Search NASA⌕ Search

SEARCH · Search NASA

Results for “Help Request”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Predicting runtime and resource utilization of jobs on integrated cloud and HPC systems

Recent advances in virtualization technologies used in cloud computing offer performance that closely approaches bare-metal levels. Combined with specialized instance types and high-speed networking services for cluster computing, cloud platforms have become a compelling option for high-performance computing (HPC). However, most current batch job schedulers in HPC systems are designed for homogeneous clusters and make decisions based on limited information about jobs and system status. Scientists typically submit computational jobs to these schedulers with a requested runtime that is often over- or under-estimated. More accurate runtime predictions can help schedulers make better decisions and reduce job turnaround times. Here, they can also support decisions about migrating jobs to the cloud to avoid long queue wait times in HPC systems.

97 MATHEMATICS AND COMPUTING↗

Mu2e Tracker's Gas Connection

This report is a resume of the activities in which I was involved during my internship at Fermilab Particle Physics and Accelerator Laboratory in Batavia. The experiment at whom my work is connected is the Mu2e experiment, in particular I worked in the Tracker’s group. The main task of my training program was to design a gas service connection that take place in a small volume located between the Tracker and the Calorimeter (two main elements that constitute the detector). During the initial phase I was lightly trained about the experiment and its general design, then I was supervised on my specific task. All the work aimed to reach a design solution that could meet all the BCs, in this view, a reasonable solution was prototyped and tested. The tests performed at Lab 3 were another fundamental aspect of my experience at Fermilab closing the circle of studying, modelling, machining and testing. I want to thank primarily Aseet Mukherjee and Mete Yucel that were my supervisors, they constantly spent their time attempting to create a favourable workplace, suggesting, listening and meeting all the requests in short time, working for them was absolutely like "working with them", without their help achieve the result would been greatly harder. Giuseppe Gallo deserve a special thanks too for revising mostly of my work and being always available for support. I had also the chance to share my work during the "Weekly Tracker’s Meetings" dealing with other bright engineers and physicists, between them I really appreciate George Ginter, Russel Rucinski, Yujing Sun and Waqar Ahmed. I want also to express my gratitude to Simone Donati, Giorgio Bellettini and Emanuela Barzi that make this unique experience possible organizing this program for decades. Thanks to my Mother, my Father, my Brother, my Nephew, my uncle Damiano and my friend Simona always near, never stopping to dream with me.

43 PARTICLE ACCELERATORS↗

Outreach to Scientists and Engineers at the Hanford Technical Library

Staff at the Hanford Technical Library has developed a suite of programs designed to help busy researchers at the Pacific Northwest National Laboratory (PNNL) make better use of library products and services. Programs include formal training classes, one-on-one consultations, and targeted email messages announcing new materials to researchers in specific fields. A staple of outreach has been to teach classes to library clients covering research tools in their fields. These classes started out in the library classroom and then expanded to other venues around PNNL. Class surveys indicated that many researchers desired a practical approach to learning rather than the traditional lecture format. The library instituted “Library Learning Day” and hosted classes in the PNNL computer training room to provide lab employees with a hands-on learning experience. Classes are generally offered at noon and lab staff attends classes on their lunch hour. Many just do not have time to spend a full hour in training. Library staff added some experimental half-hour mini classes in campus buildings geared to the projects and interests of researchers there to see if this format was more appealing. As other programs have developed librarians are teaching fewer classes but average attendance figures has remained fairly stable from 2005-2007. In summer of 2004 the library began the Traveling Librarian program. Librarians call-on groups and individuals in 24 buildings on the Richland Washington campus. Five full-time and two part-time librarians are involved in the program. Librarians usually send out email announcements prior to visits and encourage scientists and engineers to make appointments for a brief 15 minute consultation in the researcher’s own office. During the meeting lab staff learn about products or product features that can help them work more productively. Librarians also make cold calls to staff that do not request a consultation and may not be making full use of the library. Scientists and engineers who require longer sessions can arrange half-hour training appointments in the researcher’s own office or at the library. Since the program was implemented staff made 165 visits to 1249 laboratory staff including some repeat consultation requests. New acquisitions lists are sent to individuals and groups that would be interested in recent journal, database, and books purchases. These lists are topic specific and targeted to groups and individuals with an interest in the field. For example newly acquired engineering resources are targeted at engineering groups. The new acquisitions list for engineering began mid year in 2005. An analysis of circulation statistics for engineering books in fiscal year 2005, 2006, and 2007 show that circulation increased each year with 2007 circulation nearly double that of 2005. This took place when overall circulation rose in FY06 but fell slightly in FY07. Outreach strategies tailored and individualized can be effective. Offering multiple outreach options offers researchers different ways to interact with library staff and services.

