Search NASA⌕ Search

SEARCH · Search NASA

Results for “Flexible Operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Gains in operational flexibility, safety margins, and cost efficiencies via integrated Plant Reload Optimization platform

The U.S. Department of Energy Light Water Reactor Sustainability Program Risk-Informed Systems Analysis Pathway Plant Reload Optimization Project aims to develop an integrated, comprehensive framework offering an all-in-one solution for reload evaluations with a special focus on optimizing core design. Optimizing the fuel loading pattern is one of the most important considerations in reducing the amount of new fuel used in the core. Due to thousands of possible core configuration options, finding optimal solutions is an unachievable task for a human. The Plant ReLoad Optimization platform, which supports artificial-intelligence-based reactor core designing, is now fully capable of handling realistic problems. The Plant ReLoad Optimization platform development project aims to build a reactor core design tool that includes reactor safety and fuel performance analyses and uses artificial intelligence to support the optimization of core design solutions. The NSGA-II (Non-dominated Sorting Genetic Algorithm II) optimizer was developed and tested within RAVEN (Risk Analysis and Virtual ENvironment) to handle many constraints by using an augmented objectives methodology. The demonstration was performed with constrained multiobjective optimization of a 17 × 17 pressurized-water reactor core loading patterns to minimize fuel cost and maximize fuel cycle length.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

An Improved Genetic Algorithm approach to the Unit Commitment/Economic Dispatch problem

The deployment of new technologies, the importance of accurately modeling the dynamics of the generating units and the introduction of new policies are making the solution of the Unit Commitment/Economic Dispatch problem more and more complicated.In the present scenario, traditionally followed scheduling criteria might not lead to the optimal fleet configuration any more. In addition, most of the widely used techniques have limited capabilities at modeling the nonlinear dynamics of committed power plants. When realistic power systems comprising of several tens of generating units are modeled, the resulting optimization problem turns to be computationally intensive for the current computing capabilities. In this paper, an improved version of a GA-based optimization algorithm is presented. A detailed methodology aimed at obtaining a more efficient version of the GA, and a more detailed and accurate description of the flexible operation flexibility of the power plants is described.

genetic algorithm↗

Fossil Power Plant Cyber Security Life-Cycle Risk Reduction, A Practical Framework for Implementation

Market conditions are forcing fossil electricity generation facility owners and operators to implement advanced digital technologies. These technologies enable efficiencies, operational flexibility, operations and maintenance efficiencies, and adapting to a transitioning workforce. These digital technologies, however, can increase the cybersecurity attack surface. The purpose of this research was to develop a holistic cybersecurity risk reduction framework for fossil generation facilities. The framework begins with assessing how cyber risk changes across facility life cycles, including plant, system, vendor, and business life cycles. The next phase performs consequence analysis to prioritize high consequence events. Focusing on high consequence events allows owners to use a graded, risk-informed approach to prioritize cybersecurity efforts. The final phase identifies the digital asset attack surface in sensors and instrumentation and control equipment. After the vulnerabilities are identified, the owner selects mitigating cybersecurity control measures (or countermeasures) based on the risk analysis from the previous phases. This report describes the current industry cybersecurity best practices in fossil generation that are based on the first principles for cybersecurity engineering. The report is divided into five sections that describe the implementation of the risk reduction framework and present identified research, methodological, and technology gaps that were identified through this course of research and development.

01 COAL, LIGNITE, AND PEAT↗

A Development of Critical Components for the Modular Staged Pressurized Oxy-Combustion Power Plant

DOE's Coal FIRST (Flexible, Innovative, Resilient, Small, Transformative) Initiative was implemented to encourage the development of the coal plant of the future, which will be capable of flexible operation to meet the needs of the grid; using innovative and cutting-edge components that improve efficiency and reduce emissions; providing resilient power to Americans; being small compared to today's conventional utility-scale coal power plants; and transforming how coal power plant technologies are designed and manufactured. The modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. The process offers: 1) a modular plant design for improved operational flexibility; 2) fuel-staging combined with pressurized oxy-combustion, which leads to smaller plant size, higher plant efficiency, and lower cost for pollutant and greenhouse gases removal compared with traditional carbon-capture equipped coal power plants; and 3) small modular boilers and pollutant removal units that can be fabricated in shop and assembled on site, further reducing plant capital costs. Under DOE's support (DE-FE0031925), WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustion system and the direct contact cooler (DCC) from TRL 4 to TRL-5, which would allow them to be subsequently incorporated into a pilot plant. These units are the only two components that are not commercially available for a SPOC plant, and hence, their development is a key step toward the commercialization of SPOC. This work presents the objectives, task descriptions, and current progress of the project. So far, the fabrication of a new combustor design and the convective heat transfer boiler has been completed, and the integration of the combustor, boiler, and DCC is underway. Recent results obtained with the newly designed combustor show a stable coal/methane flame while dry-feeding PRB coal under oxy-combustion conditions.

