Search NASA⌕ Search

SEARCH · Search NASA

Results for “Incentive Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Enabling the Capture and Sharing of NASA Technical Expertise Through Communities of Practice

Historically, engineers at the National Aeronautics and Space Administration (NASA) had few opportunities or incentives to share their technical expertise across the Agency. Its center- and project- focused culture often meant that knowledge never left organizational and geographic boundaries. With increasingly complex missions, the closeout of the Shuttle Program, and a new generation entering the workforce, developing a knowledge sharing culture became critical. To address this need, the Office of the Chief Engineer established communities of practice on the NASA Engineering Network. These communities were strategically aligned with NASA's core competencies in such disciplines as avionics, flight mechanics, life support, propulsion, structures, loads and dynamics, human factors, and guidance, navigation, and control. This paper describes the process used to identify and develop communities, from establishing simple websites that compiled discipline-specific resources to fostering a knowledge-sharing environment through collaborative and interactive technologies. It includes qualitative evidence of improved availability and transfer of knowledge. It focuses on pivotal capabilities that increased knowledge exchange such as a custom-made Ask An Expert system, community contact lists, publication of key resources, and submission forms that allowed any user to propose content for the sites. It discusses the peer relationships that developed through the communities and the leadership and infrastructure that made them possible.

Topousis, Daria E.↗

Shuttle Propulsion System Major Events and the Final 22 Flights

Numerous lessons have been documented from the Space Shuttle Propulsion elements. Major events include loss of the Solid Rocket Boosters (SRB's) on STS-4 and shutdown of a Space Shuttle Main Engine (SSME) during ascent on STS-51F. On STS-112 only half the pyrotechnics fired during release of the vehicle from the launch pad, a testament for redundancy. STS-91 exhibited freezing of a main combustion chamber pressure measurement and on STS-93 nozzle tube ruptures necessitated a low liquid level oxygen cut off of the main engines. A number of on pad aborts were experienced during the early program resulting in delays. And the two accidents, STS-51L and STS-107, had unique heritage in history from early program decisions and vehicle configuration. Following STS-51L significant resources were invested in developing fundamental physical understanding of solid rocket motor environments and material system behavior. And following STS-107, the risk of ascent debris was better characterized and controlled. Situational awareness during all mission phases improved, and the management team instituted effective risk assessment practices. The last 22 flights of the Space Shuttle, following the Columbia accident, were characterized by remarkable improvement in safety and reliability. Numerous problems were solved in addition to reduction of the ascent debris hazard. The Shuttle system, though not as operable as envisioned in the 1970's, successfully assembled the International Space Station (ISS). By the end of the program, the remarkable Space Shuttle Propulsion system achieved very high performance, was largely reusable, exhibited high reliability, and was a heavy lift earth to orbit propulsion system. During the program a number of project management and engineering processes were implemented and improved. Technical performance, schedule accountability, cost control, and risk management were effectively managed and implemented. Award fee contracting was implemented to provide performance incentives. The Certification of Flight Readiness and Mission Management processes became very effective. A key to the success of the propulsion element projects was related to relationships between the MSFC project office and support organizations with their counterpart contractor organizations. The teams worked diligently to understand and satisfy requirements and achieve mission success.

Owen, James W.↗

Columbia Accident Investigation Board Report. Volume Five

Volume V of the Report contains appendices that were not cited in VolumeI. These consist of documents produced by NASA and other organizations, which were provided to the Columbia Accident Investigation Board in support of its inquiry into the February 1, 2003 destruction of the Space Shuttle Columbia The contents include:. Appendix G.1 Requirements and Procedures for Certification of Flight Readiness; Appendix G.2 Appendix R, Space Shuttle Program Contingency Action Plan; Appendix G.3 CAIB Charter, with Revisions; Appendix G.4 Group 1 Matrix Brief on Maintenance, Material, and Management; Appendix G.5 Vehicle Data Mapping(VDM) Team Final Report, Jun 13, 2003; Appendix G.6 SRB Working Group Presentation to CAIB; Appendix G. 7 Starfire Team Final Report, Jun 3, 2003; Appendix G.8 Using the Data and Observations from Flight STS-107, Executive Summary; Appendix G.9 Contracts, Incentives, and Safety/Technical Excellence; Appendix G.10 Detailed Summaries: Rogers Commission Report, ASAP Report, SIAT Report; Appendix G.11 Foam Application and Production Chart; Appendix G.12 Crew Survivability Report; and Appendix G.12 Aero/Aerothermal/ Thermal/Structures Team FinalReport, August 6, 2003.

