Search NASA⌕ Search

SEARCH · Search NASA

Results for “HOISTS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Implicit shock tracking for unsteady flows by the method of lines

Here, a recently developed high-order implicit shock tracking (HOIST) framework for resolving discontinuous solutions of inviscid, steady conservation laws is extended to the unsteady case. Central to the framework is an optimization problem which simultaneously computes a discontinuity-aligned mesh and the corresponding high-order approximation to the flow, which provides nonlinear stabilization and a high-order approximation to the solution. This work extends the implicit shock tracking framework to the case of unsteady conservation laws using a method of lines discretization via a diagonally implicit Runge-Kutta method by “solving a steady problem at each timestep”. We formulate and solve an optimization problem that produces a feature-aligned mesh and solution at each Runge-Kutta stage of each timestep, and advance this solution in time by standard Runge-Kutta update formulas. A Rankine-Hugoniot based prediction of the shock location together with a high-order, untangling mesh smoothing procedure provides a high-quality initial guess for the optimization problem at each time, which results in rapid convergence of the sequential quadratic programing (SQP) optimization solver. This method is shown to deliver highly accurate solutions on coarse, high-order discretizations without nonlinear stabilization and recover the design accuracy of the Runge-Kutta scheme. We demonstrate this framework on a series of inviscid, unsteady conservation laws in both one- and two- dimensions. We also verify that our method is able to recover the design order of accuracy of our time integrator in the presence of a strong discontinuity.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Main Injector ILA Lambertson Seal Installation

The Main Injector ILA Lambertson magnet uses an 18 inch tapered flange from EVAC. The flange resembles the flange on drawing MD-331910, Flange Weldment MIR Lambertson. Please note that these flanges are heavy. A PALD, portable automotive lifting device, i.e engine hoist, is required as well as the associated lifting fixture, to install the mating flange. The following are the steps to install the EVAC seal drawing MA331512, T/S Conventional Magnet MIR Lambertson Magnet Aluminum Knife Edge Seal.

43 PARTICLE ACCELERATORS↗

Dual Purpose Canister Reactivity and Groundwater Absorption Analyses

The current spent nuclear fuel (SNF) management strategy includes reliance on dry storage. Utilities are meeting their interim storage needs on an individual basis with use of large-capacity dry storage casks, with a current focus on meeting existing storage and transportation requirements, as disposal requirements are not currently available. These casks are commonly known as dual-purpose (i.e., storage and transportation) canisters (DPCs). However, a small percentage of single-purpose (storage only) systems is also being used to meet storage needs. These are included under the “DPC” heading. This report investigates the postclosure criticality safety aspects of DPCs. Placing large, heavy waste packages containing DPCs into a repository for direct disposal has not yet been implemented domestically or internationally. Therefore, direct disposal of DPCs represents new engineering and scientific challenges. Some of the engineering challenges that have already been addressed include handling and placement, use of ramps vs. shafts, use of hoists, use of transport equipment, and thermal management. Additionally, some studies have been conducted in the past regarding the feasibility of direct disposal from a criticality analysis perspective and have concluded that while possible, demonstrating subcriticality over the disposal time period is a challenge. The alternative to direct disposal of DPCs into a repository is to repackage the SNF into different canisters. The direct disposal of DPCs without cutting them open and repackaging is appealing because it could be more cost-effective, reduce the complexity of fuel management operations both in and outside reactor facilities, and result in less cumulative worker dose during interim storage and handling before eventual disposal in a deep geologic repository.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Dual Purpose Canister Reactivity and Groundwater Absorption Analyses

