Search NASA⌕ Search

SEARCH · Search NASA

Results for “Deep Impact Mission”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Terminal Guidance Navigation for an Asteroid Impactor Spacecraft

Near Earth Asteroids could potentially cause a great deal of devastation if one were to impact the Earth. If such an asteroid were found, the next step would be to mitigate the threat by one of several options, the most viable of which is to deflect the asteroids trajectory such that it misses the Earth by hitting it at a very high velocity with a spacecraft. The technology to perform such a deflection has been demonstrated by the Deep Impact (DI) mission, which successfully collided with comet Tempel 1 in July 2005 using an onboard autonomous navigation system, called AutoNav, for the terminal phase of the mission. In this paper, we evaluate the ability of AutoNav to impact a wide range of scenarios that an deflection mission could encounter, varying parameters such as the approach velocity, phase angle, size of the asteroid, and the determination of spacecraft attitude. Using realistic Monte Carlo simulations, we tabulated the probability of success of the deflection as a function of these parameters, and find the highest sensitivity to be due the spacecraft attitude determination mode. We conclude with some recommendations for future work.

autonomous navigation↗

Closed Loop Terminal Guidance Navigation for a Kinetic Impactor Spacecraft

A kinetic impactor spacecraft is a viable method to deflect an asteroid which poses a threat to the Earth. The technology to perform such a deflection has been demonstrated by the Deep Impact (DI) mission, which successfully collided with comet Tempel 1 in July 2005 using an onboard autonomous navigation system, called AutoNav, for the terminal phase of the mission. In this paper, we evaluate the ability of AutoNav to impact a wide range of scenarios that an deflection mission could encounter, varying parameters such as the approach velocity, phase angle, size of the asteroid, and the determination of spacecraft attitude. Using realistic Monte Carlo simulations, we tabulated the probability of success of the deflection as a function of these parameters, and the highest sensitivity to be due the spacecraft attitude determination mode. In addition, we also specifically analyzed the impact probability for a proposed mission which would send an impactor to the asteroid 1999RQ36. We conclude with some recommendations for future work.

closed loop guidance↗

Lessons Learned for Planning and Estimating Operations Support Requirements

Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead projects to focus on hardware development schedules and costs, de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations, and any LCC growth can directly impact the programs ability to fund new missions. The D&NF Program Office at Marshall Space Flight Center recently studied cost overruns for 7 D&NF missions related to phase C/D development of operational capabilities and phase E mission operations. The goal was to identify the underlying causes for the overruns and develop practical mitigations to assist the D&NF projects in identifying potential operations risks and controlling the associated impacts to operations development and execution costs. The study found that the drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This presentation summarizes the study and the results, providing a set of lessons NASA can use to improve early estimation and validation of operations costs.

Newhouse, Marilyn↗

Planning and Estimation of Operations Support Requirements

Life Cycle Cost (LCC) estimates during the proposal and early design phases, as well as project replans during the development phase, are heavily focused on hardware development schedules and costs. Operations (phase E) costs are typically small compared to the spacecraft development and test costs. This, combined with the long lead time for realizing operations costs, can lead to de-emphasizing estimation of operations support requirements during proposal, early design, and replan cost exercises. The Discovery and New Frontiers (D&NF) programs comprise small, cost-capped missions supporting scientific exploration of the solar system. Any LCC growth can directly impact the programs' ability to fund new missions, and even moderate yearly underestimates of the operations costs can present significant LCC impacts for deep space missions with long operational durations. The National Aeronautics and Space Administration (NASA) D&NF Program Office at Marshall Space Flight Center (MSFC) recently studied cost overruns and schedule delays for 5 missions. The goal was to identify the underlying causes for the overruns and delays, and to develop practical mitigations to assist the D&NF projects in identifying potential risks and controlling the associated impacts to proposed mission costs and schedules. The study found that 4 out of the 5 missions studied had significant overruns at or after launch due to underestimation of the complexity and supporting requirements for operations activities; the fifth mission had not launched at the time of the mission. The drivers behind these overruns include overly optimistic assumptions regarding the savings resulting from the use of heritage technology, late development of operations requirements, inadequate planning for sustaining engineering and the special requirements of long duration missions (e.g., knowledge retention and hardware/software refresh), and delayed completion of ground system development work. This paper updates the D&NF LCC study, looking at the operations (phase E) cost drivers in more detail and extending the study to include 2 additional missions and identifies areas for increased emphasis by project management in order to improve the fidelity of operations estimates.

