Search NASA⌕ Search

SEARCH · Search NASA

Results for “Fault Termination”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Block Tectonics across Western Tibet and Multi-Millennial Recurrence of Great Earthquakes on the Karakax Fault

We report that fault slip rates are critical to quantify continental deformation. Those along the Karakax fault (northwestern Altyn Tagh Fault: ATF) have been debated, even though it is one of Tibet's most outstanding active faults. At Taersa, using LiDAR measurements of terrace and fan riser offsets (~6 to ~500 m) and 10 Be/ 26 Al dating of alluvial surfaces (<210 ka), we obtain a late Quaternary slip rate of ~2.5 ± 0.5 mm/yr. This doubles the ~2.6 ± 0.5 mm/yr rate time span found to the east and west. We interpret the ~150 km-long, free-faced rupture along the fault to be that of the M ~ 7.6 event felt in Hotan in 1882. Characteristic slip (~6 m) during four large earthquakes since ~10 ka implies a ~2500 ± 500 years return time. A ~3 mm/yr rate is consistent with the ~80 km offset of the Karakax river since uplift of the West Kunlun range and sediment deposition in the Tarim foreland accelerated, ~24 Ma ago. The faster slip rate (~10.5 mm/yr) on the central ATF matches the sum of those along the reactivated West Tibetan terrane boundaries (Karakax and Longmu-Gozha Co faults) at the Uzatagh triple junction (~36°N, 83°E). The abrupt termination and altitude drop of the Karakorum range where the Longmu Co and Karakorum faults meet (Angmong junction), also reflect triple junction kinematics. Such localized changes account for the rise of the Karakorum and West Kunlun ranges and support lithospheric block tectonics rather than diffusely distributed deformation.

58 GEOSCIENCES↗

Fault tolerance in space-based digital signal processing and switching systems: Protecting up-link processing resources, demultiplexer, demodulator, and decoder

Fault tolerance features in the first three major subsystems appearing in the next generation of communications satellites are described. These satellites will contain extensive but efficient high-speed processing and switching capabilities to support the low signal strengths associated with very small aperture terminals. The terminals' numerous data channels are combined through frequency division multiplexing (FDM) on the up-links and are protected individually by forward error-correcting (FEC) binary convolutional codes. The front-end processing resources, demultiplexer, demodulators, and FEC decoders extract all data channels which are then switched individually, multiplexed, and remodulated before retransmission to earth terminals through narrow beam spot antennas. Algorithm based fault tolerance (ABFT) techniques, which relate real number parity values with data flows and operations, are used to protect the data processing operations. The additional checking features utilize resources that can be substituted for normal processing elements when resource reconfiguration is required to replace a failed unit.

Redinbo, Robert↗

Adaptive Threshold-Based Zonal Isolation of Faults in a Multiterminal DC Using Local Measurements

Fast and accurate methods of fault detection and isolation are a pre-emptive measure in multiterminal dc (MTdc) systems. Zonal isolation of faults is necessary to prevent any misopertation of the dc breakers that can lead to a shutdown of the network. Existing techniques require fast-communication or data synchronization methods have their own disadvantages. This article proposes a method for efficient fault zone isolation without the need of a communication link that prevents any misoperation of the dc breakers in a radial MTdc. This method provides individual local measurement-based control to the hybrid dc circuit breakers (dcCB). Faults created outside the zone of protection for a breaker create a change in the rate of change of current or voltage leading to misoperation. To avoid detection using a fixed threshold, an adaptive threshold based approach is suggested that updates the threshold based on the present operating status. Sensitivity analysis by varying the current limiting inductance and fault location is performed. In conclusion, a three terminal radial model of an MTdc is used for zonal isolation using power system computer aided design/electromagnetic transients including dc.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Recognition of the geologic framework of porphyry deposits on ERTS-1 imagery

The author has identified the following significant results. Photointerpretation methods have been most successfully applied in the less vegetated test sites where several previously unknown geologic features have been recognized and known ones extended. Northwest mid-Tertiary faults in the ELY, Nevada area are observed to offset north-trending ranges and abruptly terminate older Mesozoic structures. In the Ray, Arizona area the observed patterns of fault and fracture systems appear to be related to the locations of known porphyry copper deposits. In the Tanacross, Alaska area a number of regional circular features observed may represent near surface intrusions and, therefore, permissive environments for copper porphyries.

