Search NASA⌕ Search

SEARCH · Search NASA

Results for “IMPOUNDMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Migratory Behavior and Physiological Development as Potential Determinants of Life History Diversity in Fall Chinook Salmon in the Clearwater River

We studied the influence of behavior, water velocity, and physiological development on the downstream movement of subyearling fall Chinook Salmon Oncorhynchus tshawytscha in free-flowing and impounded reaches of the Clearwater and Snake rivers as potential mechanisms that might explain life history diversity in this stock. Movement rates and the percentage of radio-tagged fish that moved faster than the average current velocity were highest in the free-flowing Clearwater River compared to impounded reaches. This provided support for our hypothesis that water velocity is a primary determinant of downstream movement regardless of a fish’s physiological development. In contrast, movement rates slowed and detections became fewer in impounded reaches where velocities were much lower. The percentage of fish that moved faster than the average current velocity continued to decline and reached zero in the lower-most reach of Lower Granite Reservoir suggesting that behavioral disposition to move downstream was low. These findings contrast those of a similar, previous study of Snake River subyearlings in spite of hydrodynamic conditions being similar. Physiological differences between Snake and Clearwater river migrants shed light on this disparity. Subyearlings from the Clearwater River were parr-like in their development and never showed an increase in gill Na+/K+-ATPase activity as did smolts from the Snake River. The later emergence timing and cooler rearing temperatures in the Clearwater River may suppress normal physiological development that causes many fish to delay downstream movement and adopt a yearling life history strategy.

Tiffan, Kenneth F.↗

Assessment of Combustion Residual Leachate Volume, Composition, and Treatment Costs

Combustion residuals and the resulting leachate from storage sites represent a large volume of wastewater in the United States (U.S.) that has not been quantified. Here this work estimates the constituents present, volume of wastewater, and costs of treatment for both combustion residual landfill leachate and the leachate from surface impoundment closures. Combustion residual landfill leachate produced from contact with bituminous coal combustion byproducts is generally predicted to be higher in lithium and manganese, whereas landfill leachate produced from contact with subbituminous coal combustion byproducts is generally predicted to be higher in mercury and vanadium. The annual volume of a single landfill with combustion residual leachate can reach more than 800,000 cubic meters. This leachate represents an annual volume of 26.8–42.8 million cubic meters nationally. Closing surface impoundments can yield between 830 and 1040 cubic meters of leachate nationally for a three-year closure period. Costs as low as $1.5/m 3 or as high as $95/m 3 are observed. Treatment trains will need to remove 72% of total suspended solids (TSS), 87% of arsenic, and 64% of mercury from landfill leachate. When applied to impoundments, these treatment trains would need to remove 97% of arsenic.

01 COAL, LIGNITE, AND PEAT↗

Numerical Simulation of Rotation-Driven Plasma Transport In the Jovian Magnetosphere

A Jupiter version of the Rice Convection Model (RCM-J) was developed with support of an earlier NASA SR&T grant. The conversion from Earth to Jupiter included adding currents driven by centrifugal force, reversing the planetary magnetic field, and rescaling various parameters. A series of informative runs was carried out, all of them solving initial value problems. The simulations followed an initial plasma torus configuration as it fell apart by interchange instability. Some conclusions from the simulations were the following: 1. We confirmed that, for conventional values of the torus density and ionospheric conductance, the torus disintegrates by interchange instability on a time scale of approx. one day, which is 1-2 orders of magnitude shorter than the best estimates of the average residence time of plasma in the torus. 2. In the model, the instability could be slowed to an arbitrary degree by the addition of sufficient impounding energetic particles, as suggested earlier by Siscoe et al (1981). However, the observed energetic particles do not seem sufficient to guarantee impoundment (e.g., Mauk et al., 1996). 3. Whether inhibited by impoundment or not, the interchange was found to proceed by the formation of long fingers, which get thinner as they get longer. This picture differed dramatically from the conventional radial-diffusion picture (e.g., Siscoe and Summers (1981)), more superficially with the outward-moving-blob picture (Pontius and Hill, 1989). The obvious limitation of the original RCM-J was that it could not represent a plasma source. We could represent the decay of a pre-existing torus, but we could not represent the way ionization of material from Io continually replenishes the plasma. We consequently were precluded from studying a whole set of fundamental issues of torus theory, including whether the system can come to a steady state.

