Search NASA⌕ Search

SEARCH · Search NASA

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Advanced Simulation and Computing: ASC FY24 Implementation Plan

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, security, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including previous nuclear tests, stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent. The ASC program is a cornerstone of the SSP, providing simulation capabilities and computational resources to support the annual stockpile assessment and certification process, study advanced nuclear weapons design and manufacturing processes, analyze accident scenarios and weapons aging, and provide the tools to enable stockpile Life Extension Programs (LEPs) and the resolution of Significant Finding Investigations (SFIs). This work requires a balance of resources, including technical staff, hardware, simulation software, and computer science solutions. The ASC program focuses on increasing the predictive capabilities in a three-dimensional (3D) simulation environment while maintaining support to the SSP. The Program continues to improve its unique tools for understanding and solving progressively more difficult stockpile problems (sufficient resolution, dimensionality, and scientific details), and quantifying critical margins and uncertainties. Resolving each issue requires increasingly difficult analyses because the aging process has progressively moved the stockpile further from the original test base. While the focus remains on the U.S. nuclear weapons program, where possible, the Program also enables the use of high-performance computing (HPC) and simulation tools to address broader national security needs, such as foreign nuclear weapon assessments and nuclear counterterrorism. The 2022 Nuclear Posture Review (NPR) calls for NNSA to “deliver a modern, adaptive nuclear security enterprise based on an integrated strategy for risk management, production-based resilience, science and technology innovation, and workforce initiatives.” Furthermore, “NNSA will establish a Science and Technology Innovation Initiative to accelerate the integration of science and technology (S&T) throughout its activities.” Executing this strategy necessitates the continued emphasis on developing and sustaining high-quality scientific and engineering staff, as well as supporting computational and experimental capabilities. These components constitute the foundation of the nuclear weapons program. The continued success of the SSP and LEPs is predicated upon the ability to credibly certify the stockpile, without a return to underground nuclear tests (UGTs). Shortly after the nuclear test moratorium entered into force in 1992, the Accelerated Strategic Computing Initiative (ASCI) was established to provide an extensive simulation capability to underpin stockpile certification. While computing and simulation have always been essential to the success of the nuclear weapons program, the program goal of ASCI was to execute NNSA’s vision of using these tools in support of the stockpile stewardship mission. The ASCI program was essential to the successful demonstration of the SSP, providing critical nuclear weapons simulation and modeling capabilities. ASCI officially evolved into the ASC program in fiscal year (FY) 2005, but the mission remains essentially the same: provide the simulation and computational capabilities that underpin the ability to maintain a safe, secure, effective nuclear weapon stockpile, without returning to underground nuclear testing. The capabilities that the ASC program provides at the national laboratories play a vital role in the nuclear security enterprise and are necessary for fulfilling the stockpile stewardship and life extension requirements outlined for NNSA. The Program develops modern simulation tools that provide insights into stockpile aging issues, provide the computational and simulation tools that enable designers and analysts to certify the current stockpile and life-extended nuclear weapons, and inform the decision-making process when any modifications in nuclear warheads or the associated manufacturing processes are deemed necessary. Furthermore, ASC is enhancing the predictive simulation capabilities that are essential to evaluate weapons effects, design experiments, and ensure test readiness. The ASC program continues to improve its unique tools to solve stockpile problems— with a focus on sufficient resolution, dimensionality, and scientific detail—to enable Quantification of Margins and Uncertainties (QMU) and to resolve the increasingly difficult analyses needed for stockpile stewardship. The needs of the Stockpile Management and Production Modernization programs (formerly Directed Stockpile Work) also drive the requirements for simulation and computational resources. These requirements include planned LEPs, stockpile support activities, and mitigation efforts against the potential for technical surprise. All of the weapons within the current stockpile are in some stage of the life extension process. The simulation and computational capabilities are crucial for successful execution of these life extensions and for ensuring NNSA can certify these life-extended weapons without conducting a UGT.

97 MATHEMATICS AND COMPUTING↗

Los Alamos National Laboratory Transit Service Implementation Plan

In 2021, Los Alamos National Laboratory (LANL) partnered with Nelson\Nygaard Consulting Associates to conduct the LANL Transit Options Study in preparation for Laboratory expansion plans. When the study started, LANL was expected to grow by 3,000 employees over the next several years. Most of that growth has already taken place. Sixty percent of employees commute from outside of Los Alamos County, and with limited housing capacity in Los Alamos, most of the new employees are expected to live outside of Los Alamos County as well.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Simulation and Computing: FY25 Implementation Plan

The DOE National Nuclear Security Administration (NNSA) Stockpile Stewardship Program (SSP) is an integrated technical program for maintaining the safety, security, and reliability of the U.S. nuclear stockpile. The SSP incorporates nuclear test data, computational modeling and simulation, and experimental facilities to advance understanding of nuclear weapons. The suite of data analyzed comes from activities including previous nuclear tests, stockpile surveillance, experimental research, and development and engineering programs. This integrated national program requires the continued use of experimental facilities and the computational capabilities to support the SSP missions. These component parts, in addition to an appropriately scaled production capability, enable NNSA to support stockpile requirements. The ultimate goal of the SSP, and thus of the Advanced Simulation and Computing (ASC) program, is to ensure that the U.S. maintains a safe, secure, and effective strategic deterrent.

