Search NASA⌕ Search

SEARCH · Search NASA

Results for “Installation and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

[FeFe]-Hydrogenase In Vitro Maturation

The [FeFe]-hydrogenase H-cluster is a complex organometallic cofactor whose assembly and installation requires three dedicated accessory proteins referred to as HydE, HydF, and HydG. The roles of these maturases and the precise mechanisms by which they synthesize and insert the H-cluster are not fully understood. This Minireview will focus on new insights into the [FeFe]-hydrogenase maturation process that have been provided by in vitro approaches in which the biosynthetic pathway has been partially or fully reconstructed using semisynthetic and enzyme-based approaches. Specifically, the application of these in vitro, semisynthetic, and fully defined approaches has shed light on the roles of individual maturation enzymes, the nature of H-cluster assembly intermediates, the molecular precursors of H-cluster ligands, and the sequence of steps involved in [FeFe]-hydrogenase maturation.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Short Takeoff and Vertical Landing Capability Upgraded in NASA Glenn's 9- by 15-Foot Low-Speed Wind Tunnel

The NASA Glenn Research Center supports short takeoff and vertical landing (STOVL) tests in its 9- by 15-Foot Low Speed Wind Tunnel (9 x 15 LSWT). As part of a facility capability upgrade, a dynamic actuation system (DAS) was fabricated to enhance the STOVL testing capabilities. The DAS serves as the mechanical interface between the 9 x 15 LSWT test section structure and the STOVL model to be tested. It provides vertical and horizontal translation of the model in the test section and maintains the model attitude (pitch, yaw, and roll) during translation. It also integrates a piping system to supply the model with exhaust and hot air to simulate the inlet suction and nozzle exhausts, respectively. Hot gas ingestion studies have been performed with the facility ground plane installed. The DAS provides vertical (ascent and descent) translation speeds of up to 48 in./s and horizontal translation speeds of up to 12 in./s. Model pitch variations of +/- 7, roll variations of +/- 5, and yaw variations of 0 to 180 deg can be accommodated and are maintained within 0.25 deg throughout the translation profile. The hot air supply, generated by the facility heaters and regulated by control valves, provides three separate temperature zones to the model for STOVL and hot gas ingestion testing. Channels along the supertube provide instrumentation paths from the model to the facility data system for data collection purposes. The DAS is supported by the 9 x 15 LSWT test section ceiling structure. A carriage that rides on two linear rails provides for horizontal translation of the system along the test section longitudinal axis. A vertical translation assembly, consisting of a cage and supertube, is secured to the carriage. The supertube traverses vertically through the cage on a set of linear rails. Both translation axes are hydraulically actuated and provide position and velocity profile control. The lower flange on the supertube serves as the model interface to the DAS. The supertube also serves as the exhaust path to the model and supports the hot air piping on its external surfaces. The DAS is currently being assembled at the 9 15 LSWT facility. Following assembly and installation, a series of checkouts will be performed to confirm the operation of the system.

Stark, David E.↗

Pilot-Scale Testing of an Integrated Circuit for the Extraction of Rare Earth Minerals and Elements from Coal and Coal Byproducts Using Advanced Separation Technologies