Wolf, Richard A.↗

Three-Gorge Reservoir: A 'Controlled Experiment' for Calibration/Validation of Time-Variable Gravity Signals Detected from Space

With the advances of measurements, modern space geodesy has become a new type of remote sensing for the Earth dynamics, especially for mass transports in the geophysical fluids on large spatial scales. A case in point is the space gravity mission GRACE (Gravity Recovery And Climate Experiment) which has been in orbit collecting gravity data since early 2002. The data promise to be able to detect changes of water mass equivalent to sub-cm thickness on spatial scale of several hundred km every month or so. China s Three-Gorge Reservoir has already started the process of water impoundment in phases. By 2009,40 km3 of water will be stored behind one of the world s highest dams and spanning a section of middle Yangtze River about 600 km in length. For the GRACE observations, the Three-Gorge Reservoir would represent a geophysical controlled experiment , one that offers a unique opportunity to do detailed geophysical studies. -- Assuming a complete documentation of the water level and history of the water impoundment process and aided with a continual monitoring of the lithospheric loading response (such as in area gravity and deformation), one has at hand basically a classical forwardinverse modeling problem of surface loading, where the input and certain output are known. The invisible portion of the impounded water, i.e. underground storage, poses either added values as an observable or a complication as an unknown to be modeled. Wang (2000) has studied the possible loading effects on a local scale; we here aim for larger spatial scales upwards from several hundred km, with emphasis on the time-variable gravity signals that can be detected by GRACE and follow-on missions. Results using the Green s function approach on the PREM elastic Earth model indicate the geoid height variations reaching several millimeters on wavelengths of about a thousand kilometers. The corresponding vertical deformations have amplitude of a few centimeters. In terms of long-wavelength spherical harmonics, the induced geoid height variations are very close to the accuracy of GRACE- recoverable gravity field, while the low-degree (2 to 5) harmonics should be detectable. With a large regional time-variable gravity signal, the Three-Gorge experiment can serve as a useful calibration/verification for GRACE (including the elastic loading effects), and future gravity missions (especially for visco-elastic yielding as well as underground water variations).

Chao, Benjamin F.↗

Report of Apollo 204 Review Board to the Administrator, National Aeronautics and Space Administration : Schedule of Physical Evidence - Appendix F

Immediately following the Apollo 204 accident of January 27, 1961. all associated equipment and material were impounded. Release of this equipment and material for normal use was under the close control of the Apollo 204 Review Board. Apollo Review Board Administrative Procedure No. 11, February 11, 1961, established the Apollo 204 Review Board Material Release Record (MRR). This MRR was the official form used to release material from full impoundment and was valid only after being approved by the Board and signed by a Member. The form was used as the authority to place any impounded item into one of the three Categories defined in Administrative Procedure No. 11. This appendix contains all of the authorized MRR's. Each item submitted on an MRR was given a control number; a description, including the part number and serial number; the relevance and location to the accident; any constraints before release; and the control category. The categories placed on the equipment were as follows: Category A - Items which may have a significant influence or bearing on the results or findings of the Apollo 204 Review Board; Category B - All material other than Category A which is considered relevant to the Apollo 204 Review Board investigation; Category C - Material released from Board jurisdiction. Several classes of equipment were released by special Board action prior to the establishment of the MRR system. The operating procedure for release of these classes is Enclosure F-l to this appendix.

Source record↗

The Production of Low Ash Coals Using the Hydrophobic-Hydrophilic Separation Process with Novel Developments

Froth flotation is a common mineral processing method in coal preparation. This process becomes less efficient, however, as particle size is reduced, and ultrafine particles are often discarded prior to froth flotation, contributing to a substantial amount of coal waste in impoundments. Because of the land-use and risk of an impoundment failure, these impoundments pose an environmental liability. To address ultrafine coal rejection, researchers at Virginia Tech developed the hydrophobic-hydrophilic separation (HHS) process. Unlike in froth flotation, HHS uses an organic solvent to separate and dewater hydrophobic particles from hydrophilic minerals. Past work on the HHS process yielded promising results. In particular, the HHS process has produced a low-ash (<2%) and low moisture (<8%) product, which is a viable feed stock for carbon products. In this work, an investigation of the effects of auxiliary processes on the HHS process was conducted. The auxiliary processes included grinding, pre-concentration, and reagent conditioning. This work also contains an investigation on the interaction between two primary unit operations in the HHS process: oil agglomeration and de-emulsification. Lastly, to make the HHS process more viable for commercial scale-up, a novel unit operation was developed and tested that performs comparably to the current HHS process.

