Search NASA⌕ Search

SEARCH · Search NASA

Results for “Disassembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Final Status Survey Report for Corrective Action Unit 117 - Pluto Disassembly Facility, Building 2201, Nevada National Security Site, Nevada

This document contains the process knowledge, radiological data and subsequent statistical methodology and analysis to support approval for the radiological release of Corrective Action Unit (CAU) 117 – Pluto Disassembly Facility, Building 2201 located in Area 26 of the Nevada National Security Site (NNSS). Preparations for release of the building began in 2009 and followed the methodology described in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM). MARSSIM is the DOE approved process for release of Real Property (buildings and landmasses) to a set of established criteria or authorized limits. The pre-approved authorized limits for surface contamination values and corresponding assumptions were established by DOE O 5400.5. The release criteria coincide with the acceptance criteria of the U10C landfill permit. The U10C landfill is the proposed location to dispose of the radiologically non-impacted, or “clean,” building rubble following demolition. However, other disposition options that include the building and/or waste remaining at the NNSS may be considered providing that the same release limits apply. The Final Status Survey was designed following MARSSIM guidance by reviewing historical documentation and radiological survey data. Following this review a formal radiological characterization survey was performed in two phases. The characterization revealed multiple areas of residual radioactivity above the release criteria. These locations were remediated (decontaminated) and then the surface activity was verified to be less than the release criteria. Once remediation efforts had been successfully completed, a Final Status Survey Plan (10-015, “Final Status Survey Plan for Corrective Action Unit 117 – Pluto Disassembly Facility, Building 2201”) was developed and implemented to complete the final step in the MARSSIM process, the Final Status Survey. The Final Status Survey Plan consisted of categorizing each individual room into one of three categories: Class 1, Class 2 or Class 3 (a fourth category is a “Non-Impacted Class” which in the case of Building 2201 only pertained to exterior surfaces of the building.) The majority of the rooms were determined to fall in the less restrictive Class 3 category, however, Rooms 102, 104, 106, and 107 were identified as containing Class 1 and 2 areas. Building 2201 was divided into “survey units” and surveyed following the requirements of the Final Status Survey Plan for each particular class. As each survey unit was completed and documented, the survey results were evaluated. Each sample (static measurement) with units of counts per minute (cpm) was corrected for the appropriate background and converted to a value with units of dpm/100 cm2. With a surface contamination value in the appropriate units, it was compared to the surface contamination limits, or in this case the derived concentration guideline level (DCGLw). The appropriate statistical test (sign test) was then performed. If the survey unit was statistically determined to be below the DCGLw, then the survey unit passed and the null hypothesis (that the survey unit is above limits) was rejected. If the survey unit was equal to or below the critical value in the sign test, the null hypothesis was not rejected. This process was performed for all survey units within Building 2201. A total of thirty-three “Class 1,” four “Class 2,” and one “Class 3” survey units were developed, surveyed, and evaluated. All survey units successfully passed the statistical test. Building 2201 meets the release criteria commensurate with the Waste Acceptance Criteria (for radiological purposes) of the U10C landfill permit residing within NNSS boundaries. Based on the thorough statistical sampling and scanning of the building’s interior, Building 2201 may be considered radiologically “clean,” or free of contamination.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Standard operating procedure for post-operation component disassembly and observation of benchtop water electrolyzer testing

Post-operation component disassembly and observation of electrolyzer parts is useful in understanding the interactions of the components and the electrochemical environment beyond the systems electrochemical output. We report a standard protocol for post-operation component disassembly and observation, including directions for cell-component preservation, preliminary visual inspection of cell components, and a guide for the advanced inspection of specific components with suggestions for further analysis if necessary. The procedures outlined here allow for a standardized method that can be used and compared between different laboratories and for literature comparison to experimental results.