The primary objective of this project was to develop and demonstrate an integrated pilot-scale circuitry for recovering high-value rare earth elements (REEs) from coal and coal byproducts. The target performance was to produce a mixed REE product with content of at least two percent by weight on a dry mass basis in a cost-effective and environmentally benign manner. During the first nine months of the project period (Phase 2 Budget Period 2), pilot plant construction was completed including all field site startup activities such as permitting, engineering design, procurement/bidding, unit fabrication, site construction, equipment installation, module assembly, safety training, and circuit shakedown. During the remaining 21 months of project period (Phase 2 Budget Period 3), detailed field-testing activities were performed including feedstock sample collection and preparation, exploratory testing, circuit modification, detailed parametric study, and performance optimization. A detailed techno-economic analysis was performed based on the pilot plant testing findings which provided various scenarios for REE production. The project successfully accomplished the proposed target performance by producing mixed rare earth oxide (REO) with greater than 90% purity by weight in a continuous pilot scale operation from two distinctly different coarse refuse materials (i.e., West Kentucky No. 13 and Fire Clay coal seams), and at least three secondary sources (i.e., heap leach process and naturally formed acid mine drainage system). Project partners included the University of Kentucky, Virginia Tech, West Virginia University, Alliance Coal, Blackhawk Mining, Mineral Refining Company, and Mineral Separation Technologies. The pilot scale test facility was constructed at a former mining complex owned by Alliance Natural Resource Partners (Alliance Coal). The site was rehabilitated to accommodate the equipment installation, construction and fabrication, electrical power requirement, water line management and containment. The process units constructed and installed included X-ray sorting unit, crushing and grinding unit, physical separation unit, acid leaching unit, solvent extraction unit, and wastewater management unit. A rare earth mineral concentration unit was constructed as a standalone unit for flexible operation. A detailed environmental assessment and control plan was carried out to identify and quantify any potential impacts of the pilot-scale processing circuitry on the human and eco-system health and well-being. Corresponding mitigation strategies and control measures were provided. A conceptual flowsheet was developed to effectively remove thorium and uranium from high purity rare earth oxide mix or any potential radionuclide enriched stream. The two distinct feedstock materials were secured from the Blackhawk Mining Complex in eastern Kentucky where the Fire Clay (Hazard No. 4) seam is processed. The West Kentucky No. 13 (Baker) coarse refuse material was collected from an active process stream at an Alliance coal preparation plant located in western Kentucky. Characterization analysis indicated that both of feed materials generated from the two sources contained >300 ppm of TREEs on a dry whole mass basis which met the requirements for a qualified feed stock. The two feedstocks were further upgraded using a dual x-ray sorter to prepare the feed material for hydrometallurgical circuit. Thermal treatment on feed material prior to leaching was found to: 1) improve the leaching recovery of REEs, 2) increase the leaching kinetics, and 3) allow the leaching reaction to occur at lower acidity. Roasting at 600°C was selected as the pre-treatment condition for both West Kentucky No. 13 and Fire Clay coarse refuse material. Over 40% of leaching recovery was achieved by roasting West Kentucky No. 13 material having a top particle size of 3 mm in the pilot scale operation using 1.2M sulfuric acid leaching at 75OC. Initial pilot scale testing involved continuous operation of the pilot plant for 94 hours. The leaching unit was operated at solid-to-liquid ratio of 1 to 10 (w/v) using 0.5M sulfuric acid solution at a temperature of 75°C. The continuous solvent extraction circuit utilized rougher and cleaner units with DEHPA and TBP as the extractants. An innovative stripping circuit was developed to accumulate the REE concentration in the stripping solution to a level above 600 ppm. A bleed stream from the recycled strip solution was treated using oxalic acid precipitation which produced a high grade rare earth oxalate. The oxalate product was roasted to remove the oxalate which produced a rare earth oxide product having a purity greater 90%. Due to high concentrations of contaminant ions in the pregnant leach solution (PLS), a modified flowsheet was developed that involved pre-concentration of the REEs using multiple stages of precipitation and redissolution. The advantage of this process was improved removal of contamination before the downstream purification process and a significant cost reduction relative to the circuit that utilized the solvent extraction process. The modified circuitry included processes involving leaching, multistage precipitation, redissolution, and oxalate