Search NASA⌕ Search

SEARCH · Search NASA

Results for “Hydropower Components”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Water Energy Simulation Toolset

The Water-Energy Simulation Toolset (WEST) is an interactive simulation model that helps visualize impacts of different stakeholders on water quantity and quality of a watershed. The case study is applied for the Snake River Basin with the fictional name Cutthroat River Basin. There are four groups of stakeholders of interest: hydropower, agriculture, flood control, and environmental protection. Currently, the quality component depicts nitrogen-nitrate contaminant. Users can easily interact with the model by changing certain inputs (climate change, fertilizer inputs, etc.) to observe the change over the entire system. Users can also change certain parameters to test their management policy.

Nguyen, Thuy↗

Storage Enabled Flexibility of Conventional Generation Assets (StorFlex)

The power systems have faced progressively more demanding operational requirements over the last two decades. Several factors contribute to these challenging operating conditions, including load growth, aging infrastructure, increasing penetrations of distributed energy resources (DERs), electrification of the economy, and policy initiatives such as decarbonization. The power system and its components must provide high operational flexibility to mitigate these challenges. For example, the proliferation of intermittent DERs such as wind and solar has increased the need for conventional generation assets like hydropower plants to respond to sudden load-generation imbalances. The higher flexibility requirements for hydropower plants cause more wear and tear, potentially shortening the useful lifespan of hydropower turbines. To reduce the need for hydropower plants to follow sudden changes in the dispatch signal, we investigate their combined operation with the energy storage systems (ESSs; “ESS-based hybridization”). Our analyses focuses on improving the lifespan of hydropower plants through ESS-based hybridization. Wear and tear on hydropower turbines (particularly Francis turbines) is modeled using a loss-of-life concept that is based on damage experienced by the turbine due to various cycles of operation. Then, we show that using ESSs to offset some of the high variation increases the remaining life of the hydropower plants. To demonstrate this, a few modeling tools were developed for this work: (1) a dynamic model for various components of the turbine and its governor; (2) a control strategy that assigns a slow-varying dispatch signal to a hydropower unit versus a fastmoving signal to ESS, such that the overall power request remains the same; and (3) models for the financial analysis to quantify the economic merits of such a framework. We used the models we developed to analyze the dispatch pattern of an actual hydropower plant with a power output of 50 MW and a head height of 152 m. This work showed that ESS-based hybridization could extend the life of the hydropower plant by 5% on average. This extension in life was then used to estimate the economic benefit in terms of cost deferrals associated with hydropower plant maintenance and replacement: on average, $3.6 million. Sensitivity analysis with respect to the size of ESS and cost of turbines was performed to show the variation in benefits over the range of turbine costs and ESS sizes. Crucially, stacking damage reduction and lifetime extension with other ESS value streams such as providing ancillary services could substantially increase the financial benefits of ESS-based hybridization. The higher costs associated with ESS of appropriate size would make more financial sense when multiple value streams are stacked and co-optimized to extract the maximum benefit. This dimension will be explored in future work.

