Search NASA⌕ Search

SEARCH · Search NASA

Results for “Interconnection Standards”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Panel D report: Standards needed to interconnect ADS pilots for data sharing in data formats and descriptions

Data exchange specifications and standards needed to facilitate the interchange of information between three pilot modes in an Applications Data Service program are addressed. In designing standards, the following considerations were considered important: (1) accessible, understandable Data Base Management Systems (DBMS) catalogs, (2) formatting conventions, (3) archival data records and data descriptions formats, (4) standardized terminology, and (5) optimization of data formats by individual DBMS.

Source record↗

Digital Assurance for Grid Reliability in the Era of Large Load Growth

The rapid expansion of large electric loads is reshaping the operational and regulatory landscape of the U.S. electric grid. These facilities are reaching new scales of expansion, now exceeding a gigawatt per site, and their highly sensitive, digitally driven behaviors introduce new reliability risks. Recent grid events, including large load losses following routine transmission disturbances, highlight the consequences of limited ride-through capability, inconsistent protection settings, inadequate modeling, and lack of behind-the-meter visibility. Parallels to earlier integration challenges of new grid technologies suggest that the grid’s existing processes, standards, and interconnection frameworks are no longer adequate for emerging large loads. This brief synthesizes lessons from the evolution of inverter-based resource regulation and applies them to large-load integration. It identifies critical gaps in modeling accuracy, interconnection processes, performance standards, and compliance mechanisms. Technical recommendations emphasize advanced monitoring, improved modeling, coordinated communication protocols, modernized substations, and structured behind-the-meter control schemes. Collectively, these measures provide a roadmap to maintain bulk power system reliability while enabling the continued growth of large, electrified digital infrastructure.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Options for Upgrading Low-Voltage Spot Network Protection to Increase DER Interconnection Capacity

Existing standards and policies for interconnecting distributed energy resources (DERs) into low voltage spot networks severely limits the amount of DER installed on those networks to avoid negative impacts on protection systems. This report investigates options for upgrading the protection systems of spot networks to allow for additional DER installations beyond the normal limits (i.e., no reverse power flows allowed onto the MV system). Eight potential upgrade options are discussed that span various methods for new network protector algorithms, hardware upgrades, and the addition of communication. Each method has tradeoffs in terms of accuracy of detecting faults, requirements to upgrade equipment in the spot networks, need for communication, and sensitivity to false trips—all of which are explored in this report.

42 ENGINEERING↗

A Guide to Updating Interconnection Rules and Incorporating IEEE Standard 1547

The intent of this paper is to support local authorities in adopting the most current technical requirements for interconnecting distributed energy resources (DERs) to the electric distribution system as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, state regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this paper addresses both the technical issues and related process considerations. A lack of uniform and transparent procedures for addressing interconnection rule changes can result in implementation issues or inefficiencies, such as unclear, lengthy, and complicated interconnection rules that can increase distributed generation "soft costs" (i.e., non-hardware costs). This can further delay the deployment of DERs and jeopardize time-constrained national and state policy goals, such as renewable energy targets, or limit participation in emerging techno-economic trends. Additionally, misconstructed interconnection rules are at risk of becoming mired in stakeholder conflicts. This guide addresses the concerns of electric service regulators from both the process and technical standpoints by presenting a structured, step-by-step approach to developing and updating existing interconnection rules. In this document, the process of developing and updating interconnection rules is subdivided into three steps: (1) determining the context (stakeholders and major drivers); (2) developing the rule, including updating technical requirements; and (3) maintaining and revising the rule over time.

14 SOLAR ENERGY↗

Open System Interconnection - NASA program communications of the future

Open Systems Interconnection (OSI) standards are being developed by the ISO and the Consultative Committee on International Telephone and Telegraph with the support of industry. These standards are being developed to allow the interconnecting of computer systems and the interworking of applications such that the applications can be independent of any equipment manufacturer. Significant progress has been made, and the establishment of government OSI standards is being considered. There is considerable interest within NASA in the potential benefits of OSI and in communications standards in general. The OSI standards are being considered for possible application in the Space Station onboard data management system. The OSI standards have reached a high level of maturity, and it is now imperative that NASA plan for future migration to OSI where appropriate.

