Search NASA⌕ Search

SEARCH · Search NASA

Results for “Explainable Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

A comparative study of diversification events: the early Paleozoic versus the Mesozoic

We compare two major long-term diversifications of marine animal families that began during periods of low diversity but produced strikingly different numbers of phyla, classes, and orders. The first is the early-Paleozoic diversification (late Vendian-Ordovician; 182 MY duration) and the other the Mesozoic phase of the post-Paleozoic diversification (183 MY duration). The earlier diversification was associated with a great burst of morphological invention producing many phyla, classes, and orders and displaying high per taxon rates of family origination. The later diversification lacked novel morphologies recognized as phyla and classes, produced fewer orders, and displayed lower per taxon rates of family appearances. The chief difference between the diversifications appears to be that the earlier one proceeded from relatively narrow portions of adaptive space, whereas the latter proceeded from species widely scattered among adaptive zones and representing a variety of body plans. This difference is believed to explain the major differences in the products of these great radiations. Our data support those models that hold that evolutionary opportunity is a major factor in the outcome of evolutionary processes.

NASA Discipline Exobiology↗

Stationkeeping for the Lunar Reconnaissance Orbiter (LRO)

The Lunar Reconnaissance Orbiter (LRO) is scheduled to launch in 2008 as the first mission under NASA's Vision for Space Exploration. Follo wing several weeks in a quasi-frozen commissioning orbit, LRO will fl y in a 50 km mean altitude lunar polar orbit. During the one year mis sion duration, the orbital dynamics of a low lunar orbit force LRO to perform periodic sets of stationkeeping maneuvers. This paper explor es the characteristics of low lunar orbits and explains how the LRO s tationkeeping plan is designed to accommodate the dynamics in such an orbit. The stationkeeping algorithm used for LRO must meet five miss ion constraints. These five constraints are to maintain ground statio n contact during maneuvers, to control the altitude variation of the orbit, to distribute periselene equally between northern and southern hemispheres, to match eccentricity at the beginning and the end of the sidereal period, and to minimize stationkeeping (Delta)V. This pape r addresses how the maneuver plan for LRO is designed to meet all of the above constraints.

Beckman, Mark↗

Management philosophies as applied to major NASA programs

A definition of 'management philosophies' is discussed explaining the position of NASA in the planning and control of space programs and technology. The impact of these philosophies on the Apollo and Saturn 1 programs are described along with the need for the Saturn 5 spacecraft and launch site development. Case studies are included and describe unscheduled events where management decisions were necessary to keep programs on track.

Dannenberg, K. K.↗

Naming moon's features created 'Ocean of Storms'

The naming of lunar features from the time Galileo first viewed the moon through a telescope to the period of spaceborne lunar exploration is surveyed. Attention is given to Galileo's designation of terrae (highlands) and maria, and the 1651 scheme of Riccioli, which is responsible for the attributive names of maria and the commemoration of famous philosophers and astronomers by major craters. The standardization of lunar nomenclature by the International Astronomical Union (IAU) in 1932 is noted, and the naming of far-side features discovered by the Luna 3 and Lunar Orbiter spacecraft by their respective nations is discussed. The designation of small features during the planning of the Apollo moon landings is explained, and the formalization of operational lunar designations and the names of surface features of Mercury, Venus and Mars and its moons are considered.

El-Baz, F.↗

Individual differences in airline captains' personalities, communication strategies, and crew performance

Aircrew effectiveness in coping with emergencies has been linked to captain's personality profile. The present study analyzed cockpit communication during simulated flight to examine the relation between captains' discourse strategies, personality profiles, and crew performance. Positive Instrumental/Expressive captains and Instrumental-Negative captains used very similar communication strategies and their crews made few errors. Their talk was distinguished by high levels of planning and strategizing, gathering information, predicting/alerting, and explaining, especially during the emergency flight phase. Negative-Expressive captains talked less overall, and engaged in little problem solving talk, even during emergencies. Their crews made many errors. Findings support the theory that high crew performance results when captains use language to build shared mental models for problem situations.

