Search NASA⌕ Search

SEARCH · Search NASA

Results for “IGCC”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Abradable Sealing Materials for Emerging IGCC-Based Turbine Systems (Final Report)

Reducing the gap between rotating and stationary parts in gas turbine engines, and mitigating gas leakage via these paths, can significantly increase the performance and attendant efficiency. One approach to reducing such gaps is to deploy abradable coatings on the stationary shroud components as seals, to reduce the blade-tip clearances under operational conditions. Abradable coatings must be able to withstand high temperature oxidation, thermal cycling, and erosion, while providing optimal controlled abrasion and associated shape retention. Existing abradable seals utilized in power generation turbines have generally been optimized for use with natural gas-fired systems; however, preliminary testing of syngas and high-hydrogen-content (HHC) fired turbines has shown that the stability of hot-section materials (and presumably abradable sealing materials) may be substantially altered due to characteristic changes in the combustion by-products (partial pressures of water vapor, etc.) as well as characteristic impurities and particulate matter entrained in the fuel. The primary focus of this research program has been to develop a mechanistic understanding of how the altered combustion environments modify the thermo-mechanical stability and performance of the sealing materials, including the requisite abradable sealing behavior. A key component of the research program carried out has been an exploration of mechanisms underpinning observed degradation processes, and an assessment of connections to the combustion environments and characteristic non-combustible constituents. The ultimate goal of the project has been to advance the goals of the Advanced Turbine Program by developing materials design protocols leading to turbine hot-section components with improved resistance to service lifetime degradation under advanced fuels exposures. This research program has evaluated the performance and degradation of ceramic abradable seals used in the high-temperature turbine sections of gas turbine engines. The focus has been two-fold: (1) to understand performance of such materials in relation to the turbines operating on coal-derived syngas and high hydrogen content (HHC) fuels, ultimately seeking an improved understanding of factors that control performance and durability of abradable seal materials for these combustion environments (and play into materials design protocols); and (2) to evaluate the potential of alternative materials as abradable seals for the higher temperatures expected with IGCC and HHC fueled turbine systems. In particular, we carried out an initial assessment of multi-layered systems of existing abradable seal materials (YSZ) and other ceramics. The research program also investigated several classes of abradable coatings under simulated exposures to syngas-based combustion environments, evaluating the relevant wear behavior, hardness, stability under cyclic oxidation, and general thermo-mechanical behavior. The research also attempted to develop alternatives to carrying out full-scale combustion-based abradability test rig exposures to evaluate materials system performance. The research has been focused on correlating the measured thermo-mechanical behavior, and controlled abrasive wear, with the intrinsic properties of the multilayer coatings and processing-controlled microstructural features that have shown attractive machinability characteristics based on weak interfacial bonding between the constituent phases at elevate temperatures (while maintaining thermochemical stability). This program has resulted in an improved mechanistic understanding of factors governing performance of high temperature abradable seals, and degradation mechanisms unique to IGCC-based power generation turbine systems and the realization of coal-derived syngas and HHC-based combustion environments – ultimately with the goal of developing a knowledge base upon which the design of coatings that retain optimal sealing characteristics and are more resistant to the observed wear/attack mechanisms, important aspects of advancing the goals of the DOE Advanced Turbine Program.

36 MATERIALS SCIENCE↗

Combined Sorbent/WGS-based CO 2 Capture Process with Integrated Heat Management for IGCC Systems