CAIB (COLUMBIA ACCIDENT INVESTIGATION BOARD)↗

Space facilities: Meeting future needs for research, development, and operations

The National Facilities Study (NFS) represents an interagency effort to develop a comprehensive and integrated long-term plan for world-class aeronautical and space facilities that meet current and projected needs for commercial and government aerospace research and development and space operations. At the request of NASA and the DOD, the National Research Council's Committee on Space Facilities has reviewed the space related findings of the NFS. The inventory of more than 2800 facilities will be an important resource, especially if it continues to be updated and maintained as the NFS report recommends. The data in the inventory provide the basis for a much better understanding of the resources available in the national facilities infrastructure, as well as extensive information on which to base rational decisions about current and future facilities needs. The working groups have used the inventory data and other information to make a set of recommendations that include estimates of cast savings and steps for implementation. While it is natural that the NFS focused on cost reduction and consolidations, such a study is most useful to future planning if it gives equal weight to guiding the direction of future facilities needed to satisfy legitimate national aspirations. Even in the context of cost reduction through facilities closures and consolidations, the study is timid about recognizing and proposing program changes and realignments of roles and missions to capture what could be significant savings and increased effectiveness. The recommendations of the Committee on Space Facilities are driven by the clear need to be more realistic and precise both in recognizing current incentives and disincentives in the aerospace industry and in forecasting future conditions for U.S. space activities.

Source record↗

The Space Shuttle weather advisory panel

In 1985, the Office of Space Flight at NASA Headquarters established a Space Shuttle Weather Advisory Panel in order to review the weather support program and plans as well as to improve weather-support capabilities. The panel found that present National Space Transportation System (NSTS) weather support could be enhanced to bring it up to state-of-the-art status. Weather personnel need to be given incentives to remain on the NSTS team for 5-10 years, to constitute a small but exceptionally effective number of highly qualified and dedicated weather forecasters.

Theon, John S.↗

New energy technologies for buildings

The principal objective of the present work is to identify a variety of strategic approaches which could significantly enhance the rate of commercial development and deployment of total energy systems, fuel cells, and solar conversion. Emphasis is on the need for integration of research, conference, legislation, federal program, and industrial program aspects, leading to a fruitful feedback and follow-through process involving new energy technologies. The discussions are on a general, lay level. Recommendations made feature (1) action which improves the environment for innovation and change, (2) action which decreases risk and creates positive incentives, and (3) action which reflects the distance a particular technology is from commercialization and widespread use, as determined by its position on a development/diffusion scale.

Schoen, R.↗

The Conference Proceedings of the 2001 Air Transport Research Society (ATRS) of the WCTR Society

The ATRS held its Annual conference at Jeju Island, Korea in July 2001. The conference was a success with nearly 140 participants including 70 presenters. This report contains presentations from Volume 1 on the following: Airline and Travel Agent Relationships in Asia;Benchmarking Aviation Safety in the Commercial Airline Industry;Impact of Frequent Flyer Program on the Demand for Air Travel; Application of Genetic Algorithm on Airline Schedule;The Effects of Dual Carrier Designation and Partial Liberalization: The Case of Canada;Defense of Air Carriers and Air Agencies in FAA Enforcement proceedin gs - Damage Control Before the Case Arises; Cost Incentives for Airline Mergers? - An examination on the cost impact of U.S. airline mergers and acquisitions;Airport Regulation, Airline Competition and Canada's Airport System; Airline Competition: The Case of Israel's Domestic Doupoly; Non-Financial Indicators of Airline Distress: A Conceptual Approach;and Airport Privatization: An Empirical Analysis of Financial and Operational Efficiency.

Lee, Yeong-Heok↗

Status of Commercial Programs at NASA

NASA's strategy is two-fold: (1) Use Space Act Agreements to support the development of commercial crew transportation capabilities. (2) Use FAR-based contracts for the certification of commercially developed capabilities and for the procurement of crew transportation services to and from the ISS to meet NASA requirements. Focus is on reducing the risk and uncertainties of the development environment and on the incentives provided through competition by separating the design and early development content from the longer-term CTS Certification activities. CCP expects to develop, demonstrate, and certify U.S. commercial crew space transportation capabilities that meet ISS crew transportation needs by the end of FY 2017.