97 MATHEMATICS AND COMPUTING↗

EM Program Expectations on Implementation of DOE O 458: Radiation Protection of Public/Environment - 19553

DOE Order 458.1, Radiation Protection of the Public and Environment, was issued in 2011. DOE sites were given 18 months to implement. The revised Order promulgates requirements for property clearance actions and independent verification. DOE Order 458.1 allows for preapproved authorized limits for the clearance of property. However, when property with the potential to contain residual radioactive material does not meet preapproved authorized limits, an authorized limits package must be developed. The Order contains a range of requirements for demonstrating with reasonable assurance that dose constraints are met for any actual or likely future use of the property to be released. EM has developed a draft guidance document that provides the elements of an authorized limits package. These elements are used to review all authorized limits packages that are submitted to EM. Expected elements include property description and process knowledge documentation, current and likely future use, the conceptual site model, dose modeling methodologies, specific authorized limits, dose- or concentration-based constraints, collective dose estimate to the potentially exposed population, stakeholder communications, description of the As Low As Reasonably Achievable (ALARA) analysis, implementation plan, evaluation of difficult to assess surfaces, and independent verification plan. The draft guidance document also provides further explanation of the desired elements of an independent verification (IV) plan. An IV plan should describe the planning phase, implementation phase, assessment phase, and decision phase of an activity. The planning phase includes scope and cost, concurrent with cleanup contractor procurement, and review and approval of site radiological survey clearance program and IV program plans. The implementation phase assures sufficient collection of data and adjustment can be made as necessary. During the assessment phase, data and reports are reviewed, and coordination between the clean-up contractor and IV personnel occurs. A decision of whether or not the clearance actions need to be altered occurs during the decision phase. IV certification that the clearance action is complete also occurs during the decision phase. Issuance of the final guidance document is meant to improve the consultation process and minimize iterative interactions with EM. Standardizing and formalizing property clearance and IV actions also helps assure that cleanup actions are transparent and sustainable for future scrutiny. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2016-2020 Strategic Plan and Implementing Framework

The 2016-2020 Strategic Plan and Implementing Framework from the Office of Energy Efficiency and Renewable Energy (EERE) is the blueprint for launching the nation’s leadership in the global clean energy economy. This document will guide the organization to build on decades of progress in powering our nation from clean, affordable and secure energy.

Strategic, Plan, Framework, Vision, Clean Energy, ↗

Review of Tools for Identifying, Planning, and Implementing Habitat Restoration for Pacific Salmon and Steelhead

Abstract A key challenge in watershed restoration is identifying the appropriate assessments, data, and analyses needed to identify disrupted natural processes, lost and degraded habitats, and limiting factors to ultimately identify and design successful restoration projects. This has proven particularly challenging for large restoration programs focused on recovery of threatened and endangered salmon and trout where numerous tools, models, and other assessments have been developed to assist with habitat restoration at the watershed, reach, and project scale. Unfortunately, it is often unclear which step in the restoration process these various assessment tools will actually address. To assist with identifying the appropriate assessment tool (e.g., model, data collection, analysis, and survey), we reviewed major categories of watershed restoration assessment tools to determine their goals, inputs, outputs, and their utility in helping plan, prioritize, and implement restoration actions. The major categories of assessment tools reviewed were: (1) life cycle and fish–habitat models, (2) watershed assessment methods and techniques, (3) reach assessments, (4) prioritization tools, and (5) common monitoring methods to identify, prioritize, and plan river and watershed restoration projects. We specifically indicated whether these assessment tools directly or indirectly assisted with the key steps in the restoration process that are required to develop successful restoration plans and projects. These steps involve assessing watershed conditions, identifying limiting habitats and life stages, identifying problems and restoration actions, selecting restoration techniques, prioritizing restoration actions, or designing actual restoration projects. It is important to recognize that no single assessment tool will address all the steps in the restoration process. Selecting appropriate assessment tools requires a clear understanding of the goals of the restoration program and which step in the restoration process will be addressed by a particular tool. We provide recommendations for how restoration practitioners and managers can use our review to help select the appropriate assessment tools needed for their watershed.

