Search NASA⌕ Search

SEARCH · Search NASA

Results for “Dam”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Financial Analysis of the High Flow Experiment conducted at the Glen Canyon Dam during Water Year 2023

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specified criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases. This report examines the financial implications of the high flow experiment (HFE) conducted at GCD during the spring of Water Year (WY) 2023 as required by the LTEMP HFE Protocol. This report is part of a series of reports that describe the financial costs of LTEMP experimental releases since the 2016 ROD was adopted in January 2017. Previous reports analyzed the impact of several past HFEs and Bug Flow Experiments. This report focuses on the HFE conducted in April 2023. For this experimental release, financial costs of approximately $1.33 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum turbine flow rate. In addition, during the experiment, operators were not allowed to shape GCD power production, either to follow Firm Electric Service (FES) customer day-ahead energy deliveries or to respond to market prices. This study identifies the main factors contributing to the HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate Western Area Power Administration (WAPA) financial impacts by simulating GCD under two types of cases; namely, (1) a “With Experiment” case that mimics the operations that actually occurred and (2) a “Without Experiment” case that simulates operations under the assumption that the HFE did not occur. The “With Experiment” case mimics operations during the HFE and the entire month the HFE occurred. It complies with LTEMP hourly and daily operating criteria. The “Without Experiment” case assumes that the HFE did not occur. The monthly water release volume is assumed to be identical under both cases. The Colorado River Storage Project Python-based model (CRiSPPy) model was the main modeling tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. In the modeling process, the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and WAPA’s power purchases and sales prices. In addition to estimating the financial impact of the HFE, the team used the CRiSPPy model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the HFE, and WAPA operating practices.

13 HYDRO ENERGY↗

Bonneville Dam Powerhouse 2 Gatewell Improvement Post Construction Evaluation (Final Report)

Modifications to vertical barrier screens (VBS) and the addition of concrete corbels to improve passage conditions for juvenile salmonids in the gatewells of Bonneville Dam’s second powerhouse (B2) were completed prior to the 2024 passage season. To evaluate the effectiveness of those modifications, PNNL carried out a post construction evaluation to contrast fish condition and mortality between two turbine unit operational ranges within the peak efficiency range. A block-treatment study design was implemented in 2024 to contrast descaling and mortality of juvenile salmonids sampled in the juvenile fish facility following exposure to turbine operations (middle versus upper 1% peak efficiency range) during spring and summer passage periods. In spring, 1.96% of juvenile salmonids sampled during mid-1% operations were descaled and 0.46% were mortalities. Of those sampled during upper 1% unit operations in spring, 2.90% were descaled and 0.95% were mortalities. Although these differences appeared to be meaningful, substantial exceedances of the upper 1% limit occurred during two treatment blocks of the spring study period. Fish collected during the upper 1% treatment of these two blocks experienced substantially higher rates of descaling and mortality compared to those collected during mid-1% treatments. Censoring these two upper 1% samples from the spring study period resulted in upper 1% descaling and mortality rates that were statistically similar to those from the mid-1% treatment. During the summer study period, 0.99% of juveniles sampled during mid-1% operations were descaled and 0.33% suffered mortality; these rates were significantly lower than the descaling (2.80%) and mortality (1.73%) rates observed during upper 1% treatments. Comparing the results from the 2024 study to those from the historical (2008–2013) baseline of unmodified units revealed that the descaling and mortality rates observed during upper 1% operations in spring 2024 were near the upper end of the historic range observed for mid-1% operations. Spring 2024 upper 1% descaling and mortality rates were below, or well below the median of historical mid and upper 1% (combined) rates, which suggests that the modifications have had a positive effect. Summer 2024 upper 1% descaling and mortality rates were at or above the top of the range of historical mid 1% and above or well above the median of historical mid and upper 1% (combined) rates. It is important to keep in mind that 2024 is a single year when considering these comparisons. Additional study could help confirm these results or seek a level of operation that achieves the desired outcomes for fish.

13 HYDRO ENERGY↗

Evaluation of Howard A. Hanson Dam Juvenile Fish Passage and Survival Study: Downstream Passage and Survival (Acoustic Telemetry) (Task Final Report)

The Downstream Passage and Survival (Acoustic Telemetry) task was one of several tasks for the Evaluation of Howard A. Hanson Dam (HAHD) Juvenile Fish Passage and Survival study. For this task, a juvenile fish passage and survival study was conducted at HAHD from March 10, 2024 through June 27, 2024 for arrays in the HAHD Reservoir and Green River, and through July 9, 2024 for the arrays in the Duwamish River. Fish releases occurred over four times from March through May. Active tag (acoustic telemetry) technology was used to provide biological baseline information for the passage and survival of juvenile Puget Sound (PS) Chinook salmon (Oncorhynchus tshawytscha). Results will be used by biologists, engineers, resource managers, and regional decision-makers to inform the engineering design of the new fish passage facility (FPF) at HAHD. However, hatchery sub-yearling PS Chinook salmon of the appropriate size for tag implantation during the study period (> 95 mm in fork length, Geist et al. 2018) were unavailable. Therefore, yearling Coho salmon (O. kisutch) were used as a surrogate species for this acoustic telemetry study.

