Search NASA⌕ Search

SEARCH · Search NASA

Results for “INTERIM SAFE STORAGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Discussion on the merits of deep borehole disposal, especially with recycling - 15389

With the continued global expansion of the nuclear industry, disposal of spent nuclear fuel (SNF) and high level waste (HLW) continues to be a largely unimplemented (but extensively studied) activity throughout the world and can continue to do so due to the safe practices of 'interim' SNF/used nuclear fuel (UNF) and HLW storage. However as the industry continues to operate and expand in both existing and new countries, the accumulated SNF/UNF and HLW will continue to grow in both quantity and locations across the globe; hence, requiring more effort to control and monitor. Countries with nuclear power programs, or are considering starting nuclear power programs, must consider the potential financial and the engineering burden associated with both the interim storage and the disposal of SNF/UNF and HLW produced by these programs: can the cost of disposal be reasonably captured in the cost of electricity produced from nuclear programs and are there suitable sites for disposal in their country, such as a mined-geologic site, for the expected accumulated quantity of SNF and HLW? Answering these questions may be particularly vexing for countries with small nuclear programs where establishing viable disposal sites for SNF and HLW and funding of the development of these sites may be a challenge. In an effort to establish an alternative to traditional, expensive, mined-geologic disposal sites, the deep borehole option has been (re-)considered by multiple countries and entities to be a relatively simple solution to disposal of SNF and HLW. However, disposal of SNF in deep boreholes must overcome several issues including: (1) limiting-sized borehole diameters; (2) limited ability for retrieval; and (3) potential hang-up issues associated with lowering longer (e.g., > 180 inches) canisters down into a deep borehole. Since most SNF is a resource when recycled (i.e., UNF) and to dispose of it in an irretrievable manner would be wasteful, a more optimal alternative that could overcome these issues and maximize the benefits of the UNF is to recycle the UNF and dispose of the resulting HLW into deep boreholes. The multiple and mutual benefits of this approach are elucidated in this paper. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INSERVICE INSPECTION OF EXTENDED DRY STORAGE OF SPENT NUCLEAR FUEL, PART II: NDE/SENSOR TECHNOLOGY DEVELOPMENT AND CODIFICATION

This paper describes development and demonstration of nondestructive examination (NDE) technologies to support periodic examinations of interim dry cask storage system (DCSS) canisters for spent nuclear fuel in the USA to verify continued safe operation and that the canister confinement is intact and performing its intended safety function. Specifically, this work relates to NDE technology development for “canister” based DCSS systems which form the majority population of DCSSs, in the USA, for interim storage of spent nuclear fuel. Consideration of potential degradation of the welded stainless-steel canister in these systems is required for continued usage in the period of extended operation (PEO) beyond the initial license or certified term. Physical access to the canister surface is constrained due to narrow annulus spaces between the canister and the overpack, tortuous entry pathways, and high temperatures and radiation doses that can be damaging to materials and electronics related to inspections. Several activities to demonstrate NDE technologies for the inspections of different DCSS systems are summarized.

nondestructive examination (NDE), Dry Cask Storage↗

Application of Framework for Integrating Safety, Security and Safeguards (3Ss) into the Design Of Used Nuclear Fuel Storage Facility

Department of Energy’s Office of Nuclear Energy, Fuel Cycle Research and Development develops options to the current commercial fuel cycle management strategy to enable the safe, secure, economic, and sustainable expansion of nuclear energy while minimizing proliferation risks by conducting research and development focused on used nuclear fuel recycling and waste management to meet U.S. needs. Used nuclear fuel is currently stored onsite in either wet pools or in dry storage systems, with disposal envisioned in interim storage facility and, ultimately, in a deep-mined geologic repository. The safe management and disposition of used nuclear fuel and/or nuclear waste is a fundamental aspect of any nuclear fuel cycle. Integrating safety, security, and safeguards (3Ss) fully in the early stages of the design process for a new nuclear facility has the potential to effectively minimize safety, proliferation, and security risks. The 3Ss integration framework could become the new national and international norm and the standard process for designing future nuclear facilities. The purpose of this report is to develop a framework for integrating the safety, security and safeguards concept into the design of Used Nuclear Fuel Storage Facility (UNFSF). The primary focus is on integration of safeguards and security into the UNFSF based on the existing Nuclear Regulatory Commission (NRC) approach to addressing the safety/security interface (10 CFR 73.58 and Regulatory Guide 5.73) for nuclear power plants. The methodology used for adaptation of the NRC safety/security interface will be used as the basis for development of the safeguards /security interface and later will be used as the basis for development of safety and safeguards interface. Then this will complete the integration cycle of safety, security, and safeguards. The overall methodology for integration of 3Ss will be proposed, but only the integration of safeguards and security will be applied to the design of the UNFSF. The framework for integration of safeguards and security into the UNFSF will include 1) identification of applicable regulatory requirements, 2) selection of a common system that share dual safeguard and security functions, 3) development of functional design criteria and design requirements for the selected system, 4) identification and integration of the dual safeguards and security design requirements, and 5) assessment of the integration and potential benefit.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Establishing a store baseline during interim storage of waste packages and a review of potential technologies for base-lining

