Search NASA⌕ Search

SEARCH · Search NASA

Results for “FERC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Bulk Power System Flow Control

On July 28, 2023, the Federal Energy Regulatory Commission (FERC) issued Order Number 2023, targeting an improved generation-interconnection process in the United States. FERC Order No. 2023 requires transmission providers to evaluate transmission technologies, other than network expansion, that could provide system improvements and help expand bulk-power system capacity. Transmission providers must consider technologies that would fall under the category of Grid Enhancing Technologies (GETs), which provide capacity-expansion options other than conventional transmission expansion.

32 - ENERGY CONSERVATION, CONSUMPTION, AND UTILIZA↗

Flow Forecasting on New England’s Great River Hydro (CRADA 549) (Final Report)

Great River Hydro (GRH) is New England's largest conventional hydropower generator and operates sustainable hydropower systems in Vermont, New Hampshire, and Massachusetts. Several of GRH’s hydropower projects on the Connecticut River are largely constrained to operate as run-of-river; however, though a new FERC license they have opportunity in the form of flex hours where they are allowed to deviate operations to capture favorable market conditions or emergency operations. To maximize value from these new operations, GRH is considering new sources of forecasted inflow. Pacific Northwest National Laboratory (PNNL) is evaluating the quality of two commercial inflow forecasts for GRH under DOE Water Power Technology Office’s Notice of Opportunity for Technical Assistance: Improving Hydropower’s Value through Informed Decision Making. This project will provide an unbiased evaluation of the accuracy of inflow forecasts available through commercial vendors. GRH will use this information to support their decision on which inflow forecast to use under their new FERC license and to assess the overall value of the available inflow forecasting tools and practices. In this talk we will discuss details of the near real-time forecast evaluation process, the metrics involved in the evaluation, and some preliminary results. In addition, we’ll touch on the second phase of the project which involves evaluating scheduling strategies that identify windows of opportunity to change operations in ways that increase profit through participation in day ahead and real time markets.

13 HYDRO ENERGY↗

U.S. Hydropower Relicensing and License Surrender Data and Metadata, 2026

The U.S. Hydropower Relicensing and License Surrender Database (2026) provides a comprehensive, nationwide snapshot (as of December 31, 2025) of hydropower projects across the United States that are undergoing Federal Energy Regulatory Commission (FERC) relicensing or license surrender processes. Compiled by Oak Ridge National Laboratory, the dataset includes detailed project-level attributes such as geographic location, ownership type, waterway, project type (hydropower or pumped storage), regulatory milestones (e.g., Notice of Intent, application dates, FERC issuance dates), licensing process type (ILP, TLP, ALP), operational characteristics, capacity changes, settlement agreements, construction or turbine‑generator investments, and project status categories spanning relicensing, surrenders, exemptions, and terminations. Together, the relicensing and surrender records offer a detailed view of regulatory trends, infrastructure transitions, dam removals, and economic drivers influencing the evolution of the U.S. hydropower fleet.

Johnson, Megan [ORNL] (ORCID:0000000290141741)↗

US Hydropower & Environmental Mitigations: A 1998-2023 inventory of mitigation measures inside licensing documents

Federal Energy Regulatory Commission (FERC) license documents mandate environmental mitigation requirements to reduce potential environmental damage caused by non-federal hydropower facilities. This StoryMap showcases a dataset that leveraged Natural Language Processing (NLP) to inventory environmental mitigations from 465 FERC licenses that were issued from 1998-2023 (Ruggles et al, 2025). Users can explore trends in mitigation requirements over time and space with interactive maps and are presented with a demonstration use case.

Ruggles, Thomas A. [Oak Ridge National Laboratory ↗

What Role Do Aggregators Play in Power System Security and Resilience? Preprint

Barriers to the participation of distributed energy resources (DERs) in wholesale electricity markets have limited the use of DERs for power system security and resilience. In September 2020, the Federal Energy Regulatory Commission (FERC) approved an order to reduce these barriers. FERC Order No. 2222 enables the participation of DER aggregators in wholesale electricity markets. DERs include renewable generation and technologies that support the integration of renewable generation by increasing grid flexibility and resilience. Requiring wholesale energy markets to allow DER aggregator participation provides a path for DERs to become competitive in these markets. As the contribution from aggregated DERs continues to increase, the aggregator's role in supporting grid security and resilience will become more critical. This paper reviews work that demonstrates how DER aggregators can provide resilience support through technical capabilities, operational strategies, and secure communication architectures. Socioeconomic influences and impacts of aggregators, including implications for social resilience, are presented. There is no one-size-fits-all approach to enhancing resilience in a power grid that includes a growing cohort of DER aggregators, but there are many options for aggregators to contribute to a more resilient and secure power grid.

aggregator↗

U.S. Hydropower Relicensing Map Series V1.1

This thematic map series uses Oak Ridge National Laboratory’s 2016 Existing Hydropower Assets Plant Dataset to map currently operational FERC-licensed hydropower plants that are anticipated to be up for relicensing in the near-term.