Newhouse, Marilyn E.↗

Delay/Disruption Tolerant Networking for the International Space Station (ISS)

Disruption Tolerant Networking (DTN) is an emerging data networking technology designed to abstract the hardware communication layer from the spacecraft/payload computing resources. DTN is specifically designed to operate in environments where link delays and disruptions are common (e.g., space-based networks). The National Aeronautics and Space Administration (NASA) has demonstrated DTN on several missions, such as the Deep Impact Networking (DINET) experiment, the Earth Observing Mission 1 (EO-1) and the Lunar Laser Communication Demonstration (LLCD). To further the maturation of DTN, NASA is implementing DTN protocols on the International Space Station (ISS). This paper explains the architecture of the ISS DTN network, the operational support for the system, the results from integrated ground testing, and the future work for DTN expansion.

Schlesinger, Adam↗

Terrestrial Planet Optical Phase Curves: I. Direct Measurements of the Earth

NASA’s EPOXI mission used the Deep Impact spacecraft to observe the disk-integrated Earth as an analog to terrestrial exoplanets’ appearance. The mission took five 24 hr observations in 2008–2009 at various phase angles(57°.7–86°.4)and ranges(0.11–0.34 au), of which three equatorial(E1, E4, E5)and two polar(P1, North and P2,South). The visible data taken by the HRIV instrument ranges from 0.3 to 1.0μm, taken trough seven spectral filters that have spectral widths of about 100 nm, and which are centered about 100 nm apart, from 350 to 950 nm. The disk-integrated, 24 hr averaged signal is used in a phase angle analysis. A Lambertian-reflecting, spherical planet model is used to estimate geometric albedo for every observation and wavelength. The geometric albedos range from 0.143(E1, 950 nm)to 0.353(P2, 350 nm)and show wavelength dependence. The equatorial observations have similar values, while the polar observations have higher values due to the ice in view. Therefore, equatorial observations can be predicted for other phase angles, but(Earth-like)polar views(with ice)would be underestimated.

Roderick De Cock↗

The Impact of Traffic Prioritization on Deep Space Network Mission Traffic

A select number of missions supported by NASA's Deep Space Network (DSN) are demanding very high data rates. For example, the Kepler Mission was launched March 7, 2009 and at that time required the highest data rate of any NASA mission, with maximum rates of 4.33 Mb/s being provided via Ka band downlinks. The James Webb Space Telescope will require a maximum 28 Mb/s science downlink data rate also using Ka band links; as of this writing the launch is scheduled for a June 2014 launch. The Lunar Reconnaissance Orbiter, launched June 18, 2009, has demonstrated data rates at 100 Mb/s at lunar-Earth distances using NASA's Near Earth Network (NEN) and K-band. As further advances are made in high data rate space telecommunications, particularly with emerging optical systems, it is expected that large surges in demand on the supporting ground systems will ensue. A performance analysis of the impact of high variance in demand has been conducted using our Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) simulation tool. A comparison is made regarding the incorporation of Quality of Service (QoS) mechanisms and the resulting ground-to-ground Wide Area Network (WAN) bandwidth necessary to meet latency requirements across different user missions. It is shown that substantial reduction in WAN bandwidth may be realized through QoS techniques when low data rate users with low-latency needs are mixed with high data rate users having delay-tolerant traffic.

prioritization↗

EPOXI and Stardust NExT: The Management Challenges of Two Comet Flybys in Three Months

The EPOXI and Stardust NExT missions were missions of opportunity utilizing the Deep Impact and Stardust spacecraft, respectively. These new missions took advantage of the cost savings of utilizing spacecraft that were already flying for new science investigations. Both were retargeted to fly by an additional comet. EPOXI visited Hartley 2, significantly smaller than the other Jupiter family comets visited previously. Stardust NExT flew by Tempel 1, providing a second look at the comet previously studied by Deep Impact in 2005. Both projects were part of NASA's Discovery Program. In order to further save costs, the projects were combined into a single project office at JPL. This provided some efficiencies due to the similarity of the missions, but having the flybys space only three months apart posed challenges for the project management team to ensure each project was ready for its critical event and ensuring each received the proper support from the management team. The project office relied on an integrated calendar for tracking and scheduling meetings, reviews, and other key events. The project management team also coordinated their availability for both projects to maintain involvement with each team to ensure effective risk identification and management.