Southern Research has developed a combined CO 2 capture water-gas shift (WGS) process for integrated gasification combined cycle (IGCC) applications. A highly efficient regenerable magnesium based sorbent was prepared to remove CO 2 . It offers high and stable CO 2 capacity with minimum requirement for temperature and pressure swings. Under optimized conditions, the sorbents achieved up to 8 mmol/g of CO 2 working capacity and remained stable over 500 cycles of adsorption and regeneration. The selected WGS process achieved 96% CO per pass conversion and remained isothermal during the test duration that lasted over 500 cycles. The approach showed potential to reduce cost of electricity (COE) compared to the baseline carbon capture approaches. The process is for bench-scale and pilot development. In a commercial embodiment, syngas from the gasifier is cooled to warm gas conditions. It then enters the CO 2 sorbent-shift reactor that uses an efficient MgO-based CO 2 sorbent and a commercial catalyst to shift the CO to CO 2 and capture 90% + of the carbon. Using a dual-bed arrangement, the sorbent is regenerated periodically by a combination of pressure and temperature swing to maintain steady state conditions and produce a 95+ % CO 2 stream for sequestration. The hydrogen rich syngas is sent to the IGCC for power production. In addition to consolidating CO 2 capture with WGS, the proposed process reduces parasitic energy losses by operating at warm gas temperatures and reduces parasitic plant load (i.e., steam and auxiliary power) by reducing energy required for regeneration. The project consisted of 3 budget periods (BP) of laboratory-scale research and testing with go/no-go decisions after BP-1 and BP-2. In the 12 month BP-1, it was shown show that one promising sorbent maintained the required CO 2 capacity and durability of >1.5 mmol/g over 100 cycles. Also based on sorbent and WGS experiments in separate reactors and combined reactor modeling, it was shown that the process had the potential to capture 90% of the CO 2 at a lower than conventional amine-based approach. In the 18 month BP-2, a lab scale combined sorbent/WGS reactor system was built, commissioned, and tested with the promising sorbent from BP-1. 90% carbon capture was demonstrated over 100 cycles and it was shown that the process continued to have potential to capture 90% of the carbon at a cost that was less than the conventional amine-based approach. In the 6 month BP-3, a long term test was conducted using the best SR sorbent. The required durability of > 2 mmol/g was demonstrated after 500 cycles. Also, 90% carbon capture and 96% CO conversion was maintained over 1000 cycles. A technical and economic feasibility study was carried out to compare the proposed pre-combustion approach to a gasification plant employing a conventional pre-combustion approach and a conventional pulverized caol (PC) plant employing a conventional post combustion CO 2 capture approach.

01 COAL, LIGNITE, AND PEAT↗

Sensor placement algorithm development to maximize the efficiency of acid gas removal unit for integrated gasifiction combined sycle (IGCC) power plant with CO2 capture

Future integrated gasification combined cycle (IGCC) power plants with CO{sub 2} capture will face stricter operational and environmental constraints. Accurate values of relevant states/outputs/disturbances are needed to satisfy these constraints and to maximize the operational efficiency. Unfortunately, a number of these process variables cannot be measured while a number of them can be measured, but have low precision, reliability, or signal-to-noise ratio. In this work, a sensor placement (SP) algorithm is developed for optimal selection of sensor location, number, and type that can maximize the plant efficiency and result in a desired precision of the relevant measured/unmeasured states. In this work, an SP algorithm is developed for an selective, dual-stage Selexol-based acid gas removal (AGR) unit for an IGCC plant with pre-combustion CO{sub 2} capture. A comprehensive nonlinear dynamic model of the AGR unit is developed in Aspen Plus Dynamics® (APD) and used to generate a linear state-space model that is used in the SP algorithm. The SP algorithm is developed with the assumption that an optimal Kalman filter will be implemented in the plant for state and disturbance estimation. The algorithm is developed assuming steady-state Kalman filtering and steady-state operation of the plant. The control system is considered to operate based on the estimated states and thereby, captures the effects of the SP algorithm on the overall plant efficiency. The optimization problem is solved by Genetic Algorithm (GA) considering both linear and nonlinear equality and inequality constraints. Due to the very large number of candidate sets available for sensor placement and because of the long time that it takes to solve the constrained optimization problem that includes more than 1000 states, solution of this problem is computationally expensive. For reducing the computation time, parallel computing is performed using the Distributed Computing Server (DCS®) and the Parallel Computing® toolbox from Mathworks®. In this presentation, we will share our experience in setting up parallel computing using GA in the MATLAB® environment and present the overall approach for achieving higher computational efficiency in this framework.

