Search NASA⌕ Search

SEARCH · Search NASA

Results for “Development assurance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Safety considerations in the design and operation of large wind turbines

The engineering and safety techniques used to assure the reliable and safe operation of large wind turbine generators utilizing the Mod 2 Wind Turbine System Program as an example is described. The techniques involve a careful definition of the wind turbine's natural and operating environments, use of proven structural design criteria and analysis techniques, an evaluation of potential failure modes and hazards, and use of a fail safe and redundant component engineering philosophy. The role of an effective quality assurance program, tailored to specific hardware criticality, and the checkout and validation program developed to assure system integrity are described.

Reilly, D. H.↗

Influence of Design Variations on Systems Performance

High-risk aerospace components have to meet very stringent quality, performance, and safety requirements. Any source of variation is a concern, as it may result in scrap or rework. poor performance, and potentially unsafe flying conditions. The sources of variation during product development, including design, manufacturing, and assembly, and during operation are shown. Sources of static and dynamic variation during development need to be detected accurately in order to prevent failure when the components are placed in operation. The Systems' Health and Safety (SHAS) research at the NASA Ames Research Center addresses the problem of detecting and evaluating the statistical variation in helicopter transmissions. In this work, we focus on the variations caused by design, manufacturing, and assembly of these components, prior to being placed in operation (DMV). In particular, we aim to understand and represent the failure and variation information, and their correlation to performance and safety and feed this information back into the development cycle at an early stage. The feedback of such critical information will assure the development of more reliable components with less rework and scrap. Variations during design and manufacturing are a common source of concern in the development and production of such components. Accounting for these variations, especially those that have the potential to affect performance, is accomplished in a variety ways, including Taguchi methods, FMEA, quality control, statistical process control, and variation risk management. In this work, we start with the assumption that any of these variations can be represented mathematically, and accounted for by using analytical tools incorporating these mathematical representations. In this paper, we concentrate on variations that are introduced during design. Variations introduced during manufacturing are investigated in parallel work.

Tumer, Irem Y.↗

Taking the Risk Out of Risk Assessment

The ability to understand risks and have the right strategies in place when risky events occur is essential in the workplace. More and more organizations are being confronted with concerns over how to measure their risks or what kind of risks they can take when certain events transpire that could have a negative impact. NASA is one organization that faces these challenges on a daily basis, as effective risk management is critical to the success of its missions especially the Space Shuttle missions. On July 29, 1996, former NASA Administrator Daniel Goldin charged NASA s Office of Safety and Mission Assurance with developing a probabilistic risk assessment (PRA) tool to support decisions on the funding of Space Shuttle upgrades. When issuing the directive, Goldin said, "Since I came to NASA [in 1992], we've spent billions of dollars on Shuttle upgrades without knowing how much they improve safety. I want a tool to help base upgrade decisions on risk." Work on the PRA tool began immediately. The resulting prototype, the Quantitative Risk Assessment System (QRAS) Version 1.0, was jointly developed by NASA s Marshall Space Flight Center, its Office of Safety and Mission Assurance, and researchers at the University of Maryland. QRAS software automatically expands the reliability logic models of systems to evaluate the probability of highly detrimental outcomes occurring in complex systems that are subject to potential accident scenarios. Even in its earliest forms, QRAS was used to begin PRA modeling of the Space Shuttle. In parallel, the development of QRAS continued, with the goal of making it a world-class tool, one that was especially suited to NASA s unique needs. From the beginning, an important conceptual goal in the development of QRAS was for it to help bridge the gap between the professional risk analyst and the design engineer. In the past, only the professional risk analyst could perform, modify, use, and perhaps even adequately understand PRA. NASA wanted to change this by developing a PRA tool that would be friendlier, more understandable, and more useful to the broader engineering community. This concept ultimately led to the look, feel, and functionality that QRAS has today.

Source record↗

Safety Assurance of Software and Machine Learning Development for Nuclear Instrumentation and Controls

Digital instrumentation and control (DI&C) systems monitor and control parameters in nuclear power plants. Ensuring their safety is a critical part of ensuring overall plant safety. Nuclear power plant licensing generates thousands of safety documents that could be organized more effectively using a safety assurance case (SAC). We conducted a literature survey of SACs and created a SAC framework for DI&C software using Goal Structuring Notation (GSN). This framework focuses on four software development processes: management & assurance, pre-developed software (PDS) qualification, the Software Development Life Cycle (SDLC), and the Machine Learning Development Life Cycle (MLDLC). We organized our framework using a novel level structure that can be applied to other SACs to improve their clarity. Finally, we demonstrate how our framework can be incorporated as part of a SAC for a larger reactor system.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Technology and Tool Development to Support Safety and Mission Assurance