13 HYDRO ENERGY↗

Total Dissolved Gas Prediction and Optimization in RIVERWARE

Management and operation of dams within the Columbia River Basin (CRB) provides the region with irrigation, hydropower production, flood control, navigation, and fish passage. These various system-wide demands can require unique dam operations that may result in both voluntary and involuntary spill, thereby increasing tailrace levels of total dissolved gas (TDG) which can be fatal to fish. Appropriately managing TDG levels within the context of the systematic demands requires a predictive framework robust enough to capture the operationally related effects on TDG levels. Development of the TDG predictive methodology herein attempts to capture the different modes of hydro operation, thereby making it a viable tool to be used in conjunction with a real-time scheduling model such as RiverWare. The end result of the effort will allow hydro operators to minimize system-wide TDG while meeting hydropower operational targets and constraints. The physical parameters such as spill and hydropower flow proportions, accompanied by the characteristics of the dam such as plant head levels and tailrace depths, are used to develop the empirically-based prediction model. In the broader study, two different models are developed a simplified and comprehensive model. The latter model incorporates more specific bubble physics parameters for the prediction of tailrace TDG levels. The former model is presented herein and utilizes an empirically based approach to predict downstream TDG levels based on local saturation depth, spillway and powerhouse flow proportions, and entrainment effects. Representative data collected from each of the hydro projects is used to calibrate and validate model performance and the accuracy of predicted TDG uptake. ORNL, in conjunction with IIHR - Hydroscience & Engineering, The University of Iowa, carried out model adjustments to adequately capture TDG levels with respect to each plant while maintaining a generalized model configuration. Validation results indicate excellent model performance with coefficient of determination values exceeding 92% for all sites. This approach enables model extension to an increasingly wider array of hydropower plants, i.e., with the proper data input, TDG uptake can be calculated independent of actual physical component design. The TDG model is used as a module in the systematic optimization framework of RiverWare, a river and reservoir modeling tool used by federal agencies, public utility districts, and other dam owners and operators to forecast, schedule, and manage hydropower assets. The integration and testing of the TDG module within RiverWare, led by University of Colorado's Center for Advanced Decision Support for Water and Environmental Systems (CADSWES), will allow users to generate optimum system schedules based on the minimization of TDG. Optimization analysis and added value will be quantified as system wide reductions in TDG achieved while meeting existing hydropower constraints. Future work includes the development of a method to predict downstream reservoir forebay TDG levels as a function of upstream reservoir tailrace TDG values based on river hydrodynamics, hydro operations, and reservoir characteristics. Once implemented, a holistic model that predicts both TDG uptake and transport will give hydropower operators valuable insight into how system-wide environmental effects can be mitigated while simultaneously balancing stakeholder interests.

13 HYDRO ENERGY↗

Utility of Big Area Additive Manufacturing for Part Production for Low-Head Hydropower

ORNL worked with Cadens, LLC to explore the use of additive manufacturing (AM) for the production of low-cost parts for low-head hydropower systems. Cadens develops design optimization software that leverages the flexible, low-cost, high-strength benefits of AM and composite materials, and operates a micro-hydro lab to test AM components in controlled environments. Until now Cadens’ tests have been limited in size to components that they can cost-effectively manufacture using local commercial systems. This project provided an opportunity for Cadens to scale up their modular AM hydropower parts using the capabilities of Big Area Additive Manufacturing (BAAM). This project was a success and resulted in the design and fabrication of several end use parts of a hydropower system using a Big Area Additive Manufacturing (BAAM) system. The fabricated parts include draft tube, thimble, runner housing mold, PVC end fitting and two PVC pipe supports. The components have been in use for more than three years without a 3D printed component failing.

13 HYDRO ENERGY↗

Deployment of Energy Storage to Improve Environmental Outcomes of Hydropower

This paper describes how the installation of energy storage systems, co-sited with hydroelectric projects, can offer both economic and environmental benefits by enabling a broader range of electricity performance, capitalizing on its flexibility and grid reliability, while mitigating critical environmental impacts or improving environmental outcomes across U.S. rivers and streams. The paper attempts to link environmental outcomes to energy storage utilization. It offers a comprehensive inventory of research-grade work, site-specific studies, policies, and pilot projects regarding energy storage and hydropower that show significant environmental implications. It provides an outline of methodologies given the known costs and attributes of storage technologies, with case study illustrations. It outlines the key components of a methodology that could be applied within the context of specific projects to reveal the environmental benefits of energy storage paired with hydropower production to properly size the storage systems to seize benefits. The actual methodology would be developed in future work. Finally, we provide a set of gaps to be addressed in future work as this important idea gains traction.

13 HYDRO ENERGY↗

1D Modeling for the Development of a Digital Twin for Hydropower Systems with Applications for a Testing Rig

Modeling and simulation constitute two important parts in constructing a sensible digital twin to mimic the dynamics of hydropower systems. Because of the physical nature of a hydropower system, the basic modeling should cover the water flow systems from the reservoir to the penstock (inlet water pipes), penstock to hydro turbine, and hydro turbine to generator and from the linkage of the hydropower systems to the grid. This report describes initial attempts to model these dynamic components, including the formulation of the linearized state space model for hydro turbine systems using the well-known six-coefficients linearization method and the formulation of the voltage and power dynamical models of a synchronous generator. To validate the accuracy of the proposed model, data collected from Norwegian University of Science and Technology were used to obtain relevant parameters for the model, and the desired simulation results were obtained. Additionally, neural network modeling and learning were also developed and applied to model the generation torque and water flow rate subsystems to demonstrate a potential learning scheme, which can be used in the development of a digital twin.