99 GENERAL AND MISCELLANEOUS↗

Compilation of PRF Canyon Floor Pan Sample Analysis Results

On September 28, 2015, debris collected from the PRF (236-Z) canyon floor, Pan J, was observed to exhibit chemical reaction. The material had been transferred from the floor pan to a collection tray inside the canyon the previous Friday. Work in the canyon was stopped to allow Industrial Hygiene to perform monitoring of the material reaction. Canyon floor debris that had been sealed out was sequestered at the facility, a recovery plan was developed, and drum inspections were initiated to verify no additional reactions had occurred. On October 13, in-process drums containing other Pan J material were inspected and showed some indication of chemical reaction, limited to discoloration and degradation of inner plastic bags. All Pan J material was sealed back into the canyon and returned to collection trays. Based on the high airborne levels in the canyon during physical debris removal, ETGS (Encapsulation Technology Glycerin Solution) was used as a fogging/lock-down agent. On October 15, subject matter experts confirmed a reaction had occurred between nitrates (both Plutonium Nitrate and Aluminum Nitrate Nonahydrate (ANN) are present) in the Pan J material and the ETGS fixative used to lower airborne radioactivity levels during debris removal. Management stopped the use of fogging/lock-down agents containing glycerin on bulk materials, declared a Management Concern, and initiated the Potential Inadequacy in the Safety Analysis determination process. Additional drum inspections and laboratory analysis of both reacted and unreacted material are planned. This report compiles the results of many different sample analyses conducted by the Pacific Northwest National Laboratory on samples collected from the Plutonium Reclamation Facility (PRF) floor pans by the CH2MHill’s Plateau Remediation Company (CHPRC). Revision 1 added Appendix G that reports the results of the Gas Generation Rate and methodology. The scope of analyses requested by CHPRC includes the determination of common anions, gamma spectrometry, metals, corrosivity, organics and alpha spectrometry (note: alpha spectrometry was cancelled during the performance of this work with concurrence from CHPRC). Results may help elucidate the components that led to the unexpected reaction in the canyon as well as inform the radiological and hazardous characteristics. The specific anions, gamma emitters, organics and metals requested by CHPRC are provided in the analytical reports sections. The individual analyses were conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.) developed by PNNL specifically for this project. The final reports for each analysis set are included in this compilation of the results. Each package was reviewed under the PFP Floor Pan Evaluation Project Quality Assurance Project Plan so no additional reviews were conducted in this compilation task. The Gas Generation Rates in Appendix G were conducted under the PNNL “How Do I…” quality assurance program and were NOT conducted under the Plutonium Finishing Plant (PFP) Floor Pan Evaluation Project Quality Assurance Project Plan (PFP Floor Pan Evaluation QAPP, Revision 0.).

36 MATERIALS SCIENCE↗

Implications of Cost Effectiveness Screening Practices in a Low Natural Gas Price Environment: Case Study of a Midwestern Residential Energy Upgrade Program