NExT (New Exploration of Tempel 1)↗

The Impact of Traffic Prioritization on Deep Space Network Mission Traffic

A select number of missions supported by NASA's Deep Space Network (DSN) are demanding very high data rates. For example, the Kepler Mission was launched March 7, 2009 and at that time required the highest data rate of any NASA mission, with maximum rates of 4.33 Mb/s being provided via Ka band downlinks. The James Webb Space Telescope will require a maximum 28 Mb/s science downlink data rate also using Ka band links; as of this writing the launch is scheduled for a June 2014 launch. The Lunar Reconnaissance Orbiter, launched June 18, 2009, has demonstrated data rates at 100 Mb/s at lunar-Earth distances using NASA's Near Earth Network (NEN) and K-band. As further advances are made in high data rate space telecommunications, particularly with emerging optical systems, it is expected that large surges in demand on the supporting ground systems will ensue. A performance analysis of the impact of high variance in demand has been conducted using our Multi-mission Advanced Communications Hybrid Environment for Test and Evaluation (MACHETE) simulation tool. A comparison is made regarding the incorporation of Quality of Service (QoS) mechanisms and the resulting ground-to-ground Wide Area Network (WAN) bandwidth necessary to meet latency requirements across different user missions. It is shown that substantial reduction in WAN bandwidth may be realized through QoS techniques when low data rate users with low-latency needs are mixed with high data rate users having delay-tolerant traffic.

quality of service↗

Deep Impact, Stardust-NExT and the Behavior of Comet 9P/Tempel 1 from 1997 to 2010

We present observational data for Comet 9P/Tempel 1 taken from 1997 through 2010 in an international collaboration in support of the Deep Impact and Stardust-NExT missions. The data were obtained to characterize the nucleus prior to the Deep Impact 2005 encounter, and to enable us to understand the rotation state in order to make a time of arrival adjustment in February 2010 that would allow us to image at least 25% of the nucleus seen by the Deep Impact spacecraft to better than 80 m/pixel, and to image the crater made during the encounter, if possible. In total, approx.500 whole or partial nights were allocated to this project at 14 observatories worldwide, utilizing 25 telescopes. Seventy percent of these nights yielded useful data. The data were used to determine the linear phase coefficient for the comet in the R-band to be 0.045 +/- 0.001 mag/deg from 1deg to 16deg. Cometary activity was observed to begin inbound near r approx. 4.0 AU and the activity ended near r approx. 4.6 AU as seen from the heliocentric secular light curves, water-sublimation models and from dust dynamical modeling. The light curve exhibits a significant pre- and post-perihelion brightness and activity asymmetry. There was a secular decrease in activity between the 2000 and 2005 perihelion passages of approx. 20%. The post-perihelion light curve cannot be easily explained by a simple decrease in solar insolation or observing geometry. CN emission was detected in the comet at 2.43 AU pre-perihelion, and by r = 2.24 AU emission from C2 and C3 were evident. In December 2004 the production rate of CN increased from 1.8 x 10(exp 23) mol/s to Q(sub CN) = 2.75 x 10(exp 23) mol/s in early January 2005 and 9.3 x 10(exp 24) mol/s on June 6, 2005 at r = 1.53 AU.

Meech, K. J.↗

AutoGNC Testbed

A simulation testbed architecture was developed and implemented for the integration, test, and development of a TRL-6 flight software set called Auto- GNC. The AutoGNC software will combine the TRL-9 Deep Impact AutoNAV flight software suite, the TRL-9 Virtual Machine Language (VML) executive, and the TRL-3 G-REX guidance, estimation, and control algorithms. The Auto- GNC testbed was architected to provide software interface connections among the AutoNAV and VML flight code written in C, the G-REX algorithms in MATLAB and C, stand-alone image rendering algorithms in C, and other Fortran algorithms, such as the OBIRON landmark tracking suite. The testbed architecture incorporates software components for propagating a high-fidelity truth model of the environment and the spacecraft dynamics, along with the flight software components for onboard guidance, navigation, and control (GN&C). The interface allows for the rapid integration and testing of new algorithms prior to development of the C code for implementation in flight software. This testbed is designed to test autonomous spacecraft proximity operations around small celestial bodies, moons, or other spacecraft. The software is baselined for upcoming comet and asteroid sample return missions. This architecture and testbed will provide a direct improvement upon the onboard flight software utilized for missions such as Deep Impact, Stardust, and Deep Space 1.

