Search NASA⌕ Search

SEARCH · Search NASA

Results for “KICKER MAGNETS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

RHIC Abort Kicker Prefire Report

In an attempt to discover any pattern to prefire events, abort prefire kicker data from 2007 to the present day have been recorded. With the 2014 operations concluding, this comprises 8 years of prefire data. Any activities that the Pulsed Power Group did to decrease prefire occurrences were recorded as well, but some information may be missing. The following information is a compilation of the research to date.

43 PARTICLE ACCELERATORS↗

Comparison of the Window-Frame RHIC-abort kicker with C-type Kicker

The high intensity proton bunches (~2.5x10 11 p/bunch ) circulating in RHIC increase the temperature of the ferrite-made RHIC-abort-kickers above the Curie point; as a result, the kickers cannot provide the required field to abort the beam at the beam dump. A team of experts in the CAD department worked on modifying the design of the window-frame RHIC-abort kicker to minimize the hysteresis losses responsible for the increase of the ferrite’s temperature. In this technical note we report some results from the study of two possible modifications of the window-frame RHIC-abort kicker, and we compare these results with those of a propose C-type RHIC-abort kicker. We also include an Appendix where we describe a method which may further reduce the hysteresis losses of the window-frame kicker.

43 PARTICLE ACCELERATORS↗

RHIC Prefire Protection Masks

The protection of the RHIC experimental detectors from damage due to beam hitting close upstream elements in cases of abort kicker prefires requires some dedicated precautionary measures with two general options: to bring the beam close to a limiting aperture (i.e. the beam pipe wall), as far upstream of the detector components as possible or, alternatively, to bring a limiting aperture close to the circulating beam. During the FY 2014 RHIC Heavy Ion run the first option was chosen because of the limited time available for preparation before the start of the run. For future runs the second option, in this case the installation of dual-sided movable masks, is preferred. The installation of the masks, one per ring, is planned before the start of the FY 2015 run.

43 PARTICLE ACCELERATORS↗

Delivery of H - / H + Beams to Area A

We explore the relative merits of transporting the beam from the H + ion source and from the H - ion source to Area-A for low current applications. Transporting the H - beam to Area-A using the laser neutralization approach has some risk associated with it and will require some development. Alternative method of delivering H - beam to Area-A includes replacing LDBM00 bending magnet with kicker for sharing beam between Line D and modified Line A. Transporting the H + beam to Area-A will have significant impact on the operation the IPF facility and maintaining high pulse rate to IPF will require major modifications to the transition region of the accelerator and Drift Tube Linac.

43 PARTICLE ACCELERATORS↗

Scanning Synchronization of Colliding Bunches for MEIC Project

Synchronization of colliding beams is one of the major issues of an electron-ion collider (EIC) design because of sensitivity of ion revolution frequency to beam energy. A conventional solution for this trouble is insertion of bent chicanes in the arcs space. In our report we consider a method to provide space coincidence of encountering bunches in the crab-crossing orbits Interaction Region (IR) while repetition rates of two beams do not coincide. The method utilizes pair of fast kickers realizing a bypass for the electron bunches as the way to equalize positions of the colliding bunches at the Interaction Point (IP). A dipole-mode warm or SRF cavities fed by the magnetron transmitters are used as fast kickers, allowing a broad-band phase and amplitude control. The proposed scanning synchronization method implies stabilization of luminosity at a maximum via a feedback loop. This synchronization method is evaluated as perspective for the Medium Energy Electron-Ion collider (MEIC) project of JLab with its very high bunch repetition rate.

43 PARTICLE ACCELERATORS↗

Harmonic Resonant Kicker Design for the MEIC Electron Circular Cooler Ring

Bunched-beam electron cooling of the high-energy ion beam emittance may be a crucial technology for the proposed Medium energy Electron Ion Collider (MEIC) to achieve its design luminosity. A critical component is a fast kicker system in the Circular Ring (CR) that periodically switches electron bunches in and out of the ring from and to the driver Energy Recovery Linac (ERL). Compared to a conventional strip-line type kicker, a quarter-wave resonator (QWR)-based deflecting structure has a much higher shunt impedance and so requires much less RF power. The cavity has been designed to resonate simultaneously at many harmonic modes that are integer multiples of the fundamental mode. In this way the resulting waveform will kick only a subset of the circulating bunches. In this paper, analytical shunt impedance optimization, the electromagnetic simulations of this type of cavity, as well as tuner and coupler concept designs to produce 5 odd and 5 even harmonics of 47.63MHz will be presented, in order to kick every 10th bunch in a 476.3 MHz bunch train.