Wilson, J. C.↗

Photovoltaic system grounding and fault protection

The grounding and fault protection aspects of large photovoltaic power systems are studied. Broadly, the overlapping functions of these two plant subsystems include providing for the safety of personnel and equipment. Grounding subsystem design is generaly governed by considerations of personnel safety and the limiting of hazardous voltages to which they are exposed during the occurrence of a fault or other misoperation of equipment. A ground system is designed to provide a safe path for fault currents. Metal portions of the modules, array structures, and array foundations are used as a part of the ground system, provided that they and their interconnection are designed to be suitably reliable over the life of the plant. Several alternative types of fault protection and detection equipment are designed into the source circuits and dc buses feeding the input terminals of the subfield power conditioner. This design process requires evaluation of plausible faults, equipment, and remedial actions planned to correct faults. The evaluation should also consider life cycle cost impacts.

Stolte, W. J.↗

Adaptive Fault Current-Limiting Control of MMC for Protection of Multiterminal HVDC Systems: Preprint

For the development of multi-terminal high voltage DC (MTDC) transmission, it is critical to design the protection system that can selectively isolate the faulty area from the healthy part of the dc grid using DC circuit breakers (DCCBs) while ensuring continuous operation of converter stations in the healthy part. However, because of the lack of fault current blocking capability in half-bridge (HB) modular multilevel converters (MMCs), when a dc fault occurs, the rising fault currents can quickly reach the blocking threshold within a few milliseconds and disrupt the operation of MMCs in the healthy part. Large DC reactors are often considered in series with DCCBs to reduce the rate of rise of fault currents and prevent blocking of MMCs in the healthy part of the grid. However, large DC reactors can prohibitively increase the cost of the system, particularly when they are considered in an offshore environment, for instance in offshore wind projects. Large dc reactors can also introduce stability issues and create post-fault oscillations. This paper presents an adaptive fault current limiting control method for MMCs to avoid their blocking and enable continuous operation of MTDC systems. It contains two parts: The first part is based on circulating current feedforward control that emulates virtual reactors in each arm of an MMC, which is immediately activated when the fault current starts to increase, to reduce the rate of rise of the fault current; the second part is triggered when the fault current exceeds a preset threshold by temporarily bypassing the SMs, serving as a complement to the fault current limiting effect of the first part. Both parts do not require fault detection signal and they are activated automatically during faults. Simulation case studies of a four-terminal bipolar MMC-HVDC system are presented to demonstrate the effectiveness of the proposed control methods.

active fault current limiting↗

A fault tolerant approach to state estimation and failure detection in nonlinear systems

The design problem considered in the present investigation involves a nonlinear discrete time stochastic system where replicated sensors provide redundant observations of inputs and outputs of the system, compensate for sensor 'normal operating' bias levels, and generate reliable estimates for the plant states in the presence of possible sensor failures. The resulting fault tolerant design should utilize inherent analytical redundancy and be capable of detecting many different types and levels of sensor failures. In addition, it should have minimal complexity. In connection with these goals, a sensor fault tolerant system design methodology is developed. The performance of the considered approach to an application is discussed, taking into account the design of a sensor fault tolerant system using analytic redundancy for the Terminal Configured Vehicle research aircraft in a microwave landing system environment.