The Assurance Case approach is being adopted in a number of safety-mission-critical application domains in the U.S., e.g., medical devices, defense aviation, automotive systems, and, lately, civil aviation. This paradigm refocuses traditional, process-based approaches to assurance on demonstrating explicitly stated assurance goals, emphasizing the use of structured rationale, and concrete product-based evidence as the means for providing justified confidence that systems and software are fit for purpose in safely achieving mission objectives. NASA has also been embracing assurance cases through the concepts of Risk Informed Safety Cases (RISCs), as documented in the NASA System Safety Handbook, and Objective Hierarchies (OHs) as put forth by the Agency's Office of Safety and Mission Assurance (OSMA). This talk will give an overview of the work being performed by the SGT team located at NASA Ames Research Center, in developing technologies and tools to engineer and apply assurance cases in customer projects pertaining to aviation safety. We elaborate how our Assurance Case Automation Toolset (AdvoCATE) has not only extended the state-of-the-art in assurance case research, but also demonstrated its practical utility. We have successfully developed safety assurance cases for a number of Unmanned Aircraft Systems (UAS) operations, which underwent, and passed, scrutiny both by the aviation regulator, i.e., the FAA, as well as the applicable NASA boards for airworthiness and flight safety, flight readiness, and mission readiness. We discuss our efforts in expanding AdvoCATE capabilities to support RISCs and OHs under a project recently funded by OSMA under its Software Assurance Research Program. Finally, we speculate on the applicability of our innovations beyond aviation safety to such endeavors as robotic, and human spaceflight.

Mission Assuranc↗

Middeck Active Control Experiment (MACE), phase A

A rationale to determine which structural experiments are sufficient to verify the design of structures employing Controlled Structures Technology was derived. A survey of proposed NASA missions was undertaken to identify candidate test articles for use in the Middeck Active Control Experiment (MACE). The survey revealed that potential test articles could be classified into one of three roles: development, demonstration, and qualification, depending on the maturity of the technology and the mission the structure must fulfill. A set of criteria was derived that allowed determination of which role a potential test article must fulfill. A review of the capabilities and limitations of the STS middeck was conducted. A reference design for the MACE test article was presented. Computing requirements for running typical closed-loop controllers was determined, and various computer configurations were studied. The various components required to manufacture the structure were identified. A management plan was established for the remainder of the program experiment development, flight and ground systems development, and integration to the carrier. Procedures for configuration control, fiscal control, and safety, reliabilty, and quality assurance were developed.

Crawley, Edward F.↗

Implementation of Ferroelectric Memories for Space Applications

Ferroelectric random access semiconductor memories (FeRAMs) are an ideal nonvolatile solution for space applications. These memories have low power performance, high endurance and fast write times. By combining commercial ferroelectric memory technology with radiation hardened CMOS technology, nonvolatile semiconductor memories for space applications can be attained. Of the few radiation hardened semiconductor manufacturers, none have embraced the development of radiation hardened FeRAMs, due a limited commercial space market and funding limitations. Government funding may be necessary to assure the development of radiation hardened ferroelectric memories for space applications.

Philpy, Stephen C.↗

Systems Engineering and Assurance Modeling (SEAM): A Web-Based Solution for Integrated Mission Assurance

We present an overview of the Systems Engineering and Assurance Modeling (SEAM) platform, a web-browser-based tool which is designed to help engineers evaluate the radiation vulnerabilities and develop an assurance approach for electronic parts in space systems. The SEAM framework consists of three interconnected modeling tools, a SysML compatible system description tool, a Goal Structuring Notation (GSN) visual argument tool, and Bayesian Net and Fault Tree extraction and export tools. The SysML and GSN sections also have a coverage check application that ensures that every radiation fault identified on the SysML side is also addressed in the assurance case in GSN. The SEAM platform works on space systems of any degree of radiation hardness but is especially helpful for assessing radiation performance in systems with commercial-off-the-shelf (COTS) electronic components.

SEAM↗

Development and Evaluation of an Airborne Separation Assurance System for Autonomous Aircraft Operations

NASA Langley Research Center is developing an Autonomous Operations Planner (AOP) that functions as an Airborne Separation Assurance System for autonomous flight operations. This development effort supports NASA s Distributed Air-Ground Traffic Management (DAG-TM) operational concept, designed to significantly increase capacity of the national airspace system, while maintaining safety. Autonomous aircraft pilots use the AOP to maintain traffic separation from other autonomous aircraft and managed aircraft flying under today's Instrument Flight Rules, while maintaining traffic flow management constraints assigned by Air Traffic Service Providers. AOP is designed to facilitate eventual implementation through careful modeling of its operational environment, interfaces with other aircraft systems and data links, and conformance with established flight deck conventions and human factors guidelines. AOP uses currently available or anticipated data exchanged over modeled Arinc 429 data buses and an Automatic Dependent Surveillance Broadcast 1090 MHz link. It provides pilots with conflict detection, prevention, and resolution functions and works with the Flight Management System to maintain assigned traffic flow management constraints. The AOP design has been enhanced over the course of several experiments conducted at NASA Langley and is being prepared for an upcoming Joint Air/Ground Simulation with NASA Ames Research Center.