Roni, Philip↗

Soil Sampling Results for Closure of a Portion of Solid Waste Management Unit #16

The U.S. Department of Energy/National Nuclear Security Administration (DOE/ NNSA) and National Technology & Engineering Solutions of Sandia, LLC (NTESS), the management and operating contractor for Sandia National Laboratories/California (SNL/CA), has prepared this soil sampling results report for closure of a portion of Solid Waste Management Unit (SWMU) #16. The entire network of SNL/CA sanitary sewer lines, including building laterals, was identified as SWMU #16 under a Resource Conservation and Recovery Act (RCRA) Facility Assessment conducted for SNL/CA in April 1991 (DOE 1992). Along with the previous SWMU #16 investigation results (SNL/CA 2019), the results of this investigation are intended to support closure decisions by the San Francisco Bay Regional Water Quality Control Board (RWQCB), as discussed below. SNL/CA personnel completed upgrading its sanitary sewer discharge network in 2019. These upgrades included installing new sections of underground lines and decommissioning certain sections of the old piping system by capping in place. To date, several sections of the sewer line have been abandoned-in-place by capping as new sewer lines were installed or flow was rerouted to other existing lines. To formally close these abandoned sections of the sewer line, the RWQCB required that SNL/CA personnel collect soil samples to be analyzed for contaminants potentially released from the sewer lines. SNL/CA personnel hired Weiss Associates (Weiss) of Emeryville, California to prepare a sampling and analysis plan, implement the sampling plan and report the results of the investigation under Purchase Order #2166257. The Sampling and Analysis Plan for Partial Closure of Solid Waste Management Unit #16 (SAP) was submitted to the RWQCB on August 14, 2020 by Weiss on behalf of SNL/CA. The RWQCB approved the SAP on September 30, 2020 after Weiss updated the method detection limit and reporting limits for total polychlorinated biphenyls (PCBs) and individual aroclors. Soil sampling was conducted in accordance with the SAP except that fewer locations were sampled due to site constraints, as discussed below. This report presents the results of the sampling effort and documents all associated field activities including borehole clearing, soil sample collection, storage and transportation to the analytical laboratories, borehole backfilling and surface restoration, and storage of investigation-derived waste (IDW) for future profiling and disposal by SNL/CA waste management personnel.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for Developing a Regulatory Roadmap for Distributed Energy Resource (DER) Integration in Colombia

The USAID-NREL Partnership in Colombia, in conjunction with SURE and USEA, selected four action plan teams from the Young Professionals Leadership Program to receive tailored NREL technical assistance to support action plan implementation. The four plans selected represent various aspects associated with planning for the efficient integration of DERs, including electric mobility, residential and commercial energy applications, distributed generation modeling, and regulatory considerations. In response to national grid modernization, decentralization, digitalization, and electrification trends, CREG is looking to update Colombia's electric distribution code, with an emphasis on the integration of electric vehicles and charging stations, but also energy storage systems, non-conventional sources of renewable energy, and other distributed energy resources (DERs). CREG aims to establish the general steps that must be carried out to update the distribution code for the integration of DERs, with a view to the design and development of new markets. The objective of the TA provided to CREG was to support them in identifying and outlining the general processes and approaches to consider when updating Colombia's distribution code for the integration of electric vehicles, distributed renewable energy systems, and energy storage systems, with a view to the design and development of new markets.

24 POWER TRANSMISSION AND DISTRIBUTION↗

CWA 15793 2011 Planning and Implementation Tool

This software, built on an open source platform called Electron (runs on Chromium and Node.js), is designed to assist organizations in the implementation of a biorisk management system consistent with the requirements of the international, publicly available guidance document CEN Workshop Agreement 15793:2011 (CWA 15793). The software includes tools for conducting organizational gap analysis against CWA 15793 requirements, planning tools to support the implementation of CWA 15793 requirements, and performance monitoring support. The gap analysis questions are based on the text of CWA 15793, and its associated guidance document, CEN Workshop Agreement 16393:2012. The authors have secured permission from the publisher of CWA 15793, the European Committee for Standardization (CEN), to use language from the document in the software, with the understanding that the software will be made available freely, without charge.