Brady, Charles D.↗

Copper Nanowire Production for Interconnect Applications

A method of fabricating metallic Cu nanowires with lengths up to about 25 micrometers and diameters in a range 20-100 nanometers, or greater if desired. Vertically oriented or laterally oriented copper oxide structures (CuO and/or Cu2O) are grown on a Cu substrate. The copper oxide structures are reduced with 99+ percent H or H2, and in this reduction process the lengths decrease (to no more than about 25 micrometers), the density of surviving nanostructures on a substrate decreases, and the diameters of the surviving nanostructures have a range, of about 20-100 nanometers. The resulting nanowires are substantially pure Cu and can be oriented laterally (for local or global interconnects) or can be oriented vertically (for standard vertical interconnects).

Han, Jin-Woo↗

Key Considerations for Adoption of Technical Codes and Standards for Battery Energy Storage Systems in Thailand

Battery storage is “technology that enables power system operators and utilities to store energy for later use. A battery energy storage system (BESS) is an electrochemical device that charges (or collects energy) from the grid or a power plant and then discharges that energy at a later time to provide electricity or other grid services when needed”. As countries in Asia consider the inclusion of BESS in their power systems to meet policy objectives, renewable energy goals, increase resilience, and expand energy access, there is an opportunity to learn from the experiences of other regions and jurisdictions that have developed more advanced storage markets and deployment methodologies. This report presents global best practices of codes, standards, and interconnection procedures developed to support the safe and reliable deployment of BESS. Several relevant case studies highlight current efforts to ensure safe operation of BESS and showcase potential pathways for adoption of relevant codes and standards. Specifically, this report is intended to support the Thailand Office of Energy Regulatory Commission (OERC) and other stakeholders in their efforts to develop technical codes and standards to govern the installation and operation of BESS; it may also be utilized as a guide for other countries as interest in the deployment of BESS technologies continues to grow.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stakeholder Training for IEEE 1547-2018 (Abbreviated Final Technical Report)

This project identifies and makes publicly available educational materials to assist stakeholders in adopting the revised IEEE Std 1547-2018, Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces. The new standard is significantly different than the previous 2003 version, contains new concepts and new technical requirements, and requires educational material on the application of these changes. NREL had a principal role in accelerating the revision process though its chairmanship of the IEEE Std 1547 working group to revise the standard and through technical support provided to the working group. Under this project, NREL and partners compiled and developed publicly available educational materials for IEEE Std 1547-2018, including webinars, white papers, and other resources on related topics.

14 SOLAR ENERGY↗

Requirements for Soldering Fluxes Research using the B-53 Test Board

IPC J-STD-004B standard prescribes general requirements for the classification and testing of soldering flux for high qualify interconnections. This standard defines the classification of soldering materials through specifications of test methods and inspection criteria. The materials include liquid flux, paste flux, solderpaste flux, solder preform flux, and flux-cored solder. This research will use the proposed IPC-53 Surface Insulation Resistance (SIR) test patterns by means of an open comb (2D) and closed comb (3D to simulate a component over the comb pattern). The 2D open comb has uniformity of conductor spacing, sheet resistance, and flux outgassing. The 3D-closed comb simulates the effect of leadless or bottom-terminated components, which have non-uniform sheet resistance and flux outgassing. The response variables will include SIR testing and visual imaging. The objective is to investigate IPC test method improvements for characterizing soldering fluxes when using leadless components with narrow pad-to-pad spacing.

Diamond, Louis↗

Background Information on the Power Quality Requirements in IEEE Std 1547-2018

The revised Institute of Electrical and Electronics Engineers (IEEE) 1547-2018, Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces, was published in April 2018. This standard is one of the foundational documents in the United States needed for integrating distributed energy resources (DERs), including solar energy systems, and energy storage systems with the electric distribution grid. The revised standard contains 11 chapters (clauses) and 8 annexes that comprise 136 pages. The revision is significantly different from the 2003 version, and it contains new concepts and new technical requirements. Each clause specifies information or requirements that apply to certain aspects that are important to the interconnection of DERs to the electric power system. Implementing the requirements necessitates a careful study of the underlying technical concepts and requires appropriate information to calculate relevant settings and configurations. This document provides informative material on the requirements related to electrical power quality in IEEE Std 1547-2018, with the intent to equip the reader with basic knowledge and background information to improve understanding and use of the requirements specified.