13 HYDRO ENERGY↗

Modeling distributed energy resource aggregations in security constrained unit commitment and economic dispatch

The Federal Energy Regulatory Commission (FERC) recently issued Order 2222, which requires all wholesale electricity markets in the US to allow distributed energy resources (DERs) to participate in the market as aggregated resources. These DER aggregations may be composed of many individual resources that are offered and dispatched by the market as a single entity. We present here a model of a distributed energy resource aggregator (DERA) that is scheduled by a market operator’s security constrained unit commitment (SCUC) and security constrained economic dispatch (SCED). The DERA model includes constraints for battery energy storage systems (BESSs), demand response resources (DRRs), and a simple distributed energy resource (DER). This paper describes a model for each resource type and presents two methods for the DERA to generate market offer curves: a profit-maximizing optimization to compute cost curves and a direct cost algorithm to determine dispatch costs for each resource and combine into cost curves. Once all participating DERAs are scheduled in SCUC/SCED, the model is then modified to dispatch individual DERs to maximize profit or minimize schedule deviation of the DERAs. A simulation of a representative day illustrates the DERA offers, the scheduled generation, and the DERA dispatch. Findings show the potential for unavoidable schedule deviations due to internal DER constraints and due to economic incentives to deviate from the SCUC/SCED schedules. This highlights the importance of DERA offer construction on market efficiency and system reliability. Novel aspects of our approach include: (1) We consider the asymmetry of price incentives impacting DERAs from the wholesale market compared to those impacting consumers from the retail market, as imposed by current regulations and laws. (2) We model aggregate consumer response through statistically parameterizable utility functions rather than a potentially impractical approach of modeling each individual consumer. (3) We show how to use the DERA operational dispatch model to create offers into the wholesale electricity market. (4) We show how DERAs may fail to meet their scheduled dispatch because the market offer format may not permit them to fully express their operational features such as intertemporal costs and constraints to the market.

aggregations↗

Moving toward a framework for electricity and heat equivalence in energy systems analysis

Sustaining, maintaining, and upgrading the electricity grid, while meeting decarbonization goals is a challenge facing policymakers, regulators, grid operators, and investors. Simultaneously meeting demands for future capacity, retiring older inefficient technologies, and addressing externalities from energy production and use requires more diverse and inclusive technologies to avoid constraints and shortfalls in grid capability. Changing the energy production paradigm by encouraging alternative technologies was a key driver for FERC Order 2222. This stimulus for developing new small-scale generation will complement and supplement the existing fleet only if it attracts new investment. This investment must reflect technology that goes beyond the energy-only characteristics of traditional generation, creating systems where suites of energy-equivalent outputs are enhanced by environmental quality benefits and offsets. We use energy system designs to highlight the contribution that measuring and accounting for equivalency values provides net increases in capacity, electricity, and alternative fuels while simultaneously reducing carbon waste impacts.

42 ENGINEERING↗

Costs of mitigating the environmental impacts of hydropower projects in the United States

Developers are required to mitigate the environmental impacts of hydropower projects in the United States (U.S.) but there is very little accessible information on the associated costs. This work compiles and analyses a dataset of environmental impacts mitigation costs for 182 hydropower projects based on documents obtained from the U.S. Federal Energy Regulatory Commission (FERC). The analysis shows that environmental costs vary wildly across hydropower project classes and mitigation measures, even when normalized by plant capacity. Capital costs per kilowatt are generally higher for relicensed conventional hydropower plants, and lower for new and relicensed pumped storage hydropower plants, relative to other project classes. Smaller plants tend to spend a higher share of total project costs on mitigating environmental impacts than larger plants, and measures related to Aquatic Species, Project Operations, and Recreation have the highest capital cost per kilowatt. These findings mean that environmental costs could become a key decision variable for new hydropower developments in the U.S. due to the small scale of most of the remaining potential and the increasing stringency of environmental requirements. Therefore, technologies to reduce the environmental impacts and costs of hydropower would be important for future project developments.

