Search NASA⌕ Search

SEARCH · Search NASA

Results for “January 2011”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Closure Report for the 92-Acre Area and Corrective Action Unit 111: Area 5 WMD Retired Mixed Waste Pits, Nevada National Security Site, Nevada

This Closure Report (CR) presents information supporting closure of the 92-Acre Area, which includes Corrective Action Unit (CAU) 111, 'Area 5 WMD Retired Mixed Waste Pits.' This CR provides documentation supporting the completed corrective actions and confirmation that the closure objectives were met. This CR complies with the requirements of the Federal Facility Agreement and Consent Order (FFACO) (FFACO, 1996 [as amended March 2010]). Closure activities began in January 2011 and were completed in January 2012. Closure activities were conducted according to Revision 1 of the Corrective Action Decision Document/Corrective Action Plan (CADD/CAP) for the 92-Acre Area and CAU 111 (U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office [NNSA/NSO], 2010). The following closure activities were performed: (1) Construct an engineered evapotranspiration cover over the boreholes, trenches, and pits in the 92-Acre Area; (2) Install use restriction (UR) warning signs, concrete monuments, and subsidence survey monuments; and (3) Establish vegetation on the covers. UR documentation is included as Appendix C of this report. The post-closure plan is presented in detail in Revision 1 of the CADD/CAP for the 92-Acre Area and CAU 111, and the requirements are summarized in Section 5.2 of this document. When the next request for modification of Resource Conservation and Recovery Act Permit NEV HW0101 is submitted to the Nevada Division of Environmental Protection (NDEP), the requirements for post-closure monitoring of the 92-Acre Area will be included. NNSA/NSO requests the following: (1) A Notice of Completion from NDEP to NNSA/NSO for closure of CAU 111; and (2) The transfer of CAU 111 from Appendix III to Appendix IV, Closed Corrective Action Units, of the FFACO.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Benchmarking CME Arrival Time and Impact: Progress on Metadata, Metrics, and Events

Accurate forecasting of the arrival time and subsequent geomagnetic impacts of coronal mass ejections (CMEs) at Earth is an important objective for space weather forecasting agencies. Recently, the CME Arrival and Impact working team has made significant progress toward defining communit yagreed metrics and validation methods to assess the current state of CME modeling capabilities. This will allow the community to quantify our current capabilities and track progress in models over time. First, it is crucial that the community focuses on the collection of the necessary metadata for transparency and reproducibility of results. Concerning CME arrival and impact we have identified six different metadata types: 3D CME measurement, model description, model input, CME (non)arrival observation, model output data, and metrics and validation methods. Second, the working team has also identified a validation time period, where all events within the following two periods will be considered: 1 January 2011 to 31 December 2012 and January 2015 to 31 December 2015. Those two periods amount to a total of about 100 hit events at Earth and a large amount of misses. Considering a time period will remove any bias in selecting events and the event set will represent a sample set that will not be biased by user selection. Lastly, we have defined the basic metrics and skill scores that the CME Arrival and Impact working team will focus on.

Verbeke, C.↗

Successful Characterization Strategies for the Active High Risk Y-12 National Security Complex 9201-5 (Alpha-5) Facility, Oak Ridge, TN - 12164