With the proliferation of statewide energy savings targets and other policies favorable to energy efficiency, savings from utility customer-funded energy efficiency programs could rise to offset much of annual load growth by 2025 (Barbose et al 2013). For these increased savings to occur, however, nearly all of these programs must pass screening for cost effectiveness. Some program administrators and state regulators are finding that conventional analyses, which only consider a narrow set of energy-savings related efficiency program benefits, are now resulting in some natural gas efficiency programs failing their cost-effectiveness criteria in the new low natural gas price environment. Regulators are considering whether to scale back or terminate gas portfolios in at least four states (WA, OR, ID, NM) because of cost-effectiveness concerns. Stakeholders in several regions of the country have asked LBNL to help assess alternatives to reducing the pursuit of energy savings in their regions. We address these requests by producing two working papers: one exploring cost-effectiveness screening policy implications of low to moderate natural gas prices, and a second assessing some of the values that policymakers may take into account in weighing the pros and cons of ending natural gas efficiency programs. In this policy brief, we lay out the challenges that low gas prices pose for cost effectiveness of an electric-gas efficiency program and portfolio. We then quantify options available to regulators and administrators who want to evaluate the tradeoffs among multiple policy objectives. A multi-measure, residential energy upgrade program in the Midwest is used as a lens to explore the implications of common and emerging cost-effectiveness policies in the context of low prices for natural gas. We illustrate the results across a range of cost-effectiveness screening options, including different discount rates, levels of test application, various benefit-cost tests, and the inclusion of non-energy resource benefits.

03 NATURAL GAS↗

Humate Amendment Injection Viability Testing – Supplementary Batch Mixture and Soil Column Studies

Groundwater in the Lost Lake Aquifer Zone (LLAZ) in the Southern Sector of the M-Area Hazardous Waste management Facility (HWMF) is contaminated with chlorinated ethenes, including trichloroethylene (TCE) and tetrachloroethylene (PCE). Treatment of contaminated groundwater with humic acid is being evaluated as a potential corrective action for these volatile organic compounds (VOCs) in the LLAZ in Southern Sector (SRNS, 2019). Pilot scale injections of Huma-K brand humic acid for groundwater treatment were previously performed in M-Area between 2017 and 2020 (Amidon, 2023). Groundwater was extracted from the Lost Lake Aquifer Zone (LLAZ), then a solution of humate was mixed with recovered groundwater and subsequently re-injected into the same aquifer unit. Operations of the historical humate pilot testing were discontinued in 2020 due to COVID-19 restrictions, low injection rates, and recirculation fluid spillage. No further field scale or laboratory research to investigate humate amended groundwater injection was performed at the SRS until 2024. At the request of Area Completion Projects (ACP), the Savannah River National Laboratory (SRNL) performed supplementary testing to help determine the viability of further injection of humate as a remedial option for VOCs within the LLAZ in the Southern Sector of the M-Area HWMF.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Municipal Adaptation to Changing Curbside Demands: Findings from Semi-Structured Interviews with Ten U.S. Cities

Emerging mobility services (e.g. ride-hailing, e-commerce, micro-mobility, etc.), are generating novel and rapidly growing demands to use curbside space, with potentially large impacts on mobility, energy consumption, and related outcomes. This presents both opportunities and challenges to municipal agencies responsible for managing this interface between the road network and adjacent land uses, as legacy practices require updating. In this study, we employ a semi-structured interviewing approach to establish how municipalities are adapting to these new pressures on their curbside. We interviewed senior staff responsible for curbside policy of ten large U.S. municipalities, with populations ranging from ~250,000 to ~5,000,000 (and the majority of which are the central city of their metropolitan region). We document a trend of organizational restructuring to more formally include curbside management teams, with the majority of interviewees also reporting increased staffing. Respondents reported that operational failures at their curbside (e.g. demand in excess of capacity) have impacts on safety, capacity, and emergency vehicle mobility, with impacts highly concentrated spatially and temporally (e.g. late evenings in nightlife districts). We document a diversity of data flows between ride-hailing operators (e.g. Uber, Lyft) and municipalities, with some cities reporting obtaining types of data that other cities report not receiving, despite requesting such data. Finally, respondents consistently expressed a desire for new data streams and methodologies to help manage the curbside of the future. It is hoped that establishing the state of practice in this rapidly changing context will be of use to practitioners facing similar pressures as those of our interviewees.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Board on Earth Sciences and Resources and Its Activities

