Search NASA⌕ Search

SEARCH · Search NASA

Results for “Engineering Risk Assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Dysfunctionality Hazard Curve: Risk-Based Tool to Support the Resilient Design of Systems Subjected to Multihazards

While resilience metrics have been proposed and studied given a functionality recovery curve, they have not emphasized enough on accounting for the uncertainties in the multihazard occurrences and intensities. Moreover, these resilience metrics are not risk-based (i.e., they do not express the system's resilience loss as a frequency of exceedance), leading to inconsistencies in system performance description when compared to performance-based engineering frameworks. A risk-based tool termed dysfunctionality hazard curve is proposed to assess the resilience of systems subjected to single hazards or multihazards with inter-event dependencies. Dysfunctionality hazard curve expresses system resilience performance as frequency of exceedance of time to full functionality. In doing so, it characterizes system recovery as a sequence of repair activities and also considers the uncertainties in the multihazard occurrences and intensities. Dysfunctionality hazard curve is demonstrated for a residential building susceptible to earthquake and hurricane hazards. Results indicate that Dysfunctionality hazard curve for earthquakes is greater than that for hurricane winds under single hazards. Under multihazards, considering inter-event dependencies during system recovery leads to larger dysfunctionality hazard curve than ignoring them. Finally, the concept of dysfunctionality hazard curve is also extended to a system-of-systems consisting of residential and commercial buildings.

42 ENGINEERING↗

Application of quantitative risk assessment to address stakeholder questions in geologic carbon storage

Ambitious international greenhouse gas emissions reduction targets demand a rapid transformation to a low-carbon economy. This transformation includes the accelerated adoption of carbon dioxide (CO2) capture and storage (CCS) technology. However, as with any large-scale engineering enterprise, the widespread commercial-scale deployment of geologic carbon storage (GCS) raises important questions about technology and cost-effectiveness, safety, environmental risk, and long-term liability. Effectively assessing and managing risks and liability associated with GCS projects is a key technical need throughout the project life cycle-from site selection and permitting to monitoring design, operational risk management, and post-operational site closure. This presentation highlights recent advancements in tools for quantitative risk assessment, being developed by the National Risk Assessment Partnership (NRAP). NRAP is a multi-year, multinational laboratory research collaboration sponsored by the U.S. Department of Energy's Office of Fossil Energy and Carbon Management. Our focus will be on these tools' applications in addressing critical stakeholder questions related to supporting permitting to ensure secure and environmentally protective storage; designing effective and efficient monitoring plans; evaluating the effectiveness of remedial actions and risk management alternatives; and informing liability assessment and investment decisions. This paper will detail the key functionality of NRAP’s Open-Source Integrated Assessment Model (NRAP-Open-IAM), a computational framework for assessing leakage risk and containment assurance. This model features streamlined workflows for calculating leakage risk profiles, delineating risk-based area of review, and assessing contingency plans and post-injection site care requirements. ORION is an open-source, observation-based ensemble forecasting toolkit to help operators assess the seismic hazard at a carbon storage site. The State of Stress Analysis Tool (SOSAT), designed to assess subsurface stress conditions and evaluate geomechanical risk resulting from CO2 injection in an area of interest will also be presented. We will also introduce a prototype model to evaluate storage project costs and liability associated with risk management. The Technoeconomic and Liability Evaluation for Storage (TALES) model uses results from forecasts of leakage and induced seismicity risk to estimate the lifecycle cost of managing risk. Finally, a preliminary example of how the NRAP Risk-based Adaptive Monitoring Plan (RAMP) tool can be used to design efficient and effective site monitoring plans and estimate the detectability of fluid leakage will be provided. The relevance of these tools for addressing key stakeholder questions amidst uncertainty will be emphasized.