Interim storage is an essential component of the waste management lifecycle, providing a safe, secure environment for waste packages awaiting final disposal. In order to be able to monitor and detect change or degradation of the waste packages, storage building or equipment, it is necessary to know the original condition of these components (the 'waste storage system'). This paper presents an approach to establishing the baseline for a waste-storage system, and provides guidance on the selection and implementation of potential base-lining technologies. The approach is made up of two sections; assessment of base-lining needs and definition of base-lining approach. During the assessment of base-lining needs a review of available monitoring data and store/package records should be undertaken (if the store is operational). Evolutionary processes (affecting safety functions), and their corresponding indicators, that can be measured to provide a baseline for the waste-storage system should then be identified in order for the most suitable indicators to be selected for base-lining. In defining the approach, identification of opportunities to collect data and constraints is undertaken before selecting the techniques for base-lining and developing a base-lining plan. Base-lining data may be used to establish that the state of the packages is consistent with the waste acceptance criteria for the storage facility and to support the interpretation of monitoring and inspection data collected during store operations. Opportunities and constraints are identified for different store and package types. Technologies that could potentially be used to measure baseline indicators are also reviewed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Global recycling services for short and long term risk reduction

New schemes are being developed by AREVA in order to provide global solutions for safe and non-proliferating management of used fuels, thereby significantly contributing to overall risks reduction and sustainable nuclear development. Utilities are thereby provided with a service through which they will be able to send their used fuels and only get returned vitrified and compacted waste, the only waste remaining after reprocessing. This waste is stable, standard and has demonstrated capability for very long term interim storage. They are provided as well with associated facilities and all necessary services for storage in a demonstrated safely manner. Recycled fuels, in particular MOX, would be used either in existing LWRs or in a very limited number of full MOX reactors (like the EPR reactor), located in selected countries, that will recycle MOX so as to downgrade the isotopic quality of the Pu inventories in a significant manner. Reprocessed uranium also can be recycled. These schemes, on top of offering demonstrated operational advantages and a responsible approach, result into optimized economics for all shareholders of the scheme, as part of reactor financing (under Opex or Capex form) will be secured thanks to the value of the recycled flows. It also increases fuel cost predictability as recycled fuel is not subject to market fluctuations as much and allows, in a limited span of time, for clear risk mitigation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