Magalhaes, Duarte↗

Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Coal and Biomass – Integration of Combustor Boiler and DCC

Critical to the future of power generation is the development of a power plant that will be capable of flexible operation to meet the needs of the modern grid, providing resilient, low-emissions power to a grid that is increasingly seeing a large penetration of intermittent wind and solar. The modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. The process offers: 1) a modular plant design for improved operational flexibility; 2) fuel-staging combined with pressurized oxy-combustion, which leads to smaller plant size, higher plant efficiency, and lower cost for pollutant and greenhouse gas removal compared with traditional carbon-capture equipped coal power plants; and 3) small modular boilers and pollutant removal units that can be fabricated in shop and assembled on site, further reducing plant capital costs. Under DOE's support (DE-FE0031925), WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustion system and the direct contact cooler (DCC) from Technology Readiness Level (TRL) 4 to TRL-5, which would allow these technologies to be subsequently incorporated into a pilot plant. This talk will present an overview of the SPOC technology, CFD modeling and validation for burner and boiler development, and recent results to evaluate critical components for system integration needed to advance its TRL.

Magalhaes, Duarte↗

Development of the Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Coal and Biomass

Critical to the future of power generation is the development of a power plant that will be capable of flexible operation to meet the needs of the modern grid, providing resilient, low-emissions power to a grid that is increasingly seeing a large penetration of intermittent wind and solar. The modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. The process offers: 1) a modular plant design for improved operational flexibility; 2) fuel-staging combined with pressurized oxy-combustion, which leads to smaller plant size, higher plant efficiency, and lower cost for pollutant and greenhouse gases removal compared with traditional carbon-capture equipped coal power plants; and 3) small modular boilers and pollutant removal units that can be fabricated in shop and assembled on site, further reducing plant capital costs. Under DOE's support (DE-FE0031925), WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustion system and the direct contact cooler (DCC) from Technology Readiness Level (TRL) 4 to TRL-5, which would allow these technologies to be subsequently incorporated into a pilot plant. This talk will present an overview of the SPOC technology, CFD modeling and validation for burner and boiler development, and recent results to evaluate critical components needed to advance its TRL.

Magalhaes, Duarte↗

Fossil Power Plant Cyber Security Life-Cycle Risk Reduction: A Practical Framework for Implementation

Market conditions are forcing fossil electricity generation facility owners and operators to implement advanced digital technologies. These technologies enable efficiencies, operational flexibility, operations and maintenance efficiencies, and adapting to a transitioning workforce. These digital technologies, however, can increase the cybersecurity attack surface. The purpose of this research was to develop a holistic cybersecurity risk reduction framework for fossil generation facilities. The framework begins with assessing how cyber risk changes across facility life cycles, including plant, system, vendor, and business life cycles. The next phase performs consequence analysis to prioritize high consequence events. Focusing on high consequence events allows owners to use a graded, risk-informed approach to prioritize cybersecurity efforts. The final phase identifies the digital asset attack surface in sensors and instrumentation and control equipment. After the vulnerabilities are identified, the owner selects mitigating cybersecurity control measures (or countermeasures) based on the risk analysis from the previous phases. This report describes the current industry cybersecurity best practices in fossil generation that are based on the first principles for cybersecurity engineering. The report is divided into five sections that describe the implementation of the risk reduction framework and present identified research, methodological, and technology gaps that were identified through this course of research and development.

20 FOSSIL-FUELED POWER PLANTS↗

Fossil Power Plant Cyber Security Life-Cycle Risk Reduction: A Practical Framework for Implementation

Market conditions are forcing fossil electricity generation facility owners and operators to implement advanced digital technologies. These technologies enable efficiencies, operational flexibility, operations and maintenance efficiencies, and adapting to a transitioning workforce. These digital technologies, however, can increase the cybersecurity attack surface. The purpose of this research was to develop a holistic cybersecurity risk reduction framework for fossil generation facilities. The framework begins with assessing how cyber risk changes across facility life cycles, including plant, system, vendor, and business life cycles. The next phase performs consequence analysis to prioritize high consequence events. Focusing on high consequence events allows owners to use a graded, risk-informed approach to prioritize cybersecurity efforts. The final phase identifies the digital asset attack surface in sensors and instrumentation and control equipment. After the vulnerabilities are identified, the owner selects mitigating cybersecurity control measures (or countermeasures) based on the risk analysis from the previous phases. This report describes the current industry cybersecurity best practices in fossil generation that are based on the first principles for cybersecurity engineering. The report is divided into five sections that describe the implementation of the risk reduction framework and present identified research, methodological, and technology gaps that were identified through this course of research and development.