Building 9201-5 (Alpha 5) was completed in May 1944 and served as a production facility for National Nuclear Security Administration (NNSA) Y-12 Weapons Plant. During the Manhattan Project, it functioned as a uranium enrichment facility. The facility was renovated and altered over the years, converting the calutrons to support other missions. Alpha 5 consists of 4 floors and a basement measuring approximately 600,000 square feet. The facility contains various pieces of equipment remaining from legacy operations. A significant amount (approximately 200,000 kgs) of mercury (Hg) has been spilled in the facility over the operational history of the building. To further complicate matters, beryllium (Be) contamination in 9201-5 is found throughout approximately sixty percent of the facility. Concentrations varying from very low (< 0.2 micrograms (μg)/100 cm{sup 2}) to areas where concentrations are relatively high, approximately 600 μg/100 cm{sup 2}, in regulated beryllium areas. The primary site related contaminants (SRCs) for the waste in this facility are enriched uranium, depleted uranium, beryllium and mercury. This facility represents the highest environmental risk for DOE-ORO EM and NNSA at Y-12 and must be quickly addressed to minimize impacts to future Y-12 missions, as well as human health and the environment. As part of the American Recovery and Reinvestment Act (ARRA), approximately 700,000 cubic feet of legacy material was removed in 2010 and 2011. In addition, characterization of the 9201-5 facility was scheduled in the winter and spring of 2011. This activity was initiated in January 2011 and was completed in July 2011. Heavy schedule pressure was further complicated by the fact that this building has active utility, security and process systems. Given these complex variables, a unique, out of the box characterization strategy was forged in an effort to bound radiological and chemical contaminants, as well as providing the appropriate level of quality to ensure that this data could be used to develop waste profiles when deactivation, decontamination and demolition (D and D) activities are authorized at a future date. The characterization strategy involved a hybrid model of statistically-based and biased sampling events. To achieve the desired results, traditional intrusive sampling and laboratory analysis, as well as a number of field-based characterization methodologies (e.g., X-ray Fluorescence [XRF], Lumex and Non-Destructive Assay [NDA]) were utilized. Results were captured and synthesized into meaningful, usable conclusions in a facility characterization report that will more accurately aid D and D cost estimates for future remedial actions. This massive characterization campaign involved over 1,200 separate sample locations using 4 separate characterization methods and was successfully completed to meet a performance-based milestone within 8 months of initiation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

The Evolution and Fate of Saturn's Stratospheric Vortex: Infrared Spectroscopy from Cassini

The planet-encircling springtime storm in Saturn's troposphere (December 2010-July 2011) produced dramatic perturbations to stratospheric temperatures, winds and composition at mbar pressures that persisted long after the tropospheric disturbance had abated. Observations from the Cassini Composite Infrared Spectrometer (CIRS), supported by ground-based imaging from the VISIR instrument on the Very Large Telescope,is used to track the evolution of a large, hot stratospheric anticyclone between January 2011 and the present day. The evolutionary sequence can be divided into three phases: (I) the formation and intensification of two distinct warm airmasses near 0.5 mbar between 25 and 35N (one residing directly above the convective storm head) between January-April 2011, moving westward with different zonal velocities; (II) the merging of the warm airmasses to form the large single 'stratospheric beacon' near 40N between April and June 2011, dissociated from the storm head and at a higher pressure (2 mbar) than the original beacons; and (III) the mature phase characterized by slow cooling and longitudinal shrinkage of the anticyclone since July 2011, moving west with a near-constant velocity of 2.70+/-0.04 deg/day (-24.5+/-0.4 m/s at 40N). Peak temperatures of 220 K at 2 mbar were measured on May 5th 2011 immediately after the merger, some 80 K warmer than the quiescent surroundings. Thermal winds hear calculations in August 2011 suggest clockwise peripheral velocities of 200400 mls at 2 mbar, defining a peripheral collar with a width of 65 degrees longitude (50,000 km in diameter) and 25 degrees latitude. Stratospheric acetylene (C2H2) was uniformly enhanced by a factor of three within the vortex, whereas ethane (C2H6) remained unaffected. We will discuss the thermal and chemical characteristics of Saturn's beacon in its mature phase, and implications for stratospheric vortices on other giant planets.