Groen, Frank↗

Automatic Dependent Surveillance-Broadcast (ADS-B) In-Trail Procedures (ITP)

Aircraft in oceanic and remote non-radar airspace frequently fly for extended periods of time in the same direction, at the same time, along similar flight paths as other aircraft. Since there is no radar surveillance, controllers use procedural separation to ensure that aircraft remain separated. Procedural separation distances are typically larger than radar separation distances and as a result aircraft operating in oceanic airspace are sometimes held at non-optimal flight levels due to conflicting traffic at intervening flight levels. Automatic Dependent Surveillance-Broadcast (ADS-B) In-Trail Procedures (ITP) were developed to enable flight level change maneuvers that would otherwise not be possible with current procedural separation standards. Aircraft operators choosing to equip with an ADS-B transceiver and an appropriate onboard decision support system would be able to take advantage of these procedures when operating in proximity to aircraft equipped with a suitable ADS-B transmitter (“ADS-B Out”). The ability to perform in-trail maneuvers to achieve more time at optimum altitudes could result in more efficient and predictable flight profiles thereby saving fuel and in some cases allowing operators to make beneficial operational decisions. NASA first began developing ADS-B ITP in 2003 as a result of a desire to develop methodologies, concepts, and procedures to reduce separation requirements for future air transportation systems using airborne ADS-B. The objectives were to provide insight into the details necessary to reduce separation requirements for the future and to develop applications that could provide incentives for operators to voluntarily equip with transformational technologies. From 2003 to 2008, NASA conducted research that supported the development of ITP including batch simulations, human-in-the-loop experiments and avionics and separation standards development. This research showed enough maturity and benefit that in 2008, the FAA Surveillance and Broadcast Services (SBS) program adopted ADS-B ITP as one of their three key, near-term applications to make use of ADS-B-In. The FAA developed an agreement with NASA to transition the technology and established an FAA project for the purpose of performing an operational trial of ADS-B ITP in revenue service in the summer of 2011. The objectives of the project are to a) validate the operational performance and economic benefits of ITP; and b) develop and validate ADS-B ITP Minimum Operational Performance Specifications (MOPS) material. As a part of this project, the FAA established agreements with United Airlines and Honeywell. The agreements include the work necessary for the development, certification and installation of onboard systems for twelve United Airlines 747-400s. ITP system development is nearly complete and certification activities are underway. The FAA project has also been working with Oakland Oceanic Control Center (ZOA) and the FAA’s Oceanic and Offshore Operations Office to develop controller procedures and safety analyses that are required to support the flight trial. The FAA has also been working on the development of an ITP Operational Specification that should be approved this April. The presentation will cover some of the key aspects of the development, challenges, and integration required to successfully transition ADS-B ITP from a concept in 2003 to flight trials in revenue service in 2011.

Kenneth M Jones↗

Contractor and government - Teamwork and commitment

Procedures being implemented at NASA to improve cooperation with contractors and increase productivity are reviewed from the NASA point of view. The goals of the U.S. space program for the coming 25 years are listed, and the importance of the commercial utilization of space in these plans is stressed. Consideration is given to the ongoing American Productivity Center White-Collar Productivity-Improvement Project, the implementation of the recommendations of the 1984 NASA/Contractor Conferences in present and future contracts, and the use of incentive contracts to create situations in which both NASA and the contractor benefit from increased productivity. Future plans call for increased industry responsibility in managing and operating the STS; steamlining of Shuttle operations; advanced design-to-cost procedures, increased commonality, better NASA-contractor communications, and more use of CAD/CAM and robotics for the Space Station; and accommodation of greatly expanded private investment and exploitation of space.

Griffin, G. D.↗

Interfacing laboratory instruments to multiuser, virtual memory computers

Incentives, problems and solutions associated with interfacing laboratory equipment with multiuser, virtual memory computers are presented. The major difficulty concerns how to utilize these computers effectively in a medium sized research group. This entails optimization of hardware interconnections and software to facilitate multiple instrument control, data acquisition and processing. The architecture of the system that was devised, and associated programming and subroutines are described. An example program involving computer controlled hardware for ultrasonic scan imaging is provided to illustrate the operational features.