Orasanu, Judith↗

Cost and schedule estimation study report

This report describes the analysis performed and the findings of a study of the software development cost and schedule estimation models used by the Flight Dynamics Division (FDD), Goddard Space Flight Center. The study analyzes typical FDD projects, focusing primarily on those developed since 1982. The study reconfirms the standard SEL effort estimation model that is based on size adjusted for reuse; however, guidelines for the productivity and growth parameters in the baseline effort model have been updated. The study also produced a schedule prediction model based on empirical data that varies depending on application type. Models for the distribution of effort and schedule by life-cycle phase are also presented. Finally, this report explains how to use these models to plan SEL projects.

Condon, Steve↗

Shuttle-Mir, CD-ROM Supplement

This CD-ROM is a companion to an illustrated history book with the same title. This multi-media, searchable CD includes the full text and images in the book, as well as additional material. Interviews, photographs, and biographies of the U.S. Astronauts, cosmonauts, and team members for the Shuttle-Mir Program are available. STS Mission Summaries for each mission involved can be viewed, including launch and landing details, crew lists, and mission highlights. Photographs and videos from each mission are included, as well as diagrams of different spacecraft, and computer-generated animations of the Mir deorbit, collision, and flyaround. Additional documents include mission status reports, published documents, news releases, personal letters, and oral histories. The experiments carried out on Mir are described, highlighting combustion and fluid physics research, life in microgravity, and research of the development of the solar system. The focus on improving space technology and planning for the International Space Station is explained. The main features of the book itself include: (1) Training and Operations; (2) Long Duration Psychology; (3) Bilingual Blues; and (4) Earth Observations.

Morgan, Clay↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Crew Vehicle s (MPCV s) first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd A.↗

STS-99 / Endeavour SRTM Science Briefing and Applications from JSC

The primary objective of the STS-99 mission was to complete high resolution mapping of large sections of the Earth's surface using the Shuttle Radar Topography Mission (SRTM), a specially modified radar system. This radar system produced unrivaled 3-D images of the Earth's Surface. This videotape shows a science press briefing. The panel members are Michael Kobrick, the SRTM Project Scientist at JPL; Thomas Henning, SRTM Program Manager at the National Imagery and Mapping Agency; Diane Evans, the Director of the Earth Sciences Program at NASA; and Marian Werner, XSAR Project Manager for the DLR, Deutschen Zentrum fur Luft- und Raumfahrt, Germany's National Aerospace Research Center. Michael Kobrick explained the mechanics of interferometric measurements of the Earth. He explained and demonstrated with a scale model the deployable mast's use. He also explained the importance of the attitude and orbit determination avionics. A brief animated video showing how four beams would give a 225 km wide swath of the Earth topography was viewed. Thomas Henning discussed some of the usage of the digital terrain elevation data for flood relief planning, cell phone station placement, military planning for command and control centers, and flight simulation. He explained that public access to the most precise data would be limited. Diane Evans described data usage in flood prediction, earthquake fault identification and archeology. Marian Werner described the German and Italian input to the project. The questions from the press concerned the time to process this data, and the reasons for the limited access to the more precise data.

Source record↗

Reconfigurable L-Band Radar

The reconfigurable L-Band radar is an ongoing development at NASA/GSFC that exploits the capability inherently in phased array radar systems with a state-of-the-art data acquisition and real-time processor in order to enable multi-mode measurement techniques in a single radar architecture. The development leverages on the L-Band Imaging Scatterometer, a radar system designed for the development and testing of new radar techniques; and the custom-built DBSAR processor, a highly reconfigurable, high speed data acquisition and processing system. The radar modes currently implemented include scatterometer, synthetic aperture radar, and altimetry; and plans to add new modes such as radiometry and bi-static GNSS signals are being formulated. This development is aimed at enhancing the radar remote sensing capabilities for airborne and spaceborne applications in support of Earth Science and planetary exploration This paper describes the design of the radar and processor systems, explains the operational modes, and discusses preliminary measurements and future plans.