Lancraft, R. E.↗

Adaptive Fault Current-Limiting Control of MMC for Protection of Multiterminal HVDC Systems

A crucial requirement of the protection system for multi-terminal high-voltage DC (MTDC) transmission is that it is capable of selectively isolating the faulty area from the healthy part of the network using DC circuit breakers (DCCBs), while ensuring continuous operation of converter stations in the healthy part of the network. But in the half-bridge modular multilevel converters (HB-MMCs) based MTDC system, since HB-MMCs do not have fault current absorption capability, when a DC fault occurs, the rising fault currents can quickly reach the blocking threshold within a few milliseconds and disrupt the operation of the MMCs in the healthy part. To facilitate fault-ride-through capability of MTDC system, large DC reactors are often considered in series with DCCBs to reduce the rate of rise of the fault current and prevent blocking the MMCs in the healthy part of the DC networks; however, large DC reactors prohibitively increase the cost of the system, introduce stability issues and can create post-fault oscillations. This paper presents an adaptive fault current-limiting control method for MMCs to avoid their blocking and enable the continuous operation of the healthy part of MTDC systems. The method contains two parts: The first part is based on circulating current feedforward control, which emulates virtual reactors in each arm of an MMC, and is immediately activated when the fault current starts to increase to reduce the rate of rise of the fault current. The second part temporarily bypasses all the submodules when the fault current exceeds a preset threshold, complementing the fault current-limiting effect of the first part. Neither part requires fault detection signals, and they are automatically activated during faults. Simulation case studies of a four-terminal bipolar MMC-based high-voltage DC system are presented to demonstrate the effectiveness of the proposed control methods.

active fault current limiting↗

Comparison of Sequence Component-Based Fault Detection and Relay Coordination Algorithms in Inverter-Based Networks

Protection of inverter-based microgrids using sequence component-based relaying schemes is a promising solution. These methods offer several advantages, including lower computational requirements, compatibility with commercial relay systems, and cost-effectiveness compared to communication-based approaches. This article investigate the performance of various sequence component based schemes with the objective of identifying the algorithms that provide the best fault detection and relay coordination, solely relying on local voltages and current at relay terminals. Positive, negative and zero sequence impedance, admittance and power detection algorithms were tested on modified IEEE 13 bus test network for various shunt faults (LG, LL, LLG, LLL). Hardware-in-the-loop validation was achieved using the Typhoon real-time simulator, interfacing with a SEL 751 relay. This research demonstrates that while several algorithms are capable of detecting faults with sufficient accuracy, only a few are effective in achieving proper coordination. Validation results indicate that the negative sequence power approach provides the best performance in both fault detection and coordination.

Patel, Deepika [ORNL] (ORCID:0000000341099994)↗

Kinematics and mechanics of tectonic block rotations

Paleomagnetic, structural geology, and rock mechanics data are combined to explore the validity of the block rotation concept and its significance. The analysis is based on data from (1) Northern Israel, where fault slip and spacing are used to predict block rotation; (2) the Mojave Desert, with well-documented strike-slip fault sets, organized in at least three major domains; (3) the Lake Mead, Nevada, fault system with well-defined sets of strike-slip faults, which, in contrast to the Mojave region, are surrounded with domains of normal faults; and (4) the San Gabriel Mountains domain with a multiple set of strike-slip faults. It is found that block rotations can have a profound influence on the interpretation of geodetic measurements and the inversion of geodetic data, especially the type collected in GPS surveys. Furthermore, block rotations and domain boundaries may be involved in creating the heterogeneities along active fault systems which are responsible for the initiation and termination of earthquake rupture.

Nur, Amos↗

Operational and geological controls of coupled poroelastic stressing and pore-pressure accumulation along faults: Induced earthquakes in Pohang, South Korea

Coupled poroelastic stressing and pore-pressure accumulation along pre-existing faults in deep basement contribute to recent occurrence of seismic events at subsurface energy exploration sites. Our coupled fluid-flow and geomechanical model describes the physical processes inducing seismicity corresponding to the sequential stimulation operations in Pohang, South Korea. Simulation results show that prolonged accumulation of poroelastic energy and pore pressure along a fault can nucleate seismic events larger than M w 3 even after terminating well operations. In particular the possibility of large seismic events can be increased by multiple-well operations with alternate injection and extraction that can enhance the degree of pore-pressure diffusion and subsequent stress transfer through a rigid and low-permeability rock to the fault. This study demonstrates that the proper mechanistic model and optimal well operations need to be accounted for to mitigate unexpected seismic hazards in the presence of the site-specific uncertainty such as hidden/undetected faults and stress regime.