Generazio, Edward R.↗

Interfacing laboratory instruments to multiuser, virtual memory computers

Incentives, problems and solutions associated with interfacing laboratory equipment with multiuser, virtual memory computers are presented. The major difficulty concerns how to utilize these computers effectively in a medium sized research group. This entails optimization of hardware interconnections and software to facilitate multiple instrument control, data acquisition and processing. The architecture of the system that was devised, and associated programming and subroutines are described. An example program involving computer controlled hardware for ultrasonic scan imaging is provided to illustrate the operational features.

Generazio, Edward R.↗

Shuttle program. Solar activity prediction of sunspot numbers, predicted solar radio flux

A solar activity prediction technique for monthly mean sunspot numbers over a period of approximately ten years from February 1979 to January 1989 is presented. This includes the predicted maximum epoch of solar cycle 21, approximately January 1980, and the predicted minimum epoch of solar cycle 22, approximately March 1987. Additionally, the solar radio flux 10.7 centimeter smooth values are included for the same time frame using a smooth 13 month empirical relationship. The incentive for predicting solar activity values is the requirement of solar flux data as input to upper atmosphere density models utilized in mission planning satellite orbital lifetime studies.

Johnson, G. G.↗

The structural optimization of a spreader bar for twin lift helicopter operations

An optimization study was performed to develop a minimum weight spreader bar to allow two helicopters to lift the same payload. With this arrangement, the maximum payload that can be lifted is almost doubled without the expense of designing and building a new helicopter. The concept has had some limited use by civil helicopter operators using small helicopters and has been demonstrated in large scale by two CH-54's which successfully lifted a total load of 20 ton. To this point, rather heavy available beams or tower structures have been used for the spreader bar. Since the weight of the bar not only detracts from payload but also adds to the logistics problem, there are more than the usual incentives to minimize weight. Since the design requirement is for classic beam column with uniform side loads resulting from bar weight and aerodynamic drag, the design problem is particularly amenable to optimization. A study has been performed at Sikorsky to establish the minimum weight for a spreader bar sized to carry a load equal to the capacity of two Army BLACK HAWK helicopters. Toward this end, a computer program was written to analyze the spreader bar deflections and stresses and coupled to the NASA developed CONMIN optimization routines.

Dobyns, A.↗

Monolithic Microwave Integrated Circuit (MMIC) Phased Array Demonstrated With ACTS

Monolithic Microwave Integrated Circuit (MMIC) arrays developed by the NASA Lewis Research Center and the Air Force Rome Laboratory were demonstrated in aeronautical terminals and in mobile or fixed Earth terminals linked with NASA's Advanced Communications Technology Satellite (ACTS). Four K/Ka-band experimental arrays were demonstrated between May 1994 and May 1995. Each array had GaAs MMIC devices at each radiating element for electronic beam steering and distributed power amplification. The 30-GHz transmit array used in uplinks to ACTS was developed by Lewis and Texas Instruments. The three 20-GHz receive arrays used in downlinks from ACTS were developed in cooperation with the Air Force Rome Laboratory, taking advantage of existing Air Force integrated-circuit, active-phased-array development contracts with the Boeing Company and Lockheed Martin Corporation. Four demonstrations, each related to an application of high interest to both commercial and Department of Defense organizations, were conducted. The location, type of link, and the data rate achieved for each of the applications is shown. In one demonstration-- an aeronautical terminal experiment called AERO-X--a duplex voice link between an aeronautical terminal on the Lewis Learjet and ACTS was achieved. Two others demonstrated duplex voice links (and in one case, interactive video links as well) between ACTS and an Army high-mobility, multipurpose wheeled vehicle (HMMWV, or "humvee"). In the fourth demonstration, the array was on a fixed mount and was electronically steered toward ACTS. Lewis served as project manager for all demonstrations and as overall system integrator. Lewis engineers developed the array system including a controller for open-loop tracking of ACTS during flight and HMMWV motion, as well as a laptop data display and recording system used in all demonstrations. The Jet Propulsion Laboratory supported the AERO-X program, providing elements of the ACTS Mobile Terminal. The successful performance of experimental, proof-of-concept MMIC K/Ka-band arrays developed with U.S. industry in field demonstrations with ACTS indicates that high density MMIC integration at 20 and 30 GHz is indeed feasible. The successful development and demonstration of the MMIC array systems was possible only because of significant intergovernmental and Government/industry cooperation and the high level of teamwork within Lewis. The results provide a strong incentive for continuing the focused development of MMIC-array technology for satellite communications applications, with emphasis on packaging and cost issues, and for continuing the planning and conducting of other appropriate demonstrations or experiments of phased-array technology with ACTS. Given the present pressures on reducing funding for research and development in Government and industry, the extent to which this can be continued in a cooperative manner will determine whether MMIC array technology will make the transition from the proof-of-concept level to the operational system level.