54 ENVIRONMENTAL SCIENCES↗

Harnessing Virtual Power Plants Reliably: Enabling tools for increased observability, controllability, operation, and aggregation of distributed energy resources

Harnessing virtual power plants enhances the integration of distributed energy resources into utility grids for a sustainable energy future. Virtual power plants (VPPs) aggregate DERs to enhance resource adequacy and reduce emissions. U.S. utilities are exploring various technologies to manage DERs effectively. FERC Order 2222 allows DERs to participate in both wholesale and retail markets. Enhancing observability and controllability of behind-the-meter (BTM) DERs is essential for reliable grid operations. A hierarchical control architecture can improve coordination among residential energy resources. Field tests showed nearly 20% energy savings and 30% peak power reduction during grid events. Effective management of DERs requires enhanced situational awareness to prevent grid congestion. Integrating DER management systems (DERMS) with existing planning tools can improve operational security. Near-real-time grid models can validate optimal resource set points against resource uncertainty. Traditional uninterruptible power supplies (UPS) can be upgraded to support grid services and become part of VPPs. Upgrading UPS systems can reduce costs by 75% and unlock significant battery capacity. New battery management systems and grid-aware controllers are essential for optimizing UPS performance. Continued research and development are necessary to address challenges in integrating DERs into utility grids. Encouraging customer participation in pilot programs is vital for the evolution of VPPs. Here, the shift towards price-responsive DERs and VPPs is expected to enhance energy distribution efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Electricity Market of the Future: Potential North American Designs Without Fuel Costs

Electricity markets across the United States and Canada have evolved since their inception in the late 1990s and early 2000s. Not all states and provinces moved toward restructured organized electricity markets, but rather those that have belonged to markets operated by independent system operators (ISOs) and regional transmission organizations, with designs developed through stakeholder processes and approved through state, provincial, or federal agencies, such as the Federal Energy Regulatory Commission (FERC).

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Integrated System Planning: Emerging Software Requirements in the Power Industry

Power system planning software remains fragmented across organizational boundaries, with specialized tools for capacity expansion, production cost modeling, power flow, and dynamic analysis operating on incompatible data models and assumptions. This article argues that the fragmentation is not merely a technical problem but a predictable consequence of Conway's law: software architectures mirror the departmental structures within which they are developed. Regulatory milestones like Federal Energy Regulatory Commission (FERC) Order 888 formalized these divisions, but the roots trace back to the distinct engineering disciplines-mechanical, chemical, and electrical-that staffed generation and transmission planning departments in vertically integrated utilities. As the industry moves toward integrated system planning (ISP) that coordinates generation, transmission, and distribution investment decisions, the software ecosystem must evolve accordingly. We identify five categories of software requirements to enable this transition: coherent data inputs decoupled from individual applications, unified and extensible data schemas, modular component representations that support multiple abstraction levels, lifecycle management of planning datasets, and well-defined application programming interface (API) contracts that separate data exchange from algorithmic control. We examine how these requirements interact with three common workflow patterns-serial gate clearing, sequential multiapplication, and convergence oriented-and discuss the interface design principles each demands. We then outline a vision for platform-based planning architectures where specialized analytical services compose through standardized interfaces and where artificial intelligence (AI)/machine learning (ML) tools augment decision support within a disciplined software infrastructure. The practices proposed here offer a path from today's siloed tool collections toward collaborative planning ecosystems capable of handling the complexity of modern power system transformation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Data-Driven User-Defined Model for Inverter-based and Conventional Power Plants

Recent events in Odessa [1], [2] have shed light on the complexities of integrating large Inverter-Based Resource (IBR) plants with the transmission system, prompting NERC to stress continuous performance monitoring by transmission operators. Challenges such as plant control updates, IBR model revisions, Phase-locked loop loss of synchronism, and protection events have been identified, underscoring the need for enhanced monitoring protocols by regulatory bodies. The recent FERC 901 order underscores the importance of accurate data exchange regarding IBRs for reliability studies. However, limited access to IBR plant-related data hampers effective decision-making for transmission operators (TOP). This paper proposes a method for constructing data-driven User-Defined dynamic Models (UDM) for power plants for validating multiple-event data using field measurements from interconnection bus locations. The problem is formulated as a power plant model identification problem and a multi-task learning approach under partial input observability assumptions is proposed in this work. This approach aims to predict aggregated responses of conventional and IBR power plants during various dynamic physical events which is useful for planning studies under diverse disturbance conditions. Ultimately, this methodology emphasizes the importance of plant visibility to operators in addressing power system challenges, facilitating improved planning and operational studies.

Mahapatra, Kaveri [BATTELLE (PACIFIC NW LAB)]↗

Special Section on Local and Distributed Electricity Markets

Driven by the goals of clean energy and zero carbon emissions, the power industry is undergoing significant transformations. The rapid growth of diverse distributed energy resources (DERs) at grid edge such as rooftop photovoltaics (PVs) and electric vehicles is transforming the traditional centralized power grid management to a decentralized, bottom-up, and localized control paradigm. Establishing local and distribution-level electricity markets provides an effective solution to managing large amounts of small-scale DERs. New regulations such as the recent FERC Order 2222 in the U.S. open the door to DERs in the wholesale markets. Through coordinating the local and distribution-level markets with the transmission-level wholesale market, the DERs and prosumers can trade energy and flexibility locally with each other and meanwhile provide energy, flexibility and ancillary services to the bulk power grid. During this transition, there are many new technical challenges to address, calling for innovative ideas and interdisciplinary research in this promising direction. Advanced information and communication technologies (ICT) are needed, as a key enabler, for the development and practical implementation of local and distribution electricity markets. Research into local and distribution markets is strongly interdisciplinary, involving the state of the art in power engineering, economics, and digital/information technology. A broad spectrum of contributors from universities, industry, research laboratories and policy makers is sought to develop and present solutions and technologies that will facilitate and advance practical applications and implementations of local and distribution-level electricity markets to uncover the values of DERs.