Gross, Alan↗

FCC-ee: The Lepton Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. On the other hand, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the domination of matter over antimatter, the evidence for dark matter and the non-zero neutrino masses. Theoretical issues that need to be addressed include the hierarchy problem, the neutrality of the Universe, the stability of the Higgs boson mass upon quantum corrections and the strong CP problem. This report contains the description of a novel research infrastructure based on a highest-luminosity energy frontier electron-positron collider (FCC-ee) to address the open questions of modern physics. It will be a general precision instrument for the continued in-depth exploration of nature at the smallest scales, optimised to measure precisely the properties of the Higgs boson at the per-cent level, the Z and W bosons, the top quark and the Higgs coupling to the Z at the per-mil level. FCC-ee will provide unprecedented sensitivity to signs of new physics appearing either in the form of small deviations from the Standard Model or as rare decay processes. This collider will be implemented in stages, successively spanning the entire energy range from the Z pole over the WW threshold and H production peak to the t"t" ̅ threshold. Most of the infrastructure (e.g. underground structures, surface sites, electrical distribution, cooling & ventilation, RF systems) can be directly re-used for a subsequent highest-energy hadron collider (described in the FCC conceptual design report volume 3), serving the world-wide particle-physics community in a highly synergetic and cost-effective manner throughout the 21st century. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular lepton collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy, highest-luminosity circular lepton collider exists today. The FCC-ee concept comprises a power-saving twin-aperture magnet system, a continuous top-up injection scheme for stable operation and maximum integrated luminosity. Combined with an energy staging scheme, the FCC-ee represents the most efficient and most sustainable route for executing the research required to discover signs of new physics beyond the Standard Model. The step-wise energy increase of the FCC-ee does not require any additional civil engineering activities. Strategic R&D for FCC-ee aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate residual technology-related risks and ensure that industry can benefit from an acceptable economic utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, building the international machine and experiment consortia, developing a territorial implementation plan in agreement with the host-states’ requirements, optimising the disposal of land and underground volumes and preparing the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

Spectrum Interference from Commercial devices in 6 & 7/8 GHz

FCC repurposed spectrum in the 6 GHz band allocated to DOE for commercial use of Wi-Fi 6E/7 in 2020.The 2024 National Spectrum Strategy (NSS) implementation plan is now considering 7/8 GHz band as well for co-existence of commercial devices with federal incumbents such as DOE. This poster summarizes INL’s work on a scientific study on the potential harmful interference caused by the commercial devices in real-world scenarios. It includes research in INL for the following projects funded by DOE: 1) DOE-CIO: Spectrum security for advanced wireless technologies; 2) DOE-OE: 7 GHz Spectrum interference study; 3) DOE-CESER: Harmful interference in 6 GHz from commercial Wi-Fi 6E/7 devices on utility links in the energy sector; 4) DOE/NTIA for NSS Implementation plan: Interference study in 7/8 GHz bands identified in the NSS. 5) NSF: Spectrum Innovation Initiative- National Radio Dynamic Zones (SII-NRDZ).

6 GHz↗

Energy Options Analysis Project (Final Report)

This Bear River Band of Rohnerville Rancheria (BRB) Energy Options Analysis Project provides a rigorous and comprehensive near-term renewable energy implementation plan that aligns with the BRB’s long term strategic vision of “zero net annual utility energy consumption.” Final recommendations were arrived at by following four key project phases:A gas and electricity load assessment was conducted for all existing buildings using historic consumption data, and projected loads of new or anticipated buildings using building designs. A renewable energy resource assessment was conducted that estimated the gross generation potential of solar and wind, constrained to areas that could potentially be developed. Other renewable generation technologies were not considered feasible to meet the loads of the BRB. Demand-side efficiency and fuel switching opportunities were identified that can reduce electrical and gas consumption. These opportunities were not integrated into the load assessment in order to provide a conservative implementation plan, but are recommended to be pursued in order to cost-optimize projects during a feasibility assessment. A strategic vision advisory committee was organized and consulted when iterating on the viability of possible projects. These project phases resulted in finalizing the following three solar PV projects for the near term, which also lay the foundation for a future community-scale or multiple-facility microgrid for added resiliency. Additional solar PV on the hillside south of the Tish-Non Community Center. Solar plus battery storage microgrid at the Pump & Play fuel station. Solar PV at the Casino.

14 SOLAR ENERGY↗

Oak Ridge National Laboratory Support of Non-light Water Reactor Technologies: Capabilities Assessment for NRC Near-term Implementation Action Plans for Non-light Water Reactors

The Oak Ridge National Laboratory (ORNL) has a rich history of support for light water reactor (LWR) and non-LWR technologies. The ORNL history involves operation of 13 reactors at ORNL including the graphite reactor dating back to World War II, two aqueous homogeneous reactors, two molten salt reactors (MSRs), a fast-burst health physics reactor, and seven LWRs. Operation of the High Flux Isotope Reactor (HFIR) has been ongoing since 1965. Expertise exists amongst the ORNL staff to provide non-LWR training; support evaluation of non-LWR licensing and safety issues; perform modeling and simulation using advanced computational tools; run laboratory experiments using equipment such as the liquid salt component test facility; and perform in-depth fuel performance and thermal-hydraulic technology reviews using a vast suite of computer codes and tools. Summaries of this expertise are included in this paper.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