precipitation followed by roasting of the oxalate product. The circuit produced a mixed REO that was 92.96% pure from the initial test. A detailed parametric test plan was carried out which involved varying key parameters including solids feed rate, acid flowrate, acid concentration, multistage precipitation pH, redissolution pH, oxalate precipitation dosage and pH. The response variables included REE recovery, contaminant recovery, REO product grade and overall chemical consumption. Test results indicated that the acid-to-solid ratio is the key parameter to leaching efficiency as performance deteriorated with an increase in solids concentration. The optimal pH determined for REE precipitation and redissolution was 6.5 and 2.5, respectively. Additional tests were conducted to further improve the flowsheet. Recirculating a portion of the PLS to the feed of the leach tanks improved the leaching performance by lowering the pH of the leaching system and reducing the contamination recovery by shortening the residence time. Moreover, the removal of Al prior to REE precipitation significantly reduced the oxalic acid consumption in the oxalate precipitation circuit. The modified circuit produced over 90% grade REO by weight from both West Kentucky No. 13 and Fire Clay coarse refuse material in pilot scale continuous test programs. A case analysis model was developed to project the REE and major contaminants concentration in each PLS stream based on the leaching condition, pH cut point, and oxalic acid dosage. A correlation was established using empirical and semi-empirical models. Using the models, chemical consumption required for each stage was predicted based on the projected performance of the hydrometallurgy circuit. After identifying the optimum conditions, validation tests were carried out for the treatment of both West Kentucky No. 13 and Fire Clay coarse refuse materials in the pilot plant. The actual circuit performance and chemical consumptions were very close to the model predictions. Other than the two coarse refuse sources, several secondary feedstocks were also tested in the pilot plant facility. A “heap leach” system was constructed using the coarse refuse material generated from cleaning the West Kentucky No. 13 seam coal. Using the two stage SX rougher and cleaner circuit, a concentrate with a grade >90% REO was produced while recovering >97% of the REEs from the heap leach PLS. Naturally generated acid mine drainage (AMD) from West Kentucky No.13 mine was processed using the multistage precipitation circuit in the pilot plant in a test conducted for a period of 32 hours. The final grade of the mix RE oxide produced from the AMD was 90.84% with an overall circuit recovery of 64%. The primary source of REE was the selective precipitation steps involving iron and aluminum rejection. The hydrophobic-hydrophilic separation (HHS) process was proven to effectively recover coal from fine waste materials. For REM recovery, the HHS process was able to produce concentrates at grades of approximately 1.8% REE on an ash basis; however, recovery values were typically low, <10%, under the optimal conditions determined in the laboratory-scale testing. Staged testing of the pilot-scale HHS process for coal recovery and semi-continuous laboratory testing for REM testing showed that a total concentration ratio of more than 15x was observed for the REM recovery process. A circuit simulation package was developed for REE extraction and purification using a spreadsheet-based platform (Microsoft Excel). The REESim circuit simulation package is configured to track the mass and volume flows of components passing through a series of unit operations specified and configured by the user. The mass rates can then be utilized by the user to determine important performance indicators such as product mass yields, concentrate purity levels, element-by-element recoveries, and so forth. The techno-economic analysis showed that the roasting and leaching operations were the most expensive capital items, each contributing approximately 30% to the total capital cost. One notable contributor to the high production costs was the low REE recovery observed in the pilot scale trials. The product basket price was shown to have a strong influence on the economic viability of the scenarios, with the scandium price being the most significant influencer. Operating cost was shown to be extremely sensitive to REE recovery, REE feed grade, and leaching acid consumption. An analysis of ten different scenarios for a 500 t/h commercial operation revealed that three were economically favorable, producing internal rates of return varying from 27.7% to 33.1% and payback periods of 4 to 5 years. The project successfully developed and demonstrated a process to recover REEs from coal and coal byproducts in a pilot-plant operation which consistently produced over 90% grade REO mix from varies types of feedstocks. Commercialization analysis showed that the technology readiness level successfully achieved TRL 6 at the end of the project and demonstrated the need and the potential for scaling the process to further advance the technologies toward the goal of providing a domestic supply of REEs at a commercial scale.