01 COAL, LIGNITE, AND PEAT↗

Anomalous transients in GPS measurements due to induced changes in local site conditions

Transients in GPS time series can occur due to post-seismic deformation, seasonal hydrological loads, sea-level changes, flood and drought conditions, excessive groundwater withdrawal and recharge, etc. We report two new cases where the application of external loading, namely, earthquake loading and surface loading due to impoundment of hydroelectric reservoir, probably altered the local hydrological conditions to cause anomalous transients in the surface displacement. In the first case, moderate shaking due to the 2015 Gorkha earthquake at Patna (Bihar, India) caused transients in ground deformation in the following 50-60 days of the earthquake which are recorded by a continuous GPS site at Patna. In the second case, impoundment of the Tehri reservoir and its seasonal variations in the Garhwal Himalaya probably altered the local hydrological conditions which is causing anomalous biannual cyclic deformation at a site KUNR, near the reservoir.

58 GEOSCIENCES↗

Predictive Assessment of the Chemical Composition of Coal Ash in Reserve at U.S. Disposal Sites

In the United States, more than 2 Gt of coal combustion residuals (i.e., coal ash) are stored in hundreds of disposal units. Recent federal regulations mandate the closure or retrofitting of most coal ash impoundments, presenting significant challenges for waste management. These regulatory pressures also present opportunities to reuse coal ash. However, the quality and quantity of discarded coal ash across the U.S. are not well known, even though this information is crucial for spurring its reuse for conventional and new material applications. This study describes a predictive model for the major element composition of coal ash in reserve at disposal sites of major U.S. coal-fired power plants. This model was constructed from coal purchase records of 705 power stations from 1973 to 2022 and was trained on coal ash composition data, showing that coal ash elemental composition is strongly associated with the source of feedstock coal. The model showed regional shifts in the major element contents of ash produced by power plants in the last 50 years, particularly for calcium and iron (expressed as %CaO and %Fe2O3), as power stations changed their source of coal over this time frame. Our approach enables an estimation of chemical composition for ash stored in waste impoundments at individual power stations. Such information can help to delineate the regional market resource potential of supplementary cements for concrete and other material innovations that would utilize coal ash harvested from disposal sites across the U.S.

01 COAL, LIGNITE, AND PEAT↗

Watching the Grand Ethiopian Renaissance Dam from a distance: Implications for sustainable water management of the Nile water

Increased demands for sustainable water and energy resources in densely populated basins have led to the construction of dams, which impound waters in artificial reservoirs. In many cases, scarce field data led to the development of models that underestimated the seepage losses from reservoirs and ignored the role of extensive fault networks as preferred pathways for groundwater flow. We adopt an integrated approach (remote sensing, hydrologic modeling, and field observations) to assess the magnitude and nature of seepage from such systems using the Grand Ethiopian Renaissance Dam (GERD), Africa's largest hydropower project, as a test site. The dam was constructed on the Blue Nile within steep, highly fractured, and weathered terrain in the western Ethiopian Highlands. The GERD Gravity Recovery and Climate Experiment Terrestrial Water Storage (GRACETWS), seasonal peak difference product, reveals significant mass accumulation (43 ± 5 BCM) in the reservoir and seepage in its surroundings with progressive south-southwest mass migration along mapped structures between 2019 and 2022. Seepage, but not a decrease in inflow or increase in outflow, could explain, at least in part, the observed drop in the reservoir's water level and volume following each of the three fillings. Using mass balance calculations and GRACETWS observations, we estimate significant seepage (19.8 ± 6 BCM) comparable to the reservoir's impounded waters (19.9 ± 1.2 BCM). Investigating and addressing the seepage from the GERD will ensure sustainable development and promote regional cooperation; overlooking the seepage would compromise hydrological modeling efforts on the Nile Basin and misinform ongoing negotiations on the Nile water management.