Fletcher, Leigh N.↗

The Origin and Evolution of Saturn's 2011-2012 Stratospheric Vortex

The planet-encircling springtime storm in Saturn's troposphere (December 2010-July 2011, Fletcher, L.N. et al. [2011]. Science 332, 1413-1414; Sánchez-Lavega, A. et al. [2011]. Nature 475, 71-74; Fischer, G. et al. [2011]. Nature 475, 75-77) produced dramatic perturbations to stratospheric temperatures, winds and composition at mbar pressures that persisted long after the tropospheric disturbance had abated. Thermal infrared (IR) spectroscopy from the Cassini Composite Infrared Spectrometer (CIRS), supported by ground-based IR imaging from the VISIR instrument on the Very Large Telescope and the MIRSI instrument on NASA's IRTF, is used to track the evolution of a large, hot stratospheric anticyclone between January 2011 and March 2012. The evolutionary sequence can be divided into three phases: (I) the formation and intensification of two distinct warm airmasses near 0.5 mbar between 25 and 35degN (B1 and B2) between January-April 2011, moving westward with different zonal velocities, B1 residing directly above the convective tropospheric storm head; (II) the merging of the warm airmasses to form the large single 'stratospheric beacon' near 40degN (B0) between April and June 2011, disassociated from the storm head and at a higher pressure (2 mbar) than the original beacons, a downward shift of 1.4 scale heights (approximately 85 km) post-merger; and (III) the mature phase characterised by slow cooling (0.11 +/- 0.01 K/day) and longitudinal shrinkage of the anticyclone since July 2011. Peak temperatures of 221.6 +/- 1.4 K at 2 mbar were measured on May 5th 2011 immediately after the merger, some 80 K warmer than the quiescent surroundings. From July 2011 to the time of writing, B0 remained as a long-lived stable stratospheric phenomenon at 2 mbar, moving west with a near-constant velocity of 2.70 +/- 0.04 deg/day (24.5 +/- 0.4 m/s at 40degN relative to System III longitudes). No perturbations to visible clouds and hazes were detected during this period. With no direct tracers of motion in the stratosphere, we use thermal windshear calculations to estimate clockwise peripheral velocities of 200-400 m/s at 2 mbar around B0. The peripheral velocities of the two original airmasses were smaller (70-140 m/s). In August 2011, the size of the vortex as defined by the peripheral collar was 65deg longitude (50,000 km in diameter) and 25deg latitude. Stratospheric acetylene (C2H2) was uniformly enhanced by a factor of three within the vortex, whereas ethane (C2H6) remained unaffected. The passage of B0 generated a new band of warm stratospheric emission at 0.5 mbar at its northern edge, and there are hints of warm stratospheric structures associated with the beacons at higher altitudes (p < 0.1 mbar) than can be reliably observed by CIRS nadir spectroscopy. Analysis of the zonal windshear suggests that Rossby wave perturbations from the convective storm could have propagated vertically into the stratosphere at this point in Saturn's seasonal cycle, one possible source of energy for the formation of these stratospheric anticyclones.

evolution↗

AGR-1, AGR-2, AGR-3/4, and AGR-5/6/7 DimensionalChange Analysis

A series of fuel irradiation experiments have been planned in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) to support the licensing and operation of the Advanced Reactor Technologies high temperature gas-cooled reactor. The advanced gas reactor (AGR) experiments are comprised of multiple independent capsules containing multiple cylindrical fuel compacts, placed inside of a graphite cylinder in ATR. The purpose of the AGR experiments is to provide data on fuel performance under irradiation, support fuel process development, qualify the fuel for normal operating conditions, provide irradiated fuel for accident testing, and support the development of fuel performance and fission product transport models. The advanced graphite creep (AGC) experiments provide irradiation creep data for design and licensing. To date, six irradiation campaigns have been completed: AGR-1 (December, 2006 – November, 2009); AGR-2 (June, 2010 – October, 2013); AGR-3/4 (December, 2011 – April, 2014); AGC-1 (September, 2009 – January, 2011); AGC-2 (April, 2011 – May, 2012); and AGC-3 (November, 2012 – April, 2014).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Five-Year ALARA Review of Dosimetry Results (1 Jan 2011 - 31 Dec 2015)