Rincon, Rafael F.↗

Planning Bias: Planning as a Source of Sampling Bias

Many data-driven planning methods are trained on data generated by planners. It is well known that many statistical learning methods are sensitive to sampling bias, and yet there has been little or no attention to planning as a sampling method and its role in introducing sampling bias into planner-generated training data. Recently, it has been demonstrated that A**,* in the presence of problems with variable heuristic error, prefers some solutions over other equally cost-optimal solutions. But, as we discuss in this paper, mitigation may not be as simple as resolving arbitrary tie-breaking by sampling from ties uniformly at random. In this paper, we formalize an intuition of planning bias. We focus on problems which output a single solution. Diverse planning only complicates the problem by generalizing it to bias in the set of sets; we show how it is subject to bias in the single solution. We make some useful observations about deterministic algorithms in contrast to non-deterministic algorithms. We explain how information entropy may be a good way to measure planning bias, and discuss some issues in evaluating practical approaches to measurement. We address the intuition that uniform random tiebreaking should mitigate bias; and sketch a novel approach to constructing an appropriate random distribution for duplicate detection during forward search for unbiased A*. Finally, we suggest directions for future work.

Planning Scheduling Algorithms↗

Proceedings of the 2003 NASA/JPL Workshop on Fundamental Physics in Space

The 2003 Fundamental Physics workshop included presentations ranging from forces acting on RNA to properties of clouds of degenerate Fermi atoms, to techniques to probe for a added space-time dimensions, and to flight hardware for low temperature experiments, amongst others. Mark Lee from NASA Headquarters described the new strategic plan that NASA has developed under Administrator Sean O'Keefe's leadership. Mark explained that the Fundamental Physics community now needs to align its research program and the roadmap describing the long-term goals of the program with the NASA plan. Ulf Israelsson of JPL discussed how the rewrite of the roadmap will be implemented under the leadership of the Fundamental Physics Discipline Working Group (DWG). Nick Bigelow, chair of the DWG, outlined how investigators can contribute to the writing of the roadmap. Results of measurements on very cold clouds of Fermi atoms near a Feshbach resonance were described by three investigators. Also, new measurements relating to tests of Einstein equivalence were discussed. Investigators also described methods to test other aspects of Einstein's relativity theories.

Strayer, Don↗

Results of Apollo 16.

The results of the Apollo 16 mission are summarized, and the present level of hardware and procedures maturity is illustrated. The primary objective was to obtain a sample of the lunar highlands. It appears that the moon and its history are too complex to be explained by any of the models currently available. Contingency plans fell into three categories: (1) emergency recovery from a hazardous situation, (2) alternate plans to maximize the mission return following a hardware malfunction, and (3) alternate procedures to work around specific problems. Operational experience indicates that it is better to execute a plan with some known disadvantages than to replace it with one which has some apparent advantages but is not thoroughly understood.

Mattingly, T. K., II↗

A Fundamental Study of Smoldering with Emphasis on Experimental Design for Zero-G

The objective of this section of the microgravity project is to identify key sets of low-gravity experiments which would critically compliment a larger set of more easily performed normal-gravity experiments to explain the phenomena found in smoldering combustion. It is planned to follow through on the conceptual design of these experiments by participating in the future in the fabrication of the refined apparatus and in the data collection and interpretation. Low-gravity experiments are appropriate for smoldering combustion because of the complexity of smoldering which requires every means possible to discriminate among the many chemical and physical mechanisms active in most smoldering combustion scenarios. Efforts will be primarily analytical, attempting to identify appropriate approximations and dominant dimensionless groups based on existing data and state-of-the-art combustion modelling. Transient stability questions such as ignition, extinction and the choices among charring, tarring, or flaming modes will be included.