03 NATURAL GAS↗

Recycling Disassembled Automotive Plastic Components for New Vehicle Components: Enabling the Automotive Circular Economy

As the automotive industry increasingly relies on plastic components to meet fuel efficiency and emissions targets, the challenge of managing end-of-life vehicle (ELV) plastics continues to grow. Currently, more than 80% of ELV plastics in the U.S. are landfilled due to limited economic incentives and technical barriers to recycling. This study examines a mechanical recycling pathway for thermoplastic components disassembled from ELVs and assesses their usability for reintegration into new vehicle parts. Four representative materials were chosen based on material labels embedded in recovered parts and aligned with their virgin industrial equivalents: polypropylene (PP), 10% talc-filled PP (PP-T10), 20% talc-filled PP (PP-T20), and a 20% glass-/mineral-filled polyamide (PA6 + GF7 + MF13). The materials underwent shredding, drying, and injection molding before being characterized by particle size analysis, density measurement, thermal analysis (TGA, DSC), mechanical testing, and heat deflection temperature (HDT) evaluation. The results in this work indicated that minor differences in crystallinity were observed and small differences between model materials and ELV materials could have contributed to these changes. Mechanical testing revealed that neat polypropylene suffered a 15–20% reduction in stiffness and tensile strength, but talc-filled polypropylene and glass/mineral-filled nylon retained >90% of their modulus, strength, and heat deflection temperature values relative to virgin controls. Differences between virgin and ELV materials could have been attributed to use life degradation, contamination during use life, or even chemical/processing differences in model materials and ELV materials. However, these findings suggest that mechanically recycled, disassembled ELV plastics can retain sufficient structural performance to support circularity efforts in the automotive sector.

automotive recycling↗

Damage-Free Relief-Valve Disassembly

Tool safely disassembles relief valves without damage to sensitive parts. Relief-valve disassembly tool used to extract valve nozzle from its housing. Holding device on tool grops nozzle. When user strikes hammer against impact disk, holding device pulls nozzle from press fit. Previously, nozzle dislodged by striking spindle above it, but practice often damaged retaining screw. New tool removes nozzle directly. With minor modifications, tool adapted to valves from different manufacturers.

Haselmaier, H.↗

Assembly, disassembly and repair of large truss structures in space

This paper addresses the problem of planning assembly, disassembly and repair sequences for large truss structures in space. First, the AND/OR graph representation scheme for mechanical assemblies is reviewed and extended to truss structures. The assembly, disassembly and repair sequence planning problem is then formulated as a graph search problem using assembly's AND/OR graph and appropriate cost functions. The general search problem, which is known to be exponential, is simplified by taking advantage of the symmetries that exist in truss structures. General cost functions for truss assembly are discussed.

Desai, Rajiv S.↗

RADIOLOGICAL SURVEY STATION DEVELOPMENT FOR THE PIT DISASSEMBLY AND CONVERSION PROJECT

The Savannah River National Laboratory (SRNL) has developed prototype equipment to demonstrate remote surveying of Inner and Outer DOE Standard 3013 containers for fixed and transferable contamination in accordance with DOE Standard 3013 and 10 CFR 835 Appendix B. When fully developed the equipment will be part of a larger suite of equipment used to package material in accordance with DOE Standard 3013 at the Pit Disassembly and Conversion Project slated for installation at the Savannah River Site. The prototype system consists of a small six-axis industrial robot with an end effector consisting of a force sensor, vacuum gripper and a three fingered pneumatic gripper. The work cell also contains two alpha survey instruments, swipes, swipe dispenser, and other ancillary equipment. An external controller interfaces with the robot controller, survey instruments and other ancillary equipment to control the overall process. SRNL is developing automated equipment for the Pit Disassembly and Conversion (PDC) Project that is slated for the Savannah River Site (SRS). The equipment being developed is automated packaging equipment for packaging plutonium bearing materials in accordance with DOE-STD-3013-2004. The subject of this paper is the development of a prototype Radiological Survey Station (RSS). Other automated equipment being developed for the PDC includes the Bagless transfer System, Outer Can Welder, Gantry Robot System (GRS) and Leak Test Station. The purpose of the RSS is to perform a frisk and swipe of the DOE Standard 3013 Container (either inner can or outer can) to check for fixed and transferable contamination. This is required to verify that the contamination levels are within the limits specified in DOE-STD-3013-2004 and 10 CFR 835, Appendix D. The surface contamination limit for the 3013 Outer Can (OC) is 500 dpm/100 cm2 (total) and 20 dpm/100 cm2 (transferable). This paper will concentrate on the RSS developments for the 3013 OC but the system for the 3013 Inner Can (IC) is nearly identical.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Strategies for achieving circular economy goals in the lighting industry through design for disassembly- based methodologies