A review of dosimetry results from 1 January 2011 through 31 December 2015 was conducted to demonstrate that radiation protection methods used are compliant with regulatory limits and conform to the philosophy to keep exposures to radiation As Low As is Reasonably Achievable (ALARA). This included a review and evaluation of personnel dosimetry (external and internal) results at Sandia National Laboratories, New Mexico as well as at Sandia National Laboratories, California. Additionally, results of environmental monitoring efforts at Sandia National Laboratories, New Mexico were reviewed. ALARA is a philosophical approach to radiation protection by managing and controlling radiation exposures (individual and collective) to the work force and to the general public to levels that are As Low As is Reasonably Achievable taking social, technical, economic, practical, and public policy considerations into account. ALARA is not a dose limit but a process which has the objective of attaining doses as far below applicable dose limits As Low As is Reasonably Achievable. In the case of Sandia National Laboratories, a need for formal ALARA goals has not been identified. Collective and individual doses are kept at acceptable through Operational ALARA practices implemented during the development of radiological Technical Work Documents.

61 RADIATION PROTECTION AND DOSIMETRY↗

The Eucalyptus grandis Genome Project: Genome and transcriptome resources for comparative analysis of woody plant biology

The International Year of Forests - 2011 [http://www. un.org/en/events/iyof2011/] will be a milestone for forest tree genomics. The draft genome sequence of Eucalyptus grandis was released in January 2011 in the USA (Phytozome [http://www.phytozome.net]) and in Belgium (BOGAS, [http://bioinformatics.psb.ugent.be/webtools/bogas/]). The genome sequencing was funded by the US Department of Energy (DOE) and performed at the DOE Joint Genome Institute (JGI) in collaboration with members of the Eucalyptus Genome Network (EUCAGEN, [http://www.eucagen.org]) who contributed genetic materials, linkage maps, EST resources and bioinformatics support. The E. grandis genome together with that of Populus trichocarpa[1]and other woody plant genomes recently completed (e.g. Vitis, Cacao, Prunus, Citrus and Malus)will provide excellent opportunities for comparative studies of the unique biology of woody plants. Eucalypts are currently the most widely grown hardwood fibre crop in the world and eucalypt breeding programs will benefit greatly from the new genomic resources. The reference genome sequence of Eucalyptus, a foundation tree genus in Australia comprising more than 70% of the native forest estate, will also offer important benefits for ecological and evolutionary biology studies. We report the sequencing, assembly and annotation of the E. grandis genome.

59 BASIC BIOLOGICAL SCIENCES↗

Financial analysis of experimental releases conducted at Glen Canyon Dam during water year 2011

This report examines the financial implications of experimental flows conducted at the Glen Canyon Dam (GCD) in water year 2011. It is the third report in a series examining financial implications of experimental flows conducted since the Record of Decision (ROD) was adopted in February 1997 (Reclamation 1996). A report released in January 2011 examined water years 1997 to 2005 (Veselka et al. 2011), and a report released in August 2011 examined water years 2006 to 2010 (Poch et al. 2011). An experimental release may have either a positive or negative impact on the financial value of energy production. This study estimates the financial costs of experimental releases, identifies the main factors that contribute to these costs, and compares the interdependencies among these factors. An integrated set of tools was used to compute the financial impacts of the experimental releases by simulating the operation of the GCD under two scenarios, namely, (1) a baseline scenario that assumes both that operations comply with the ROD operating criteria and the experimental releases that actually took place during the study period, and (2) a 'without experiments' scenario that is identical to the baseline scenario of operations that comply with the GCD ROD, except it assumes that experimental releases did not occur. The Generation and Transmission Maximization (GTMax) model was the main simulation tool used to dispatch GCD and other hydropower plants that comprise the Salt Lake City Area Integrated Projects (SLCA/IP). Extensive data sets and historical information on SLCA/IP powerplant characteristics, hydrologic conditions, and Western Area Power Administration's (Western's) power purchase prices were used for the simulation. In addition to estimating the financial impact of experimental releases, the GTMax model was also used to gain insights into the interplay among ROD operating criteria, exceptions that were made to criteria to accommodate the experimental releases, and Western operating practices. Experimental releases conducted in water year 2011 resulted only in financial costs; the total cost of all experimental releases was about $\$$622,000.