The National Academies’ Board on Earth Sciences and Resources (BESR) and its standing committees provide an ongoing forum for advancing the understanding and communication of Earth sciences and resource topics, including emerging topics and innovative techniques. BESR activities help to provide evidence-based information to members of the executive and legislative branches of the federal government, the private sector, states and tribes, academia, non-governmental organizations, and the public to support decision-making. BESR and its standing Committee on Solid Earth Geophysics (COSEG), also supported by this award, fulfill this role through development and administration of consensus studies, as well as workshops and other convening activities related to the Earth sciences; overseeing selected activities of the Board’s standing committees, such as disciplinary meetings and webinars; and communicating, sharing information, and providing opportunities for interaction and exchange among technical and non-technical stakeholders. The core support received from DOE helps BESR and COSEG maintain a central body of volunteer experts and National Academies staff who can respond to pressing needs and requests from federal sponsors and other members of the Earth science community, to maintain the health and relevance of the Earth sciences discipline, and to provide the Earth science community with a privileged interface to the government to support scientific and engineering advances and decision making related to Earth sciences and engineering. Initiation and oversight of Earth science activities at the National Academies is an enduring function of the BESR and COSG that helps to ensure development and completion of projects and activities that are responsive to the needs of sponsors and the broader Earth science and research enterprise.

58 GEOSCIENCES↗

Transition to a Thorium-based Fuel Cycle - Choices, Challenges, and Options

The Charter for the Evaluation and Screening (E and S) of Nuclear Fuel Cycle Options requested by the US Department of Energy calls for the identification of promising fuel cycle options to help guide the future directions of research and development in this area. The final report for this study, which was produced by various national laboratory and industry experts, collected the expansive set of fuel cycle options into 40 evaluation groups (EGs). In support of this study, detailed steady-state physics and mass flow data for each of these groups were compiled into a set of Fuel Cycle Data Packages (FCDPs). The data in the FCDPs were then used to quantify the nine criteria detailed in the study to identify the most promising EGs. In addition to supporting the E and S study, data from these FCDPs can be used to benchmark fuel cycle simulation tools for equilibrium calculations. Once benchmarked, their dynamic modeling capabilities can support the continuing effort to determine the most effective approaches for transitioning to proposed advanced future fuel cycles. While steady-state conditions can be calculated directly in some cases, fuel cycle simulation tools allow for the transition scenarios to be simultaneously optimized on multiple parameters such as the fissile material availability, the amount of desirable material in storage, and the time required for transition. In addition to fuel cycle simulations where material availability is considered and is often a constraint to achieving transition, determining the technology needs to enable a transition to take place is also a key consideration (e.g., what technology is needed, when it is needed, and whether it is needed only during the transition and not for the equilibrium fuel cycle). This paper evaluates the material and technology issues and challenges associated with a transition from a uranium-based fuel cycle (such as that operating in the US today, represented by EG01) to a thorium-based fuel cycle, recognizing that thorium requires fissile material to start up. Based on the findings of the E and S report, the two most promising thorium fuel cycle options are considered in this report: (1) EG26, a thermal spectrum molten salt reactor (MSR), and (2) EG28, represented by a sodium fast reactor (SFR, fast spectrum) and a resource-renewable boiling water reactor (RBWR, intermediate spectrum). (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Assessing Community Preferences Regarding Solar Development

Preparing a plan regarding solar development in your community requires bringing together people from a variety of backgrounds and perspectives, who often have strong feelings and preferences about the amount and location of local solar PV projects developed in their community. The planning process should be designed in an inclusive way, where meaningful community engagement is prioritized. With a topic such as solar development, which can elicit strong reactions among community members, proactive community engagement that is perceived as fair will likely lead to more favorable outcomes. Whether your community hosts large tracts of forest, brownfields, residential neighborhoods, and/or large buildings and parking lots, there are a variety of ways community members might envision growth of solar energy. The engagement process can help clarify how and where solar is preferred, so that local government can respond to future solar development requests or to initiate solar projects that are preferred by the community.