13 HYDRO ENERGY↗

Integrated modeling for assessing climate change impacts on water resources and hydropower potential in the Himalayas

Regional hydroclimatic variability and change can affect water resources and hydropower generation. It is essential to assess hydropower potential under current and future climatic conditions to inform the design and operation of hydropower infrastructures. Here, we employ an integrated modeling framework to assess the impact of projected hydroclimatic conditions on water resource systems and hydropower generation. The integrated framework samples climate model outputs under different scenarios to force a hydrologic model and produces streamflow projections. The projected streamflows are inputs for the future hydropower potential assessment. We implement the framework in the central Himalayan river basin. Our results demonstrate substantial spatiotemporal variability in different water balance components (precipitation, evapotranspiration, and water yield) under current and future climatic conditions. For the Himalayan Tila river basin, the annual average energy production is expected to increase under future hydroclimatic conditions (up to 39% in Tila-2 hydropower project, suggested by ensemble mean). Furthermore, this increase in energy is driven mainly by the increased streamflow projections, particularly during the dry season and in the late century. Our results highlight the impacts of hydroclimatic variability in hydropower productions and are of practical use to provide decision-relevant information for designing and operating hydropower infrastructures. The integrated modeling framework presented here is region-specific; however, the approach is reproducible, and the overall insights are generalizable across the Himalayan region.

54 ENVIRONMENTAL SCIENCES↗

Non-Powered Dam Retrofit Exemplary Design for Hydropower Applications

Non-powered dams (NPDs) represent complex systems, situated at the intersection of natural stream environments and the built environment. The presence and operations of NPDs affect stream constituents (e.g., fish, recreational craft, sediment, water) and serve one or more engineered purposes (e.g., recreation, flood control, water supply, irrigation, tailings and debris control, navigation). By definition, NPDs do not provide hydropower generation. However, every NPD contains some untapped hydropower resource potential, represented by the pre-existing hydraulic head created by the dam and presence of flowing water. Adding power generation to an NPD requires retrofitting the NPD, which could involve the addition of any new component or function beyond that currently installed. Because this research is funded by the US Department of Energy Water Power Technologies Office, adding hydropower to NPDs is among the primary objectives for research investment. However, NPD retrofitting extends beyond the purview of hydropower additions. This report provides background information regarding NPD development in the United States, including an overview of the US NPD population, development potential, and recent development. It also summarizes challenges and opportunities facing NPD retrofit development, highlights the importance of maintaining or improving stream and dam functionality, notes key NPD characteristics, describes NPD retrofit methods, and identifies innovation areas for spurring future NPD retrofit development. Section 4 describes retrofit exemplary design principles and concepts that could apply to a wide range of NPD projects. These principles and concepts inform an NPD Retrofit Exemplary Design Specification (REDS), as included in Appendix A. The NPD REDS is heavily influenced by prior work under the standard modular hydropower technology acceleration research initiative, especially the work documented in the Exemplary Design Envelope Specification for Standard Modular Hydropower Technology (Witt et al., 2017). Whereas this prior work focuses on a particular technology class that applies most intentionally for new stream-reach development (i.e., greenfield sites), the NPD REDS contained herein applies more broadly to the NPD resource class and is technology-agnostic (i.e., the specific technologies intended to be described are not explicitly prescribed). This report serves as a part of early-phase research on NPD retrofit development, aimed toward spurring additional, follow-on efforts to specifically address development challenges, capitalize on development opportunities, and inspire innovation. As documented in the landmark “Hydropower Vision” report (DOE 2016), “transformative technical innovations able to meet the co-objectives of environmental sustainability and low-carbon energy will be critical to enabling additional hydropower growth.” This report serves as an important step in steering transformation of US non-powered dam infrastructure.