97 MATHEMATICS AND COMPUTING↗

Sensor placement algorithm development to maximize the efficiency of acid gas removal unit for integrated gasification combined cycle (IGCC) power plant with CO{sub 2} capture

Future integrated gasification combined cycle (IGCC) power plants with CO{sub 2} capture will face stricter operational and environmental constraints. Accurate values of relevant states/outputs/disturbances are needed to satisfy these constraints and to maximize the operational efficiency. Unfortunately, a number of these process variables cannot be measured while a number of them can be measured, but have low precision, reliability, or signal-to-noise ratio. In this work, a sensor placement (SP) algorithm is developed for optimal selection of sensor location, number, and type that can maximize the plant efficiency and result in a desired precision of the relevant measured/unmeasured states. In this work, an SP algorithm is developed for an selective, dual-stage Selexol-based acid gas removal (AGR) unit for an IGCC plant with pre-combustion CO{sub 2} capture. A comprehensive nonlinear dynamic model of the AGR unit is developed in Aspen Plus Dynamics® (APD) and used to generate a linear state-space model that is used in the SP algorithm. The SP algorithm is developed with the assumption that an optimal Kalman filter will be implemented in the plant for state and disturbance estimation. The algorithm is developed assuming steady-state Kalman filtering and steady-state operation of the plant. The control system is considered to operate based on the estimated states and thereby, captures the effects of the SP algorithm on the overall plant efficiency. The optimization problem is solved by Genetic Algorithm (GA) considering both linear and nonlinear equality and inequality constraints. Due to the very large number of candidate sets available for sensor placement and because of the long time that it takes to solve the constrained optimization problem that includes more than 1000 states, solution of this problem is computationally expensive. For reducing the computation time, parallel computing is performed using the Distributed Computing Server (DCS®) and the Parallel Computing® toolbox from Mathworks®. In this presentation, we will share our experience in setting up parallel computing using GA in the MATLAB® environment and present the overall approach for achieving higher computational efficiency in this framework.

20 FOSSIL-FUELED POWER PLANTS↗

IGCC rides a regulatory seesaw

The Mesaba Energy Project to build a 603 MW IGCC power plant in Minnesota's Iron Range may or may not go ahead. Developers have proposed incorporating carbon capture and sequestration (CCS), including a pipeline. Opponents insist Mesaba should not go ahead unless it uses CCS immediately. Until November the project looked on the road to recovery but then the regulators came close to derailing the project citing recent delays and cancellations of IGCC projects in Florida, Colorado and Arizona. The next step is to work with the US DOE to structure the loan guarantee and to work with regulators in Minnesota to structure an off-take plan. 1 photo.

01 COAL, LIGNITE, AND PEAT↗

IGCC update: are we there yet?

If a number of technical, financial and regulatory hurdles can be overcome, power generated by integrated gasification combined-cycle technology could become an important source for US utilities. Our overview presents diverse perspectives from three industry experts about what it will take to move this technology off the design table and into the field. Well-known advantages are IGCC uses less water, creates a usable slag by-product and the technology required for pre-combustion CO{sub 2} capture has already been used successfully on coal gasification technology. These points, together with roadblocks to the deployment of IGCC technology in the USA, are discussed. 3 figs., 1 tab.

01 COAL, LIGNITE, AND PEAT↗

Cost and Performance Baseline for Fossil Energy Plants Volume 1b: Bituminous Coal (IGCC) to Electricity Revision 2b – Year Dollar Update

This report presents the cost and performance results of an assessment of seven integrated gasification combined cycle (IGCC) plants. The primary value of this report lies not in the absolute accuracy of the capital cost estimates for the individual cases (estimated to be -15 percent/+30), but in the application of a consistent approach to allow meaningful comparisons of relative costs among the cases evaluated.