14 SOLAR ENERGY↗

The Effect of Congress' Mandate to Create Greater Efficiencies in the Characterization of Transuranic Waste through the Waste Isolation Pilot Plant (WIPP) Hazardous Waste Facility Permit

Effective December 1, 2003, the U.S. Congress directed the Department of Energy (DOE) to file a permit modification request with the New Mexico Environment Department (NMED) to amend the Hazardous Waste Facility Permit (hereinafter 'the Permit') at the Waste Isolation Pilot Plant (WIPP). This legislation, Section 311 of the 2004 Energy and Water Development Appropriations Act, was designed to increase efficiencies in Transuranic (TRU) waste characterization processes by focusing on only those activities necessary to characterize waste streams, while continuing to protect human health and the environment. Congressionally prescribed changes would impact DOE generator site waste characterization programs and waste disposal operations at WIPP. With this legislative impetus, in early 2004 the DOE and Washington TRU Solutions (WTS), co-permittee under the Permit, submitted a permit modification request to the NMED pursuant to Section 311. After a lengthy process, including extensive public and other stakeholder input, the NMED granted the Permittees' request in October 2006, as part of a modification authorizing disposal of Remote-Handled (RH) TRU waste at WIPP. In conclusion: Implementation of the Permit under the revised Section 311 provisions is still in its early stages. Data are limited, as noted above. In view of these limited data and fluctuations in waste feed due to varying factors, at the current time it is difficult to determine with accuracy the impacts of Section 311 on the costs of characterizing TRU waste. It is safe to say, however, that the there have been many positive impacts flowing from Section 311. The generator sites now have more flexibility in characterizing waste. Also, RH TRU waste is now being disposed at WIPP - which was not possible before the 2006 Permit modification. As previously noted, the RH modification was approved at the same time as the Section 311 modification. Had the Section 311 changes not been implemented, RH TRU waste may not have been successfully permitted for disposal at WIPP. Changes made pursuant to Section 311 helped to facilitate approval of the proposed RH TRU modifications. For example, the three scenarios for use in AK Sufficiency Determination Requests, described herein, are essential to securing approval of some RH TRU waste streams for eventual disposal at WIPP. Thus, even if characterization rates do not increase significantly, options for disposal of RH TRU waste, which may not have been possible without Section 311, are now available and the TRU waste disposal mission is being accomplished as mandated by Congress in the LWA. Also, with the Section 311 modification, the Permittees commenced room-based VOC monitoring in the WIPP repository, which is also a positive impact of Section 311. Permit changes pursuant to Section 311 were a good beginning, but much more is need to encourage more efficient methodologies in waste characterization activities for TRU mixed waste destined for WIPP. Although the Permittees now have more flexibility in characterizing waste for disposal at WIPP, the processes are still lengthy, cumbersome, and paper-intensive. As the generator sites continue to characterize waste under Section 311, more data will likely be compiled and evaluated to assess the longer term cost and technical impacts of Section 311. Also, further refinements in TRU waste characterization requirements through Permit modifications are likely in future years to eliminate, improve, and clarify remaining unnecessary and redundant Permit provisions. Continuous improvements to the TRU waste characterization program are bound to occur, resulting in even greater efficiencies in the characterization and ultimate disposal of TRU waste. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Forensics: A Capability at Risk (Abbreviated Version)