13 HYDRO ENERGY↗

Quantum Key Distribution for Critical Infrastructures: Towards Cyber-Physical Security for Hydropower and Dams

Hydropower facilities are often remotely monitored or controlled from a centralized remote control room. Additionally, major component manufacturers monitor the performance of installed components, increasingly via public communication infrastructures. While these communications enable efficiencies and increased reliability, they also expand the cyber-attack surface. Communications may use the internet to remote control a facility’s control systems, or it may involve sending control commands over a network from a control room to a machine. The content could be encrypted and decrypted using a public key to protect the communicated information. These cryptographic encoding and decoding schemes become vulnerable as more advances are made in computer technologies, such as quantum computing. In contrast, quantum key distribution (QKD) and other quantum cryptographic protocols are not based upon a computational problem, and offer an alternative to symmetric cryptography in some scenarios. Although the underlying mechanism of quantum cryptogrpahic protocols such as QKD ensure that any attempt by an adversary to observe the quantum part of the protocol will result in a detectable signature as an increased error rate, potentially even preventing key generation, it serves as a warning for further investigation. In QKD, when the error rate is low enough and enough photons have been detected, a shared private key can be generated known only to the sender and receiver. We describe how this novel technology and its several modalities could benefit the critical infrastructures of dams or hydropower facilities. The presented discussions may be viewed as a precursor to a quantum cybersecurity roadmap for the identification of relevant threats and mitigation.

97 MATHEMATICS AND COMPUTING↗

Utility of Big Area Additive Manufacturing for Part Production for Low-Head Hydropower (CRADA NFE-18-07280 Final Report)

ORNL worked with Cadens, LLC, to explore the use of additive manufacturing (AM) to produce low-cost parts for low-head hydropower systems. Cadens develops design optimization software that leverages the flexible, low-cost, high-strength benefits of AM and composite materials. Cadens also operates a micro-hydro lab to test AM components in controlled environments. Until now, Cadens’ tests have been limited to components of a size that they can cost-effectively manufacture using local commercial systems. This project provided an opportunity for Cadens to scale up their modular AM hydropower parts using the capabilities of Big Area Additive Manufacturing (BAAM). This project was a success and resulted in the design and fabrication of several end-use parts of a hydropower system, using a Big Area Additive Manufacturing (BAAM) system. The fabricated parts include a draft tube, thimble, runner housing mold, PVC end fitting and two PVC pipe supports. In addition, a runner system was fabricated using fused deposition modeling on a 3D Platform Workbench 400 Series System.

13 HYDRO ENERGY↗

Assessing the Costs of Hydropower at Non-Powered Dams Using a Reference Site Model

Hydropower capacity in the United States currently stands at approximately 103 GW, and there are remaining water resources that could help meet the rapidly increasing demand for electricity and ancillary grid services. Existing dams that do not generate power, known as non-powered dams, are a near-term solution to enhance the contribution of hydropower to the US power grid. However, there are thousands of such sites, and the lack of detailed information about their specific characteristics and associated costs presents significant challenges for stakeholders. This study addresses these challenges by developing a reference site model to evaluate the potential costs of hydropower at non-powered dams using currently available technologies. An application of the model reveals a wide range of estimates for capacity, capital costs, levelized cost of electricity, and cost components. While many sites are competitive with current technologies, the majority would need cost-reducing innovations to be viable. Despite the limited available information, the model offers valuable insights into the relative competitiveness of hydropower projects at non-powered dams. The simulation results highlight the need for continued technological advancements in hydropower and provide a basis for evaluating the benefits of new innovations.

cost drivers↗

Large Power Transformer Supply Chain Gap Analysis and Domestic Content Strategies for Hydropower Rehabilitation: Supplemental Report

Large Power Transformers (LPTs) are indispensable to U.S. hydropower operations, serving as generator step-up (GSU) units that interconnect hydro facilities to the transmission grid. Yet the LPT supply chain faces mounting stress from aging infrastructure, limited domestic production, and long lead times. Currently, more than 80% of LPT demand is met through imports, with primary suppliers including Mexico, South Korea, Brazil, Austria, and Canada. Domestic manufacturers supply only about 20% of units, constrained by bottlenecks in high-grade Grain-Oriented Electrical Steel (GOES), copper conductors, bushings, and on-load tap changers (OLTCs). Hydropower rehabilitation projects in particular face additional challenges due to custom design requirements, remote siting, and regulatory needs around domestic content. Regional cost disparities, driven by transportation logistics, labor markets, and import price volatility, further exacerbate project risks. To address these vulnerabilities, coordinated action is required: strengthening domestic capacity for GOES and secondary components, developing near-site assembly hubs, and leveraging IRS domestic content safe harbors to incentivize U.S. manufacturing. This addendum refines the 2024 NREL Hydropower Supply Chain Gap Analysis by focusing specifically on critical issues related to LPT domestic manufacturing capacity and key considerations for hydropower developers and asset owners.