Barhydt, Richard↗

Modernizing NASA’s Space Flight Safety and Mission Success (S&MS) Assurance Framework In Line With Evolving Acquisition Strategies and Systems Engineering Practices

This paper presents the objectives-driven, case-based safety and mission success (S&MS) assurance framework being developed by the NASA Office of Safety and Mission Assurance (OSMA), including its motivations and its implementation via a S&MS Assurance Standard that is under development, supplemented by supporting standards including an S&MS Analysis Management Standard that is also under development. A need to evolve NASA’s S&MS assurance framework has emerged in recent years, resulting from the need to accommodate new acquisition models; the need to accommodate evolving systems engineering (SE) practices; the need to stipulate acceptable levels of S&MS risk; the need for improved integration of S&MS into SE; and the need for clearer risk acceptance accountability. The objectives-driven, case-based S&MS assurance framework proposed here is responsive to that need. Its key features include: • The establishment, by NASA Acquirers, of fundamental S&MS performance objectives that define limits of acceptability for the likelihoods that mission technical objectives will be accomplished and that people, assets, and environments put at risk by the mission will not be adversely affected; • The development and approval of Providers’ S&MS plans for meeting Acquirers’ S&MS performance objectives, including commitments to support Acquirer audit, investigation, and reporting needs; • The development, by Providers, of S&MS assurance cases that argue, supported by evidence, that the Provider has met, or is on track to meeting, the fundamental S&MS objectives; • The evaluation, throughout the program/project life cycle, of Provider S&MS assurance cases as the primary S&MS-related technical basis for Acquirer risk acceptance and the granting to the Provider of authority to proceed through the program/project life cycle. This proposed S&MS assurance framework is notable for its lack of prescription of traditional S&MS requirements and strategies such as defined failure tolerances, margins, or analysis requirements. Instead, Providers are given latitude to propose their own strategies for meeting the fundamental S&MS performance objectives, subject to independent review and Acquirer approval. The result is a framework for S&MS assurance that is at once both rigorous and flexible.

Assurance Case↗

Space Station - An integrated approach to operational logistics support

Development of an efficient and cost effective operational logistics system for the Space Station will require logistics planning early in the program's design and development phase. This paper will focus on Integrated Logistics Support (ILS) Program techniques and their application to the Space Station program design, production and deployment phases to assure the development of an effective and cost efficient operational logistics system. The paper will provide the methodology and time-phased programmatic steps required to establish a Space Station ILS Program that will provide an operational logistics system based on planned Space Station program logistics support.

Hosmer, G. J.↗

First Phase Consensus Roadmap for Development of Condition-Based Cable Reliability Assurance

The objective of this work was to develop a first phase consensus roadmap for condition-based qualification (CBQ) of electrical cables. With CBQ, qualification of Class 1E electrical cables moves from a time-based approach to a condition-based approach, which is anticipated to be safer in terms of reliability and conservatism, and more cost effective in the long run. However, due to barriers, the CBQ approach has not yet been adopted by U.S. nuclear power plants (NPPs). Based upon a review of current work evaluating CBQ, the limitation of available condition monitoring technology seems to be the largest barrier. The importance of condition monitoring, or more specifically selecting appropriate condition indicators, during CBQ cannot be understated. However, selecting appropriate condition indicators is challenged by techniques that are destructive and only evaluate cable degradation locally. Further, arguably, no one identified condition indicator fully establishes cable condition. Thus, additional work is necessary to evaluate potential condition indicators towards CBQ. In addition to the requirements of IEC/IEEE Std. 60780-323, ideal condition indicators should include a) both destructive and non-destructive approaches, b) both local and global measurements, c) real-time (i.e., online) monitoring that trends with degradation, d) enable correlation with qualified levels of degradation, and e) be established within a repository of condition indicators with applicable materials and/or components and their acceptance criteria. Additional work is needed in development of technology and methodology prior to adoption of CBQ, especially for extending qualified life of installed components. Education and early experience by the industry and regulators will be required for this change in approach as an alternative to re-analysis. A series of workshops that bring together stakeholders to identify and address gaps will be needed. The longstanding cooperative working group of cable researchers from the U.S. Department of Energy, the Electric Power Research Institute, and the Nuclear Regulatory Commission forms a valuable starting point for development of a consensus roadmap to condition-based qualification approach as a viable options for qualification of cable systems in U.S. light water reactors.