Carson, John M., III↗

Dynamic Acquisition and Retrieval Tool (DART) for Comet Sample Return : Session: 2.06.Robotic Mobility and Sample Acquisition Systems

The 2011 Decadal Survey for planetary science released by the National Research Council of the National Academies identified Comet Surface Sample Return (CSSR) as one of five high priority potential New Frontiers-class missions in the next decade. The main objectives of the research described in this publication are: develop a concept for an end-to-end system for collecting and storing a comet sample to be returned to Earth; design, fabricate and test a prototype Dynamic Acquisition and Retrieval Tool (DART) capable of collecting 500 cc sample in a canister and eject the canister with a predetermined speed; identify a set of simulants with physical properties at room temperature that suitably match the physical properties of the comet surface as it would be sampled. We propose the use of a dart that would be launched from the spacecraft to impact and penetrate the comet surface. After collecting the sample, the sample canister would be ejected at a speed greater than the comet's escape velocity and captured by the spacecraft, packaged into a return capsule and returned to Earth. The dart would be composed of an inner tube or sample canister, an outer tube, a decelerator, a means of capturing and retaining the sample, and a mechanism to eject the canister with the sample for later rendezvous with the spacecraft. One of the significant unknowns is the physical properties of the comet surface. Based on new findings from the recent Deep Impact comet encounter mission, we have limited our search of solutions for sampling materials to materials with 10 to 100 kPa shear strength in loose or consolidated form. As the possible range of values for the comet surface temperature is also significantly different than room temperature and testing at conditions other than the room temperature can become resource intensive, we sought sample simulants with physical properties at room temperature similar to the expected physical properties of the comet surface material. The chosen DART configuration, the efforts to identify a test simulant and the properties of these simulants, and the results of the preliminary testing will be described in this paper.

Dynamic Acquisition and Retrieval Tool (DART)↗

Optimization of a Multifunctional Hot Structure Aeroshell for Mars Entry

Vehicle size and weight are driving cost factors in sending vehicles into space because the cost of launch is directly related to the payload mass being delivered. Vehicle size and weight have a larger impact on deep- space missions compared to sending a payload to low Earth orbit due to the extra fuel and supplies required to complete the longer duration mission. One area of study for possible vehicle volume or weight reduction is the thermal protection system (TPS) of a vehicle. Hot structures have been proposed as a TPS concept which can carry both primary structural loads and thermal loads. The use of hot structures on a Mars entry vehicle may be feasible and have potential volume and weight savings over the current state of the art ablative TPS technology. A preliminary trade study was performed on a mid lift-to-drag aeroshell Mars entry concept vehicle; comparing the weight and skin thickness of a vehicle using ablative TPS with a vehicle using hot structures. Independent thermal and structural analyses were performed to determine the minimum mass designs. The goal of this study was to determine if the use of hot structures was feasible and had potential for significant vehicle volume and weight savings over the current state of the art. This trade study found that use of a hot structures leads to a feasible alternative to ablative TPS technology, with potential 53% weight and 22% thickness (volume) saving benefits that could enable future missions.

Langston, Sarah L.↗

Deep Impact Delta II Launch Vehicle Cracked Thick Film Coating on Electronic Packages Technical Consultation Report

The Deep Impact spacecraft was launched on a Boeing Delta II rocket from Cape Canaveral Air Force Station (CCAFS) on January 12, 2005. Prior to the launch, the Director of the Office of Safety and Mission Assurance (OS&MA) requested the NASA Engineering and Safety Center (NESC) lead a team to render an independent opinion on the rationale for flight and the risk code assignments for the hazard of cracked Thick Film Assemblies (TFAs) in the E-packages of the Delta II launch vehicle for the Deep Impact Mission. The results of the evaluation are contained in this report.