14 SOLAR ENERGY↗

An Overview of Issues Related to IEEE Std 1547-2018 Requirements Regarding Voltage and Reactive Power Control

The revised Institute of Electrical and Electronics Engineers (IEEE) 1547 Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018) was published in April 2018. This standard is one of the foundational documents in the United States needed for integrating distributed energy resources (DERs), including solar energy systems, with the electric distribution grid. The revised standard contains 11 chapters (clauses) and 8 annexes that comprise 136 pages. The revision is significantly different from the 2003 version, and it contains new concepts and new technical requirements. Each clause specifies information or requirements that apply to certain aspects important to the interconnection of DERs to the electric power system. Implementing the requirements necessitates a careful study of the underlying technical concept and requires the appropriate information required to calculate relevant settings and configurations. Various stakeholders have different roles in implementing the standard, and portions of the standard are directed toward a specific audience who must possess specialized information and technical training to use and apply the requirements. This document aims to (1) summarize a specific portion of the standard as concisely as possible and (2) provide the reader with introductory knowledge and information to support the utilization of the requirements.

14 SOLAR ENERGY↗

A Methodology to Evaluate the Grid Reliability Impact of Oscillations Induced by Large Loads

The rapid growth of hyperscale AI data centers is bringing renewed attention to the reliability risk that sustained forced oscillations pose to bulk power systems, with cyclic computational workloads emerging as a new forcing source. Unlike the broadband, stochastic disturbances from traditional industrial loads such as arc furnaces, AI training and inference facilities can inject large active power swings concentrated at specific frequencies over extended durations - characteristics that existing grid planning practices do not account for. While the North American Electric Reliability Corporation (NERC) has recognized this gap and called for system-level studies of large load interconnections, no standardized methodology exists to screen, simulate, and quantify these risks at the planning stage. This report presents the Risk Assessment Tool for Large Load-induced Events (RATLLE), a Python-based, publicly available script suite developed at the Pacific Northwest National Laboratory to evaluate bulk power system reliability risks from data center-induced oscillations. RATLLE implements a three-module workflow: a screening module that identifies vulnerable interconnection locations and excitable system modes; a simulation module that models cyclic data center load behavior using a commercial positive sequence simulation platform; and an analysis module that computes risk metrics and generates interactive visualization dashboards. The risk metrics, formulated around simulation observables, map oscillation impacts to a three-stage severity scale spanning latent equipment fatigue through imminent cascading failure. The methodology is demonstrated on two Western Electricity Coordinating Council (WECC) system models: a publicly available 240-bus reduced representation and a detailed 2031 Heavy Winter planning case. Case studies illustrate that even modest 50 MW forced oscillations at resonant frequencies can produce wide-area power swings, N-1 security constraint violations, and cascading generator trips through protection actions - outcomes that would not occur under normal operating conditions without oscillations present. The results underscore the need for standardized oscillation impact assessment in large load interconnection studies and provide a reproducible, extensible framework for utilities to adopt or customize within their existing planning workflows.

Biswas, Shuchismita↗

Informative Background on the Interoperability Requirements in IEEE Std 1547-2018

The intent of this document is to support local authorities governing interconnection requirements in adopting the most current requirements for interconnecting distributed energy resources (DERs) to the electric distribution system, as specified in the Institute of Electrical and Electronics Engineers Standard for Interconnection and Interoperability of Distributed Energy Resources with Associated Electric Power Systems Interfaces (IEEE Std 1547-2018 ). To create interconnection rules that successfully address policy goals, market trends, and technical requirements, electric service regulators need to be well informed of DER integration considerations. Interconnection processes and technical issues often overlap; the two are not easily segregated, and they are often considered and evaluated concurrently within the context of interconnection rulemaking. Accordingly, this document addresses both the technical issues and related process considerations.

24 POWER TRANSMISSION AND DISTRIBUTION↗

DOE Laboratory Support for DER and Inverter-Based Resource Integration Standards (ACCEL II) (Final Report)

This report documents efforts under a project that followed work completed under Accelerating Systems Integration Standards (ACCEL). In this continuation, the project team provided support for updates to critical standards for interconnection and interoperability of distributed energy resources at the distribution level. In addition, the project contributed to development of guidance for operational best practices of the bulk power system with high levels of DERs. Additional goals of the project were to inform and develop improved recommended practices and certification standards for end-to-end interoperability of DERs, utilizing Sandia laboratory assets when needed.

24 POWER TRANSMISSION AND DISTRIBUTION↗

C-MOS bulk metal design handbook

The LSI standard cell array technique was used in the fabrication of more than 20 CMOS custom arrays. This technique consists of a series of computer programs and design automation techniques referred to as the Computer Aided Design And Test (CADAT) system that automatically translate a partitioned logic diagram into a set of instructions for driving an automatic plotter which generates precision mask artwork for complex LSI arrays of CMOS standard cells. The standard cell concept for producing LSI arrays begins with the design, layout, and validation of a group of custom circuits called standard cells. Once validated, these cells are given identification or pattern numbers and are permanently stored. To use one of these cells in a logic design, the user calls for the desired cell by pattern number. The Place, Route in Two Dimension (PR2D) computer program is then used to automatically generate the metalization and/or tunnels to interconnect the standard cells into the required function. Data sheets that describe the function, artwork, and performance of each of the standard cells, the general procedure for implementation of logic in CMOS standard cells, and additional detailed design information are presented.