13 HYDRO ENERGY↗

Clinical Pathways: A Catalyst for the Adoption of Hypofractionation for Early-Stage Breast Cancer

Purpose: Hypofractionated whole-breast irradiation (HF-WBI) remains underutilized in the United States despite support by multiple clinical trials. We evaluated the success of iterative modifications of our breast cancer clinical pathway on the adoption of HF-WBI in a large, integrated radiation oncology network. Methods and Materials: The breast clinical pathway was modified in January 2011 (Amendment 1) to recommend HF-WBI as the first option for women ≥70 of age with stages 0 to IIA, while maintaining conventional fractionation (CF) as a pathway-concordant secondary option. In January 2013 (Amendment 2), the pathway's HF-WBI recommendation was extended to women ≥50 years of age. In January 2014 (Amendment 3), the pathway mandated HF-WBI as the only pathway-concordant option in women ≥50 years of age, and all pathway-discordant plans were subject to peer review and justification. Women ≥50 years of age with ductal carcinoma in situ or invasive breast cancer who underwent breast conserving surgery and adjuvant WBI were included in this analysis. Results: We identified 5112 patients from 2009 to 2014 who met inclusion criteria. From 2009 to 2012, the overall HF-WBI use rate was 8.3%. Following Amendments 2 and 3 (2013 and 2014, respectively), HF-WBI use significantly increased to 21.8% (17.3% in the community, 39.7% at academic sites) and 76.7% (75.5% in the community, 81.4% at academic sites), respectively (P<.001). Compared to 2009 to 2012, the relative risk of using HF-WBI was 7.9 (95% confidence interval: 7.1-8.6, P<.001) and 10.7 (95% CI: 10.3-11.0, P<.001), respectively, after Amendments 2 and 3, respectively. Age ≥70 and treatment at an academic site increased the likelihood of receiving HF-WBI in 2009 to 2012 and following Amendment 2 (P<.001). Conclusions: This study demonstrates the transformative effect of a clinical pathway on patterns of care for breast radiation therapy. Although our initial HF-WBI use rate was low (8%-22%) and consistent with national rates, the clinical pathway approach dramatically increased adoption rate to >75%. In contrast to passive guidelines, clinical pathways serve as active tools to promote current best practices.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

The outburst of the blazar S4 0954+658 in 2011 March-April

We present the results of optical (R-band) photometric and polarimetric monitoring and Very Long Baseline Array imaging of the blazar S4 0954+658, along with Fermi γ-ray data during a multi-waveband outburst in 2011 March-April. After a faint state with a brightness level R ∼ 17.6 mag registered in the first half of 2011 January, the optical brightness of the source started to rise and reached ∼14.8 mag during the middle of March, showing flare-like behavior. The most spectacular case of intranight variability was observed during the night of 2011 March 9, when the blazar brightened by ∼0.7 mag within 7 hr. During the rise of the flux, the position angle of the optical polarization rotated smoothly over more than 300°. At the same time, within 1σ uncertainty, a new superluminal knot appeared with an apparent speed of 19.0 ± 0.3c. We have very strong evidence that this knot is associated with the multi-waveband outburst in 2011 March-April. We also analyze the multi-frequency behavior of S4 0954+658 during a number of minor outbursts from 2008 August to 2012 April. We find some evidence of connections between at least two additional superluminal ejecta and near-simultaneous optical flares.

79 ASTRONOMY AND ASTROPHYSICS↗

Sao Paulo Lightning Mapping Array (SP-LMA): Deployment and Plans

An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of tHe main precipitation systems in Brazil: A contribUtion to cloud resolVing modeling and to the GPM (GlobAl Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luz Paraitinga intensive operation period (IOP) in December 2011-January 2012, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sa Luz Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sa Jos dos Campos.