58 GEOSCIENCES↗

Mechanics of distributed fault and block rotation

Paleomagnetic data, structural geology, and rock mechanics are used to explore the validity and significance of the block rotation concept. The analysis is based on data from Northern Israel, where fault slip and spacing are used to predict block rotation; the Mojave Desert, with well documented strike-slip sets; the Lake Mead, Nevada fault system with well-defined sets of strike-slip faults; and the San Gabriel Mountains domain with a multiple set of strike-slip faults. The results of the analysis indicate that block rotations can have a profound influence on the interpretation of geodetic measurments and the inversion of geodetic data. Furthermore, the block rotations and domain boundaries may be involved in creating the heterogeneities along active fault systems which may be responsible for the initiation and termination of earthquake rupture.

Nur, A.↗

Study of a High Voltage Ion Engine Power Supply

A complete laboratory breadboard version of a ion engine power converter was built and tested. This prototype operated on a line voltage of 80-120 Vdc, and provided output ratings of 1100 V at 1.8 kW, and 250 V at 20 mA. The high-voltage (HV) output voltage rating was revised from the original value of 1350 V at the beginning of the project. The LV output was designed to hold up during a 1-A surge current lasting up to 1 second. The prototype power converter included a internal housekeeping power supply which also operated from the line input. The power consumed in housekeeping was included in the overall energy budget presented for the ion engine converter. HV and LV output voltage setpoints were commanded through potentiometers. The HV converter itself reached its highest power efficiency of slightly over 93% at low line and maximum output. This would dip below 90% at high line. The no-load (rated output voltages, zero load current) power consumption of the entire system was less than 13 W. A careful loss breakdown shows that converter losses are predominately Metal-Oxide-Semiconductor Field Effect Transistor (MOSFET) conduction losses and HV rectifier snubbing losses, with the rectifier snubbing losses becoming predominant at high line. This suggests that further improvements in power efficiency could best be obtained by either developing a rectifier that was adequately protected against voltage overshoot with less snubbing, or by developing a pre-regulator to reduced the range of line voltage on the converter. The transient testing showed the converter to be fully protected against load faults, including a direct short-circuit from the HV output to the LV output terminals. Two currents sensors were used: one to directly detect any core ratcheting on the output transformer and re-initiate a soft start, and the other to directly detect a load fault and quickly shut down the converter for load protection. The finished converter has been extensively fault tested without failure. The finished converter has been packaged suitable for use as a laboratory prototype for further testing. The finished converter is readily transportable. An article on design issues for high voltage converters for ion engines is included as an attachement.

Stuart, Thomas A.↗

A study on dc fault handling of dc-dc converter based on series and parallel connected DABs in MVdc applications

With the increase of direct current (dc) based power generating stations and loads, multi-terminal medium voltage dc (MT-MVdc) systems are gaining popularity. The dc sources and loads are interfaced with the MT-MVdc systems using series and parallel connected dual-active-bridge (SP-DAB). In this paper, the dc fault ride through procedure of SP-DAB meant for MT-MVdc application is analyzed. The need for dc breaker (DCB) under the requirements of MT-MVdc is established through EMT simulation studies. It is shown that an additional dc filter capacitor is essential at the output terminals of the SP-DAB to ride through the dc faults.