Nuclear forensics is important to our national security. Actions, including provision of appropriate funding, are needed now to sustain and improve the nation's nuclear forensics capabilities. The Department of Homeland Security (DHS), working with cooperating agencies and national laboratories, should plan and implement a sustainable, effective nuclear forensics program. Nuclear forensics is the examination and evaluation of discovered or seized nuclear materials and devices or, in cases of nuclear explosions or radiological dispersals, of detonation signals and post-detonation debris. Nuclear forensic evidence helps law enforcement and intelligence agencies work toward preventing, mitigating, and attributing a nuclear or radiological incident. This report, requested by DHS, the National Nuclear Security Administration, and the Department of Defense, makes recommendations on how to sustain and improve U.S. nuclear forensics capabilities. The United States has developed a nuclear forensics capability that has been demonstrated in real-world incidents of interdicted materials and in exercises of actions required after a nuclear detonation. The committee, however, has concerns about the program and finds that without strong leadership, careful planning, and additional funds, these capabilities will decline. Major areas of concern include: Organization. The responsibility for nuclear forensics is shared by several agencies without central authority and with no consensus on strategic requirements to guide the program. This organizational complexity hampers the program and could prove to be a major hindrance operationally. Sustainability. The nation's current nuclear forensics capabilities are available primarily because the system of laboratories, equipment, and personnel upon which they depend was developed and funded by the nuclear weapons program. However, the weapons program's funds are declining. Workforce and Infrastructure. Personnel skilled in nuclear forensics are too few and are spread too thinly. Some key facilities are in need of replacement because they are old, outdated, and not built to modern environmental, health, and safety standards. Procedures and Tools. Most nuclear forensics techniques were developed to carry out Cold War missions and to satisfy a different, less restrictive set of environmental, health, and safety standards. Some of the equipment also does not reflect today's technical capabilities. The Executive Office of the President established the National Technical Nuclear Forensics Center under the direction of the Secretary of Homeland Security, to coordinate nuclear forensics in the United States. DHS's responsibility can only be carried out with the cooperation and support of the other agencies involved. The committee recommends that DHS and the other cooperating agencies should: 1. Streamline the organizational structure, aligning authority and responsibility; and develop and issue appropriate requirements documents. 2. Issue a coordinated and integrated implementation plan for fulfilling the requirements and sustaining and improving the program's capabilities. This plan would form the basis for the agencies' multi-year program budget requests. 3. Implement a plan to build and maintain an appropriately sized and composed nuclear forensics workforce, ensuring sufficient staffing at the national laboratories and support for university research, training programs, and collaborative relationships among the national laboratories and other organizations. 4. Adapt nuclear forensics to the challenges of real emergency situations, including, for example, conducting more realistic exercises that are unannounced and that challenge regulations and procedures followed in the normal work environment, and implementing lessons learned. The national laboratories should: 5. Optimize procedures and equipment through R&D to meet program requirements. Modeling and simulation should play an increased role in research, development, and planning. The nuclear forensics community should: 6. Develop standards and procedures for nuclear forensics that are rooted in the same underlying principles that have been recommended to guide modern forensic science. DHS and the other cooperating agencies should: 7. Devise and implement a plan that enables access to relevant information in databases including classified and proprietary databases for nuclear forensics missions. The Executive Office of the President and the Department of State, working with the community of nuclear forensics experts, should: 8. Determine the classes of data and methods that are to be shared internationally and explore mechanisms to accomplish that sharing.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Anticipating Change - A Means to Save Time and Rethink the Implementation of the 10 Code of Federal Regulations 770 Real Property Transfer Process - 15662

