Search NASA⌕ Search

SEARCH · Search NASA

Results for “Front end”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Front end for GPS receivers

The front end in GPS receivers has the functions of amplifying, down-converting, filtering and sampling the received signals. In the preferred embodiment, only two operations, A/D conversion and a sum, bring the signal from RF to filtered quadrature baseband samples. After amplification and filtering at RF, the L1 and L2 signals are each sampled at RF at a high selected subharmonic rate. The subharmonic sample rates are approximately 900 MHz for L1 and 982 MHz for L2. With the selected subharmonic sampling, the A/D conversion effectively down-converts the signal from RF to quadrature components at baseband. The resulting sample streams for L1 and L2 are each reduced to a lower rate with a digital filter, which becomes a straight sum in the simplest embodiment. The frequency subsystem can be very simple, only requiring the generation of a single reference frequency (e.g. 20.46 MHz minus a small offset) and the simple multiplication of this reference up to the subharmonic sample rates for L1 and L2. The small offset in the reference frequency serves the dual purpose of providing an advantageous offset in the down-converted carrier frequency and in the final baseband sample rate.

Thomas, Jr., Jess Brooks↗

PIP-II Injector Test Warm Front End: Commissioning Update

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test [1] at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.

43 PARTICLE ACCELERATORS↗

Measures of the Environmental Footprint of the Front End of the Nuclear Fuel Cycle

Previous estimates of environmental impacts associated with the front end of the nuclear fuel cycle have focused primarily on energy consumption and CO2 emissions. Results have varied widely. Section 2 of this report provides a summary of historical estimates. This study revises existing empirical correlations and their underlying assumptions to fit to a more complete set of existing data. This study also addresses land transformation, water withdrawals, and occupational and public health impacts associated with the processes of the front end of the once-through nuclear fuel cycle. These processes include uranium mining, milling, refining, conversion, enrichment, and fuel fabrication. Metrics are developed to allow environmental impacts to be summed across the full set of front end processes, including transportation and disposition of the resulting depleted uranium.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Analog Front-end for the LGAD Based Precision Timing Application in CMS ETL

The analog front-end for the Low Gain Avalanche Detector (LGAD) based precision timing application in the CMS Endcap Timing Layer (ETL) has been prototyped in a 65 nm CMOS mini-ASIC named ETROC0. Serving as the very first prototype of ETL readout chip (ETROC), ETROC0 aims to study and demonstrate the performance of the analog frontend, with the goal to achieve 40 to 50 ps time resolution per hit with LGAD (therefore reach about 30ps per track with two detector-layer hits per track). ETROC0 consists of preamplifier and discriminator stages, which amplifies the LGAD signal and generates digital pulses containing time of arrival and time over threshold information. This paper will focus on the design considerations that lead to the ETROC front-end architecture choice, the key design features of the building blocks, the methodology of using the LGAD simulation data to evaluate and optimize the front-end design. The ETROC0 prototype chips have been extensively tested using charge injection and the measured performance agrees well with simulation. The initial beam test results are also presented, with time resolution of around 33 ps observed from the preamplifier waveform analysis and around 41 ps from the discriminator pulses analysis. A subset of ETROC0 chips have also been tested to a total ionizing dose of 100 MRad with X-ray and no performance degradation been observed.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Commissioning and Operation of the FNAL Front end Injection Line and Ion Sources.

This thesis documents the efforts made in commissioning and operating the RFQ Injection Line (RIL) as a replacement for the Cockcroft Walton front end. The Low Energy Beam Transport (LEBT) was assembled and tested with multiwire position and emittance monitor measurements. The Radio Frequency Quadrupole (RFQ) commissioning was completed with the same measurements as well as output beam energy measurements that showed it initially accelerated beam only to 700 keV, which was 50 keV lower than the design energy. Working with the manufacturer solutions were found and instituted to continue testing. The Medium Energy Beam Transport (MEBT) was then connected as the RIL was installed as the new front end of Linac. Testing gave way to operation when the new front end was used as the source of all High Energy Physics (HEP) beam for Fermi National Accelerator Laboratory (FNAL). The magnetron ion source that provides the H- beam for the front end required several changes and eventual upgrades to operate well; such as new source operating points for vacuum pressure and cesium admixture, and new materials for critical source components. Further research was conducted on the cathode geometry and nitrogen doping of the hydrogen gas as well as using solid state switches for the extractor system high voltage.

