Search NASA⌕ Search

SEARCH · Search NASA

Results for “Development Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Commercial Development Plan for the International Space Station

The long term objective of the development plan for the International Space Station (ISS) is to establish the foundation for a marketplace and stimulate a national economy for space products and services in low-Earth orbit, where both demand and supply are dominated by the private sector. The short term objective is to begin the transition to private investment and offset a share of the public cost for operating the space shuttle fleet and space station through commercial enterprise in open markets.

Source record↗

Large Deployable Reflector (LDR) system concept and technology definition study. Volume 2: Technology assessment and technology development plan

A study was conducted to define reasonable and representative LDR system concepts for the purpose of defining a technology development program aimed at providing the requisite technological capability necessary to start LDR development by the end of 1991. This volume presents thirteen technology assessments and technology development plans, as well as an overview and summary of the LDR concepts. Twenty-two proposed augmentation projects are described (selected from more than 30 candidates). The five LDR technology areas most in need of supplementary support are: cryogenic cooling; astronaut assembly of the optically precise LDR in space; active segmented primary mirror; dynamic structural control; and primary mirror contamination control. Three broad, time-phased, five-year programs were synthesized from the 22 projects, scheduled, and funding requirements estimated.

Agnew, Donald L.↗

Technology Development Plan for the Baseline Detector System of the X-Ray Microcalorimeter Spectrometer (XMS) of the International X-Ray Observatory (IXO)

The primary purpose of this document is to present the technology development plan for the XMS detector system. It covers the current status (including assessment of the Technology Readiness Level, TRL, and a justification of the level assigned), the roadmap to progress to a level between TRL 5 and TRL 6 by the middle of 2012, and an assessment of the associated cost. A secondary purpose of this document is to address the Action Items raised at the XMS Phase-A Study Mid-Term Review that pertain to the detector system (AI #4, #8, and #9).

Kilbourne, C. A.↗

Assessing Ecosystem Service Provision Under Climate Change to Support Conservation and Development Planning in Myanmar

Inclusion of ecosystem services (ES) information into national-scale development and climate adaptation planning has yet to become common practice, despite demand from decision makers. Identifying where ES originate and to whom the benefits flowunder current and future climate conditionsis especially critical in rapidly developing countries, where the risk of ES loss is high. Here, using Myanmar as a case study, we assess where and how ecosystems provide key benefits to the countrys people and infrastructure. We model the supply of and demand for sediment retention, dry-season baseflows, flood risk reduction and coastal storm protection from multiple beneficiaries. We find that locations currently providing the greatest amount of services are likely to remain important under the range of climate conditions considered, demonstrating their importance in planning for climate resilience. Overlap between priority areas for ES provision and biodiversity conservation is higher than expected by chance overall, but the areas important for multiple ES are underrepresented in currently designated protected areas and Key Biodiversity Areas. Our results are contributing to development planning in Myanmar, and our approach could be extended to other contexts where there is demand for national-scale natural capital information to shape development plans and policies

Climate change↗

Fly-by-light technology development plan

The driving factors and developments which make a fly-by-light (FBL) viable are discussed. Documentation, analyses, and recommendations are provided on the major issues pertinent to facilitating the U.S. implementation of commercial FBL aircraft before the turn of the century. Areas of particular concern include ultra-reliable computing (hardware/software); electromagnetic environment (EME); verification and validation; optical techniques; life-cycle maintenance; and basis and procedures for certification.

Todd, J. R.↗

The Habitable Worlds Observatory Technology Development Plan

The Habitable Worlds Observatory (HWO) is NASA’s next large space telescope, selected by the 2020 Decadal Survey in Astronomy and Astrophysics to search for and characterize habitable exoplanets while enabling a broad range of transformative astrophysics. In August 2024, the HWO Technology Maturation Project Office (TMPO) was formed to begin exploring the HWO science, technology, and mission architectures toward a Mission Concept Review (MCR) at the end of the decade. A primary deliverable of this effort is this technology development plan that identifies critical technologies that enable the mission, defines a process for assessing the readiness of those technologies, and outlines a strategy for developing those technologies to a Technology Readiness Level (TRL) of 5 before the MCR. This document covers technologies organized along three “tracks”: Coronagraph System technologies, Ultra-stable Telescope System technologies, and High-sensitivity Ultraviolet and Visible Instrumentation technologies. Additional emerging and enhancing technologies are also discussed.

technology development↗

Space Station Freedom advanced photovoltaics and battery technology development planning

Space Station Freedom (SSF) usable electrical power is planned to be built up incrementally during assembly phase to a peak of 75 kW end-of-life (EOL) shortly after Permanently Manned Capability (PMC) is achieved in 1999. This power will be provided by planar silicon (Si) arrays and nickel-hydrogen (NiH2) batteries. The need for power is expected to grow from 75 kW to as much as 150 kW EOL during the evolutionary phase of SSF, with initial increases beginning as early as 2002. Providing this additional power with current technology may not be as cost effective as using advanced technology arrays and batteries expected to develop prior to this evolutionary phase. A six-month study sponsored by NASA Langley Research Center and conducted by Boeing Defense and Space Group was initiated in Aug. 1991. The purpose of the study was to prepare technology development plans for cost effective advanced photovoltaic (PV) and battery technologies with application to SSF growth, SSF upgrade after its arrays and batteries reach the end of their design lives, and other low Earth orbit (LEO) platforms. Study scope was limited to information available in the literature, informal industry contacts, and key representatives from NASA and Boeing involved in PV and battery research and development. Ten battery and 32 PV technologies were examined and their performance estimated for SSF application. Promising technologies were identified based on performance and development risk. Rough order of magnitude cost estimates were prepared for development, fabrication, launch, and operation. Roadmaps were generated describing key issues and development paths for maturing these technologies with focus on SSF application.