20 FOSSIL-FUELED POWER PLANTS↗

Co-optimization of nuclear reactor flexible power operation and maintenance scheduling

As flexible power operation of nuclear power plants becomes more attractive due to the reduction in fossil-fueled dispatchable generation on energy grids, finding optimal power production strategies that balance revenue generation with operational concerns becomes more complex. This article presents a general framework to aid operators in designing economically optimal long term dispatch strategies for nuclear power plants. The principal novelty is the linking of estimated system remaining useable life (RUL) to strategic operational decisions. It is shown that, depending on the relationship between the fixed costs from maintenance and the associated lost revenue from an outage, it can be economically optimal in the long term to delay a maintenance outage and not perform this alongside refueling. For a given relationship between power ramping and degradation, optimal strategies were found that discouraged load following in some situations while minimizing unnecessary maintenance. It is shown that heavy load following can cause maintenance and refueling outages to diverge due to their inverse relationships with respect to load following, potentially leading to a significant loss in capacity factor. As a result, this general framework can be applied to specific reactor dispatch allowing operators to adapt operational strategies as future grid conditions change.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The value of hydropower flexibility for electricity system decarbonization

Hydropower is an abundant, dispatchable, clean energy resource that will play an important role in supporting the clean energy transition. In particular, dispatchable hydropower can provide the operational flexibility that will be required in future systems with high variable renewable energy penetrations. However, the theoretical operational flexibility of hydropower can be restricted in practice by various non-power constraints. In this paper, we quantify how increasing the operational flexibility of dispatchable hydropower resources with reservoirs impacts least-cost generation portfolios and supports power system decarbonization. Specifically, we conduct a capacity expansion analysis of a two-zone system: a hydro-dominated region and a neighboring region with aggressive decarbonization targets that are represented by the United States Pacific Northwest and California respectively. We then introduce a quantifiable index for characterizing the operational flexibility of reservoir hydropower and assess how changes in this metric impact the system-optimal generation portfolio. We find that increasing hydropower flexibility leads to more investment in wind generation, less investment in natural gas generation, lower system costs, and lower system emissions. We further demonstrate a substitution effect between the grid services provided by flexible hydropower operation, increased transmission capacity on a congested line, and energy storage resources. Finally, we show that increasing the operational flexibility of hydropower increases the effective load carrying capability of both hydropower and wind resources. This research supports a more nuanced understanding of how hydropower can support electricity system decarbonization and may motivate reassessing the cost-benefit tradeoffs of non-power constraints that restrict operational flexibility.

Capacity expansion modeling↗

Dispatch analysis of flexible power operation with multi-unit small modular reactors

The relevance of nuclear power plant flexible power operation (FPO) is rising due to increased penetration of variable renewables. Small Modular Reactors (SMRs) such as NuScale are envisaged to have multiple units on one site. This provides opportunities for coordinating FPO between units, but also introduces challenges as common services (e.g., refueling equipment) must be shared between units and fuel loadings may be standardized. It is therefore important to quantify whether FPO with SMRs is economically beneficial. Here, this paper quantifies the economics of FPO on different timescales to analyze refueling outages of such multi-unit SMRs. A 24-h price-taker profit maximization of SMR operation is first solved considering revenues from wholesale power and ancillary service (AS) markets. The results are then used to find the most profitable operation strategy over several years for multiple units at the site accounting for the physics and materials limits on NPP operation, including refueling outages. Results show a small but appreciable participation of nuclear into AS, contributing 4% of revenues. Due to the longer fuel cycle, over a decade of operation the units’ refueling outages drifted by 3 months, ultimately leading to refueling during summer.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Flexible Plant Operation and Generation Technical Program Plan for FY2023

This report presents the Technical Program Plan for Fiscal Years 2023-2027 (FY2023 to FY2027) for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability Program—Flexible Plant Operation and Generation Research Pathway. The objective of this pathway is to carry out the research needed to help nuclear power plants diversify revenue generation for the life of these plants. The purpose of these research and development activities is two fold: (1) to reduce the technical and economic risks of implementing FPOG applications and (2) to provide guidance on relevant safety and environmental operating license reviews, amendments, and renewals. This pathway provides a clear understanding of the benefits of nuclear energy beyond electricity markets. A detailed description of the research and development activities that have been completed and that are planned for FY2023—FY2027 are presented in this report. These activities include completing the development of analysis tools to perform technical and economic assessments of realistic market opportunities for producing secondary energy products near nuclear power plants. They also include developing and demonstrating engineering systems and control concepts to dispatch thermal and electrical power to an industrial user. Additionally, this plan includes developing guidance for addressing potential regulatory and licensing requirements. In addition, the formation, purpose, and activities of a group referred to as the Hydrogen Regulatory Research and Review Group is discussed. An overview is also provided on the potential benefits of the Infrastructure Investment and Jobs Act (IIJA) Bill that will support the commencement of Regional Clean Hydrogen Hubs, and the Inflation Reduction Act (IRA) that provides compelling production tax credits for nuclear electricity and clean hydrogen using nuclear energy.