13 HYDRO ENERGY↗

Feasibility of Using Additive Manufacturing to Produce Axial Flow Hydropower Turbine Housing, Runner, and Draft Tube

Oak Ridge National Laboratory (ORNL) worked with AMJET Turbine Systems, LLC (ATS), to demonstrate additive manufacturing of components for low head hydro turbine/generator applications. Several different types of additive manufacturing systems were used. Components were finished and assembled for testing in a turbine. However, one of the processes, Big Area Additive Manufacturing (BAAM),produced components that did not adequately perform due to persistent leaks that were caused by porosity in the parts produced. Therefore, the BAAM system was eliminated from contention. Vacuum infusion of rein into the parts eventually solved the porosity problem.Components were installed in anATS-8 turbine to be tested on the Keokuk Dam for operationally testing the unit.

13 HYDRO ENERGY↗

A Reduced-form Cost Model for Prefeasibility Analysis of Hydropower at Non-Powered Dams

This study presents a reduced-form model to support a better understanding of the capacity potential and drivers of costs for hydropower development at U.S. non-powered dams (NPD), which are existing dams that are not currently used for hydropower. With information on nineteen reference sites, a set of reduced-form design and cost equations were estimated to enable rapid assessments of aggregate costs and their components for a large number of NPD sites. The model was then applied to 36,000+ potential U.S. NPD sites using the limited data commonly available. Although the cost estimates span a wide range, there exists a significant amount of U.S. NPD hydropower capacity potential, which are considered cost-competitive in the current market using baseline technologies.

13 HYDRO ENERGY↗

Financial Analysis of Experimental Releases Conducted at Glen Canyon Dam during Water Year 2017

This report examines the financial implications of the high-flow experiment (HFE) conducted at Glen Canyon Dam (GCD) during water year (WY) 2017. It is the eighth in a series of reports examining the financial implications of experimental flows conducted since the 1996 Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). The 1996 ROD implemented the Modified Low Fluctuating Flow (MLFF) regime. This is the first report since the 2016 ROD was adopted in January 2017 (Reclamation 2016). The 2016 ROD implemented the Long-Term Experimental and Management Plan (LTEMP) regime for monthly water releases, daily and hourly operating criteria, and experimental releases. A report released in January 2011 examined WYs 1997 to 2005 (Veselka et al. 2011); a report released in August 2011 examined WYs 2006 to 2010 (Poch et al. 2011); a report released in June 2012 examined WY 2011 (Poch et al. 2012); a report released in April 2013 examined WY 2012 (Poch et al. 2013); a report released in June 2014 examined WY 2013 (Graziano et al. 2014); a report released in September 2015 examined WY 2014 (Graziano et al. 2015); and a report released in November 2016 examined WY 2015 (Graziano et al. 2016). An experimental release may have either a positive or a negative impact on the financial value of energy production. Only one experimental release was conducted at GCD in WY 2017, specifically, a HFE release in November 2016. For this experimental release, financial costs of approximately $1.15 million were incurred because the HFE required sustained water releases exceeding the power plant’s maximum flow rate. In addition, during the month of the experiment, operators were not allowed to shape GCD power production, neither to follow firm electric service (FES) customer day-ahead energy deliveries nor to respond to market prices. This study identifies the main factors contributing to HFE costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating GCD operations under two scenarios: (1) a Baseline scenario that mimics HFE operations both during the experiment and during the rest of the year when it complies with the 1996 daily/hourly operating criteria and the 2016 ROD monthly water release mandates, and (2) a counterfactual Without Experiments scenario identical to the Baseline scenario except it assumes that the HFE did not occur. The Generation and Transmission Maximization Superlite (GTMax SL) model was the main simulation tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. GCD is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). In the modeling process the research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power purchase and sale prices. In addition to estimating the financial impact of the HFE, the team used the GTMax SL model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the experimental releases, and WAPA operating practices.