GRACE and GRACE-FO↗

Alternatives Analysis Amchitka Island Mud Pit Cap Repair, Amchitka, Alaska January 2016

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) manages the Nevada Offsites program, which includes a series of reclaimed drilling mud impoundments on Amchitka Island, Alaska (Figure 1). Navarro Research and Engineering, Inc. is the Legacy Management Support contractor (the Contractor) for LM. The Contractor has procured Tetra Tech, Inc. to provide engineering support to the Amchitka mud pit reclamation project. The mud pit caps were damaged during a 7.9-magnitude earthquake that occurred in 2014. The goals of the current project are to investigate conditions at the mud pit impoundments, identify feasible alternatives for repair of the cover systems and the contents, and estimate relative costs of repair alternatives. This report presents descriptions of the sites and past investigations, existing conditions, summaries of various repair/mitigation alternatives, and direct, unburdened, order-of-magnitude (-15% to +50%) associated costs.

54 ENVIRONMENTAL SCIENCES↗

2015 Uranium Mill Tailings Radiation Control Act (UMTRCA) Title ll Annual Report, L-Bar, New Mexico Disposal Site

The L-Bar, New Mexico, Uranium Mill Tailings Radiation Control Act (UMTRCA) Title II Disposal Site was inspected on August 18, 2015. The tailings impoundment was in excellent condition. Erosion and vegetation measurements to monitor the condition of the impoundment cover indicated that no erosion is occurring, and perennial vegetation foliar cover at the measurement plots increased substantially compared to previous years due to above-average precipitation for the year. A short segment of the perimeter fence near the site entrance was realigned in spring 2015 because a gully was undermining the fence corner. Loose fence strands at another location were repaired during the inspection, and a section of fence needs to be realigned to avoid areas affected by deep gullies and sediment deposition. Inspectors identified no other maintenance needs or cause for a follow-up inspection. Groundwater monitoring is required every 3 years. The next monitoring event will be in 2016.

54 ENVIRONMENTAL SCIENCES↗

Monticello Mill Tailings Site, Operable Unit lll, Annual Groundwater Report, May 2015 Through April 2016

This report provides the annual analysis of water quality restoration progress, cumulative through April 2016, for Operable Unit (OU) III, surface water and groundwater, of the U.S. Department of Energy (DOE) Office of Legacy Management (LM) Monticello Mill Tailings Site (MMTS). The MMTS is a Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List site located in and near the city of Monticello, San Juan County, Utah. MMTS comprises the 110-acre site of a former uranium- and vanadium-ore-processing mill (mill site) and 1700 acres of surrounding private and municipal property. Milling operations generated 2.5 million cubic yards of waste (tailings) from 1942 to 1960. The tailings were impounded at four locations on the mill site. Inorganic constituents in the tailings drained from the impoundments to contaminate local surface water (Montezuma Creek) and groundwater in the underlying alluvial aquifer. Mill tailings dispersed by wind and water also contaminated properties surrounding and downstream of the mill site. Remedial actions to remove and isolate radiologically contaminated soil, sediment, and debris from the former mill site, Operable Unit I (OU I), and surrounding properties (OU II) were completed in 1999 with the encapsulation of the wastes in an engineered repository located on DOE property 1 mile south of the former mill site. This effectively removed the primary source of groundwater contamination; however, contamination of groundwater and surface water remains within OU III at levels that exceed water quality protection standards. Uranium is the primary contaminant of concern (COC). LM implemented monitored natural attenuation with institutional controls as the OU III remedy in 2004. Because groundwater restoration proceeded more slowly than expected and did not meet performance criteria established in the OU III Record of Decision (June 2004), LM implemented a contingency action in 2009 by an Explanation of Significant Difference to include a pump-and­ treat system using a single extraction well and treatment by zero-valent iron (ex situ treatment system). The contingency action was optimized in 2015 with the installation of8 extraction wells and 16 monitoring wells in a focused area of the aquifer, the area of attainment (AOA). Contaminated water is treated by solar evaporation at an existing facility at the LM repository.