decision support↗

A data engineering approach for sustainable chemical end-of-life management

The presence of chemicals causing significant adverse human health and environmental effects during end-of-life (EoL) stages is a challenge for implementing sustainable management efforts and transitioning towards a safer circular life cycle. Conducting chemical risk evaluation and exposure assessment of potential EoL scenarios can help understand the chemical EoL management chain for its safer utilization in a circular life-cycle environment. However, the first step is to track the chemical flows, estimate releases, and potential exposure pathways. Hence, this work proposes an EoL data engineering approach to perform chemical flow analysis and screening to support risk evaluation and exposure assessment for designing a safer circular life cycle of chemicals. This work uses publicly-available data to identify potential post-recycling scenarios (e.g., industrial processing/use operations), estimate inter-industry chemical transfers, and exposure pathways to chemicals of interest. Furthermore, a case study demonstration shows how the data engineering framework identifies, estimates, and tracks chemical flow transfers from EoL stage facilities (e.g., recycling and recovery) to upstream chemical life cycle stage facilities (e.g., manufacturing). Also, the proposed framework considers current regulatory constraints on closing the recycling loop operations and provides a range of values for the flow allocated to post-recycling uses associated with occupational exposure and fugitive air releases from EoL operations.

54 ENVIRONMENTAL SCIENCES↗

Risk-Informed Applications and Science – Past, Present, & Future

This is a presentation to be made at the University of Tokyo. The Idaho National Laboratory is creating the next-generation reliability- and risk-assessment methods and tools that support risk-informed decision-making by combining physics-based models with probabilistic quantification approaches. Integrating these two worlds of physics and probability using a simulation framework leads us to predictions based upon an approach called “computational risk assessment” which will serve as the technical basis for the future of reliability and risk approaches. The driving factors for this new approach includes: temporal (timing issues), spatial (location issues), mechanistic (physics issues), and topological (complexity issues). By combining phenomenology directly with stochastic quantification, we are able to perform advanced uncertainty analysis directly on both parameters and models. In addition, new tools allow for the creation of reduced order models that mimic high-fidelity engineering models while still permitting the realization of thousands of simulation iterations in short run-times on current workstation-class computers. While these advanced methods and tools can provide increased realism in our engineering safety and risk approaches, their greater benefit is to provide a risk-informed engineering framework for design and operation. This talk will briefly review the history of risk assessment and risk-informed applications, describe some of the current research and development found at the Idaho National Laboratory, and discuss potential future applications and approaches for advanced methods and tools.

97 MATHEMATICS AND COMPUTING↗

Analytical Solutions for Seismic Fluid-Structure Interaction of Head-Supported Cylindrical Tanks

Fluid-structure interaction (FSI) of earthquake shaking is a design consideration in the civil, nuclear, chemical, and mechanical industries. Preliminary sizing of structures and components in these industries will often use analytical solutions because there is insufficient information to warrant the analysis of numerical models. Here, this study extends prior analytical work on seismic FSI of base-supported tanks in the 1980s to accommodate head-supported tanks with geometries similar to those proposed for new-build, liquid (fluid)-filled, advanced reactors. Analytical solutions are derived for flexible, head-supported, cylindrical tanks subjected to small-amplitude, unidirectional, horizontal seismic motion, and address frequencies of lateral motions of the tank, hydrodynamic pressures, frequencies of waves, wave heights, and reactions at the head support. Solutions are presented for a range of tank dimensions and could be used for a) preliminary design of head-supported cylindrical tanks and their supporting structures with idealized seismic input, and b) verification of numerical models to be used for final seismic analysis, design, and probabilistic risk assessment.

42 ENGINEERING↗

HyRAM+ (Hydrogen Plus Other Alternative Fuels Risk Assessment Models) v.6.1

SAND2025-11565O HyRAM+ (Hydrogen Plus Other Alternative Fuels Risk Assessment Models) is a tool for conducting quantitative risk assessment (QRA) in transportation systems. HyRAM+ contains validated, simplified release behavior models, engineering models, and generic data relevant to hydrogen installations. HyRAM+’s platform integrates models and data to conduct QRA on user-defined hydrogen or other alternative fuel systems. The software will enable the international safety research community to add validated models to the HyRAM+ platform for use in QRAs. HyRAM (hydrogen-only) versions 1.0 to 3.1 were developed by Sandia for the Department of Energy (DOE) Hydrogen and Fuel Cell Technologies Office. The following agencies contributed to the development of HyRAM+ version 4.0 regarding the addition of methane (natural gas) and propane models: the DOE Vehicle Technologies Office and the Department of Transportation Pipeline and Hazardous Material Safety Administration. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Groth, Katrina [Sandia National Lab. (SNL-NM), Alb↗