D and D of a Large Waste Treatment Plant in Germany - 18458

With its 40 years of nuclear experience, GNS, the world leading supplier of casks for spent fuel, ILW and HLW, also offers services for conditioning and management of all types of radioactive waste, especially for the German NPP. Since 1985, GNS treats and packages ILW and LLW from the operations and phase-out of German NPP in its Duisburg plant. To enable its permanent safe final disposal, solid wastes are compacted and dried before being shipped to an interim storage facility or - later - the Konrad repository. The total premises cover 20.000 m{sup 2} (215.000 sq ft), of which 9000 m{sup 2} (97.000 sq ft) is controlled area. The Duisburg Plant has three large industrial warehouses (each 25 m x 136 m or 82 ft x 446 ft) with a total capacity of 10.200 m{sup 2} or 110.000 sqft. For the treatment of open contaminated waste, six enclosures were built. These enclosures have a special ventilation system including a specific filtration plant. In one enclosure a high compaction plant was used, in another enclosures a drying facility for drums was in operation. During peak periods, more than 900 tonne of waste were treated annually. One enclosure was mainly used for maintenance, restoration and extension of mobile facilities, which were normally used for campaigns in NPP. Due to the decreasing amount of operational waste during the nuclear phase out in Germany, GNS has decided to close the Duisburg Plant. In the first half-year of 2017, the last waste packages were treated but around 80 20'-containers are still located on site. The D and D started in January 2017. The presentation will show the first experience of decommission processes of the first three enclosures. The following steps including the techniques used will be explained in detail: - Dismantling and removal of the high compaction facility; - Dismantling and removal of the drying facility; - Cleaning and wipe tests of the empty enclosures; - Removal of the stainless steel plates of the floor; - Investigations of the lower floor parts for contamination; - Removal of contaminated underground drainpipes; - Decontamination of the concrete floor; - Dismantling of the ventilation system in three enclosures; - Dismantling of the steel constructions. An important aim during the dismantling is to reduce the amount of nuclear waste and maximize the fraction material for free release. Next to the first three enclosures, in one of the enclosure IV - VI, a 150 tons scrap shear had been installed before the construction of the enclosure building. The scrap shear has to be dismantled and handled by heavy duty lifting equipment. Only afterwards is it possible to start the decommissioning of the last three enclosures. Our goal is to transfer this very large controlled area and the whole plant to the site owner, the Duisburg Port company, after 2 years and 5 months and doing so in a way so that the industrial warehouses can be used again for all possible types of industries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Advancing the Robotic Air-slot Volumetric Inspection System (RAVIS) for Hanford Under-tank Inspection - 20519

The 27 in-service double-shell tank (DST) systems at Hanford provide interim storage for nearly 56 million gallons of nuclear and hazardous chemical legacy waste. The safe and reliable storage of the waste is critical to the site's extended cleanup mission. While in service, the leak integrity of the DSTs must be demonstrated to satisfy the Washington Administrative Code, inform decisions on tank management, and gauge fitness for continued service beyond originally intended design lives. The carbon steel plates and welds that comprise DST primary tank sidewalls and lower knuckles are routinely 'sampled' for volumetric non-destructive testing using ultrasonic inspection technology to determine whether corrosion pitting, cracking, or general corrosion are occurring that could compromise tank leak integrity. However, the carbon steel plates and welds that comprise the bottoms of primary tanks have not been thoroughly inspected since the DSTs were constructed (i.e., since 1968-1986) due to limited physical access to the exterior tank bottoms. The Robotic Air-slot Volumetric Inspection System, or 'RAVIS,' is being engineered to overcome the challenge of tank bottom in-service inspection. The system will be deployed under primary tanks within the small cooling channels/air-slots in the refractory pads upon which the tanks rest and will use ultrasonic guided wave inspection technology to volumetrically inspect physically inaccessible regions that make up ∼90% of a tank bottom, as well as regions that are physically accessible from the air-slots but comprise only ∼10% of a tank bottom. This paper describes the air-slot sensor and robotic deployment system and focuses on the testing approach and methods that are being applied to support (1) design feedback and performance acceptance (requirement verification) and (2) performance repeatability/reliability assessments (qualification) to ensure the RAVIS is prepared for successful inservice inspections of primary tank bottoms. Test progress made against the test plan, the results of 2019 testing, and the future outlook are included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Estimation of the Transportation Risks for the Spent Fuel in Korea for Various Transportation Scenarios

According to the long term management strategy for spent fuels in Korea, they will be transported from the spent fuel pools in each nuclear power plant to the central interim storage facility (CISF) which is to start operation in 2016. Therefore, we have to determine the safe and economical logistics for the transportation of these spent fuels by considering their transportation risks and costs. In this study, we developed four transportation scenarios by considering the type of transportation casks and transport means in order to suggest safe and economical transportation logistics for the spent fuels in Korea. Also, we estimated and compared the transportation risks for these four transportation scenarios. From the results of this study, we found that these four transportation scenarios for spent fuels have a very low radiological risk activity with a manageable safety and health consequences. The results of this study can be used as basic data for the development of safe and economical logistics for a transportation of the spent fuels in Korea by considering the transportation costs for the four scenarios which will be needed in the near future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste is our Product. Developing, Implementing and Optimising Waste Management at Dounreay - 19039