54 ENVIRONMENTAL SCIENCES↗

Monticello Mill Tailings Site Operable Unit III Annual Groundwater Report May 2014 Through April 2015, October 2015

This report provides the annual analysis of water quality restoration progress, cumulative through April 2015, for Operable Unit (OU) III, surface water and groundwater, of the U.S. Department of Energy (DOE) Office of Legacy Management Monticello Mill Tailings Site (MMTS). The MMTS is a Comprehensive Environmental Response, Compensation, and Liability Act National Priorities List site located in and near the city of Monticello, San Juan County, Utah. MMTS comprises the 110-acre site of a former uranium- and vanadium-ore-processing mill (mill site) and 1,700 acres of surrounding private and municipal property. Milling operations generated 2.5 million cubic yards of waste (tailings) from 1942 to 1960. The tailings were impounded at four locations on the mill site. Inorganic constituents in the tailings drained from the impoundments to contaminate local surface water (Montezuma Creek) and groundwater in the underlying alluvial aquifer. Mill tailings dispersed by wind and water also contaminated properties surrounding and downstream of the mill site. Remedial actions to remove and isolate radiologically contaminated soil, sediment, and debris from the former mill site (OU I) and surrounding properties (OU II) were completed in 1999 with the encapsulation of the wastes in an engineered repository located on DOE property 1 mile south of the former mill site. Contamination of groundwater and surface water remains within OU III at levels that exceed water quality protection standards. Uranium is the primary contaminant of concern. LM implemented monitored natural attenuation with institutional controls as the OU III remedy in 2004. Because groundwater restoration proceeded more slowly than expected and did not meet performance criteria established in the OU III Record of Decision (June 2004), LM implemented a contingency action in 2009 by an Explanation of Significant Difference to include a pump-and-treat system using a single extraction well and treatment by zero-valent iron (ex-situ treatment system). The contingency action was optimized in 2015 with the installation of 8 extraction wells and 16 monitoring wells in a focused area of the aquifer (area of attainment). Contaminated water is treated by solar evaporation at an existing onsite LM facility. Environmental monitoring at OU III consists of twice-yearly (April and October) collection and analysis of hydrologic and water-quality data from an established network of observation wells, seeps, and surface water locations. The scope of monitoring was expanded in 2009 for the ex situ treatment system and in 2015 for the remedy optimization system. Operation and monitoring of the ex situ treatment system was discontinued in 2014 with the start-up of the remedy optimization system. No data anomalies for OU III water quality trending or restoration progress are identified for the May 2014 through April 2015 reporting period. Although some regions of the aquifer demonstrate decreasing concentration trends, such trending is not evident for the bulk of the aquifer and a prolonged restoration period is indicated. The groundwater contingency remedy optimization system captures significant contaminant mass (primarily uranium) from the area of attainment; however, because that system only became operational in 2015, a long-term forecast of restoration progress is premature.

54 ENVIRONMENTAL SCIENCES↗

Gasification Combined Heat and Power from Coal Fines

The goal of this final project report is to comprehensively summarize the work for public domain conducted on project DE-FE 0031520. In accordance with the Statement of Project Objectives (SOPO), the University of Kentucky Center for Applied Energy Research (UKy-CAER) (Recipient) has completed a Front End Engineering Design (FEED) study 5 MWe polygeneration unit using the Coal Fields Regional Industrial Park in Hazard, Kentucky (KY) as a model location and using coal recovered from the adjacent Pads Branch Impoundment as feed. The scope of work is a thorough study that can be used as a template for the application of the proposed technology throughout Eastern KY and other coal communities nationwide. The Technology Design Basis was developed based on three elements: basic site characteristics; fuel feedstock; and environmental health and safety requirements. The Basic Engineering Design Elements include the preliminary process design (the process area descriptions; the Block Flow Diagram (BFD), Process Flow Diagrams (PFDs) and Piping and Instrumentation Diagrams (P&IDs), process simulation outputs and Heat and Mass Balance (H&MB) stream tables, the major process equipment and instrumentation lists which includes specifications and materials of construction); the cost estimate (capital cost estimate, operational cost estimate, and comparison with state-of-the-art commercial scale similar technologies, options to lower cost, construction cost and schedule estimate); and other supporting elements (guidelines for execution and management of the project), logistical summary, and balance of plant summary, the Environmental Health and Safety (EH&S) assessment; and a Social and Economic Impact (S&EI) assessment. All project milestones, deliverables and success criteria were met. The proposed 5 MWe polygeneration facility being fed from impoundment recovered coal has been shown to be technically feasible. Annual revenues are estimated at $\$ $2.4M from electricity, steam and hydrocarbon production; annual operating expenses are $\$ $5.2M ($\$ $2.9 M in operating expenses, and $\$ $2.4M in indirect expenses). The gasifier facility, as configured during the FEED, will lose money when operating under commercial operating conditions and terms. However, eight options improving the economics can be considered during the detailed design phase to make the facility profitable by taking advantage of the positive differential of revenue to variable operating costs, and reducing the influence of fixed operating costs. Coupled with the findings from the S&EI assessment estimating a total economic impact of $\$ $374M for the proposed polygeneration facility at >$\$ $1.5B, if three additional such projects are implemented, clearly positive economics are demonstrated. No EH&S issues are identified that would prohibit proceeding with the project, although permitting efforts are estimated to take 3-5 years.