Predicting High Energy Arcing Fault Zones of Influence for Aluminum Using an Arc Flash Modeling Approach: Evaluation of a model bias, uncertainty, parameter sensitivity and zone of influence estimation

This report documents the development of an arc flash hazard model to calculate the incident energy and zone of influence from high energy arcing faults involving aluminum. The NRC has identified the potential for (HEAFs) involving aluminum to increase the damage zone beyond what is currently postulated in fire probabilistic risk assessment (PRA) methodologies. To estimate the hazard from HEAFs involving aluminum an arc flash model was developed. Differences between the initial model and nuclear power plant (NPP) fire PRA scenarios were identified. Modification of the initial model established from existing literature and test data was used to minimize these differences. The developed model was evaluated against NRC datasets to understand the model prediction and relative uncertainties. Finally, a range of fire PRA zone of influences (ZOI) were developed based on the developed model, target fragility estimates and update HEAF PRA methodology. The results were developed to support an NRC LIC-504 evaluation in tandem with other modeling efforts. The report documents the effort and provides a reference for any future advancements in arc flash modeling.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Risk-informed Graded Approach for Reliability and Performance Assessment of Machine Learning and Artificial Intelligence for Advanced Condition Monitoring Techniques

With the shift away from time-based maintenance and toward condition-based maintenance, and to reduce overall maintenance costs, there has been an upsurge in the usage and development of advanced condition monitoring (ACM) techniques for real-time monitoring of nuclear power plant (NPP) components. ACM is particularly useful in the development of digital twins, which are designed to predict the failure or degradation of plant components. Successful implementation of ACM requires an assessment to inform the development of a risk-informed approach to evaluate the use of ACM to meet Nuclear Regulatory Committee (NRC) regulations for in-service testing (IST) programs. This includes the monitoring and diagnostics of reactor components and systems in current, new, and advanced reactors. A key component in ACM is the usage of machine learning (ML) and artificial intelligence (AI) algorithms that can employ real-time data from instrumentation and sensors to detect and predict reactor component degradations. Such predictive capabilities enable early detection of component degradation so as to help plant personnel plan and execute necessary maintenance. For successful implementation of ML/AI in ACM such that regulatory requirements are met, a risk-informed graded approach is needed to assess the reliability and performance of ML/AI for ACM. The American Society for Mechanical Engineers (ASME) developed their Operations and Maintenance (O&M) Code to provide guidance on safe, reliable O&M of NPPs. The IST section of the O&M Code specifically establishes requirements for IST and examination to gauge operational readiness of components in water-cooled NPPs. This paper presents a state-of-the-art review of how reliability and risk assessment can be integrated with ACM to assess component performance by non-nuclear industries. This is followed by different methodologies and approaches for conducting performance and reliability assessments so as to meet IST requirements for NPP components.

97 - MATHEMATICS AND COMPUTING↗

Risk-informed Graded Approach for Reliability and Performance Assessment for Advanced Condition Monitoring Techniques

With the shift away from time-based maintenance and toward condition-based maintenance, and to reduce overall maintenance costs, there has been an upsurge in the usage and development of advanced condition monitoring (ACM) techniques for real-time monitoring of nuclear power plant (NPP) components. ACM is particularly useful in the development of digital twins, which are designed to predict the failure or degradation of plant components. Successful implementation of ACM requires an assessment to inform the development of a risk-informed approach to evaluate the use of ACM to meet Nuclear Regulatory Committee (NRC) regulations for in-service testing (IST) programs. This includes the monitoring and diagnostics of reactor components and systems in current, new, and advanced reactors. A key component in ACM is the usage of machine learning (ML) and artificial intelligence (AI) algorithms that can employ real-time data from instrumentation and sensors to detect and predict reactor component degradations. Such predictive capabilities enable early detection of component degradation so as to help plant personnel plan and execute necessary maintenance. For successful implementation of ML/AI in ACM such that regulatory requirements are met, a risk-informed graded approach is needed to assess the reliability and performance of ML/AI for ACM. The American Society for Mechanical Engineers (ASME) developed their Operations and Maintenance (O&M) Code to provide guidance on safe, reliable O&M of NPPs. The IST section of the O&M Code specifically establishes requirements for IST and examination to gauge operational readiness of components in water-cooled NPPs. This paper presents a state-of-the-art review of how reliability and risk assessment can be integrated with ACM to assess component performance by non-nuclear industries. This is followed by different methodologies and approaches for conducting performance and reliability assessments so as to meet IST requirements for NPP components.