01 COAL, LIGNITE, AND PEAT↗

Load-following control of an IGCC plant with CO2 capture

In this paper, a decentralized control strategy is considered for load-following control of an integrated gasification combined cycle (IGCC) plant with CO2 capture without flaring the syngas. The control strategy considered is gas turbine (GT) lead with gasifier follow. In this strategy, the GT controls the power load by manipulating its firing rate while the slurry feed flow to the gasifier is manipulated to control the syngas pressure at the GT inlet. However, the syngas pressure control is an integrating process with significant timedelay. In this work, a modified proportional-integral-derivative (PID) control is considered for syngas pressure control given that conventional PID controllers show poor control performance for integrating processes with large time delays. The conventional PID control is augmented with an internal feedback loop. The P-controller used in this internal loop converts the integrating process to an open-loop stable process. The resulting secondorder plus time delay model uses a PID controller where the tuning parameters are found by minimizing the integral time-weighted absolute error (ITAE) for disturbance rejection. A plant model with single integrator and time delay is identified by a P-control method. When a ramp change is introduced in the set-point of the load controller, the performance of both the load and pressure controllers with the modified PID control strategy is found to be superior to that using a traditional PID controller. Key

01 COAL, LIGNITE, AND PEAT↗

AVESTAR Center: Dynamic simulation-based collaboration toward achieving opertional excellence for IGCC plants with crbon capture

To address challenges in attaining operational excellence for clean energy plants, the National Energy Technology Laboratory has launched a world-class facility for Advanced Virtual Energy Simulation Training And Research (AVESTAR(TM)). The AVESTAR Center brings together state-of-the-art, real-time, high-fidelity dynamic simulators with operator training systems and 3D virtual immersive training systems into an integrated energy plant and control room environment. This paper will highlight the AVESTAR Center simulators, facilities, and comprehensive training, education, and research programs focused on the operation and control of an integrated gasification combined cycle power plant (IGCC) with carbon dioxide capture.

20 FOSSIL-FUELED POWER PLANTS↗

Opportunities for increasing CO 2 storage in deep, saline formations by active reservoir management and treatment of extracted formation water: Case study at the GreenGen IGCC facility, Tianjin, PR China

Carbon capture, utilization and storage (CCUS) seeks beneficial applications for CO 2 recovered from fossil fuel combustion. This study evaluated the potential for removing formation water to create additional storage capacity for CO 2 , while simultaneously treating the produced water for beneficial use. Furthermore, the process would control pressures within the target formation, lessen the risk of caprock failure, and better control the movement of CO 2 within that formation. The project plans to highlight the method of using individual wells to produce formation water prior to injecting CO 2 as an efficient means of managing reservoir pressure. Because the pressure drawdown resulting from pre-injection formation water production will inversely correlate with pressure buildup resulting from CO 2 injection, it can be proactively used to estimate CO 2 storage capacity and to plan well-field operations. The project studied the GreenGen site in Tianjin, China where Huaneng Corporation is capturing CO 2 at a coal fired IGCC power plant. Known as the Tianjin Enhanced Water Recovery (EWR) project, local rock units were evaluated for CO 2 storage potential and produced water treatment options were then developed. Average treatment cost for produced water with a cooling water treatment goal ranged from 2.27 to 2.96 US$/m 3 (recovery 95.25%), and for a boiler water treatment goal ranged from 2.37 to 3.18 US$/m 3 (recovery 92.78%). Importance analysis indicated that water quality parameters and transportation are significant cost factors as the injection-extraction system is managed over time. Our study found that in a broad sense, active reservoir management in the context of CCUS/EWR is technically feasible. In addition, criteria for evaluating suitable vs. unsuitable reservoir properties, reservoir storage (caprock) integrity, a recommended injection/withdrawal strategy and cost estimates for water treatment and reservoir management are proposed.