01 COAL, LIGNITE, AND PEAT↗

Cost analysis of hydrogen production by high-temperature solid oxide electrolysis

In this study, we estimate construction and operation costs of gigawatt-scale solid oxide electrolysis (SOE) facilities for producing high purity hydrogen gas from water. Manufacturing and assembly costs for two types of SOE cell stacks are estimated using a detailed design for manufacture and assembly (DFMA®) analysis. Modular balance of plant (BOP) process equipment is designed and sized with Aspen®, and cost estimated using equipment vendor quotes. Factory and on-site assembly and installation costs for SOEC stack and BOP equipment integration into modular SOE process units are calculated using a simplified DFMA® method. Total stack costs on a stack input power (SIP) basis reduce to <$100/kW e DC SIP for >500 MW e DC SIP /year production rates with electrode cermet, interconnects, and high-temperature heat treatments dominating the total cost. Integration of stacks with larger BOP equipment operating at higher pressures offers ~36% cost reduction in total facility capital cost due to an economies of physical scale effect since BOP equipment comprises >50% of facility costs. Optimized H 2 prices decrease from ~$\$$4/kgH 2 to ~$\$$2/kgH 2 for 1 GWe DCSIP facilities using $\$$0.025/kWh electricity price. All costs are reported in 2021 US dollars.

08 HYDROGEN↗

Cost analysis of alternative large-scale high-temperature solid oxide electrolysis hydrogen production facilities

We extend our past cost analysis of gigawatt-scale solid oxide electrolysis (SOE) facilities that produce high purity hydrogen gas from water by estimating construction and operating costs for three new alternative design cases: (1) offsite feed steam generation; (2) near-atmospheric pressure (NAP) stack; and (3) onsite electric boiler feed steam generation. Pressure effects on hydrogen electrode-(cathode-)supported SOE cell (SOEC) stack performance are estimated for the same assumed cell and stack construction and used to determine facility-wide stack capital costs for achieving a fixed H2 production at different pressures. Modular balance of plant (BOP) process equipment capital costs are estimated for each new alternative design case using our past equipment sizing, design, and cost data and scaling relationships. Furthermore, we update BOP equipment sizing and design for the NAP case using Aspen®. Vendor quotes for electric boilers are used to estimate costs for the electric boiler design case. Factory and onsite assembly and installation costs for SOEC stacks and BOP equipment are calculated using our past simplified first-principles approach. First-of-a-kind (FOAK) and N th -of-a-kind (NOAK) production maturity cost estimates are included for all results. The case with NAP stacks offers the lowest facility total capital cost (TCC, ~23% lower than base) while use of small electric boilers requires the highest TCC (~3% higher than base). H 2 production prices decrease from the base of ~$\$2.17$ /kgH 2 to ~$\$1.92$/kgH 2 for 1 GW e DC SIP facilities utilizing NAP stacks supplied by offsites steam situated in large modules and blocks for $\$0.030$/kWh e and $0.009/kWh t prices for electricity and thermal energy, respectively. We report all costs in 2021 US dollars.

Balance of plant (BOP) process equipment↗

Turbulent flow characteristics in an 84-pin rod bundle for typical and damaged spacer grids

Hexagonal rod bundles arranged in a tightly packed triangular lattice are extensively used for heat transfer and energy generation applications. Staggered spacer grids are used to maintain the structural integrity of gas-cooled fast reactor (GFR) fuel assemblies, while inducing localized turbulence in flow. Damage to these spacer grids results in a disruption of flow fields within these hexagonal fuel bundles. Experimental flow visualizations are critical to identify the differences in local flow properties that the structural damage may cause. This experimental research investigates the flow-field characteristics at a near-wall and center plane in a prototypical 84-pin GFR fuel assembly. Newly installed typical spacers and spacers subject to naturally occurring damage due to material degradation over prolonged experimentation were investigated. Velocity fields were acquired by utilizing the matched-index-of-refraction method to obtain time-resolved particle image velocimetry measurements for a Reynolds number of 12 000. Reynolds decomposition statistical results divulged differences in the time-averaged velocity, velocity fluctuations, flow anisotropy, and Reynolds stress distributions. Galilean decomposition demarcated the influence of spacer grid damage on the velocity fields. To extract turbulent structures and elucidate mechanisms of flow instabilities, proper orthogonal decomposition analysis was employed. Reduced order flow reconstructions enabled the application of vortex identification algorithms to determine the spatial and statistical characteristics of vortices generated. This research work provides unique experimental data on the spacer grid condition-dependent flow. The results offer a deeper understanding of fluid dynamics behavior to support GFR rod bundle design efforts and computational fluid dynamics model validation.

