NASA NTRSDate not supplied
As one of the tracking systems used for the altimeter missions (such as TOPEX/Poseidon, Envisat, Jason-1/-2/-3, CryoSat-2, Saral/AltiKa, Sentinel-3A/-3B, HY-2A/C/D, Jason-CS/Sentinel-6A, SWOT), the position of the DORIS tracking stations provides a fundamental reference for the estimation of the precise orbits and so, by extension is fundamental for the quality of the altimeter data analysis and derived products. Due to the time evolution of the DORIS ground network, stations included in ITRF2020 may have been decommissioned and stations that were added to the tracking network after 2021.0 are, by definition, not part of ITRF2020. Therefore, to satisfy operational requirements for precise orbit determination and routine delivery of geodetic products, the International DORIS Service maintains the DORIS terrestrial reference frame for Precise Orbit Determination (DPOD) solutions. Since 2016, the DPOD products are computed by the IDS Combination Center (CC) as a DORIS cumulative position and linear velocity solution aligned to the latest available ITRF and using the latest IDS weekly combined series. Mid-2023, the IDS CC started the computation of the second version of the DPOD2020 based on the IDS 20 weekly solutions from 1993.0 to 2023.0. With that new solution, the IDS CC will include Post Seismic Deformation (PSD) corrections for some DORIS sites such as Socorro Island. These DPOD PSD corrections are determined from the analysis of DORIS coordinate time series only. The second version will also include optional annual and semi-annual station corrections. The presentation will describe the analysis used for extracting the PSD and seasonal DORIS station corrections, compare such corrections to those derived for ITRF2020, and evaluate the impact these new corrections have on station positioning and satellite POD.