99 - GENERAL AND MISCELLANEOUS↗

Airport Risk Assessment Model Stakeholder Symposium Event Report

On June 22-23, 2021, the Pacific Northwest National Laboratory hosted a two-day virtual stakeholder symposium to share how the Airport Risk Assessment Model (ARAM) is putting security resource allocation planning into the hands of our airport’s front lines of defense. This report highlights the key takeaways from the discussions.

42 ENGINEERING↗

Application of Numerical Atmospheric Models

In this study, a numerical modeling framework for simulating extreme storm events was established using the Weather Research and Forecasting (WRF) model. Such a framework is necessary for the derivation of engineering parameters such as probable maximum precipitation that are the cornerstone of large water-management infrastructure design. Here, this framework was built based on a heavy storm that occurred in Nashville, Tennessee (U.S.), in 2010, and verified using two other extreme storms. To achieve the optimal setup, several combinations of model resolutions, initial/boundary conditions (IC/BC), cloud microphysics, and cumulus parameterization schemes were evaluated using multiple metrics of precipitation characteristics. The evaluation suggests that WRF is most sensitive to the IC/BC option. Simulation generally benefits from finer resolutions up to 5 km. At the 15 km level, NCEP2 IC/BC produces better results, whereas NAM IC/BC performs best at the 5 km level. The recommended model configuration from this study is: NAM or NCEP2 IC/BC (depending on data availability), 15 km or 15–5 km nested grids, Morrison microphysics, and Kain-Fritsch cumulus schemes. Validation of the optimal framework suggests that these options are good starting choices for modeling extreme events similar to the test cases. This optimal framework is proposed in response to emerging engineering demands of extreme storm event forecasting and analyses for design, operations, and risk assessment of large water infrastructures.

Chen, Xiaodong↗

MASTODON: An Open-Source Software for Seismic Analysis and Risk Assessment of Critical Infrastructure

Seismic analysis and risk assessment of safety-critical infrastructure like hospitals, nuclear power plants, dams, and facilities handling radioactive materials involve computationally intensive numerical models and coupled multiphysics scenarios. They are also performed in a strict regulatory environment that requires high software quality assurance standards, and in the case of safety-related nuclear facilities, a conformance to the American Society of Mechanical Engineers Nuclear Quality Assurance (NQA-1) standard. This paper introduces the open-source finite-element software, MASTODON (Multi-hazard Analysis of Stochastic Time-Domain Phenomena), which implements state-of-the-art seismic analysis and risk assessment tools in a quality-controlled environment. MASTODON is built on MOOSE (Multi-physics Object-Oriented Simulation Environment), which is a highly parallelizable, NQA-1 conforming, coupled multiphysics, finite-element framework developed at Idaho National Laboratory. MASTODON is capable of fault rupture and source-to-site wave propagation using the domain reduction method, nonlinear site response, and soil-structure interaction analysis, implicit and explicit time integration, automated stochastic simulations, and seismic probabilistic risk assessment. When coupled with other MOOSE applications, MASTODON can also solve strongly and weakly coupled multiphysics problems. This paper presents a summary of the capabilities of MASTODON and some demonstrative examples.