Cameron, Kenneth D.↗

Subsurface Structure in the Martian Polar Layered Deposits: The Deep Space 2 Impact Accelerometry Experiment

While primarily a technology demonstration mission, the New Millenium Mars Microprobes (also known as Deep Space 2, or simply DS2)will also provide the first in situ science measurements of the martian subsurface. The DS2 impact accelerometry experiment will provide both engineering data about the depth of probe emplacement and science data about the physical nature of the subsurface at the probes' landing sites. Little is known about the detailed physical properties or small-scale vertical structure of the subsurface at the DS2 landing site in the southern martian polar layered deposits. Imaging data from the Viking Orbiters and Mars Global Surveyor reveal alternating bands of light and dark material in this region with thicknesses at least as small as the limit of resolution, about 10 m. The overall composition of these layers is poorly constrained, but generally thought to be a mixture of dust and ice with the layers being caused by variations in the dust/ice ratio, or perhaps by dust deposits of different densities. Low thermal inertias in the region suggest that the top few centimeters of the surface are composed of a mantling of fine-grained dust. However, 3.5-cm radar returns indicate that the maximum depth of this dust is not greater than a few tens of centimeters. Thermal models generally agree that, while the layered deposits do provide a potential near-surface reservoir for ice, the uppermost few centimeters to meters in these regions are likely to be ice-free because of sublimation losses. Finally, while it is generally agreed that the layered deposits are the product of variations in the martian climate, no direct correlation has been made between band sequences and specific climate changes. Our intention is to shed light on some of these questions about the martian polar layered deposits by using the DS2 accelerometry experiment to determine the physical nature of the layered deposits, and to detect the presence of any subsurface layering of dust, ice, and/or rock. In the process, we will also determine the final resting depth of the two microprobes, an important parameter in the interpretation of other DS2 experiments.

Moersch, J. E.↗

Millimeter and Submillimeter Observations of Comet 103P/Hartley 2

The close approach (0.12 AU) of Comet 103P/Hartley 2 to the Earth only S days prior to perihelion provides a unique opportunity to probe the chemical composition of this object. We will employ the Arizona Radio Observatory's Kitt Peak 12m (KPH12M) and the Submillimeter Telescope (SMT) for observations of multiple molecular species and their isotopologs towards the comet. There will also be an attempt to monitor this object during the EPOXI (Extrasolar Planet Observation. and Deep Impact Extended Investigation) flyby mission, which will obtain high resolution infrared spectra, for a comparison of the molecular inventory and a more accurate assessment of the abundances, sources (e.g. jets or cometismals), and chemistry.

Milan, S. N.↗

Centimeter, Millimeter, and Submillimeter Observations of Comet l03P/Hartley 2

The close approach (0.12 AU) of Comet 103P/Hartley 2 to the Earth only 8 days prior to perihelion provided a unique opportunity to probe the chemical composition of this object. Additionally, supporting data was acquired during the EPOXI (Extrasolar Planet Observation and Deep Impact Extended Investigation) flyby mission [1], which provided high resolution infrared spectra and images. Observations were conducted from four facilities, contributing to the large ground-based consortium organized in support of the EPOXI mission [2]. The Arizona Radio Observatory's 12m telescope, Kitt Peak, AZ, and Submillimeter telescope, Mt. Graham, AZ, as well as the James Clerk Maxwell Telescope, Mauna Kea, HI and the Greenbank 100m telescope, Greenbank, WV, were employed for this study covering 20 cm, 3 cm, and 0.8-3 mm. Data were obtained, collectively, from 12 October 2010 to 5 November 2010 [3]. HCN, CH3OH, H2CO, HNC, OH, and CS were detected, and upper limits on the abundance of H2S, SO2, c-C3H2, and deuterated isotopologues of HCN, H2CO, and H2O were measured. Upper limits on the D/H ratio derived from DCN gave D/H less than 0.01[3]. Detailed analysis of these data will help constrain the temperature, abundances, variance or periodicity of a given species, and can be compared to results from other comets, as well as support the data obtained from the EPOXI mission. The full analysis and comparison will be presented.

Milam, Stefanie N.↗