The UK's Fast Breeder Reactor Research programme was centred at Dounreay, in the very north of Scotland, from 1955. Since 1994, the site has been focused on decommissioning, and represents one of the most complex, technically challenging and hazardous nuclear clean-up projects in Europe. Since 2012, Dounreay Site Restoration Ltd (DSRL) has been contracted by the NDA as the Site License Company to deliver the defined scope of work, under a Target Cost contract, to decommission the site to achieve the Interim End State by 2030-2033, whilst managing the transition of its people. All parties, including DSRL's Parent Body Organisation Cavendish Dounreay Partnership Ltd (a consortium of Cavendish Nuclear, AECOM, and Jacobs), recognise that there are significant technical and regulatory challenges to achieve this, as well as safely managing the transition for our workforce on what is effectively a 'closure' contract. The product of decommissioning is waste; over the course of the programme, a full range of higher activity and lower level radioactive wastes will be generated, and must be safely managed. This paper will address: - The Policy issues relating to radioactive waste management at Dounreay, including particular issues relating to implementation of Scottish policy, including how Waste Management is Optimised. - An overview of the decommissioning programme and the delivery of an Interim End State; - The type, range and nature of radioactive wastes requiring safe management at Dounreay; - Higher Activity Wastes (HAW): - Setting higher activity waste strategy; defining products and interim storage requirements; - Technical, regulatory and stakeholder issues for HAW strategy; - Lower Activity Wastes: - Setting Low Level Waste (LLW) strategy; defining a disposal product and development and status for Dounreay's LLW Disposal Vaults; - Implementing LLW strategy; - Technical, regulatory and stakeholder issues for LLW strategy; - Optimising Waste Management -Optimising waste from generation (from decommissioning workfaces) through to disposal -why, and how; - The Waste Informed Decommissioning model as a methodology and approach; - Impact and importance of Waste Management on a target cost contract; - Establishment of a Waste Optimisation Programme to drive ownership, delivery and culture change; - Management responsibilities and informing organisational design; - Sharing and learning from Best Practice; - The Challenge - how to ensure workforce and teams are engaged in delivering optimisation requirements; - Conclusions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Technology Development for Aluminum-clad Spent Nuclear Fuel for Extended Dry Storage (Status Report)

A task group under the Spent Nuclear Fuel Working Group of the U.S. Department of Energy (DOE), Offices of Environmental Management (EM) and Nuclear Energy (NE) identified technical challenges (“information gaps"’) to the ability to provide for safe extended (>50 years) dry storage of Aluminum-Clad Spent Nuclear Fuel (ASNF) in a report issued in 2017, An Action Plan was developed, and a task- based program was launched under the sponsorship of DOE-EM, Office of Technology Development (EMTD) in October 2018 to close the gaps and complete the technical information set needed to implement extended dry storage with confidence. This interim status report summarizes the work to date of this EMTD program to complete the technical bases and demonstrate that extended dry storage is safe and viable.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Safety Classification and Design Rules for Structures, Systems and Components in a Near Surface Disposal Facility-Post Closure Phase - 19716

Canadian Nuclear Laboratories (CNL) is developing a Near Surface Disposal Facility (NSDF) to be constructed at its Chalk River Laboratories (CRL) site. In general, a NSDF is a facility for radioactive waste disposal, under an engineered cover, located at or within a few meters of the earth's surface. The NSDF will establish a safe, local and permanent means for the disposal of low level radioactive waste. The NSDF is intended to dispose historic waste currently in interim storage as well as waste arising from building decommissioning and environmental remediation activities. The NSDF is to be composed of engineered containment mound, waste water treatment plant and other supporting facilities and infrastructures that are needed to preserve radioactive waste. The NSDF life cycle will comprise two distinct phases: pre closure and post closure. The pre closure phase involves construction, operation and closure activities. The post closure phase includes institutional control and post-institutional control to ensure long term safety and radiological acceptability of the disposal facility. As part of the evolving activities for the NSDF project, a process is developed in accordance with Canadian regulations and International Atomic Energy Agency (IAEA) principles to classify systems that comprise NSDF for safe operation, long term safety of the disposal facility and the protection of workers, the public and the environment. This paper describes the methodology developed to classify Structures, Systems and Components (SSCs) important to safety in post closure phase and determine their design rules. The design rules are the relevant codes, standards and proven engineering practices that should be applied, as appropriate, to the design of SSCs to meet the applicable design requirements. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Used Fuel Dry Storage Systems and Components for Shutdown Plants to Expedite Defueling of Spent Fuel Pool - 18378