The current spent nuclear fuel (SNF) management strategy includes reliance on dry storage. Utilities are meeting their interim storage needs on an individual basis with use of large-capacity dry storage casks, with a current focus on meeting existing storage and transportation requirements, as disposal requirements are not currently available. These casks are commonly known as dual-purpose (i.e., storage and transportation) canisters (DPCs). However, a small percentage of single-purpose (storage only) systems is also being used to meet storage needs. These are included under the “DPC” heading. This report investigates the postclosure criticality safety aspects of DPCs. Placing large, heavy waste packages containing DPCs into a repository for direct disposal has not yet been implemented domestically or internationally. Therefore, direct disposal of DPCs represents new engineering and scientific challenges. Some of the engineering challenges that have already been addressed include handling and placement, use of ramps vs. shafts, use of hoists, use of transport equipment, and thermal management. Additionally, some studies have been conducted in the past regarding the feasibility of direct disposal from a criticality analysis perspective and have concluded that while possible, demonstrating subcriticality over the disposal time period is a challenge. The alternative to direct disposal of DPCs into a repository is to repackage the SNF into different canisters. The direct disposal of DPCs without cutting them open and repackaging is appealing because it could be more cost-effective, reduce the complexity of fuel management operations both in and outside reactor facilities, and result in less cumulative worker dose during interim storage and handling before eventual disposal in a deep geologic repository.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Marine Energy Technology Development Risk Management Framework

Over the past decades, the global marine energy industry has suffered a number of serious technological and commercial setbacks. To help reduce the risks of industry failures and advance the development of new technologies, the U.S. Department of Energy (DOE) and the National Renewable Energy Laboratory (NREL) developed a Marine Energy Risk Management Framework in 2015, with this revision published in 2024. This risk management framework shall be utilized on all DOE Water Power Technologies Office (WPTO) projects that require system testing in the open water. By addressing uncertainties, the Marine Energy Risk Management Framework increases the likelihood of successful development of marine energy converter technology. It covers projects of any technology readiness level technology performance level (TPL) and all risk types (e.g. technological risk, regulatory risk, commercial risk) over the development cycle. This risk framework is not a substitute for other risk management procedures that may be required for marine operations, such as installations at sea, hoisting and rigging, safe diver operations, and other safety requirements. This risk framework is intended to meet DOE's risk management expectations for marine energy technology research and development efforts from WPTO. It also provides an overview of other relevant risk management tools and documentation.

16 TIDAL AND WAVE POWER↗

NRIC DOME Crane Trade Study and Recommendation

The National Reactor Innovation Center (NRIC) is a national program that was established as part of the Nuclear Energy Innovation Capabilities Act (NEICA). NRIC’s mission is to accelerate the demonstration and deployment of advanced nuclear energy through its mission to inspire stakeholders and the public, empower innovators, and deliver successful outcomes through efficient coordination of partners and resources. NRIC is designed to bridge the gap between research, development, and the marketplace to help convert some of the nation’s most promising advanced nuclear reactors into commercial applications. The NRIC Demonstration of Microreactor Experiments (DOME) facility, formerly known as Experimental Breeder Reactor II (EBR II), located at the Materials and Fuels Complex (MFC) at the Idaho National Laboratory (INL) is intended to allow industrial and other partners the opportunity to test Advanced Microreactors up to 20MW thermal power. The 75-ton capacity polar crane located in the EBR II facility was rendered inoperable to support planned facility demolition in 2015; small holes were flame cut in the girders; hoists and cables were removed; oil was drained from gear boxes; trolley drive, and then filled with absorbent; and the electrical and control umbilical’s were disconnected, removed and disposed. Subsequently, the decision was made to convert the EBR II facility into the DOME test bed.

21 - SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLAN↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Speed-sensing device aids crane operators

So that crane operators can judge payload movements accurately, a friction-driven multilobed cam device energizes a buzzer and indicator lamp in the crane cab. The signal frequency of this speed sensor has a sensitivity to hoist movement of 1/8 inch.

Source record↗

Lifting clamp positively grips structural shapes

Welded steel clamps securely grip structural shapes of various sizes for crane operations. The clamp has adjustable clamping jaws and screw-operated internal v-jaws and provides greater safety than hoisting slings presently used. The structural member can be rotated in any manner, angle, or direction without being released by the clamp.

