Search NASA⌕ Search

SEARCH · Search NASA

Results for “GROUND SUPPORT EQUIPMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Shuttle Ground Support Equipment (GSE) T-0 Umbilical to Space Shuttle Program (SSP) Flight Elements Consultation

The NASA Engineering and Safety Center (NESC) was tasked with assessing the validity of an alternate opinion that surfaced during the investigation of recurrent failures at the Space Shuttle T-0 umbilical interface. The most visible problem occurred during the Space Transportation System (STS)-112 launch when pyrotechnics used to separate Solid Rocket Booster (SRB) Hold-Down Post (HDP) frangible nuts failed to fire. Subsequent investigations recommended several improvements to the Ground Support Equipment (GSE) and processing changes were implemented, including replacement of ground-half cables and connectors between flights, along with wiring modifications to make critical circuits quad-redundant across the interface. The alternate opinions maintained that insufficient data existed to exonerate the design, that additional data needed to be gathered under launch conditions, and that the interface should be further modified to ensure additional margin existed to preclude failure. The results of the assessment are contained in this report.

Wilson, Timmy R.↗

Spaceflight Ground Support Equipment Reliability & System Safety Data

Presented were Reliability Analysis, consisting primarily of Failure Modes and Effects Analysis (FMEA), and System Safety Analysis, consisting of Preliminary Hazards Analysis (PHA), performed to ensure that the CoNNeCT (Communications, Navigation, and Networking re- Configurable Testbed) Flight System was safely and reliably operated during its Assembly, Integration and Test (AI&T) phase. A tailored approach to the NASA Ground Support Equipment (GSE) standard, NASA-STD-5005C, involving the application of the appropriate Requirements, S&MA discipline expertise, and a Configuration Management system (to retain a record of the analysis and documentation) were presented. Presented were System Block Diagrams of selected GSE and the corresponding FMEA, as well as the PHAs. Also discussed are the specific examples of the FMEAs and PHAs being used during the AI&T phase to drive modifications to the GSE (via "redlining" of test procedures, and the placement of warning stickers to protect the flight hardware) before being interfaced to the Flight System. These modifications were necessary because failure modes and hazards were identified during the analysis that had not been properly mitigated. Strict Configuration Management was applied to changes (whether due to upgrades or expired calibrations) in the GSE by revisiting the FMEAs and PHAs to reflect the latest System Block Diagrams and Bill Of Material. The CoNNeCT flight system has been successfully assembled, integrated, tested, and shipped to the launch site without incident. This demonstrates that the steps taken to safeguard the flight system when it was interfaced to the various GSE were successful.

Fernandez, Rene↗

Cryogenic Testing of the Thermal Vacuum Chamber and Ground Support Equipment for the James Webb Space Telescope in Chamber A at Johnson Space Center

The James Webb Space Telescope (JWST) is the largest cryogenic instrument telescope to be developed for space flight. The telescope will be passively cooled to 50 K and the instrument package will be at 40 K with the mid-infrared instrument at 6 K. The final cryogenic test of the Optical Telescope Element (OTE) and Integrated Science Instrument Module (ISIM) as an assembly (OTE + ISIM OTIS) will be performed in the largest 15 K chamber in the world, Chamber A at Johnson Space Center. The planned duration of this test will be 100 days in the middle of 2017. Needless to say, this ultimate test of OTIS, the cryogenic portion of JWST will be crucial in verifying the end-to-end performance of JWST. A repeat of this test would not only be expensive, but would delay the launch schedule (currently October 2018). Therefore a series of checkouts and verifications of the chamber and ground support equipment were planned and carried out between 2012 and 2016. This paper will provide a top-level summary of those tests, trades in coming up with the test plan, as well as some details of individual issues that were encountered and resolved in the course of testing.

thermal vacuum chamber↗

Qualification of Coatings for Launch Facilities and Ground Support Equipment Through the NASA Corrosion Technology Laboratory

Corrosion protection at NASA's Kennedy Space Center is a high priority item. The launch facilities at the Kennedy Space Center are located approximately 1000 feet from the Atlantic Ocean where they are exposed to salt deposits, high humidity, high UV degradation, and acidic exhaust from solid rocket boosters. These assets are constructed from carbon steel, which requires a suitable coating to provide long-term protection to reduce corrosion and its associated costs.

Ground Support Equipment↗

Electrical, Electronic, and Electromechanical (EEE) Parts Management and Control Requirements for Space Flight Hardware and Critical Ground Support Equipment...aka... The NASA EEE Parts Standard, NASA-STD 8739.10

Describes development and content of a new NASA Standard for Electrical Electronic and Electromechanical (EEE) parts. This Standard reflects current practices, instead of changing them. Most NASA Centers utilize local documents, but there is minimal consistency across the Agency. A gap analysis clearly shows the differences that exist among the different centers and with respect to the NASA Parts Policy. Once approved, the new standard can be referenced in contracts and agreements with organizations outside of NASA.

Electronic↗

On-Orbit Constraints Test - Performing Pre-Flight Tests with Flight Hardware, Astronauts and Ground Support Equipment to Assure On-Orbit Success

On-Orbit Constraints Test (OOCT's) refers to mating flight hardware together on the ground before they will be mated on-orbit. The concept seems simple but it can be difficult to perform operations like this on the ground when the flight hardware is being designed to be mated on-orbit in a zero-g and/or vacuum environment of space. Also some of the items are manufactured years apart so how are mating tasks performed on these components if one piece is on-orbit before its mating piece is planned to be built. Both the Internal Vehicular Activity (IVA) and Extra-Vehicular Activity (EVA) OOCT's performed at Kennedy Space Center will be presented in this paper. Details include how OOCT's should mimic on-orbit operational scenarios, a series of photographs will be shown that were taken during OOCT's performed on International Space Station (ISS) flight elements, lessons learned as a result of the OOCT's will be presented and the paper will conclude with possible applications to Moon and Mars Surface operations planned for the Constellation Program.

Haddad, Michael E.↗

The ESA Large Space Simulator Mechanical Ground Support Equipment for Spacecraft Testing

Environmental test facilities are not suitable in any case to comply with special or complex test requirements without modifications. Dedicated upgrades of the test facility and their subsystems with respect to the test requirements and specifications are often necessary. The Flight Model of the Planck Space Telescope was tested in the Large Space Simulator (LSS) of the ESTEC Test Centre. Main goals of the test were the verification of the deformation of the Telescope during thermal vacuum conditions at different temperature levels and the validation of the Thermal Model. The deformations of the telescope have been traced by two Videogrammetry canisters. In order to provide different view positions with respect to the PLANCK Telescope it was necessary to rotate the specimen by +/- 180deg. In addition very stringent requirements for the low temperature level of the thermal environment has lead to a comprehensive test set-up which was divided in four main elements: Dedicated support structure for the Videogrammetry canisters providing several DoF for adjustment. Structure to support three Infrared panels around the specimen. MLI curtain to cover the LSS 8m auxiliary chamber opening. System providing LN2 supply for the rotating PLANCK telescope cold panel. The design, manufacturing and integration of the necessary mechanical ground support to install for instance the canisters and to ensure the 180 rotation of the telescope under cold and high vacuum conditions was an extensive and important part of the entire test program. This paper will concentrate on the design issues, the implementation and verification of the MGSE provided for the Planck Space Telescope FM Videogrammetry Test in the LSS and the troubleshooting caused by a failure during the first rotation under cold conditions.

Hagelschuer, Dirk↗