For plants that have announced plans to shut down, their main priority is to off-load the Used Nuclear Fuel from the spent fuel pool to dry storage at an ISFSI so that they can proceed to 'Safe store' or other storage options, and start their decommissioning process as soon as possible. One of the major expenses for a decommissioned plant is the cost of maintenance of the spent fuel pool. Therefore, the ability of the dry storage system to store short cooled fuel is an important aspect of dry storage system for shutdown plants. When a shutdown plant evaluates the dry storage options, total cost of the transferring the fuel from the pool to ISFSI site needs to be evaluated. One of the major costs to the utility for dry storage is the cost of ISFSI pad (basemat) along with the cost of dry storage system hardware. Smaller ISFSI footprint saves utility for the cost of ISFSI site excavation, cost of engineered backfill and cost of ISFSI pad. In order to minimize the cost of dry storage systems, besides the size of the ISFSI pad as described above, other important considerations is to use high capacity systems. The highest capacity systems available in the dry storage market today are with 37 PWR or 89 BWR used fuel assemblies per canister. These dry storage systems are expected to be at the plant sites for extended duration due to the unavailability of Interim Storage Facilities or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the dry storage systems canisters and storage overpack so that they can safely protect the fuel and integrity of used nuclear fuel is maintained during storage period is of utmost importance. Robust Aging Management Program is an important aspect for dry storage systems not only at the shutdown plants but also at the operating plants. This paper will provide the update of a reduced footprint version of TN Americas NUHOMS{sup R} System with MATRIX HSM and NUHOMS{sup R} EOS Canisters that addresses the need for maximizing safety, ISFSI capacity while optimizing cost. It will provide an update on the current capabilities, design features and current status of the licensing and deployment of NUHOMS{sup R} EOS System. It will provide the current status of the MATRIX HSM along with the significant enhancement included for a robust Canister Evolved Safety Program for Aging Management. It will also describe the construction sequence; loading operations, and inspections during extended storage as a part of aging management program. The compact version of TN Americas NUHOMS{sup R} System with MATRIX HSM offers a 'Universal' Storage Overpack which is designed to accept all different designs dry storage canisters available in the industry. As UNF storage continues to drives the industry towards innovations that address the need for optimized dry storage systems, compact ISFSIs and prudent aging management programs, this new evolution of the TN Americas NUHOMS{sup R} system with MATRIX HSM and EOS Canisters offers a significant leap forward in addressing all of these challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Transportation of Radioactive Waste in Support of Ontario Power Generation's Darlington Nuclear Generating Station Refurbishment Project - 19384

Ontario Power Generation's (OPG) Darlington Nuclear Generating Station (DNGS) is currently executing a major refurbishment of the first of their four Candu reactors. As expected, the volumes of Low and Intermediate Level Waste (LILW) generated from this large-scale project have been significant. As a result, unique solutions were needed for the safe and efficient transportation of radioactive waste from the Darlington Nuclear Generating Station to OPG's Western Waste Management Facility for volume reduction and interim storage. OPG's Nuclear Waste Management Division and the Darlington Refurbishment Project worked together to identify unique radioactive waste transportation solutions. These solutions included staging and temporary storage facilities, new waste containers and specialized transportation packages, additional human resources and enhanced planning and logistics required to transport large volumes of routine and non-routine radioactive waste in a manner that minimized the impact on employee and public safety, project schedule and project costs. From a facilities perspective a shielded 'Marshalling Area' that allowed for loaded transportation packages to be staged was built on the Darlington site and a temporary licensed off-site radioactive waste storage facility close to the DNGS was contracted through a third party vendor. These two facilities allowed for more consistent and efficient schedules that limited radioactive waste shipments during off-hours and avoided peak traffic periods thereby limiting the risk to Refurbishment critical path activities. Special purpose-built transportation packages and waste containers were designed and fabricated to handle unique waste streams such as feeder pipes and other miscellaneous intermediate level waste items associated with reactor dismantling. Twenty-four Type A qualified transportation packages mounted to six flat deck trailers were designed and fabricated to support the shipment of contaminated feeder pipes. An Intermediate Level Waste Utility Container (ILWUC) to be used in conjunction with the Type B qualified Trillium Transportation Package was designed and fabricated to handle unique intermediate level waste streams arising from the reactor dismantling process. Logistics software was used to plan the shipments to ensure waste transportation packages could be loaded, transported, unloaded and returned safely to the project site in a timely manner without impacting project schedules. Several shipping scenarios were simulated and adjusted using the software to ensure that the most efficient use of equipment and resources for the radioactive waste transportation aspects of the project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Systems and Tools to Facilitate Aging Management Inspections of Used Nuclear Fuel Dry Storage Systems - 18382