distributed energy resources↗

Electric Power Grid and Natural Gas Network Operations and Coordination

In this report, we present findings from three studies related to the coordination of natural gas and electricity system operations. We first propose and demonstrate a modeling platform for examining the interdependence of natural gas and electricity networks based on a direct current unit-commitment and economic dispatch model for the power system and a transient hydraulic gas model for the gas system. We use this platform to analyze the value of day-ahead coordination of power and natural gas network operations and to show the importance of considering gas system constraints when analyzing power systems operation with high penetration of gas generators and variable renewable energy sources. In the second study, we utilize our modeling platform to consider the U.S. Federal Energy Regulatory Commission (FERC) Order 809, issued in 2015 to improve day-ahead and intraday coordination of power and gas systems. Finally, in the third study we expand our modeling platform to focus on market-based coordination of electricity and natural gas system operations for a real system, namely a subset of the power and gas networks in the Front Range region of Colorado. We use real system data to evaluate the benefits of coordination operations under different conditions, including different levels of renewable penetration and the use of time-variant, shaped flow nominations. Our results indicate that coordination at various timescales can contribute to a reduction in curtailed gas in high-stress periods (such as those with large ramps in gas offtakes) and a reduction in energy consumption of gas compressor stations. We find that intraday coordination can reduce total power system production costs and natural gas deliverability constraints, yielding cost and reliability benefits. We observe these benefits for the test system as well as in the Colorado case study, where we find that coordination and shaped flows may provide additional value for systems with high penetration of variable renewable energy. Together, these three studies demonstrate a pathway for integrated gas and electricity grid modeling and for studying the benefits of coordinated operations of these increasingly interdependent energy systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Evaluation of Modular and Scalable Downstream Passage Systems for Silver American Eels

Implementation of effective downstream passage for silver-phase American Eel (Anguilla rostrata) at hydropower dams using methods that are economically feasible has been a challenge for many project owners. Due to the potential for high mortality rates during turbine passage, resource agencies have focused on mandatory prescriptions that prevent entrainment by physically excluding eels (i.e., narrow trash rack bar spacing) or eliminating turbines as a passage route (i.e., unit shutdowns at night when eel movement is greatest). Both of these options can significantly impact the economic viability of a project. Consequently, there is a need for alternative technologies that can provide safe and effective downstream passage for silver eels without having a major impact on the ability of a project to generate power during the eel downstream migration period. This need is of particular concern now because about 300 hydropower projects within the range of American Eel freshwater habitats are scheduled to be relicensed by the Federal Energy Regulatory Commission (FERC) in the next 15 years

13 HYDRO ENERGY↗

Construction Support for New Slab Creek Powerhouse Project (Final Technical Report)

The Sacramento Municipal Utility District (SMUD) has constructed a new powerhouse and Boating Flow Release Facility (BFRF) ¼ mile downstream of the existing Slab Creek Dam with the assistance of grant funding from the Department of Energy in the amount of $1.5 million. Slab Creek Dam impounds 16,600 acre-feet of storage and has a normal full pool elevation of 1850ft. Water is conveyed from Slab Creek Reservoir through a 4.9 mile power tunnel to the 224 MW White Rock Powerhouse which discharges into Chili Bar Reservoir. A small 450 kW powerhouse located at Slab Creek Dam utilizes the original license in-stream flow requirement. The new license (FERC Project No. 2101-084) requires significantly more instream flows immediately below the dam for aquatic preservation and recreational flows over the original license. The terms of the new license allow the Slab Creek Powerhouse to utilize the original required dam releases, while the new South Fork Powerhouse will use the new instream flow requirements above the original license requirement. The South Fork Powerhouse routes flows back to the South Fork of the American River via a new penstock that is tied into the White Rock Tunnel at Adit #3. This new penstock bifurcates at the Adit #3 portal with one leg going to the BFRF and the other to the new powerhouse. The South Fork Powerhouse is a single generating unit with a capacity of 2.98 kVA. The BFRF is valve house with an energy dissipation chamber for a 60” fixed cone valve capable of passing 1,300 cfs for meeting the recreational flow requirements of the license.

power tunnel↗