Source record↗

Programmable Cadence Timer

Electronic metronome paces users through wide range of exercise routines. Conceptual programmable cadence timer provides rhythmic aural and visual cues. Timer automatically changes cadence according to program entered by the user. It also functions as clock, stopwatch, or alarm. Modular pacer operated as single unit or as two units. With audiovisual module moved away from base module, user concentrates on exercise cues without distraction from information appearing on the liquid-crystal display. Variety of uses in rehabilitative medicine, experimental medicine, sports, and gymnastics. Used in intermittent positive-pressure breathing treatment, in which patient must rhythmically inhale and retain medication delivered under positive pressure; and in incentive spirometer treatment, in which patient must inhale maximally at regular intervals.

Hall, William A.↗

The Economics of NASA Mission Cost Reserves

Increases in NASA mission costs are well-noted but not well-understood, and there is little evidence that they are decreasing in frequency or amount over time. The need to control spending has led to analysis of the causes and magnitude of historical mission overruns, and many program control efforts are being implemented to attempt to prevent or mitigate the problem (NPR 7120). However, cost overruns have not abated, and while some direct causes of increased spending may be obvious (requirements creep, launch delays, directed changes, etc.), the underlying impetus to spend past the original budget may be more subtle. Gaining better insight into the causes of cost overruns will help NASA and its contracting organizations to avoid .them. This paper hypothesizes that one cause of NASA mission cost overruns is that the availability of reserves gives project team members an incentive to make decisions and behave in ways that increase costs. We theorize that the presence of reserves is a contributing factor to cost overruns because it causes organizations to use their funds less efficiently or to control spending less effectively. We draw a comparison to the insurance industry concept of moral hazard, the phenomenon that the presence of insurance causes insureds to have more frequent and higher insurance losses, and we attempt to apply actuarial techniques to quantifY the increase in the expected cost of a mission due to the availability of reserves. We create a theoretical model of reserve spending motivation by defining a variable ReserveSpending as a function of total reserves. This function has a positive slope; for every dollar of reserves available, there is a positive probability of spending it. Finally, the function should be concave down; the probability of spending each incremental dollar of reserves decreases progressively. We test the model against available NASA CADRe data by examining missions with reserve dollars initially available and testing whether they are more likely to spend those dollars, and whether larger levels of reserves lead to higher cost overruns. Finally, we address the question of how to prevent reserves from increasing mission spending without increasing cost risk to projects budgeted without any reserves. Is there a "sweet spot"? How can we derive the maximum benefit associated with risk reduction from reserves while minimizing the effects of reserve spending motivation?

Whitley, Sally↗

On-Board Propulsion System Analysis of High Density Propellants

The impact of the performance and density of on-board propellants on science payload mass of Discovery Program class missions is evaluated. A propulsion system dry mass model, anchored on flight-weight system data from the Near Earth Asteroid Rendezvous mission is used. This model is used to evaluate the performance of liquid oxygen, hydrogen peroxide, hydroxylammonium nitrate, and oxygen difluoride oxidizers with hydrocarbon and metal hydride fuels. Results for the propellants evaluated indicate that the state-of-art, Earth Storable propellants with high performance rhenium engine technology in both the axial and attitude control systems has performance capabilities that can only be exceeded by liquid oxygen/hydrazine, liquid oxygen/diborane and oxygen difluoride/diborane propellant combinations. Potentially lower ground operations costs is the incentive for working with nontoxic propellant combinations.

Schneider, Steven J.↗