The Used Nuclear Fuel (UNF) dry storage systems (DSSs) are currently used at almost all the nuclear plants in the USA for the storage of their UNF as the spent fuel pools are running out of capacity to store any additional discharged fuel. Even though these DSSs are supposed to be at the reactor site for a short amount of time, they are expected to be at the reactor sites for an extended duration due to the unavailability of Interim Storage Facilities (ISF) or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the DSS canisters and storage overpacks so they can safely protect the fuel and maintain the integrity of UNF is of utmost importance during storage at reactor site ISFSI or at the ISF. Comprehensive and robust Aging Management Program (AMP) is an important aspect for DSSs to satisfy these requirements. In order to address this industry need, TN Americas have developed an enhanced NUHOMS{sup R} DSS licensed by NRC under 10 CFR Part 72 regulations and a comprehensive AMP development which includes prevention, inspection, monitoring and mitigation of any corrosion or degradation of DSS components. For DSC and HSM inspection, two remotely operating delivery systems have been developed using non-destructive examination (NDE) methods including robotic crawler and inspection ring system. This paper describes details of these developments and status of their deployment for implementation at various utility ISFSI sites. TN Americas completed the detailed design of the DSC inspection system and conducted functional tests of the inspection system on a DSC mockup and the system is ready for deployment at any NUHOMS{sup R} ISFSI site. TN Americas is committed to offer the most robust and comprehensive AMP systems, tools and services to the industry to assure the safety of the deployed DSS at the utility sites. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

INFORMATION: Management Alert on Environmental Management's Select Strategy for Disposition of Savannah River Site Depleted Uranium Oxides

The Administration and the Congress, through policy statements and passage of the American Recovery and Reinvestment Act of 2009 (Recovery Act), have signaled that they hope that proactive actions by agency Inspectors General will help ensure that Federal Recovery Act activities are transparent, effective and efficient. In that context, the purpose of this management alert is to share with you concerns that have been raised to the Office of Inspector General regarding the planned disposition of the Savannah River Site's (SRS) inventory of Depleted Uranium (DU) oxides. This inventory, generated as a by-product of the nuclear weapons production process and amounting to approximately 15,600 drums of DU oxides, has been stored at SRS for decades. A Department source we deem reliable and credible recently came to the Office of Inspector General expressing concern that imminent actions are planned that may not provide for the most cost effective disposition of these materials. During April 2009, the Department chose to use funds provided under the Recovery Act to accelerate final disposition of the SRS inventory of DU oxides. After coordination with State of Utah regulators, elected officials and the U.S. Nuclear Regulatory Commission, the Department initiated a campaign to ship the material to a facility operated by EnergySolutions in Clive, Utah. Although one shipment of a portion of the material has already been sent to the EnergySolutions facility, the majority of the product remains at SRS. As had been planned, both for the shipment already made and those planned in the near term, the EnergySolutions facility was to have been the final disposal location for the material. Recently, a member of Congress and various Utah State officials raised questions regarding the radioactive and other constituents present in the DU oxides to be disposed of at the Clive, Utah, facility. These concerns revolved around the characterization of the material and its acceptability under existing licensing criteria. As a consequence, the Governor of Utah met with Department officials to voice concerns regarding further shipments of the material and to seek return of the initial shipment of DU oxides to SRS. Utah's objections and the Department's agreement to accede to the State's demands effectively prohibit the transfer of the remaining material from South Carolina to Utah. In response, the Department evaluated its options and issued a draft decision paper on March 1, 2010, which outlined an alternative for temporary storage until the final disposition issue could be resolved. Under the terms of the proposed option, the remaining shipments from SRS are to be sent on an interim basis to a facility owned by Waste Control Specialists (WCS) in Andrews, Texas. Clearly, this choice carries with it a number of significant logistical burdens, including substantial additional costs for, among several items, repackaging at SRS, transportation to Texas, storage at the interim site, and, repackaging and transportation to the yet-to-be-determined final disposition point. The Department source expressed the concern that the proposal to store the material on an interim basis in Texas was inefficient and unnecessary, asserting: (1) that the materials could remain at SRS until a final disposition path is identified, and that this could be done safely, securely and cost effectively; and, (2) that the nature of the material was not subject to existing compliance agreements with the State of South Carolina, suggesting the viability of keeping the material in storage at SRS until a permanent disposal site is definitively established. We noted that, while the Department's decision paper referred to 'numerous project and programmatic factors that make it impractical to retain the remaining inventory at Savannah River,' it did not outline the specific issues involved nor did it provide any substantive economic or environmental analysis supporting the need for the planned interim storage action. The only apparent driver in this case was a Recovery Act-related goal established by the Department to accelerate the general disposition of the SRS material. We recognize that decisions such as the one proposed for the SRS inventory of DU oxides are often more complex and nuanced than might appear on the surface. Consideration of factors such as cost, state interest, posture of local regulators, etc., are important elements in this process. Although, we have not completed sufficient work to reach an independent judgment on the merits of this matter, we wanted to ensure that the Department was aware of the concerns that have been raised before imminent decisions and resource commitments were made regarding the path forward.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Drying Simulated Advanced Gas Reactor Fuel: Proving the Concept - 17637