01 COAL, LIGNITE, AND PEAT↗

Resource Recovery and Environmental Protection in Wyoming’s Greater Green River Basin Using Selective Nanostructured Membranes (Final Report)

Produced water (PW) represents a sizable waste stream that is co-generated with oil and natural gas production. In 2021 Wyoming ranked 8th and 9th, respectively in domestic oil and natural gas production. In 2017 Wyoming ranked as the 4th highest generator of PW in the U.S, accounting for 7% of the total volume generated. In the context of being the 3rd most arid state in the U.S., the value of water reuse becomes obvious. PW reuse, and resource recovery, in any form requires some level of treatment to remove particulates, residual (free, dispersed) hydrocarbons, organics, and salts. The level of treatment depends on the requirements of the reuse, or resource recovery, application. PW management systems in Wyoming employ in order of volume of PW managed the following management strategies: reinjection for enhanced oil recovery, surface discharge, deep well injection, evaporation ponds (impoundments), and commercial management/treatment. Complicating treatment efforts are the relatively high concentrations of organics (natural and synthetic), dispersed/free hydrocarbons, benzene-toluene-ethylbenzene, and xylenes (BTEX) compounds, biologicals, salts, and minerals. Hydrocarbons (dispersed/dissolved crude oils) and BTEX compounds, as well as synthetic organics, present economic and environmental concerns. The former represents lost revenue, while the latter results in negative environmental impacts like emissions from surface impoundments. The overall objective of this proposal was to synthesize superhydrophilic/oleophobic and superhydrophobic/oleophilic membranes for selectively concentrating and then separating BTEX compounds and oil and grease (O&G) from PW originating from the Greater Green River Basin (GGRB) in Wyoming. Three specific research aims were pursued to accomplish this overall objective. This final report details the development of the superhydrophobic and superhydrophilic membranes, as well as the design of the membrane module prototypes specifically. The technoeconomic assessment is separately reported in another document. 1. Aim #1 – Material optimization and performance evaluation of superhydrophilic/oleophobic and superhydrophobic/oleophilic membranes made by electrospinning/spraying. 2. Aim #2 – Design and construction of cross-flow membrane modules for selectively concentrating and then separating BTEX/oil from GGRB produced water. 3. Aim #3 – Techno-economic assessment of BTEX/oil recovery, and clean water production, using superhydrophilic/oleophobic and superhydrophobic/oleophilic membrane separation for GGRB PW. Superhydrophobic membranes were synthesized by electrospinning poly(vinylidene fluoride-co-hexafluoropropylene) (PVDF-HFP) nanofibers onto polyester (PET) substrates and electrospraying nano-carbon black/PVDF-HFP onto the nanofibrous layer. These membranes were characterized by high (>8000 liters per square meter per hour per bar (LMH/bar)) permeance values for pure hydrocarbon phases and a high hydrocarbon selectivity (>96%) when treating GGRB PW. All results were obtained when operating the membrane in a crossflow configuration representative of actual field operating conditions. Solvent/oil properties, specifically viscosity and total surface energy/tension, affected permeance across the membrane, which resulted in light mineral oil (394 LMH/bar) and o-xylene (1834 LMH/bar) being characterized by lower permeance values in the pure phase tests. Mixed phase fluxes between 40 to 80 LMH were obtained for the PW when operating the membrane at a feed pressure of 0.3 bar. Flux decreased as the mixed phase concentration in the feed decreased pointing to the importance of maximizing the collision efficiency between the emulsion and the membrane surface and maximizing the emulsion concentration in the feed and the turbulence within the feed channel. These tests demonstrated that the superhydrophobic membranes developed here are a viable hydrocarbon recovery method for GGRB PWs and should be pursued for testing in pilot-scale trials. Superhydrophilic membranes were successfully synthesized via electrospinning/spraying using polyacrylonitrile (PAN) nanofibers as a base nanofibrous matrix. Integration of polyaniline (PANI) into the nanofibrous matrix produced a superior membrane, for water filtration applications, relative to PAN alone and reduced graphene oxide (RGO) when integrated into the nanofibrous matrix. This conclusion was based on the PANI-PAN resistance to flux loss (fouling) when treating model solvent/oil solutions representative of GGRB PWs and field collected PW from the GGRB. The synthesized PAN membranes outperformed a commercially available PAN membrane designed for oil/water separation. This finding indicates that the surface chemical and physical characteristics of the electrospun membranes presents improved properties for filtration of challenging waters like GGRB PWs. The electrospun membranes therefore show promise overall as a substitute for conventionally polymerized membranes in PW treatment applications. The PANI-PAN membrane specifically presents superior performance characteristics for concentration O&G prior to treatment by the hydrocarbon recovery membrane and producing high-quality filtrate for reuse and/or additional treatment (desalination).