Reinhardt, E. C.↗

The Slate all metal airship

The development of the Slate all metal airship City of Glendale built and completed in 1930 is presented. The airship facilities are discussed. Pertinent data which led to other engineering accomplishments for aviation are shown. The SMD-100 concept is presented along with a brief commentary on the costs and problems involved in such an airship design and the application of the hoisting and elevator facilities to airship development.

Slate, C. C.↗

The Airfloat HL project

A design study is described for a large low-cost rigid airship intended primarily for the movement of large indivisible loads (cargo) between industrial sites. A survey of the ship and its overall performance is followed by accounts of the operational procedures for the above function and for an alternative application to unit module transfer between fixed terminals. A final section indicates the estimated costs of construction and operation. Safety factors are also considered. Lifting devices such as winches, hoists are shown and described, and airship configurations are also shown.

Mowforth, E.↗

Reusable Release Mechanism

Slider release mechanism reusable. Bears heavy loads while latched, yet gives smooth release motion. Release effected by explosively driving perpendicular slider out of engagement with load-bearing shank. Device has potential industrial applications such as emergency release of lifting cables from helicopters, cranes and hoists.

Bunker, J. W.↗

The orbiter mate/demate device

The numerous components and systems of the space shuttle orbiter mate/demate device (MDD) are discussed. Special emphasis is given, mechanisms and mechanical systems to discuss in general their requirements, functions, and design; and, where applicable, to relate any unusual problems encountered during the initial concept studies, final design, and construction are discussed. The MDD and its electrical, machinery, and mechanical systems, including the main hoisting system, power operated access service platform, wind restrain and adjustment mechanism, etc., were successfully designed and constructed. The MDD was used routinely during the initial orbiter-747 approach and landing test and the more recent orbiter flight tests recovery and mate operations.

Miller, A. J.↗

Transportation Applications, Part 1

The applications of tethers in support of space transportation is divided into: (1) orbit transfer, momentum transfer release/rendezvous (hanging, swinging, and spinning) and simplified docking; (2) orbit maintenance: electrodynamic thrust in or out of plane, electrodynamic libration pumping or damping, momentum scavenging, and isolate thruster exhaust; and (3) transfer within constellation: deployment or retrieval of whole constellation, clothesline loop, hoist, tram for travel on the tether, monkey between the tethers, and power and fluid transfer.

Carroll, J.↗

Orbiter processing facility service platform failure and redesign

In a high bay of the Orbiter Processing Facility (OPF) at the Kennedy Space Center, technicians were preparing the space shuttle orbiter Discovery for rollout to the Vehicle Assembly Building (VAB). A service platform, commonly referred to as an OPF Bucket, was being retracted when it suddenly fell, striking a technician and impacting Discovery's payload bay door. A critical component in the OPF Bucket hoist system had failed, allowing the platform to fall. The incident was thoroughly investigated by both NASA and Lockheed, revealing many design deficiencies within the system. The deficiencies and the design changes made to correct them are reviewed.

Harris, Jesse L.↗

Mechanism synthesis and 2-D control designs of an active three cable crane

A Lunar Crane with a suspension system based on a three cable mechanism is investigated to provide a stable end-effector for hoisting, positioning, and assembling large components during construction and servicing of a Lunar Base. The three cable suspension mechanism consists of a structural framework of three cables pointing to a common point that closely coincides with the suspended payload's center of gravity. The vibrational characteristics of this three cable suspension system are investigated by comparing a simple 2-D symmetric suspension model and a swinging pendulum in terms of their analytical natural frequency equations. A study is also made of actively controlling the dynamics of the crane using two different actuator concepts. Also, Lyapunov-based control algorithms are developed to determine two regulator-type control laws performing the system vibrational suppression for both system dynamics. Simulations including initial-valued dynamic responses as well as control performances for two different system dynamics are also presented.

Yang, Li-Farn↗