42 ENGINEERING↗

Direct Air Capture-Based Carbon Dioxide Removal with United States Low-Carbon Energy and Sinks

The overall objective of this project was to complete an initial design of a commercial-scale, Carbon Capture and Storage system for Direct Air Capture (CCS-DAC) that separates and stores a minimum of 100,000 tonnes/year (t/yr.) net CO 2 from air. Three geographically diverse host sites will be used to determine the impact of different climates on the design and cost of the CCS-DAC systems; California (dry-hot), Louisiana (humid-hot), and Wyoming (mid-continental). In addition, the impact of using different low-carbon energy sources was also examined. The focus of this project was to geologically store the CO 2 , rather than the utilization of CO 2 . This Final Scientific/Technical Report is a collection of the deliverables for the project. The project team was able to successfully complete all the necessary tasks needed to determine the feasibility of the designs and operational needs of the DAC systems for each location. The data created by this allowed the project team to conduct the required evaluations to meet the requirements of the deliverables. The following deliverables were drafted and submitted to DOE prior to the conclusion of the project: (1) Initial Engineering Design; (2) Costing Estimate; (3) Techno-Economic Analysis (TEA); (4) Life Cycle Analysis (LCA); (5) Business Case Assessment; and (6) Technology EH&S Risk Assessment.

42 ENGINEERING↗

Thermal Damage Potential of Electric Vehicles

The main objective is to assess the risk that electric vehicle (EV) battery fires pose regarding thermal damage to other vehicles involved in a crash and to compare EV and internal combustion engine vehicle (ICEV) fires. A literature review of experimental data and statistics are used to perform the assessment. The findings indicate: (1) the heat flux emitted from an EV and ICEV fire are similar due to cabin materials being the main contributor to heat flux, (2) for ICEVs involved in a crash with fuel tank leakage, the thermal damage is significantly more than from an EV fire for equivalent fire durations, (3) the thermal damage potential from ICEV pool fires is at least 5 times higher than EV fires, and (4) EV and ICEV crashes resulting in a fire is about 0.002% and 0.2%, respectively. Thus, EV battery fires have a lower risk than ICEV fires.

33 ADVANCED PROPULSION SYSTEMS↗

Enhancement of risk informed validation framework for external hazard scenario

In recent years, the U.S. Nuclear Regulatory Commission (USNRC) and the International Atomic Energy Agency (IAEA) have developed methodologies to assess the vulnerabilities of nuclear plants against site specific extreme hazards. In many cases, advanced simulation tools are being considered to simulate multi-physics, multi-scale phenomena and to evaluate vulnerability of nuclear facilities. The credibility of advanced simulation tools is assessed based on a formal verification, validation, and uncertainty quantification procedure. One of the key limitations in validation is the lack of relevant experimental data at system-level. This limitation leads to a decrease in the confidence of system-level risk predictions. Therefore, a robust validation framework is needed to formalize the confidence in predictive capability of advanced simulation results. Additionally, this study enhances the existing risk informed validation methodology, originally proposed by Kwag et al. [1] and Bodda et al. [2], by developing additional attributes and a new set of validation indicies for a complete and wider applicability of the framework. In this manuscript, the methodology to identify the critical path that leads to the system-level failure is illustrated. The overall validation is checked for completeness and consistency by comparing the critical path for both the system-level simulation and experimental models. The applicability of the code for an intended application is represented in terms of various maturity levels and helps in the process of decision making.

42 ENGINEERING↗

Review of Release Behavior of Hydrogen & Natural Gas Blends from Pipelines

Hydrogen can be used to reduce carbon emissions by blending into other gaseous energy carriers, such as natural gas. However, hydrogen blending into natural gas has important implications for safety which need to be evaluated. Hydrogen has different physical properties than natural gas, and these properties affect safety evaluations concerning a leak of the blended gas. The intent of this report is to begin to investigate the safety implications of blending hydrogen into the natural gas infrastructure with respect to a leak event from a pipeline. A literature review was conducted to identify existing data that will better inform future hazard and risk assessments for hydrogen/natural gas blends. Metrics with safety implications such as heat flux and dispersion behavior may be affected by the overall blend ratio of the mixture. Of the literature reviewed, there was no directly observed separation of the hydrogen from the natural gas or methane blend. No literature was identified that experimentally examined unconfined releases such as concentration fields or concentration at specific distances. Computational efforts have predicted concentration fields by modified versions of existing engineering models, but the validation of these models is limited by the unavailability of literature data. There are multiple literature sources that measured flame lengths and heat flux values, which are both relevant metrics to risk and hazard assessments. These data can be more directly compared to the outputs of existing engineering models for validation.

03 NATURAL GAS↗