Jaldanki, Sreenivasa [ORNL] (ORCID:000000028122322↗

FINDS: A fault inferring nonlinear detection system. User's guide

The computer program FINDS is written in FORTRAN-77, and is intended for operation on a VAX 11-780 or 11-750 super minicomputer, using the VMS operating system. The program detects, isolates, and compensates for failures in navigation aid instruments and onboard flight control and navigation sensors of a Terminal Configured Vehicle aircraft in a Microwave Landing System environment. In addition, FINDS provides sensor fault tolerant estimates for the aircraft states which are then used by an automatic guidance and control system to land the aircraft along a prescribed path. FINDS monitors for failures by evaluating all sensor outputs simultaneously using the nonlinear analytic relationships between the various sensor outputs arising from the aircraft point mass equations of motion. Hence, FINDS is an integrated sensor failure detection and isolation system.

Lancraft, R. E.↗

Seismicity and plate tectonics in south central Alaska

Hypocenter distribution shows that the Benioff zone associated with the Aleutian arc terminates in interior Alaska some 75 km north of the Denali fault. There appears to be a break in the subducting Pacific plate in the Yentna River-Prince William Sound area which separates two seismically independent blocks, similar to the segmented structure reported for the central Aleutian arc.

Van Wormer, J. D.↗

Parallel NPARC: Implementation and Performance

Version 3 of the NPARC Navier-Stokes code includes support for large-grain (block level) parallelism using explicit message passing between a heterogeneous collection of computers. This capability has the potential for significant performance gains, depending upon the block data distribution. The parallel implementation uses a master/worker arrangement of processes. The master process assigns blocks to workers, controls worker actions, and provides remote file access for the workers. The processes communicate via explicit message passing using an interface library which provides portability to a number of message passing libraries, such as PVM (Parallel Virtual Machine). A Bourne shell script is used to simplify the task of selecting hosts, starting processes, retrieving remote files, and terminating a computation. This script also provides a simple form of fault tolerance. An analysis of the computational performance of NPARC is presented, using data sets from an F/A-18 inlet study and a Rocket Based Combined Cycle Engine analysis. Parallel speedup and overall computational efficiency were obtained for various NPARC run parameters on a cluster of IBM RS6000 workstations. The data show that although NPARC performance compares favorably with the estimated potential parallelism, typical data sets used with previous versions of NPARC will often need to be reblocked for optimum parallel performance. In one of the cases studied, reblocking increased peak parallel speedup from 3.2 to 11.8.

Townsend, S. E.↗

High-Voltage DC MULTI-terminal SIMulation (HVDC MULTISIM): Technical Program Summary

Expansion of the power grid in the USA is essential to fulfilling the rising energy demand of the country. In particular, the transmission grid, a network of electrical energy corridors that enable the flow of large amounts of energy from the point of generation to the point of consumption, needs significant expansion to cater to this growth of electrification. The current infrastructure is also dated, and any new transmission corridor should be based on a vision of building a modern infrastructure that is futureproof. High voltage DC (HVDC) transmission technology falls in this category: it is the most economical way to build large transmission lines and relies on sophisticated electronics and flexible controls, rather than just passive components like switchgear and transformers. This project is aimed at establishing the technical and economic feasibility of a network of HVDC lines that are interconnected to form a multi-terminal DC network. HVDC transmission is not a new technology and United States has a number of such lines; however, these are point to point transmissions and do not form a DC grid. Modeling and analyzing DC grids is challenging since there are no established modeling tools and the traditional ways of modeling AC grids fall short of providing the fidelity required the fast dynamics of the DC grid. This project aims to build a software-in-the-loop simulator for a multi-terminal HVDC grid, called MULTISIM and, establish new control and protection algorithms to operate such a connected DC system. NLR, a key partner, established the core framework of the MULTISIM simulator and validated its functionality. The GE Vernova team, created a full-scale model of a four-terminal HVDC network using PSCAD (Power Systems Computer Aided Design) software and established the baseline performance of the system during normal and fault operation. The project was started on 10/12024 with a kick-off meeting held on 12/11/2024 and ran through two quarters till termination. All the tasks, milestones and deliverables during this period were met. Several interim reports detailing the various tasks were submitted. The following sections provide details on the completed tasks till the project pause and termination after Q2.

24 POWER TRANSMISSION AND DISTRIBUTION↗