The significance of circular economy and its integration into core strategies for smart, sustainable, and inclusive growth, is increasingly being recognized by individuals, organisations, and nations in recent times. The term Design for Disassembly (DfD) may conjure up images about the end-of-life of a product or its disposal. However, DfD connects to numerous circularity and sustainability goals over the lifetime of a product or project and can have a large impact on the carbon footprint of the product. The DfD is a product development methodology which is in line with the vision of a circular economy, and supports increase in material efficiency, extends product lifetimes and improves recycling efficiency. Reduction of the imposed environmental risks and impact on the climate, by utilising circularity approaches such as remanufacturing, are tied to lowering of carbon footprint. This paper describes specific and actionable approaches that can be applied by luminaire manufacturers, specifiers, and other players in the lighting industry. The readers will learn about current tools and methodologies that can be used to improve iterative design, as well as measure, assess, and compare products or materials.

design for disassembly, dfd, circularity↗

Disassembly time of deuterium-cluster-fusion plasma irradiated by an intense laser pulse

Energetic deuterium ions from large deuterium clusters (>10 nm diameter) irradiated by an intense laser pulse (>10¹⁶ W/cm²) produce DD fusion neutrons for a time interval determined by the geometry of the resulting fusion plasma. We show an analytical solution of this time interval, the plasma disassembly time, for deuterium plasmas that are cylindrical in shape. Assuming a symmetrically expanding deuterium plasma, we calculate the expected fusion neutron yield and compare with an independent calculation of the yield using the concept of a finite confinement time at a fixed plasma density. The calculated neutron yields agree quantitatively with the available experimental data. Our one-dimensional simulations indicate that one could expect a tenfold increase in total neutron yield by magnetically confining a 10 - keV deuterium fusion plasma for 10 ns.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Joining, Disassembly, and Reconfiguration of Thermoplastic Composites for Space Applications

Thermoplastic composites are increasingly being investigated for aerospace applications because of their relatively short processing time, good chemical and radiation resistance, and potential for reforming and reuse via melting. The manufacturing, reforming, and reuse of thermoplastic composites can be leveraged to advance joining, disassembly, and reassembly of structures for space exploration activities. Potential applications include, but are not limited to, habitats and on-orbit assembly and/or reassembly of large-scale truss structures.

Reassembly↗

AGR-5/6/7 Test Train Disassembly & Tools Phases I & II

This document provides the process for qualification of the AGR-5/6/7 Test Train Disassembly equipment for remote operation in the HFEF Main Cell. The test train is composed of five welded stainless steel capsules that are expected to be transported in two sections. The first section will be Capsules 1 and 2. The second section will include Capsules 3, 4 and 5. The capsules range in length from about 9 inches to about 12 inches. Inside the capsules is a graphite holder that contains multiple fueled AGR compacts.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Trametinib suppresses HIV-1 replication by interfering with the disassembly of human immunodeficiency virus type 1 capsid core

Highlights: • Phosphorylated/activated MEK1/2 as well as ERK2 are incorporated into the virion. • Trametinib treatment results in a decrease in ERK2 phosphorylation level in the virion. • ERK2-phosphorylation-defective virion shows an attenuated HIV-1 replication. • Capsid core dissociation is attenuated by Trametinib treatment. Our previous study showed that the phosphorylation of a highly conserved serine residue, Ser{sup 16} in the human immunodeficiency virus type 1 (HIV-1) capsid (CA) protein is promoted by virion-incorporated extracellular signal-regulated kinase 2 (ERK2) and required for proper peptidyl-prolyl isomerase (Pin1)-mediated uncoating. Interestingly, western blot analysis demonstrated that phosphorylated/activated mitogen-activated protein kinase kinase 1/2 (MEK1/2), the upstream activator of ERK2, as well as ERK2 are incorporated into virions. Here, we show that the MEK1/2 selective allosteric inhibitor Trametinib reduces HIV-1 infectivity via the decrease in virion-incorporated ERK2 phosphorylation. The treatment of chronic HIV-1-infected T-cell line, CEM/LAV-1 cells with Trametinib results in a decrease in ERK2 phosphorylation in the virions. The viruses have relatively low infectivity and impaired reverse transcription. Cell-based fate-of-capsid uncoating assay showed that the reduction in infectivity was caused by a functional impairment of the uncoating process. Furthermore, the viruses from Trametinib-treated CEM/LAV-1 cells also showed decreased reverse transcription efficiency and attenuated multiple rounds of replication in human peripheral blood mononuclear cells (PBMCs). Taken together, these findings suggest that Trametinib suppresses HIV-1 replication by abrogating the proper disassembly of CA core.