54 ENVIRONMENTAL SCIENCES↗

Degradation of TBC Systems in Environments Relevant to Advanced Gas Turbines for IGCC Systems

Air plasma sprayed (APS) thermal barrier coatings (TBCs) are used to provide thermal insulation for the hottest components in gas turbines. Zirconia stabilized with 7wt% yttria (7YSZ) is the most common ceramic top coat used for turbine blades. The 7YSZ coating can be degraded from the buildup of fly-ash deposits created in the power-generation process. Fly ash from an integrated gasification combined cycle (IGCC) system can result from coal-based syngas. TBCs are also exposed to harsh gas environments containing CO 2 , SO 2 , and steam. Degradation from the combined effects of fly ash and harsh gas atmospheres has the potential to severely limit TBC lifetimes. The main objective of this study was to use lab-scale testing to systematically elucidate the interplay between prototypical deposit chemistries (i.e., ash and its constituents, K 2 SO 4 , and FeS) and environmental oxidants (i.e., O 2 , H 2 O and CO 2 ) on the degradation behavior of advanced TBC systems. Several mechanisms of early TBC failure were identified, as were the specific fly-ash constituents responsible for degradation. The reactivity of MCrAlY bondcoats used in TBC systems was also investigated. The specific roles of oxide and sulfate components were assessed, together with the complex interplay between gas composition, deposit chemistry and alloy reactivity. Bondcoat composition design strategies to mitigate corrosion were established, particularly with regard to controlling phase constitution and the amount of reactive elements the bondcoat contains in order to achieve optimal corrosion resistance.

01 COAL, LIGNITE, AND PEAT↗

Low Thermal Conductivity, High Durability Thermal Barrier Coatings for IGCC Environments

Advanced thermal barrier coatings (TBC) are crucial to improved energy efficiency in next generation gas turbine engines. The use of traditional topcoat materials, e.g. yttria-stabilized zirconia (YSZ), is limited at elevated temperatures due to (1) the accelerated undesirable phase transformations and (2) corrosive attacks by calcium-magnesium-aluminum-silicate (CMAS) deposits and moisture. The first goal of this project is to use the Solution Precursor Plasma Spray (SPPS) process to further reduce the thermal conductivity of YSZ TBCs by introducing a unique microstructural feature of layered porosity, called inter-pass boundaries (IPBs). Extensive process optimization accompanied with hundreds of spray trials as well as associated SEM cross-section and laser-flash measurements, yielded a thermal conductivity as low as 0.62 Wm⁻¹K⁻¹ in SPPS YSZ TBCs, approximately 50% reduction of APS TBCs; while other engine critical properties, such as cyclic durability, erosion resistance and sintering resistance, were characterized to be equivalent or better than APS baselines. In addition, modifications were introduced to SPPS TBCs so as to enhance their resistance to CMAS under harsh IGCC environments. Several mitigation approaches were explored, including doping the coatings with Al₂O₃ and TiO₂, applying a CMAS infiltration-inhibiting surface layer, and filling topcoat cracks with blocking substances. The efficacy of all these modifications was assessed with a set of novel CMAS-TBC interaction tests, and the moisture resistance was tested in a custom-built high-temperature moisture rig. In the end, the optimal low thermal conductivity TBC system was selected based on all evaluation tests and its processing conditions were documented. The optimal coating consisted on a thick inner layer of YSZ coating made by the SPPS process having a thermal conductivity 50% lower than standard YSZ coatings topped with a high temperature tolerant CMAS resistant gadolinium zirconate Coating made by the SPPS process. Noteworthy was the fact that the YSZ to GZO interface made by the SPPS process was not the failure location as had been observed in APS coatings.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of ITM oxygen technology for integration in IGCC and other advanced power generation