Pagni, P. J.↗

Attitude Design for the LADEE Mission

The Lunar Atmosphere and Dust Environment Explorer (LADEE) satellite successfully completed its 148-day science investigation in a low-altitude, near-equatorial lunar orbit on April 18, 2014. The LADEE spacecraft was built, managed and operated by NASA's Ames Research Center (ARC). The Mission Operations Center (MOC) was located at Ames and was responsible for activity planning, command sequencing, trajectory and attitude design, orbit determination, and spacecraft operations. The Science Operations Center (SOC) was located at Goddard Space Flight Center and was responsible for science planning, data archiving and distribution. This paper details attitude design and operations support for the LADEE mission. LADEE's attitude design was shaped by a wide range of instrument pointing requirements that necessitated regular excursions from the baseline one revolution per orbit "Ram" attitude. Such attitude excursions were constrained by a number of flight rules levied to protect instruments from the Sun, avoid geometries that would result in simultaneous occlusion of LADEE's two star tracker heads, and maintain the spacecraft within its thermal and power operating limits. To satisfy LADEE's many attitude requirements and constraints, a set of rules and conventions was adopted to manage the complexity of this design challenge and facilitate the automation of ground software that generated pointing commands spanning multiple days of operations at a time. The resulting LADEE Flight Dynamics System (FDS) that was developed used Visual Basic scripts that generated instructions to AGI's Satellite Tool Kit (STK) in order to derive quaternion commands at regular intervals that satisfied LADEE's pointing requirements. These scripts relied heavily on the powerful "align and constrain" capability of STK's attitude module to construct LADEE's attitude profiles and the slews to get there. A description of the scripts and the attitude modeling they embodied is provided. One particular challenge analysts faced was in the design of LADEE maneuver attitudes. A flight rule requiring pre-maneuver verification of in-flight maneuver conditions by ground operators prior to burn execution resulted in the need to accommodate long periods in the maneuver attitude. This in turn complicated efforts to satisfy star tracker interference and communication constraints in lunar orbit. In response to this challenge, a graphical method was developed and used to survey candidate rotation angles about the thrust vector. This survey method is described and an example of its use on a particular LADEE maneuver is discussed. Finally, the software and methodology used to satisfy LADEE's attitude requirements are also discussed in the context of LADEE's overall activity planning effort. In particular, the way in which strategic schedules of instrument and engineering activities were translated into actual attitude profiles at the tactical level, then converted into precise quaternion commands to achieve those pointing goals is explained. In order to reduce the risk of time-consuming re-planning efforts, this process included the generation of long-term projections of constraint violation predictions for individual attitude profiles that could be used to establish keep-out time-frames for particular attitude profiles. The challenges experienced and overall efficacy of both the overall LADEE ground system and the attitude components of the Flight Dynamics System in meeting LADEE's varied pointing requirements are discussed.

LADEE↗

The Navstar GPS master control station's Kalman filter experience

The Navstar Global Positioning System (GPS) is a highly accurate space based navigation system providing all weather, 24 hour a day service to both military and civilian users. The system provides a Gaussian position solution with four satellites, each providing its ephemeris and clock offset with respect to GPS time. The GPS Master Clock Station (MCS) is charged with tracking each Navstar spacecraft and precisely defining the ephemeris and clock parameters for upload into the vehicle's navigation message. Briefly described here are the Navstar system and the Kalman filter estimation process used by MCS to determine, predict, and ensure quality control for each of the satellite's ephemeris and clock states. Routine performance is shown. Kalman filter reaction and response is discussed for anomalous clock behavior and trajectory perturbations. Particular attention is given to MCS efforts to improve orbital adjust modeling. The satellite out of service time due to orbital maneuvering has been reduced in the past year from four days to under twelve hours. The planning, reference trajectory model, and Kalman filter management improvements are explained.

Scardera, Michael P.↗

The Voyager Uranus Travel Guide

Its purpose is to explain in simple language, including numerous illustrations, the Voyager-2 plans to examine Uranus and its moons, rings, particles, and fields. The Guide will also contain a variety of interesting facts about the Voyager mission, both past and future.

Source record↗