there is a need for documented end‐of‐life Re‐X scenarios and end‐of‐life data of more building materials to motivate widespread use of Re‐X strategies in building design. This paper outlines the efforts of the National Renewable Energy Laboratory, Carbon Leadership Forum, Building Transparency, and Skidmore, Owings & Merrill to (a) create an open‐access BRE‐X (Building Re‐X) end‐of‐life emissions database consisting of greenhouse gas emissions data associated with various end‐of‐life scenarios for a select list of high‐impact building construction materials, and (b) integrate the BRE‐X end‐of‐life emissions database with CAD/BIM/LCA tools for evaluating various end‐of‐life scenarios. The paper also presents a few existing life cycle inventory databases that contain sparse amounts of end‐of‐life data for a few construction materials and their limitations in terms of scaling and data consolidation. Finally, a sample of how the collected data can be ingested into whole‐building LCA tools using open data formats and a public access link to the BRE‐X end‐of‐life emissions database is also included.

36 MATERIALS SCIENCE↗