02 PETROLEUM↗

Synthesis and Functionalization of Coal Fly Ash-Derived Zeolites for Boron Removal From Wastewater

There are hundreds of both active and unused surface impoundments in the United States containing coal combustion residuals (CCRs) produced by coal-fired power plants which can leach toxic elements into surface and groundwater. Therefore, the development of efficient means for both the clean-up of surface impoundments and for deriving economically viable products from CCRs are urgent tasks for researchers. Herein, a microwave-assisted strategy is presented for converting a common coal combustion residual, coal fly ash (CFA), into zeolite-based sorbents for boron (B) removal from wastewater. Specifically, CFA constitutes the main source of Si and Al ions to produce zeolite type-A and the resulting sorbent subsequently undergoes simple cation exchange with Ca to enhance its B adsorption capacity. Structure and composition of the sorbents were characterized by X-ray diffraction (XRD), scanning electron microscopy (SEM), energy dispersive X-ray spectroscopy (EDS), inductively coupled plasma (ICP)-mass spectrometry (MS), and ICP-optical emission spectroscopy (OES). The Ca-modified zeolite sorbent derived from CFA exhibits comparable B removal capacity with similar commercial zeolites.

Muldoon, Patrick↗

Beneficial Use of Harvested Ponded Fly Ash and Landfilled FGD Materials for High-Volume Surface Mine Reclamation

The overall motivation of this project was to demonstrate at laboratory, bench-scale, and full-scale demonstration levels that (a) coal ash surface impoundments can go through closure by removal as per USEPA and state regulations so that the material can be used as is (other than draining free water using CCRs piles) in high-volume beneficial applications, (b) FGD material from closed out FGD facilities can be excavated and recompacted for coal mine reclamation, and (c) harvested CCRs can be beneficially utilized (providing a net environmental gain) in large-volumes for reclamation at abandoned coal mine sites across the US, especially in the Eastern and Midwest coal mining regions. The objectives of this project were to: 1) promote the safe and cost-effective closure by removal of coal ash impoundments, 2) harvest landfilled FGD, and 3) promote the high-volume beneficial use of these harvested CCRs in the reclamation of abandoned surface coal mine sites across the eastern and midwestern coal mining regions of the United States. The major tasks carried out for this project are summarized below: 1) Conesville Full-Scale Demonstration Project: About 2 million tons of harvested CCR materials from the closure by removal of an inactive fly ash pond and an adjacent old FGD landfill were used for the full-scale demonstration project to fully reclaim a nearby partially completed abandoned surface coal mine. Site monitoring for the project duration was carried out and results are discussed. 2) Laboratory Testing: Geotechnical and environmental testing of harvested ponded fly ash and landfilled FGD material at the former Conesville power plant were carried out. Completing the laboratory testing allowed for QA/QC for the full-scale site construction and informed the formulation of the risk analysis. 3) Risk Analysis: We developed a reliable computational model for fate and transport. We used these models and the rich set of monitored data for the Conesville site to analyze risks to human health and ecological risks associated with high-volume surface mine reclamation using harvested CCRs. 4) GIS Siting Study: A Geographic Information System (GIS) study was carried out for three states in the Eastern coal mining region and two states in the Midwest coal region. This effort provided site specific GIS information for five states and allowed us to establish protocols that other states can follow in implementing their own state specific GIS study.