36 MATERIALS SCIENCE↗

Slow control and monitoring system at the JSNS 2

The Sterile Neutrino Search at the J-PARC Spallation Neutron Source (JSNS$^2$) experiment aims to search for sterile neutrino oscillations using a neutrino beam from muon decays at rest. The JSNS$^2$ detector contains 17 tons of 0.1$\%$ gadolinium (Gd) loaded liquid scintillator (LS) as a neutrino target. Detector construction was completed in the spring of 2020. A slow control and monitoring system (SCMS) was implemented for reliable control and quick monitoring of the detector operational status and environmental conditions. It issues an alarm if any of the monitored parameters exceed a preset acceptable range. The SCMS monitors the high voltage of the photomultiplier tubes, the LS level in the detector, possible LS overflow and leakage, the temperature and air pressure in the detector, the humidity of the experimental hall, and the LS flow rate during filling and extraction. An initial 10 days of data-taking with a neutrino beam was done following a successful commissioning of the detector and SCMS in 2020 June. In this paper, we present a description of the assembly and installation of the SCMS and its performance.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Solar Photovoltaics: Supply Chain Deep Dive Assessment

This is one of a series of reports and deep dive assessments produced in response to Executive Order 14017 “America’s Supply Chains,” which directs the Secretary of Energy to submit a report on supply chains for the energy sector industrial base. The Executive Order is helping the federal government to build more secure and diverse U.S. supply chains, including energy supply chains. Over the past decade, solar power has gone from an emerging, niche technology to a mature energy industry. By 2035, solar power could supply 40% or more of U.S. electricity demand, dramatically accelerating the decarbonization of buildings, transportation, and industry; and, if current technology trends continue, it could do so without increasing the price of electricity. The rapid expansion of solar energy has the potential to yield broad benefits in the form of economic activity and workforce development. The solar industry already employs roughly 230,000 people in the United States, at an average wage that is higher than the national average for most comparable positions. By decarbonizing the electricity sector by 2035, the U.S. solar industry could employ 500,000–1,500,000 people by 2030. The components that are assembled to install a photovoltaic power system are produced by a global supply chain. Photovoltaic (PV) modules (also called panels) are made of cells that use a variety of technologies. There are two leading types of solar modules used in the United States, with crystalline silicon (c-Si) modules representing 84% of the market and cadmium telluride (CdTe) modules representing 16% of the market. Modules of either type require mounting structures to provide mechanical support (racking), which may be configured to follow the sun (tracking). The output of any PV module is direct current (dc), which is almost always converted to alternating current (ac) by an inverter.

14 SOLAR ENERGY↗

C1Po2D-04: Cryogenic Testing of the First HL-LHC Q1/Q3 Cryo-Assembly at

In early 2023, Fermilab is conducting horizontal cryogenic testing of the first Q1/Q3 Cryo-Assembly for the high-luminosity LHC upgrade (HL-LHC). The Cryo-Assembly was installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of this test include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressure up to 18 bar with full helium recovery after a quench.

Rabehl, R.↗

Target fabrication fields first NIF shot with new 3D-printed microfluidic target design

Capable of producing ultrafine features, two-photon polymerization (2PP) 3D printing made it possible to field a first-of-its-kind leak-proof liquid-filled diffraction target. These targets are used for shots aimed at using laser pressure instead of low temperatures turn water into ice. The shot is the product of months of design, assembly, and installation work by LSEO’s target fabrication team, in collaboration with 3D printing experts Widi Moestopo (MED) and Xiaoxing Xia (MED) and PLS researcher Neal Bhandarkar.