60 APPLIED LIFE SCIENCES↗

Role of a reducing environment in disassembly of the herpesvirus tegument

Initiation of infection by herpes family viruses involves a step in which most of the virus tegument becomes detached from the capsid. Detachment takes place in the host cell cytosol near the virus entry site and it is followed by dispersal of tegument proteins and disappearance of the tegument as a distinct entity. Here we describe the results of experiments designed to test the idea that the reducing environment of the cytosol may contribute to tegument detachment and disassembly. Non-ionic detergent was used to remove the membrane of purified herpes simplex virus under control and reducing conditions. The effects on the tegument were then examined by SDS-PAGE and electron microscopy. Protein analysis demonstrated that most major tegument proteins were removed under both oxidizing and reducing conditions except for UL49 which required a reducing environment. It is proposed therefore that the reducing conditions in the cytosol are involved in removal of UL49 protein. Electron microscopic analysis revealed that capsids produced under oxidizing conditions contained a coating of protein that was absent in reduced virions and which correlated uniquely with the presence of UL49. This capsid-associated layer is suggested to be the location of UL49 in the extracted virion.

60 APPLIED LIFE SCIENCES↗

Protein Vesicles with pH-Responsive Disassembly

We report protein biomaterials offer several advantages over those made from other components because their amino acid sequence can be precisely controlled with genetic engineering to produce a diverse set of material building blocks. In this work, three different elastin-like polypeptide (ELP) sequences were designed to synthesize pH-responsive protein vesicles. ELPs undergo a thermally induced hydrophobic transition that enables self-assembly of different kinds of protein biomaterials. The transition can be tuned by the composition of the guest residue, X, within the ELP pentapeptide repeat unit, VPGXG. When the guest residue is substituted with an ionizable amino acid, such as histidine, the ELP undergoes a pH-dependent hydrophobic phase transition. We used pH-responsive ELPs with different levels of histidine substitution, in combination with leucine zippers and globular, functional proteins, to fabricate protein vesicles. We demonstrate pH-dependent self-assembly, diameter, and disassembly of the vesicles using a combination of turbidimetry, dynamic light scattering, microscopy, and small angle X-ray scattering. As the ELP transition is dependent on the sequence, the vesicle properties also depend on the histidine content in the ELP building blocks. These results demonstrate the tunability of protein vesicles endowed with pH responsiveness, which expands their potential in drug-delivery applications.

59 BASIC BIOLOGICAL SCIENCES↗

Structural basis for assembly and disassembly of the CRM1 nuclear export complex

CRM1 (or exportin 1, Xpo1) transports proteins out of the cell nucleus through the nuclear pore complex. In the cytoplasm, GTP hydrolysis and consequent dissociation of Ran from CRM1 releases low-affinity substrates, while additional factors facilitate release of high-affinity substrates. Here we provide a model for human CRM1 export complex assembly and disassembly through structural and biochemical analyses of CRM1 bound to the substrate snurportin 1 (SNUPN, also called snuportin 1).

59 BASIC BIOLOGICAL SCIENCES↗

Unprecedented generation of 3D heterostructures by mechanochemical disassembly and re-ordering of incommensurate metal chalcogenides

Three-dimensional heterostructures are usually created either by assembling two-dimensional building blocks into hierarchical architectures or using stepwise chemical processes that sequentially deposit individual monolayers. Both approaches suffer from a number of issues, including lack of suitable precursors, limited reproducibility, and poor scalability of the preparation protocols. Therefore, development of alternative methods that enable preparation of heterostructured materials is desired. We create heterostructures with incommensurate arrangements of well-defined building blocks using a synthetic approach that comprises mechanical disassembly and simultaneous reordering of layered transition-metal dichalcogenides, MX 2 , and non-layered monochalcogenides, REX, where M = Ta, Nb, RE = Sm, La, and X = S, Se. We show that the discovered solid-state processes are rooted in stochastic mechanochemical transformations directed by electronic interaction between chemically and structurally dissimilar solids toward atomic-scale ordering, and offer an alternative to conventional heterostructuring. Details of composition–structure–properties relationships in the studied materials are also highlighted.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