Edge, T. M.↗

Converter-Interfaced CHP Plant for Improved Grid-Integration, Flexibility and Resiliency

GE Research and its partner GE Renewables have proposed the use of an interface converter solution to increase the penetration of small to medium-sized CHP (1MWe to 20MWe) into distribution grids and improve their flexibility and grid support capability. Indeed, the proposed interface converter solution thanks to presence of the grid-ready inverter, allows to streamline the compliance to grid codes requirements, reduce the interconnection delays and costs and ultimately one of the main barriers for CHP adoption by commercial and industrial facilities. An additional benefit provided by the interface converter is the use of the grid-ready inverter for reactive power which eliminates the need of sizing the generator for that capability. These two benefits highly favor the economic feasibility of converter-interfaced CHP. Five user cases, each in one of the leading U.S states for CHP potential reported by the DOE in its estimation of the U.S Technical Potential of CHP, were selected to compare the economic performances of converter-interfaced CHP as compared with directly-coupled. They include a college campus in California, a hospital in New York, a water reclamation plant in Texas, a hotel in Minnesota, and a large office building in Pennsylvania. Results showed that, the presence of the interface converter allows to increase the return on investment (ROI) by 0.5 to 2 percentage points in most of the cases (4 of 5). Indeed, the interface converter by shortening the interconnection process allows to accelerate revenues while reducing interconnection costs. Added to the reduced cost of the required generator these savings trade favorably the capital cost of the converter. The analysis also showed that the profitability of the converter-interfaced CHP is highly sensitive to the energy price, interconnection delay, and converter cost. However, it appears that if the interface converter can shorten the interconnection process by at least 6 months, adopting this solution will be more economically viable than directly-coupled configuration in almost all the +23,000 sites of the U.S Technical Potential CHP. The evaluation of the benefits of a converter-interfaced CHP also showed that it enables higher ROI when coupled with other distributed energy resources (DER) such as battery energy systems (BESS) or solar photovoltaic (PV). Indeed, in those scenario, the grid-ready inverter included in the interface converter eliminates the need of separate inverters if DC-coupling is used. On the technical performance, it has been verified that the presence of the interface converter allows to reduce by 70% to 80% the CHP short-circuit contribution to grid faults. This not only reduces the mechanical and thermal stresses exposed to the CHP electrical components but also increases the grid hosting capacity which ultimately enables higher penetrations CHP. Another key benefit of the interface converter validated with hardware-in-the-loop simulations and testing is its superior capability for reactive power support. Indeed, using a power hardware testbed with two +700kW inverters configured in back-to-back, a microgrid controller and actual facilities loads it was demonstrated that the presence of the interface converter can help maintain a power factor near ~1 or regulate the voltage to ~1.0pu at the point of common coupling. This benefit can be highly valuable if in the future, due to higher penetration of renewable distributed energy resources (DER), utilities start billing demand charge based on kVA instead of kW as currently. It was also validated that converter-interfaced CHP can dispatch heat and power commands and seamlessly switch between the two modes while consistently controlling the power factor or voltage at PCC. Indeed, the power hardware testing showed that grid-connected converter-interfaced CHP can follow either the power or heat demand while maintaining a unity power factor at converter output. This research proved that the adoption of an interface converter as the solution for interconnection of CHP system into the distribution grid can greatly improve the economic feasibility of small to medium-sized CHP as well as the plant power quality, flexibility and resiliency. Additionally, it allows increased penetrations of CHP into the distribution grid, extends their grid support capability, and facilitates the integration of BESS and PV DER by streamlining their collocation within the same facilities. This ultimately provides an opportunity for commercial and small industrial facilities in the U.S to accelerate their energy transition thanks to the high energy efficiency of CHP systems and its reliable, flexible, and resilient microgrid operation when interconnected with an interface converter.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ADS pilot methodologies as candidates for ADS standards

Panel presentations and activities aimed at a critical assessment of the completeness and accuracy of a pilot methodology survey for an Applications Data Service are presented. Standards for interconnecting pilot programs for data sharing are outlined. Panel responsibilities and assignments for the session are given.

Giragosian, P.↗