Challenges, Successes, and Lessons Learned: Deep Core Drilling in a Previously Unconstrained Fault Zone
Explore the source record for details and available documents.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Not provided.
Not Available
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
As part of a U.S. DOE Geothermal Technologies Office funding opportunity, Geysers Power Company, LLC (GPC), an indirect subsidiary of Calpine Corporation, partnered with Sandia National Labs, EGI at the University of Utah, and Texas A&M University to demonstrate increased drilling performance at The Geysers Geothermal Field. The performance target in the drilling demonstrations is at least a 25% improvement in rates of penetration, with increased footage on bottom for each bit coupled with increased bit life and time drilling. The project leverages advances in oil and gas drilling technologies including PDC bits, along with the physics-based limiter redesign techniques championed in drilling demonstrations conducted at the Utah FORGE geothermal site. The planned drilling demonstrations are being conducted as part of an existing drilling campaign intended to enhance reservoir utilization. The wells are typically drilled to the top of the reservoir with mud and then air-drilled to total depth (TD) through fractured zones at temperatures ≥ 450°F. A major goal of the project is to assess the effectiveness of implementing mechanical specific energy (MSE) and drilling dysfunction diagnosis and remediation in these challenging environments, as well as alternate rock reduction technologies. The first demonstration well has been completed, with 15 PDC bit runs in the 17.5”, 12.25” and 8.5” sections. Initial analysis shows ROP gains in all three sections, especially in the 17.5” and 12.25” sections, compared with conventional roller cone bit runs in the demonstration well and offset wells. However, in the 8.5” hole, wear and damage to the PDC bits resulted in relatively short bit runs. Analysis is underway to take advantage of the positive results and remediate the challenges. This paper provides updates on drilling activities conducted since the Phase 1 demonstration well at GDC-36 which was drilled from November 2023-January 2024. Additional analysis of the bit performance has been conducted. Furthermore, in subsequent wells drilled by GPC, PDC bits have been used extensively, building on the gains realized at GDC-36. GPC has continued to work with bit vendors to identify designs that last longer in the harsh, air-drilled 8.5” portions of the wells. Planning for the Phase 2 demonstration at Prati-44 is ongoing.
Unconventional oil and natural gas development (UOGD) has expanded rapidly across the United States in recent decades and raised concerns about associated air quality impacts. While significant effort has been made to quantify methane emissions, relatively few observations have been made of Volatile Organic Compounds (VOCs), especially during drilling and completion of new wells. Extensive air monitoring during development of several large, multi-well pads in Broomfield, Colorado, in the Denver-Julesburg Basin, provides a novel opportunity to examine changes in local air toxics and other VOC concentrations during well drilling and completions and production. These operations offer an especially useful case to study as several management practices were implemented to reduce emissions (e.g., electrified, grid-powered drill rigs and closed loop fluid handling systems to reduce truck traffic and limit fluid handling on the pad). With simultaneous measurements of methane and 50 VOCs from October 2018 to December 2022 at as many as 19 sites near well pads, in adjacent neighborhoods, and at a more distant reference location, we identify impacts from each phase of well development and production. Use of weekly, time-integrated canisters, a Proton Transfer Reaction Mass Spectrometer (PTR-MS), continuous photoionization detectors (PID) to trigger canister collection upon detection of VOC-rich plumes, and an instrumented vehicle, provided a powerful suite of measurements to characterize both transient plumes and longer-term changes in air quality. Prior to the start of well development, VOC gradients were small across Broomfield. Once drilling commenced, concentrations of oil and gas (O&G) related VOCs, including alkanes and aromatics, increased around active well pads. Concentration increases were clearly apparent during certain operations, including drilling, coil tubing/millout operations, and production tubing installation. Emissions of C 8 –C 10 n-alkanes during drilling operations highlighted the importance of VOC emissions from synthetic drilling mud chosen to reduce odor impacts. More than 90 samples were collected of transient plumes. Using composition measurements, meteorological data, and information about well pad activities, these plumes were connected with specific UOGD operations including drilling, flowback, and production equipment maintenance. The chemical signatures of these plumes differed by operation type (e.g., C 8 –C 10 n-alkanes constituted a larger fraction of measured VOCs in drilling-related plumes). Concentrations of individual, oil and gas-related VOCs in these plumes were often several orders of magnitude higher than in background air, with maximum ethane and benzene concentrations of 79,600 and 819 ppbv, respectively. Because these plumes typically impact a monitoring site for just several minutes, they are easily missed by slower-responding instruments. Study measurements highlight future emission mitigation opportunities during UOGD operations, including better control of emissions from shakers that separate drill cuttings from drilling mud, production separator maintenance operations, and periodic emptying of sand cans during flowback operations.