Ion Transport Membrane (ITM) technology is based on the oxygen-ion-conducting properties of certain mixed-metal oxide ceramic materials that can separate oxygen from an oxygen-containing gas, such as air, under a suitable driving force. The “ITM Oxygen” air separation system that results from the use of such ceramic membranes produces a hot, pure oxygen stream and a hot, pressurized, oxygen-depleted stream from which significant amounts of energy can be extracted. Accordingly, the technology integrates well with other high-temperature processes, including power generation. Air Products and Chemicals, Inc., the Recipient, in conjunction with a dozen subcontractors, developed ITM Oxygen technology under this five-phase Cooperative Agreement from the laboratory bench scale to implementation in a pilot plant capable of producing power and 100 tons per day (TPD) of purified oxygen. A commercial-scale membrane module manufacturing facility (the “CerFab”), sized to support a conceptual 2000 TPD ITM Oxygen Development Facility (ODF), was also established and operated under this Agreement. In the course of this work, the team developed prototype ceramic production processes and a robust planar ceramic membrane architecture based on a novel ceramic compound capable of high oxygen fluxes. The concept and feasibility of the technology was thoroughly established through laboratory pilot-scale operations testing commercial-scale membrane modules run under industrial operating conditions with compelling lifetime and reliability performance that supported further scale-up. Auxiliary systems, including contaminant mitigation, process controls, heat exchange, turbo-machinery, combustion, and membrane pressure vessels were extensively investigated and developed. The Recipient and subcontractors developed efficient process cycles that co-produce oxygen and power based on compact, low-cost ITMs. Process economics assessments show significant benefits relative to state-of-the-art cryogenic air separation technology in energy-intensive applications such as IGCC with and without carbon capture.

Armstrong, Phillip A.↗

Greenhouse Gas Reductions in the Power Industry Using Domestic Coal and Biomass - Volume 1: IGCC

The objective of this study was to simulate biomass co-firing in a dry-fed, entrained-flow gasifier in an integrated gasification combined cycle (IGCC) power plant and examine the resulting performance, environmental response, and economic response. To develop a more complete understanding of the impact of co-feeding biomass, each case was examined using a limited life cycle greenhouse gas (GHG) analysis, which examines GHG emissions beyond the plant stack. Included in the limited life cycle GHG analysis were anthropogenic greenhouse gas emissions from the production, processing, transportation, and fertilization of biomass and from mining, transporting and handling coal.

01 COAL, LIGNITE, AND PEAT↗

IGCC Power Plant, Construction

Material input for the construction of the NETL baseline integrated gasification combined cycle (IGCC) plant with or without carbon capture and sequestration (CCS). To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=089EFC23-423F-4D26-BDA5-CF913488C597

42 ENGINEERING↗

Operation of baseline IGCC plant

The operations of the Integrated Gasification Combined Cycle (IGCC) with or without carbon capture and sequestration (CCS) on the basis of 1 MWh electricity output. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=FA2BC628-088D-45AF-B709-782A88DAEC94

01 COAL, LIGNITE, AND PEAT↗

Comprehensive Exergy Analysis of Three IGCC Power Plant Configurations with CO 2 Capture

We have conducted comprehensive exergy analyses of three integrated gasification combined cycle with carbon capture and storage (IGCC-CCS) power plant configurations: (1) a baseline model using Selexol™ for H 2 S/CO 2 removal; (2) a modified version that adds a H 2 -selective membrane before the Selexol™ acid gas removal system; and (3) a modified baseline version that uses a CO 2 -selective membrane before the Selexol™ acid gas removal system. While holding the coal input flow rate and the CO 2 captured flow rates constant, it was determined that the H 2 -selective membrane case had a higher net power output (584 MW) compared to the baseline (564 MW) and compared to the CO 2 -selective membrane case (550 MW). Interestingly, the CO 2 -selective membrane case destroyed the least amount of exergy within the power plant (967 MW), compared with the Baseline case (999 MW) and the H 2 -membrane case (972 MW). The main problem with the CO 2 -selective membrane case was the large amount of H 2 (48 MW worth of H 2 chemical exergy) remaining within the supercritical CO 2 that exits the power plant. Finally, regardless of the CO 2 capture process used, the majority of the exergy destruction occurred in the gasifier (305 MW) and gas turbine (~380 MW) subsystems, suggesting that these two areas should be key areas of focus of future improvements.

20 FOSSIL-FUELED POWER PLANTS↗