42 ENGINEERING↗

Cryogenic Testing of HL-LHC Q1/Q3 Cryo-Assemblies at Fermilab

Fermilab is conducting horizontal cryogenic testing of Q1/Q3 Cryo-Assemblies for the high-luminosity LHC upgrade (HL-LHC). Cryo-Assemblies are installed on the upgraded Fermilab horizontal test stand previously used for testing the LHC inner triplet quadrupoles. The cryogenic process requirements of these tests include controlled cool-down and warm-up with a 100 K maximum temperature differential between the two ends of the cold mass, operation of a 1.3 bar, 1.9 K bath of subcooled superfluid helium during power testing and magnetic measurements, and operation at pressures up to 18 bar with full helium recovery after a quench. This paper presents the operational experience gained from the first tests as well as improvements for subsequent tests.

Rabehl, R. [Fermilab]↗

Modified faceplate assembly for stud-welding gun

Ventilated barrel assembly aids installation of studs on narrow uneven weld lands. The modified faceplate permits proper aligning of the percussion stud-welding gun in any position and on a smaller surface, and it maintains gap setting without any other adjustment.

Johnson, R. E.↗

STARPAHC. Part 1: Final summary report

A ground-based demonstration of IMBLMS Space Technology was conducted in a remote geographical area of the U.S. The STARPAHC program, designed to improve the capability for delivering health care to the Papago Indians, is divided into three areas: (1) design and definition; (2) system assembly, test, installation, checkout, and training; and (3) operations and evaluation. The accomplishments achieved in the program are summarized emphasizing system requirements in the areas of communication, specialized medical equipment, display, and computer software. Budgetary history and future cost plans are presented and planned activities are summarized.

Riley, F. E.↗

A leading edge heating array and a flat surface heating array - operation, maintenance and repair manual

A general description of the leading edge/flat surface heating array is presented along with its components, assembly instructions, installation instructions, operation procedures, maintenance instructions, repair procedures, schematics, spare parts lists, engineering drawings of the array, and functional acceptance test log sheets. The proper replacement of components, correct torque values, step-by-step maintenance instructions, and pretest checkouts are described.

Source record↗

Owens-Illinois subsystem design package for the SEC-601 air-cooled solar collector

The subsystem design of the SEC-601 solar collector was evaluated. The collector is of modular design and is approximately 12 feet three inches wide and eight feet seven inches tall. It contains 72 collector tube elements and weighs approximately 300 pounds. Included in this report are the subsystem performance specifications and the assembly and installation drawings of the solar collectors and manifold.

Source record↗

Manual for Raman cells

Characteristics of Raman cells offered by Lambda Physik are described, assembly and installation instructions are given, and conversion from one variant to another is explained.

Mueckenheim, W.↗

Automated assembly in space

The installation of robots and their use of assembly in space will create an exciting and promising future for the U.S. Space Program. The concept of assembly in space is very complicated and error prone and it is not possible unless the various parts and modules are suitably designed for automation. Certain guidelines are developed for part designing and for an easy precision assembly. Major design problems associated with automated assembly are considered and solutions to resolve these problems are evaluated in the guidelines format. Methods for gripping and methods for part feeding are developed with regard to the absence of gravity in space. The guidelines for part orientation, adjustments, compliances and various assembly construction are discussed. Design modifications of various fasteners and fastening methods are also investigated.

Srivastava, Sandanand↗

Stability and 3-D spatial dynamics analysis of a three cable crane

A 3-cable crane mechanism has been designed for incorporation into a highly loaded Lunar crane for planetary construction. This 3-cable crane must maintain a positive stability margin in all phases of the loading/unloading, assembly, or installation operations. A 2D kinematic curvature theory is applied to: (1) derive a general stability criterion to prevent the 3-cable crane from instability; and (2) determine a simple equation of natural frequency for two planar models of 3-cable crane. Investigation of the 2D vibrational characteristics of the planar models provides valuable insight toward understanding of 3D dynamic behavior of the 3-cable crane. Also, precision in natural frequency from this simple kinematic equation due to the exclusion of the radius-of-gyration of a suspended article is discussed. Multibody dynamics of the 3D 3-cable crane is presented and simulated to study the resulting vibrational characteristics under external disturbances and to verify the feasibility of the stability criterion for the 3-cable crane.

Yang, Li-Farn↗