43 PARTICLE ACCELERATORS↗

The Timepix4 analog front-end design: Lessons learnt on fundamental limits to noise and time resolution in highly segmented hybrid pixel detectors

This manuscript describes the optimization of the front-end readout electronics for high granularity hybrid pixel detectors. The theoretical study aims at minimizing the noise and jitter. The model presented here is validated with both circuit post layout simulations and measurements on the Timepix4 Application Specific Integrated Circuit (ASIC). The analog front-end circuit and the procedure to optimize the dimensions of the main transistors are described with detail. The Timepix4 is the most recent ASIC designed in the framework of the Medipix4 Collaboration. It was manufactured in 65nm CMOS process, and consists of a four side buttable matrix of 448 × 512 pixels with 55µm pitch. The analog front-end has a gain of ~36mV/ke - when configured in High Gain Mode, and ~20mV/ke - when configured in Low Gain Mode. The Equivalent Noise Charge (ENC) is ~68e - rms and ~80e - rms in High Gain Mode and in Low Gain Mode respectively. In event driven mode the incoming hits can be time stamped within a ~ 200ps time bin and the chip can deal with a maximum flux of ~ 3.6MHzmm –2 s –1 . In photon counting mode, the chip can deal with up to ~ 5GHzmm –2 s –1 . The routine designed to optimize the Timepix4 front-end is then used to analyze the performance limits in terms of jitter and noise for Charge Sensitive Amplifiers in pixel detectors.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Loran digital phase-locked loop and RF front-end system error analysis

An analysis of the system performance of the digital phase locked loops (DPLL) and RF front end that are implemented in the MINI-L4 Loran receiver is presented. Three of the four experiments deal with the performance of the digital phase locked loops. The other experiment deals with the RF front end and DPLL system error which arise in the front end due to poor signal to noise ratios. The ability of the DPLLs to track the offsets is studied.

Mccall, D. L.↗

CW Room Temperature Re-Buncher for the Project X Front End

At Fermilab there is a plan to construct the Project X Injector Experiment (PXIE) facility - a prototype of the front end of the Project X, a multi-MW proton source based on superconducting linac. The construction and successful operations of this facility will validate the concept for the Project X front end, thereby minimizing the primary technical risk element within the Project. The room temperature front end of the linac contains an ion source, an RFQ accelerator and a Medium Energy Beam Transport (MEBT) section comprising a high bandwidth bunch selective chopper. The MEBT length is about 10 m, so three re-bunching CW cavities are used to support the beam longitudinal dynamics. The paper reports a RF design of the re-bunchers along with preliminary beam dynamic and thermal analysis of the cavities.

43 PARTICLE ACCELERATORS↗

Front-End ASIC for Liquid Argon TPC

We present a front-end application-specific integrated circuit (ASIC) for a wire based time-projection-chamber (TPC) operating in liquid Argon (LAr). The LAr TPC will be used for long baseline neutrino oscillation experiments. The ASIC must provide a low-noise readout of the signals induced on the TPC wires, digitization of those signals at 2 MSamples/s, compression, buffering and multiplexing. A resolution of better than 1000 rms electrons at 200 pF input capacitance for an input range of 300 fC is required, along with low power and operation in LAr (at 87 K). We include the characterization of a commercial technology for operation in the cryogenic environment and the first experimental results on the analog front end. The results demonstrate that complementary metal-oxide semiconductor transistors have lower noise and much improved dc characteristics at LAr temperature. Finally, we introduce the concept of '1/f equivalent' to model the low-frequency component of the noise spectral density, for use in the input metal-oxide semiconductor field-effect transistor optimization.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Microwave integrated circuit radiometer front-ends for the Push Broom Microwave Radiometer

Microwave integrated circuit front-ends for the L-band, S-band and C-band stepped frequency null-balanced noise-injection Dicke-switched radiometer to be installed in the NASA Langley airborne prototype Push Broom Microwave Radiometer (PBMR) are described. These front-ends were developed for the fixed frequency of 1.413 GHz and the variable frequencies of 1.8-2.8 GHz and 3.8-5.8 GHz. Measurements of the noise temperature of these units were made at 55.8 C, and the results of these tests are given. While the overall performance was reasonable, improvements need to be made in circuit losses and noise temperatures, which in the case of the C-band were from 1000 to 1850 K instead of the 500 K specified. Further development of the prototypes is underway to improve performance and extend the frequency range.

Harrington, R. F.↗

The COLUTA ADC ASIC and the ATLAS HL-LHC Liquid Argon Front-End Readout

Abstract The upgraded High-Luminosity Large Hadron Collider (HL-LHC) requires a new radiation tolerant ATLAS Liquid Argon (LAr) Calorimeter readout operating at 40 MHz with 16-bit dynamic range. The Front-End Board 2 (FEB2) will provide the front-end readout for the calorimeter, and will interface a series of custom ASICs due to radiation tolerance requirements of the HL-LHC. The COLUTA is a 65 nm CMOS custom 8-channel 15-bit 40 MSPS ADC ASIC developed for this application. This contribution will present performance results of the final prototype of the COLUTA, surpassing specifications at >11.5 ENOB for relevant frequencies, as well as non-linearity and radiation requirements. Preliminary integration results of the front-end readout components will also be described by means of the FEB2 Pre-Prototype, the “Slice Testboard”.