Building 01-103, the Drill Bit Repair Building was originally recorded as SHPO Resource No. B18848 in 2020 during an architectural survey of the Area 1 Subdock (Collins et al. 2022). It was recommended individually eligible for listing in the NRHP under Criteria A and C and contributing to the significance of the Area 1 Subdock Historic District. The SHPO concurred with these determinations in a letter dated April 29, 2022 (Reed 2022). The Drill Bit Repair Building retains all seven aspects of integrity. The location, materials, workmanship, feeling, and association have not changed since its original construction. The design was modified slightly in 1996 with the addition of a removable and non-destructive chain-link fence. Nearby buildings 01-101 and 01-102 were removed (Collins and Menocal 2020) but the other buildings and storage yards remain. Therefore, the integrity of setting has been changed, but not to the degree that the building no longer conveys its significance (see Figures 4 and 5 for comparison). Building 01-103 was constructed in 1985 to coincide with the relocation of the Area 3 Subdock to Area 1. The design for the new Subdock provided a centralized cluster of buildings surrounded by two large storage yards. The buildings included administrative and engineering office space, warehouses, a radiograph building, and Building 01-103 as the drill bit maintenance and repair building, among others. The Drill Bit Repair Building was critical to the success of underground nuclear testing and is eligible under Criterion A for its contribution to broad patterns of history by maintaining specially designed equipment for underground nuclear testing at the NNSS. It is also eligible under Criterion C as it is the only recorded example of a facility built specifically for the maintenance of big-hole drill bits on the NNSS. As it retains both significance and integrity, it remains individually eligible under Criteria A and C. In addition to its individual significance, the Drill Bit Repair Building also contributes to the significance of the Area 1 Subdock Historic District as a representative of a big-hole drilling support facility necessary for underground nuclear testing. The building and the equipment therein were designed specifically for testing at the NNSS, where much of the early technology and methods for big-hole drilling were developed. Its removal will result in not only the demolition of a contributing element but also a change in the physical features of the district’s setting that contribute to its historic significance. The change in setting will diminish the district’s integrity. However, the district still contains numerous examples of other buildings constructed for the purpose of supporting big-hole drilling and remains eligible under Criteria A and C.
The Main Storage Yard was originally recorded as SHPO Resource No. S2772 in 2020 during an architectural survey of the Area 1 Subdock (Collins et al. 2022). It was recommended individually eligible for listing in the NRHP under Criteria A and C and as contributing to the significance of the potential Area 1 Subdock Historic District. The SHPO concurred with these determinations in a letter dated April 29, 2022 (Reed). The Main Storage Yard retains all seven aspects of integrity. The location, design, materials, workmanship, feeling, and association have not changed since the original construction. Since the purpose of the yard is to maintain storage equipment that is actively being used, the design and feeling will change each time equipment is moved. Such actions reinforce the integrity of design and feeling. Buildings 01-101 and 01-102 were removed (Collins and Menocal 2020), but the other buildings and storage yard remain. Therefore, the setting has been changed, but not to the degree that the Main Storage Yard no longer conveys its significance (see Figures 4 and 5 for comparison). The Main Storage Yard was designed to facilitate the relocation of the Area 3 Subdock to Area 1 in 1985. The design for the overall Subdock provided a centralized cluster of buildings surrounded by two large storage yards. While the North Storage Yard largely serves as overflow storage, the Main Storage Yard holds the majority of drill rigs and drilling equipment needed to support big hole drilling. The Main Storage Yard and its contents were essential elements of the nuclear testing drilling program on the NNSS thus making it eligible for the NRHP under Criterion A for its contribution to broad patterns of history by storing specially designed equipment for underground nuclear testing at the NNSS. It is also eligible under Criterion C as it is an engineered landscape that now serves as an open-air repository of drilling technology and nuclear testing. In addition to its individual significance, the Main Storage Yard also contributes to the significance of the Area 1 Subdock Historic District as it showcases a variety of big-hole drilling equipment, support facilities, and warehouses that were specially designed for nuclear testing at the NNSS. Despite the demolition of two contributing elements to date, the district still contains numerous examples of other facilities with the purpose of supporting big-hole drilling; therefore, the district still remains eligible under Criteria A and C.