13 HYDRO ENERGY↗

Financial Analysis of the 2018 Glen Canyon Dam Bug Flow Experiment

This report examines the financial implications of the macroinvertebrate production flows (MPF) experiment conducted at the Glen Canyon Dam (GCD) from May 1, through August 31, 2018. It is the first report examining the financial implications of a MPF experiment since the 2016 Record of Decision (ROD) was adopted in December 2016 (Reclamation 2016). The 2016 ROD implemented the Long-Term Experimental and Management Plan (LTEMP) regime. Experimental releases may have either a positive or a negative impact on the financial value of energy production. For these experimental releases, financial costs of approximately $165,000 were incurred because this experiment maintained flat releases on the weekends and holidays. This study identifies the main factors that contribute to MPF costs and examines the interdependencies among these factors. It applies an integrated set of tools to estimate financial impacts by simulating GCD operations under two scenarios: (1) a Baseline scenario that mimics MPF operations during the period of the experiment when it complies with the 2016 ROD operating criteria, and (2) a counterfactual Without Experiments scenario that is identical to the baseline except it assumes that the MPF experiment did not occur. The Generation and Transmission Maximization Superlite (GTMax SL) model was the main simulation tool used to simulate the dispatch of the GCD hydropower plant and associated water releases from Lake Powell. GCD is a Colorado River Storage Project (CRSP) power resource that is a component of the Salt Lake City Area Integrated Projects (SLCA/IP). The research team used extensive data sets and historical information on SLCA/IP power plant characteristics, hydrologic conditions, and Western Area Power Administration’s (WAPA’s) power sale prices in the modeling process. In addition to estimating the financial impact of MPFs, the team used the GTMax SL model to gain insights into the interplay among ROD operating criteria, exceptions made to criteria to accommodate the experimental releases, and WAPA operating practices.

13 HYDRO ENERGY↗

Prefabricated Zero Ascend Omnispecies (ZAO) Modular Fish Passage Modules Using Advanced Manufacturing Techniques

The Zero Ascend Omnispecies (ZAO) fish passage attraction module “ZAO Attractor” is a novel system designed to facilitate upstream passage for a broad spectrum of fish species, with a particular focus on American shad and river herring (alewife and/or blueback herring). Combining the use of prefabricated, modular components with advanced manufacturing, the ZAO aims to provide a cost-effective and scalable solution for fish passage attractions across various hydropower sites. The system features a surface level entry, so fish do not need to climb. In addition, it is designed to be adjusted and repositioned to create the most effective attraction flows by managing the outflows from hydropower turbines. Budget Period 1 (BP1) focused on the design and modeling of the ZAO Attractor and demonstrated the engineering feasibility of a modular, prefabricated, hydrodynamically efficient structure with surface level entry and passage. It was discovered that there were limited published studies on the direct correlation between quantified flow patterns and fish attraction, emphasizing the need for controlled studies to observe and measure these effects. In Budget Period 2 (BP2), controlled studies with live fish were prioritized to address these complexities. In conclusion, the ZAO fish passage attraction module presents a promising approach to fish passage at hydropower stations, with the potential to balance environmental concerns with renewable energy development. However, further field validation and optimization are necessary to ensure its effectiveness and practicality in real-world applications.

13 HYDRO ENERGY↗

Evaluation of Global Climate Models for Use in Energy Analysis

The interplay between energy, climate, and weather is becoming more complex due to increasing contributions of renewable energy generation, energy storage, electrified end uses, and the increasing frequency of extreme weather events. Energy system analyses commonly rely on meteorological inputs to estimate renewable energy generation and energy demand; however, these inputs rarely represent the estimated impacts of future climate change. Climate models and publicly available climate change datasets can be used for this purpose, but the selection of inputs from the myriad of available models and datasets is a nuanced and subjective process. In this work, we assess datasets from various global climate models (GCMs) from the Coupled Model Intercomparison Project Phase 6 (CMIP6). We present evaluations of their skills with respect to the historical climate and comparisons of their future projections of climate change for two climate change scenarios. We present the results for different climatic and energy system regions and include interactive figures in the accompanying software repository. Previous work has presented similar GCM evaluations, but none have presented variables and metrics specifically intended for comprehensive energy systems analysis including impacts on energy demand, thermal cooling, hydropower, water availability, solar energy generation, and wind energy generation. We focus on GCM output meteorological variables that directly affect these energy system components including the representation of extreme values that can drive grid resilience events. The objective of this work is not to recommend the best climate model and dataset for a given analysis, but instead to provide a reference to facilitate the selection of climate models and scenarios in subsequent work.

14 SOLAR ENERGY↗