42 ENGINEERING↗

Space station common module power system network topology and hardware development

Candidate power system newtork topologies for the space station common module are defined and developed and the necessary hardware for test and evaluation is provided. Martin Marietta's approach to performing the proposed program is presented. Performance of the tasks described will assure systematic development and evaluation of program results, and will provide the necessary management tools, visibility, and control techniques for performance assessment. The plan is submitted in accordance with the data requirements given and includes a comprehensive task logic flow diagram, time phased manpower requirements, a program milestone schedule, and detailed descriptions of each program task.

Landis, D. M.↗

An Assurance Case with a Model at its Core

We describe our pilot study development of an Assurance Case arguing the robustness of a spacecraft demonstration of optical communication. Our Assurance Case addresses the concern that optical communication may be interrupted by the presence of cloud cover, threatening the success of the demonstration. Central to our Assurance Case is its use of a model of atmospheric attenuation to support a key portion of the robustness argument. The conclusion for the demonstration is that its schedule slack plus ability to store data for transmission later accommodates occasional weather-caused atmospheric attenuation.We indicate how the overall structure of the Assurance Case derives from the Objectives Hierarchy set forth in the NASA Reliability and Maintainability standard. We then present the portions of the Assurance Case that argue (1) the atmospheric attenuation model is sufficiently accurate, (2) application of the model shows the desired robustness of the demonstration, and (3) all the model assumptions are satisfied in its application. Lastly, we suggest how an engineering model of the demonstration system and its use could inform the development of the Assurance Case encompassing additional plausible hazards.

DiVenti, Anthony↗

Use of Preliminary PRA to Inform Decisions During Initial NASA Gateway Development

How do you use Probabilistic Risk Assessment (PRA) to support a program in development before designs are even known? Traditional PRAs require detailed design information and early in a program life cycle such information is not available. National Aeronautics and Space Administration (NASA) Safety and Mission Assurance (SMA) developed a preliminary PRA for the Gateway Program based upon NASA reference designs utilizing data and models from pervious PRA studies as surrogates for the Gateway systems. Gateway will be a lunar outpost that supports missions to the moon and includes several elements/modules developed by NASA and International Partners. NASA SMA began supporting Gateway in fall 2017 during initial formulation and continues to support the Gateway Program today. This paper will explore how the NASA SMA developed preliminary PRA was used to inform Gateway Program decisions with specific examples provided.

PRA↗

Use of Preliminary PRA to Inform Decisions During Initial NASA Gateway Development

How do you use Probabilistic Risk Assessment (PRA) to support a program in development before designs are even known? Traditional PRAs require detailed design information and early in a program life cycle such information is not available. National Aeronautics and Space Administration (NASA) Safety and Mission Assurance (SMA) developed a preliminary PRA for the Gateway Program based upon NASA reference designs utilizing data and models from previous PRA studies as surrogates for the Gateway systems. Gateway will be a lunar outpost that supports missions to the moon and includes several elements/modules developed by NASA and International Partners. NASA SMA began supporting Gateway in fall 2017 during initial formulation and continues to support the Gateway Program today. This paper will explore how the NASA SMA developed preliminary PRA was used to inform Gateway Program decisions with specific examples provided.

PRA↗

Report of the Interagency Optical Network Testbeds Workshop 2, NASA Ames Research Center, September 12-14, 2005

The Optical Network Testbeds Workshop 2 (ONT2), held on September 12-14, 2005, was cosponsored by the Department of Energy Office of Science (DOE/SC) and the National Aeronautics and Space Administration (NASA), in cooperation with the Joint Engineering Team (JET) of the Federal Networking and Information Technology Research and Development (NITRD) Program's Large Scale Networking (LSN) Coordinating Group. The ONT2 workshop was a follow-on to an August 2004 Workshop on Optical Network Testbeds (ONT1). ONT1 recommended actions by the Federal agencies to assure timely development and implementation of optical networking technologies and infrastructure. Hosted by the NASA Ames Research Center in Mountain View, California, the ONT2 workshop brought together representatives of the U.S. advanced research and education (R&E) networks, regional optical networks (RONs), service providers, international networking organizations, and senior engineering and R&D managers from Federal agencies and national research laboratories. Its purpose was to develop a common vision of the optical network technologies, services, infrastructure, and organizations needed to enable widespread use of optical networks; recommend activities for transitioning the optical networking research community and its current infrastructure to leading-edge optical networks over the next three to five years; and present information enabling commercial network infrastructure providers to plan for and use leading-edge optical network services in that time frame.

OEP(Open Exchange Points)↗