The Department of Energy (DOE) issued 10 Code of Federal Regulations (CFR) 770 in 2000 for the 'Transfer of Real Property at Defense Nuclear Facilities for Economic Development'. The rule was issued in order to 'offset negative impacts on communities caused by unemployment from related DOE down-sizing, facility close-outs and workforce restructuring'. There is a sense of urgency implied in efforts designed to address economic conditions, especially in communities that have hosted DOE facilities and are experiencing negative impacts of mission changes. Despite the urgency, the transfer of real property from DOE or any federal agency is a lengthy, complex, iterative, but necessarily diligent effort. After all, the aim of the process is to be able to demonstrate that the property proposed for transfer is protective of human health and the environment for the intended use. Notwithstanding the efforts of the economic development organization to market, recruit, and prepare a robust proposal to request property, and the efforts of DOE to perform the many due diligence activities in response to that request, the actual results of the evaluations are an unknown until a major portion of the process is completed. Will the property be determined to be suitable for transfer? Will there be deed restrictions? Is indemnification available? Has a mission need for the property arisen while working through the reviews? There are many points along the way that can sidetrack or delay progress and, in the interim, the economic viability of the proposal can collapse. Even without the unforeseen events, the process in and of itself is lengthy. It is often heard (loudly) that it takes far too long to obtain a piece of property once a request is made; that observation/criticism is worthy of serious attention. Rather than revisit old debates, why not learn from them? Why not look at the transfer process from a different point of view and ameliorate it so it can be more responsive to community needs? Why not anticipate change, anticipate requests, and make property available before a request as well as responding to requests to make property available? There are several ways to rethink and modify the way the transfer process is implemented to reduce the time following a request. The modifications would arise from both internal information sharing, integrated and timely up-front planning and, in particular, by varying how and when certain elements of the process to enable transfer are performed. This paper will address: 1. How a unified overall vision can be created from the cleanup input of Site-Specific Advisory Boards with the Community Reuse Organizations' planning for economic development and can help inform site cleanup to end state to future use; 2. Why DOE is in the best position to know its site conditions and could determine ahead of a transfer request what property is indeed available and notify of that determination; 3. How a range of disposition paths for real property are available to DOE; and 4. Why broadening the understanding of 'best interest of the government' to one that is clearly able to recognize non-monetary benefits is in the best interest of the government. Anticipating change helps prepare DOE and their host communities for the future. It creates opportunities for flexibility and time savings. The sooner DOE's unneeded and under-utilized real property can be made available to the communities that need it most, the sooner those communities can work to moderate the adverse effects of DOE mission changes. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements (Book)

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Fortifying Environmental Compliance Strategies at Hanford - 19541

At the Hanford Site, located near Richland, Washington, the Department of Energy is cleaning up legacy radioactive and mixed-waste generated from the Manhattan Project in the 1940's. A major component of cleaning up the waste is maintaining compliance with federal and state environmental regulations. Environmental compliance is also determined through permits, agreements, and consent orders issued by regulating agencies such as the Washington State Department of Health: Office of Radiation Protection, Washington State Department of Ecology Nuclear Waste Program, and the Environmental Protection Agency. Maintaining compliance at Hanford reduces environmental impacts and addresses violations, or non-compliances. The following strategies improve compliance and support the avoidance of enforcement actions. At Hanford, regulatory agency environmental enforcement actions, and their corrective actions, are tracked to completion using databases maintained by inspection subject matter experts. The databases are used to provide the Department of Energy and contractor management with up-to-date status of regulatory agency activity and the required corrective actions. Trending enforcement actions helps target compliance vulnerabilities. Findings and corrective actions that are entered into the databases are then trended by date, location, responsible contractor, agency, and type of compliance issue. The ability to review previous non-compliances in certain locations of the Site, or by general alleged violation, provides the project's environmental contacts with information on what types of issues to look for on pre-inspection walk downs. Finding non-compliances during pre-inspection walk downs allows the contractor to correct the issue and avoid potential fines from regulating agencies. The walk downs are conducted by environmental specialists and project personnel looking for issues that may be viewed as a compliance problem. Using agency checklists and previous inspection correspondence can help to provide valuable information during pre-inspection activities. Training regulatory agency inspectors on Site security requirements, cultural and ecological standards, and inspection protocols allows for increased efficiency and reduces potential miscommunication between regulatory agencies and the regulated contractors. The training also allows the contractors to give the regulating agencies the up-to-date policies and procedures that will be addressed during the inspection. Hanford has pre-identified inspection coordinators within each contractor to assist in coordinating with Department of Energy personnel, projects, and management prior to the inspections. These inspection coordinators notify affected management, accommodate and escort the regulators to locations they ask to inspect, set up requested interviews, and gather requested information that will need to be cleared for public release. These practices make for positive experiences and interactions with the regulating agency personnel and help reduce and eliminate environmental non-compliances, findings, violations, and fines. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Alternative Compliance: Guidelines for Preparing and Submitting a Waiver Request Application and Other Documentation Requirements

This document is designed to assist covered fleets interested in taking advantage of more flexible compliance options and to facilitate the transition from Standard Compliance to Alternative Compliance. It is designed to help fleets better understand the Alternative Compliance option and successfully complete the waiver application process.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