An in vitro BRAF activation assay elucidates molecular mechanisms driving disassembly of the autoinhibited BRAF state

The RAF kinases (ARAF, BRAF, and CRAF) are essential components of the RAS-ERK signaling pathway, which controls vital cellular processes and is frequently dysregulated in human disease. Notably, mutations that alter BRAF function are prominent drivers of human cancer and certain RASopathy disorders, making BRAF an important target for therapeutic intervention. Despite extensive research, several aspects of BRAF regulation remain unclear. In this study, we developed an in vitro BRAF activation assay using purified autoinhibited BRAF:14-3-3 2 :MEK complexes. Our results show that fully processed, active-state KRAS alone can promote dimer-dependent BRAF activation. Moreover, we found that phosphatidylserine (PS)-containing liposomes synergized with KRAS to promote BRAF activation, achieving activity levels comparable to those observed with BRAF proteins that constitutively dimerize. In contrast, the SMP phosphatase complex had only a minimal effect on BRAF catalytic activity in this system but mediated the dephosphorylation of the negative regulatory pS365 14-3-3 binding site in a manner that was accelerated by the presence of KRAS alone or KRAS and 30% PS liposomes. Finally, we show that inhibitors blocking the BRAF RBD:KRAS interaction were able to suppress the in vitro activation of BRAF, underscoring the critical role of RAS binding in initiating the disassembly of the BRAF autoinhibited state. Thus, this assay provides valuable insights into the steps required for BRAF activation and can serve as an effective screening tool for identifying compounds that may inhibit this process and have therapeutic potential.

BRAF↗

Treatment head disassembly to improve the accuracy of large electron field simulation

Purpose: The purposes of this study are to improve the accuracy of source and geometry parameters used in the simulation of large electron fields from a clinical linear accelerator and to evaluate improvement in the accuracy of the calculated dose distributions. Methods: The monitor chamber and scattering foils of a clinical machine not in clinical service were removed for direct measurement of component geometry. Dose distributions were measured at various stages of reassembly, reducing the number of geometry variables in the simulation. The measured spot position and beam angle were found to vary with the beam energy. A magnetic field from the bending magnet was found between the exit window and the secondary collimators of sufficient strength to deflect electrons 1 cm off the beam axis at 100 cm from the exit window. The exit window was 0.05 cm thicker than manufacturer's specification, with over half of the increased thickness due to water pressure in the channel used to cool the window. Dose distributions were calculated with Monte Carlo simulation of the treatment head and water phantom using EGSnrc, a code benchmarked at radiotherapy energies for electron scatter and bremsstrahlung production, both critical to the simulation. The secondary scattering foil and monitor chamber offset from the collimator rotation axis were allowed to vary with the beam energy in the simulation to accommodate the deflection of the beam by the magnetic field, which was not simulated. Results: The energy varied linearly with bending magnet current to within 1.4% from 6.7 to 19.6 MeV, the bending magnet beginning to saturate at the highest beam energy. The range in secondary foil offset used to account for the magnetic field was 0.09 cm crossplane and 0.15 cm inplane, the range in monitor chamber offset was 0.14 cm crossplane and 0.07 cm inplane. A 1.5%/0.09 cm match or better was obtained to measured depth dose curves. Profiles measured at the depth of maximum dose matched the simulated profiles to 2.6% or better at doses of 80% or more of the dose on the central axis. The profiles along the direction of MLC motion agreed to within 0.16 cm at the edge of the field. There remained a mismatch for the lower beam energies at the edge of the profile that ran parallel to the direction of jaw motion of up to 1.4 cm for the 6 MeV beam, attributed to the MLC support block at the periphery of the field left out of the simulation and to beam deflection by the magnetic field. The possibility of using these results to perform accurate simulation without disassembly is discussed. Phase-space files were made available for benchmarking beam models and other purposes. Conclusions: The match to measured large field dose distributions from clinical electron beams with Monte Carlo simulation was improved with more accurate source details and geometry details closer to manufacturer's specification than previously achieved.

61 RADIATION PROTECTION AND DOSIMETRY↗