Instruments & Instrumentation↗

Full-Scale Testing of the Ambient Pressure, Acid-Dissolution Front-End Process for the Current Mo-99 Recovery Processes

The Global Threat Reduction Initiative (GTRI) Conversion Program is actively developing technologies for the conversion of civilian facilities using high enriched uranium (HEU) to low enriched uranium (LEU) fuels and targets. The conversion of conventional HEU targets to LEU for 99 Mo production requires approximately five times the uranium in a target to maintain the 99 Mo yield on a per target basis. Under GTRI, Argonne is developing two front-end options for current 99 Mo production processes to allow the use of LEU-foil targets. In both processes, the aim is to produce a front-end product that is compatible with current 99 Mo purification operations and will provide the same or higher yield of 99 Mo for the same number of irradiated targets. The two front-end processes under development as part of this project are (1) the dissolution of irradiated LEU foil (up to 250 g in a single batch) and nickel fission recoil barrier in nitric acid at ambient pressure and (2) the electrochemical dissolution of LEU foil in a series of steps that produces an alkaline (basic) solution feed for 99 Mo purification. This report describes the results of performance tests and design optimization of the ambient pressure, nitric acid dissolver system. The design, fabrication, and performance test planning for this system are described in more detail in previous reports (Jerden et al. 2011a,b, 2012). Full-scale demonstrations of both of the front-end processes using irradiated uranium foils are planned to be performed at Oak Ridge National Laboratory this fiscal year.

Jerden, James↗

Resource intensities of the front end of the nuclear fuel cycle

This paper presents resource intensities, including direct and embodied energy consumption, land and water use, associated with the processes comprising the front end of the nuclear fuel cycle. These processes include uranium extraction, conversion, enrichment, fuel fabrication and depleted uranium de-conversion. To the extent feasible, these impacts are calculated based on data reported by operating facilities, with preference given to more recent data based on current technologies and regulations. All impacts are normalized per GWh of electricity produced. Uranium extraction is seen to be the most resource intensive front end process. Combined, the energy consumed by all front end processes is equal to less than 1% of the electricity produced by the uranium in a nuclear reactor. Land transformation and water withdrawals are calculated at 8.07 m{sup 2} /GWh(e) and 1.37x10{sup 5} l/GWh(e), respectively. Both are dominated by the requirements of uranium extraction, which accounts for over 70% of land use and nearly 90% of water use.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

RF front end interface and AGC modification

Preliminary results indicate that the new front end automatic gain control (AGC) combination perform satisfactorily. Side by side bench tests with Trimble 10A and Texas Instruments 9900 LORAN-C receivers have proven that the proper time differences are being obtained. Further optimization of the AGC circuit will occur as software to track all of the stations in a LORAN-C chain is developed. The AGC circuit was designed to sample up to six separate LORAN-C stations. Along with expanded station tracking software, a more sophisticated search routine is also under development. A printed circuit board for the AGC is planned and will be enclosed with the RF front end in a sealed enclosure to reduce interference from the other digital circuits of the microcomputer.

Yost, S. R.↗

Radiological Consequences of Beam Loss on Beamline Front End Collimator during Top-off Injection into the Storage Ring

The primary radiological safety concern for the top-off injection, with the beam line front end safety shutters open, is the scenario where electrons could be conveyed down to the beam line through the front end due to the erroneous combination of lattice magnetic field settings and beam energy. It is of paramount importance to ensure that such events are of remote possibility. Particle tracking simulations by the NSLS-II Accelerator Physicists have shown that by a set of interlocking requirements of the lattice magnetic fields and by the implementation of physical apertures, the errant electron beam can be confined to the front end components within the storage ring.

36 MATERIALS SCIENCE↗

Method and apparatus for front end gather/scatter memory coalescing

A system for processing gather and scatter instructions can implement a front-end subsystem, a back-end subsystem, or both. The front-end subsystem includes a prediction unit configured to determine a predicted quantity of coalesced memory access operations required by an instruction. A decode unit converts the instruction into a plurality of access operations based on the predicted quantity, and transmits the plurality of access operations and an indication of the predicted quantity to an issue queue. The back-end subsystem includes a load-store unit that receives a plurality of access operations corresponding to an instruction, determines a subset of the plurality of access operations that can be coalesced, and forms a coalesced memory access operation from the subset. A queue stores multiple memory addresses for a given load-store entry to provide for execution of coalesced memory accesses.

97 MATHEMATICS AND COMPUTING↗

PIP-II Injector Test Warm Front End: Commissioning Update [Slides]

The Warm Front End (WFE) of the Proton Improvement Plan II Injector Test (PIP2IT) at Fermilab has been constructed to its full length. It includes a 15-mA DC, 30-keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT) with a switching dipole magnet, a 2.1 MeV CW RFQ, followed by a Medium Energy Beam Transport (MEBT) with various diagnostics and a dump. This report presents the commissioning status, focusing on beam measurements in the MEBT. In particular, a beam with the parameters required for injection into the Booster (5 mA, 0.55 ms macro-pulse at 20 Hz) was transported through the WFE.

43 PARTICLE ACCELERATORS↗

A Highly Digital Front End For GPS Receivers

In digital front end of GPS receiver, half-subharmonic sampling of incoming radio-frequency signal followed by summing operation produces desired baseband output in filtered and sampled form. Design generates baseband samples in guadrature with exactness in quadrature separation surpassing analog implementations. Advantages include compactness, lower cost, greater accuracy, and greater reliability.

Thomas, J. Brooks↗