Spent Nuclear Fuel (SNF) reprocessing is due to cease in the UK in 2018 and a new interim storage method may be required if it is found that pond storage is not viable beyond the 25 year period which is currently understood to be safe. Dry storage has been used elsewhere in the world for zircaloy and aluminium clad fuel and has been proposed for use in the UK, however since the UK's fuel is predominantly stainless steel (SS) clad, testing will need to be carried out to ensure that drying methods are suitable. This will require representative samples for macro scale drying tests. To date, little long term stored fuel has been examined. As a result, work has been carried out to try and ascertain whether the corrosion associated with long term storage leads to significant bound water and whether through wall cracks can be formed in intact lengths of SS tube. It was found that unlike an aluminium simulant, corroded SS showed no sign of water loss as a result of oxide dehydration during controlled drying by thermogravimetric analysis, and consequently bound water could be disregarded. It was also found that through wall cracks could be produced in an intact length of SS tube which would be suitable for macro scale drying tests. Some initial macro scale drying tests have been carried out using an alternative test piece with preformed cracks, and three distinct drying regimes to complete dryness have been detected. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How the low price of oil can spur CCS research innovation

The global consumption of oil grew in 2015 as prices fell due to oversupply. Low oil prices are problematic for greenhouse gas (GHG) reduction efforts because they tend to discourage use of energy-efficient vehicles and encourage driving and related CO 2 emissions. From this perspective, low oil prices would seem to be entirely detrimental to lowering GHG emissions. When you factor in the fact that low oil prices have reduced oil-company-sponsored funding for carbon capture and storage (CCS) research efforts which aim to develop safe and feasible ways to reduce GHG emissions from the use of fossil fuels, the picture for lowering GHG emissions seems even gloomier. But there is at least one potential silver lining in low oil prices for CCS research and development, and this involves utilization, and in particular, geologic interim storage of CO 2 .

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Hanford Waste Transfer Planning and Control - 13465

Hanford tank waste cleanup requires efficient use of double-shell tank space to support single-shell tank retrievals and future waste feed delivery to the Waste Treatment and Immobilization Plant (WTP). Every waste transfer, including single-shell tank retrievals and evaporator campaign, is evaluated via the Waste Transfer Compatibility Program for compliance with safety basis, environmental compliance, operational limits and controls to enhance future waste treatment. Mixed radioactive and hazardous wastes are stored at the Hanford Site on an interim basis until they can be treated, as necessary, for final disposal. Implementation of the Tank Farms Waste Transfer Compatibility Program helps to ensure continued safe and prudent storage and handling of these wastes within the Tank Farms Facility. The Tank Farms Waste Transfer Compatibility Program is a Safety Management Program that is a formal process for evaluating waste transfers and chemical additions through the preparation of documented Waste Compatibility Assessments (WCA). The primary purpose of the program is to ensure that sufficient controls are in place to prevent the formation of incompatible mixtures as the result of waste transfer operations. The program defines a consistent means of evaluating compliance with certain administrative controls, safety, operational, regulatory, and programmatic criteria and specifies considerations necessary to assess waste transfers and chemical additions. Current operations are most limited by staying within compliance with the safety basis controls to prevent flammable gas build up in the tank headspace. The depth of solids, the depth of supernatant, the total waste depth and the waste temperature are monitored and controlled to stay within the Compatibility Program rules. Also, transfer planning includes a preliminary evaluation against the Compatibility Program to assure that operating plans will comply with the Waste Transfer Compatibility Program. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