13 HYDRO ENERGY↗

Financial Analysis of the Smallmouth Bass Flows implemented at the Glen Canyon Dam during 2025

The Glen Canyon Dam (GCD) is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The 2016 record of decision (ROD) for the GCD long-term experimental and management plan (LTEMP) final Environmental Impact Statement (EIS) specifies criteria for GCD monthly water releases, daily and hourly operating limits, and experimental releases.

Ploussard, Quentin [Argonne National Laboratory (A↗

Calculating arch dams

Approximation methods used in design of thin walled shells for hydroelectric power plant arch dams

POWER PLANT↗

ERTS-1 data in support of the national program of inspection of dams

A computer-aided procedure, for use in the detection and location of areas of surface water, has been developed. The procedure was developed in support of the National Program of Inspection of Dams established by Public Law 92-367. The procedure utilizes data acquired by the unmanned Earth Resources Technology Satellite in conjunction with ancillary data in the form of topographic and highway maps, and meteorological data summaries. The procedure is divided into several distinct phases. A five-volume manual has been prepared to instruct potential users of the procedure.

Graybeal, G. E.↗

Detection And Mapping (DAM) package. Volume 1: General procedure

The author has identified the following significant results. The DAM package is an integrated set of manual procedures, computer programs, and graphic devices designed for efficient production of precisely registered and formatted maps from digital LANDSAT multispectral scanner data. The software can be readily implemented on any Univac 1100 series computer with standard peripheral equipment. This version of the software includes predefined spectral limits for use in classifying and mapping surface water.

Schlosser, E. H.↗

A study of suspended solids in the Requena Dam by remote sensing

Remote sensing was applied to a preliminary study of suspended solids in the Requena Dam. Aerial and terrestrial photographs were analyzed by photointerpretation and microdensitometry. Field measurements and sampling were also made. A relationship between ground data for the concentration of suspended solids and the transmissibility of the aerial infrared film was suggested.

Azuara, P. R.↗

DAM package version 7807: Software fixes and enhancements

The Detection and Mapping package is an integrated set of manual procedures, computer programs, and graphic devices designed for efficient production of precisely registered, formatted, and interpreted maps from digital LANDSAT multispectral scanner data. This report documents changes to the DAM package in support of its use by the Corps of Engineers for inventorying impounded surface water. Although these changes are presented in terms of their application to detecting and mapping surface water, they are equally relevant to other land surface materials.

Schlosser, E.↗

Rat Gestation During Space Flight: Outcomes for Dams and Their Offspring Born After Return to Earth

Sprague-Dawley rats were studied to learn whether gestation in the near-zero gravity, high radiation environment of space impacts selected mammalian postnatal events. Ten rats spent days nine to twenty of pregnancy aboard the space shuttle orbiter Atlantis (STS-66). Their movement was studied shortly after return to Earth; subsequently, several of their offspring were cross-fostered and examined through postnatal day 81 (P81) for whole body growth and somatic motor development. Values for the flight animals were compared to ground-based control groups. Relative to controls, the pregnant flight rats showed a marked paucity of locomotion during the first few hours after returning to Earth. There was greater likelihood of perinatal morbidity for the offspring of flight dams when compared to the control groups. Whole body weight of surviving offspring, averaged for each group separately, showed typical sigmoidal growth curves when plotted against postnatal age. The flight group for our study had a larger ratio of female to male pups, and that was sufficient to account for the lower average daily weight gained by the flight animals when compared to the control groups. Walking was universally achieved by P13 and preceded eye opening, which was complete in all pups by P17. Thus, both of these developmental horizons were attained on schedule in the flight as well as the control rats. Characteristic changes were observed in hind limb step length and gait width as the pups grew. These patterns occurred at the same time in each group of rats. Therefore, prenatal space flight from days nine to twenty of gestation did not interfere with the establishment of normal patterns for hind paw placement during walking.

Wong, Andre M.↗

Dam Failure Inundation Map Project

At the end of the first year, we remain on schedule. Property owners were identified and contacted for land access purposes. A prototype software package has been completed and was demonstrated to the Division of Land and Natural Resources (DLNR), National Weather Service (NWS) and Pacific Disaster Center (PDC). A field crew gathered data and surveyed the areas surrounding two dams in Waimea. (A field report is included in the annual report.) Data sensitivity analysis was initiated and completed. A user's manual has been completed. Beta testing of the software was initiated, but not completed. The initial TNK and property owner data collection for the additional test sites on Oahu and Kauai have been initiated.

Johnson, Carl↗

EOS Terra: EOS DAM Automation Constellation MOWG

Brief summary of the decision factors considered and process improvement steps made, to evolve the ESMO debris avoidance maneuver process to a more automated process. Presentation is in response to an action item/question received at a prior MOWG meeting.

Constellation MOW↗