Bailey, J. C.↗

TEMPORAL AND SPECTRAL EVOLUTION IN X- AND {gamma}-RAYS OF MAGNETAR 1E 1547.0-5408 SINCE ITS 2008 OCTOBER OUTBURST: THE DISCOVERY OF A TRANSIENT HARD PULSED COMPONENT AFTER ITS 2009 JANUARY OUTBURST

The magnetar 1E 1547.0-5408 exhibited outbursts in 2008 October and 2009 January. In this paper, we present in great detail the evolution of the temporal and spectral characteristics of the persistent total and pulsed emission of 1E 1547.0-5408 between {approx}1 and 300 keV starting on 2008 October 3 and ending in 2011 January. We analyzed data collected with the Rossi X-ray Timing Explorer (RXTE) the International Gamma-Ray Astrophysics Laboratory (INTEGRAL), and the Swift satellite. We report the evolution of the pulse frequency, and the measurement at the time of the onset of the 2009 January outburst of an insignificant jump in frequency, but a major frequency derivative jump {Delta}{nu}-dot of +(1.30 {+-} 0.14) Multiplication-Sign 10{sup -11} Hz s{sup -1} ({Delta}{nu}-dot/{nu}-dot of -0.69 {+-} 0.07). Before this {nu}-dot glitch, a single broad pulse is detected, mainly for energies below {approx}10 keV. Surprisingly, {approx}11 days after the glitch a new transient high-energy (up to {approx}150 keV) pulse appears with a Gaussian shape and width 0.23, shifted in phase by {approx}0.31 compared to the low-energy pulse, which smoothly fades to undetectable levels in {approx}350 days. We report the evolution of the pulsed-emission spectra. For energies 2.5-10 keV all pulsed spectra are very soft with photon indices {Gamma} between -4.6 and -3.9. For {approx}10-150 keV, after the {nu}-dot glitch, we report hard non-thermal pulsed spectra, similar to what has been reported for the persistent pulsed emission of some anomalous X-ray pulsars. This pulsed hard X-ray emission reached maximal luminosity 70 {+-} 30 days after the glitch epoch, followed by a gradual decrease by more than a factor of 10 over {approx}300 days. These characteristics differ from those of the total emission. Both, the total soft X-ray (1-10 keV) and hard X-ray (10-150 keV) fluxes, were maximal already 2 days after the 2009 January outburst, and decayed by a factor of {approx}>3 over {approx}400 days. The total spectra can be described with a blackbody (kT values varying in the range 0.57-0.74 keV) plus a single power-law model. The photon index exhibited a hardening ({approx} - 1.4 to {approx} - 0.9) with time, correlated with a decrease in flux in the 20-300 keV band. We discuss these findings in the framework of the magnetar model.

79 ASTRONOMY AND ASTROPHYSICS↗

Line-of-sight measurements for the NIF Neutron Imaging System and determination of line-of-sight offsets in OPAS 90-135 images

This report describes line-of-sight (LOS) measurements for the NIF Neutron Imaging System (NIS) and a characterization of the NIS LOS relative to OPAS 90-135 that were performed during the NIS commissioning Nov. 2010 – Jan. 2011. As described here, data from those measurements were used to determine the relative offsets between the TCC position (x and y pixel coordinates in OPAS images) and the NIS LOS as functions of the OPAS focal distance. This data is needed to place the NIS pinhole array (PHA) onto the NIS LOS with high precision using OPAS imaging of alignment fiducials attached to the front and the back of the PHA. (A description of the PHA alignment fiducials, data from metrology performed on the fiducials and a description on how these fiducials were used to align the PHA for the first NIS imaging shot on Feb,. 17, 2011 will be summarized in an upcoming separate report. This report consists of an overview given in this document and a main body that consists of a set of viewgraphs (see Appendix 1) that were iterated and refined within the NIS team and with the Alignment Working Group and that contain more detailed information, schematics and calculations of the NIS line of sight offset from the OPAS LOS. See also Drury, “OPAS 90-135 Registration of Neutron Imaging System Line of Sight,” January 2011, NIF-5035484.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