08 HYDROGEN↗

Feasible Actuator Range Modifier (FARM), a Tool Aiding the Solution of Unit Dispatch Problems for Advanced Energy Systems

Integrated energy systems (IESs) seek to minimize power generating costs in future power grids through the coupling of different energy technologies. To accommodate fluctuations in load demand due to the penetration of renewable energy sources, flexible operation capabilities must be fully exploited, and even power plants that are traditionally considered as base-load units need to be operated according to unconventional paradigms. Thermomechanical loads induced by frequent power adjustments can accelerate the wear and tear. If a unit is flexibly operated without respecting limits on materials, the risk of failures of expensive components will eventually increase, nullifying the additional profits ensured by flexible operation. In addition to the bounds on power variations (explicit constraints),the solution of the unit dispatch problem needs to meet the limits on the variation of key process variables, including temperature, pressure and flow rate (implicit constraints).The FARM (Feasible Actuator Range Modifier) module was developed to enable existing optimization algorithms to identify solutions to the unit dispatch problem that are both economically favorable and technologically sustainable. Thanks to the iterative dispatcher–validator scheme, FARM permits addressing all the imposed constraints without excessively increasing the computational costs. In this work, the algorithms constituting the module are described, and the performance was assessed by solving the unit dispatch problem for an IES composed of three units, i.e., balance of plant, gas turbine, and high-temperature steam electrolysis. Finally, the FARM module provides dedicated tools for visualizing the response of the constrained variables of interest during operational transients and a tool aiding the operator at making decisions. These techniques might represent the first step towards the deployment of an ecological interface design (EID) for IES units.

47 OTHER INSTRUMENTATION↗

Economic Dispatch Optimization of Multi-Unit SMR Site

With the increase of integration of variable renewable into the grid, grid resilience can be compromised without flexible electricity suppliers. Flexible operation of NPP can expand the scope of integration of new nuclear power plants in regions with high share of renewables. It also provides opportunity to increase profits through participation in ancillary services. In this research, NuScale modules are used as the case study. NuScale is an integrated pressurized water reactor with thermal power of 250 MWth. Having multiple units can provide higher flexibility in changing power levels and supplying the grid with electricity all year long. Additionally, load-following might perturbate the ordered sequence of refueling (every 24 months for NuScale). To maintain the 2 year refueling cycles, the loading patterns will need to be adjusted in a year-to-year basis, resulting in additional unnecessary costs. Another solution is to find the optimal outage schedule. This will also shift the focus of the planned outage to a more optimized predictive outages and maintenance. Results from short-term optimization (i.e., daily participation in energy and ancillary services markets) shows that average commitment to regulation down ancillary service markets during late night and early morning hours can increase revenues. Participating in upward reserves during pre-work commuting hours and early evening hours can also generate additional revenues due to high ramp up of electricity demand. Having multiple units at a single site can also help operate flexibly. Results from long-term optimization show that daily fluctuation in electric power is usually handled by few units while other units operate on base-load profile. It is possible to combine base-load operation with flexible operation to extend component remaining useful life in some units and find optimal outage schedule for the units.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Load-Shifting Strategies for Cost-Effective Emission Reductions at Wastewater Facilities

Significant hourly variation in the carbon intensity of electricity supplied to wastewater facilities introduces an opportunity to lower emissions by shifting the timing of their energy demand. This shift could be accomplished by storing wastewater, biogas from sludge digestion, or electricity from on-site biogas generation. However, the life cycle emissions and cost implications of these options are not clear. Here, we present a multiobjective optimization framework for comparing cost- and emission-minimizing load-shifting strategies at a California case study facility with a relatively low carbon intensity grid and high spread in peak and off-peak electricity prices. We evaluate cost and emission trade-offs from the optimal flexible operation of both existing infrastructure and optimally sized energy flexibility upgrades. We estimate energy-related emission reductions of up to 9.0% with flexible operation of existing infrastructure and up to 16.8% with optimally sized storage upgrades. Only a fraction of these potential savings are realized under actual industrial energy tariffs and the EPA’s recommended social cost of carbon. Energy flexibility may hold promise as a short-term emission-saving solution for the wastewater sector, but the extent of savings is heavily dependent on the cost of carbon, electricity tariffs, and emission intensity of the regional electricity grid.

climate↗