01 COAL, LIGNITE, AND PEAT↗

Characterization of Arsenic and Selenium in Coal Fly Ash to Improve Evaluations for Disposal and Reuse Potential (Final Technical Report)

Coal fly ash is a high volume waste material that is discarded in landfills and surface water impoundments across the U.S. and is also widely recycled for a variety of applications. The leaching of potential of contaminants of concern, such as arsenic (As) and selenium (Se), is often the driver of risk assessments for coal ash disposal and reuse. The extent of leachable As and Se depends on several factors related to environmental conditions and fly ash characteristics. Previous studies employed various methods to delineate the concentration, chemical form, and distribution of As and Se in fly ash materials. However, few studies have attempted to directly correlate these properties to mobilization parameters relevant to disposal and reuse. Instead, the coal residuals industries often rely upon standardized leaching protocols that can be laborious or involve hazardous chemicals. The goals of the project were to: 1) Develop and evaluate a characterization protocol that can be used to screen fly ash samples for leachability of As and Se; 2) Characterize As, Se, and associated constituents of fly ash particles at multiple length scales (nanometer to micrometer) to determine if elemental associations differ as a function of the resolution of characterization; and 3) Establish a predictive model for the chemical composition of coal ash produced annually at major U.S. coal fired power facilities on 50-year national coal supply records. For the first objective, we performed leaching experiments with 52 fly ash samples collected from 15 different U.S. power plants and representing coal feedstocks from the three major domestic coal regions. For this work, we assessed the mobilization potential of As and Se in fly ash based on standardized leaching protocols and performed multivariate and lasso regression analyses to explore correlations of leachable As and Se contents with characteristics such as major element contents, loss on ignition (LOI) and pH. The results of regression models indicated that major elements (Fe, Ca, Al) for a wide range of fly ashes can serve as predictor variables for the leaching potential of As, but not for Se. LOI and pH were not important predictive variables in the models. Both regression approaches resulted in relatively strong fits for leachable As (correlation coefficient R 2 = 0.78 for both models) compared to models for leachable Se (R 2 = 0.49). Overall, these results suggest that correlation models combined with on-site elemental analysis with portable analyzers may enable a screening method for leachable As in coal ash. For the second objective, we utilized nanoscale 2-D imaging (30-50 nm spot size) with the Hard X-ray Nanoprobe (HXN) in combination with microprobe X-ray capabilities (~5 µm resolution) to determine As and Se elemental associations in fly ash particles. Speciation of As and Se was also measured at the nano- to microscale with X-ray absorption spectroscopy. The enhanced resolution of HXN showed As and Se that were diffusely located around or comingled with Ca- and Fe-rich particles. The results also showed nanoparticles of Se attached to the surface of fly ash grains. Overall, a comparison of As and Se species across scales highlights the heterogeneity and complexity of chemical associations for these trace elements of concern in coal fly ash. For the final objective, we developed a predictive model for major element composition of coal ash in reserve at disposal sites of major U.S. coal fired power plants. This model was constructed from coal purchase records of 705 power stations from 1973-2022 and was trained on coal ash composition data showing that coal ash elemental composition is strongly associated with the source of feedstock coal. The model showed regional shifts in the major element contents of ash produced by power plants in the last 50 years, particularly for calcium and iron (expressed as %CaO and %Fe 2 O 3 ), as coal-fired power stations changed their source of coal over this time frame. Our approach enables an estimation of coal ash chemical composition that is stored in waste impoundments at individual power stations. Such information can help delineate the regional market potential for material applications that would utilize coal ash harvested from disposal sites across the U.S.

01 COAL, LIGNITE, AND PEAT↗