Brender, Karen D.↗

Spaceborne Gravity Gradiometers. Part 5: Development plan

The critical steps needed to develop a gravity gradiometer instrument and a conceptual design for a Gravity Gradiometer Mission (GGM) are defined and organized into a logical sequence. Funding requirements for an advanced development program beginning in FY-1985 are estimated.

Source record↗

Ka-band (32 GHz) spacecraft development plan

A road map for the development of a protoflight 32 GHz spacecraft solid state transmitter is given. The major milestones include the development of device and component technology required for use in the spaceborne experimental and operational transmitter systems. Two experimental spacecraft transmitter systems are envisioned: first, a low power beacon, to determine the performance of a 32 GHz downlink communications system; and second, an array feed, to further verify the results of the first experiment and service as a test bed for technology required for an operational system. The first experiment was proposed to NASA Headquarters for flight aboard the Mars Observer spacecraft with spacecraft integration in early 1989. The second is to be available for integration aboard a spacecraft such as the Comet Rendezvous Asteroid Flyby (CRAF) mission in the 1990 time frame. These experimental systems are to lead to the development of a protoflight transmitter for subsequent spacecraft integration in 1992, the time frame of the Cassini mission to Saturn.

Riley, A. L.↗

xEMU Lite Development Plan

Since 2012, the Advanced EVA Development team has been maturing the design for an exploration suit (xEMU) capable of supporting Deep Space Gateway missions with the goal of demonstrating the core system architecture (xEMU Lite) on ISS by the mid-2020s. This presentation will provide a high-level status on progress made since the 2016 EVA Workshop, an overview of the xEMU architecture, and a summary of new development milestones and decision points between now and 2024.

Rodriggs, Liana↗

Update on Technology Development Plan for a Low Temperature Hybrid Mars Ascent Vehicle Concept

Technology development to mature a hybrid rocket option for a potential Mars Ascent Vehicle has been underway at the Jet Propulsion Laboratory and Marshall Space Flight Center. A conceptual design was completed in 2016 and has been used to determine the motor size for risk reduction development. The task plan for the FY17 testing, actually completed in mid FY18, is discussed. The major achievement of this effort was successful full scale hotfire testing with a representative ambient Earth storable propellant combination: SP7/MON3. A near term plan, through July 2019 is briefly discussed.

Prince, Andrew↗

Long life Regenerative Fuel Cell technology development plan

This paper summarizes a technology roadmap for completing advanced development of a Proton Exchange Membrane (PEM) Regenerative Fuel Cell (RFC) to meet long life (20,000 hrs at 50 percent duty cycle) mobile or portable power system applications on the surface of the moon and Mars. Development of two different sized RFC power system modules is included in this plan (3 and 7.5 kWe). A conservative approach was taken which includes the development of a Ground Engineering System, Qualification Unit, and Flight Unit. This paper includes a concept description, technology assessment, development issues, development tasks, and development schedule.

Littman, Franklin D.↗

Skylab flight plan development

For the Skylab Program, extensive premission flight planning was accomplished in the 3-yr period preceding lift-off. After the activation phase for each mission, however, all flight planning for real-time operations was conducted by ground support personnel on a daily basis, primarily for two reasons: (1) the long duration of the missions precluded the continued use of a premission plan, and (2) the variation in the earth resources experiment package (EREP) requirements and opportunities (primarily due to weather), precluded any premission planning for these experiments. An onboard teleprinter was used each day to transmit the flight plan and necessary supporting data to the crew. The teleprinter enabled the routine transmission of large amounts of data to the crew and therefore was primarily responsible for the daily planning capability in the Skylab Program.

Anderson, W. M.↗

The Path to Far-IR Interferometry in Space: Recent Developments, Plans, and Prospects

The far-IR astrophysics community is eager to follow up Spitzer and Herschel observations with sensitive, highresolution imaging and spectroscopy, for such measurements are needed to understand merger-driven star formation and chemical enrichment in galaxies, star and planetary system formation, and the development and prevalence of waterbearing planets. The community is united in its support for a space-based interferometry mission. Through concerted efforts worldwide, the key enabling technologies are maturing. Two balloon-borne far-IR interferometers are presently under development. This paper reviews recent technological and programmatic developments, summarizes plans, and offers a vision for space-based far-IR interferometry involving international collaboration.

Leisawitz, David T.↗

Phase C/D program development plan. Volume 1: Program plan

The Phase C/D definition of the Modular Space Station has been developed. The modular approach selected during the option period was evaluated, requirements were defined, and program definition and preliminary design were accomplished. The Space Station Project is covered in depth, the research applications module is limited to a project-level definition, and the shuttle operations are included for interface requirements identification, scheduling, and costing. Discussed in detail are: (1) baseline program and project descriptions; (2) phase project planning; (3) modular space station program schedule; (4) program management plan; (5) operations; (6) facilities; (7) logistics; and (8) manpower.

Source record↗

Application of radar for automotive collision avoidance. Volume 2: Development plan and progress reports

The purpose of this project was research and development of an automobile collision avoidance radar system. Items within the scope of the one-year effort were to: (1) review previous authors' work in this field; (2) select a suitable radar approach; (3) develop a system design; (4) perform basic analyses and observations pertinent to radar design, performance, and effects; (5) fabricate and collect radar data from a data collection radar; (6) analyze and derive conclusions from the radar data; and (7) make recommendations about the likelihood of success of the investigated radar techniques. The final technical report presenting all conclusions is contained in Volume 1.

Lichtenberg, Christopher L.↗