43 PARTICLE ACCELERATORS↗

ACCELERATOR SYSTEMS MODIFICATIONS FOR A SECOND TARGET STATION AT THE OAK RIDGE SPALLATION NEUTRON SOURCE

A second target station is planned for the Oak Ridge Spallation Neutron Source. The ion source will be upgraded to increase the peak current from 38 to 49 mA, additional superconducting RF cavities will be added to the linac to increase the H beam energy from 938 to 1300 MeV, and the accumulator ring will receive modifications to the injection and extraction systems to accommodate the higher beam energy. After pulse compression in the storage ring one sixth of the beam pulses (10 out of 60 Hz) will be diverted to the second target by kicker and septum magnets added to the existing Ring to Target Beam Transport (RTBT) line. No further modifications will be made to the RTBT so that when the kicker and septum magnets are turned off the original beam transport lattice will be unaffected. In this paper we will discuss these and other planned modifications and upgrades to the accelerator facility.

Galambos, John D↗

Lowering the RHIC-Injection Lambertson Septum magnet to reduce the strength of the RHIC Injection Kickers

The present RHIC beam-injection-system and one of its components the Lambertson septum magnet will be used by the EIC project to inject the hadrons from the AGS into the EIC hadron ring for further acceleration. The number of hadron bunches injected to fill the EIC ring will be almost three times as many as compared to the number of bunches to fill RHIC. The increase of the injected bunches requires new type of kickers known as “transmission line” or “strip line” kickers which provide faster rise time of ~18 nsec, but this type of kickers may not be strong enough to provide the kick required to place the injected beam trajectory into the reference orbit of the circulating beam. In this technical note we provide a modification of the RHIC injection system which consists of lowering the Lambertson septum to decrease the strength of the kickers required to place the injected beam into the reference orbit of the circulating beam.

43 PARTICLE ACCELERATORS↗

The fast non-ferric kicker system for the Muon g–2 Experiment at Fermilab

Here we describe the installation, commissioning, and characterization of the new injection kicker system in the Muon g – 2 Experiment (E989) at Fermilab, which makes a precision measurement of the muon magnetic anomaly. Three Blumlein pulsers drive each of the 1.27-m-long non-ferric kicker magnets, which reside in a storage ring vacuum (SRV) that is subjected to a 1.45 T magnetic field. The new system has been redesigned relative to Muon g – 2 ’s predecessor experiment, and we present those details in this manuscript.

43 PARTICLE ACCELERATORS↗

Investigation of an Ultrafast Harmonic Resonant RF Kicker

An Energy Recovery Linac (ERL) based multi-turn electron Circulator Cooler Ring (CCR) is envisaged in the proposed Jefferson Lab Electron Ion Collider (JLEIC) to cool the ion bunches with high energy (55 MeV), high current (1.5 A), high repetition frequency (476.3 MHz), high quality magnetized electron bunches. A critical component in this scheme is a pair of ultrafast kickers for the exchange of electron bunches between the ERL and the CCR. The ultrafast kicker should operate with the rise and fall time in less than 2.1 ns, at the repetition rate of ~10s MHz, and should be able to run continuously during the whole period of cooling. These -and-fall time being combined together, are well beyond the state-of-art of traditional pulsed power supplies and magnet kickers. To solve this technical challenge, an alternative method is to generate this high repetition rate, fast rise-and-fall time short pulse continuous waveform by summing several finite number of (co)sine waves at harmonic frequencies of the kicking repetition frequency, and these harmonic modes can be generated by the Quarter Wave Resonater (QWR) based multifrequency cavities. Assuming the recirculator factor is 10, 10 harmonic modes (from 47.63 MHz to 476.3 MHz) with proper amplitudes and phases, plus a DC offset are combined together, a continuous short pulse waveform with the rise-and-fall time in less than 2.1 ns, repetition rate of 47.63 MHz waveform can be generated. With the compact and matured technology of QWR cavities, the total cost of both hardware development and operation can be reduced to a modest level. Focuse on the technical scheme, three main topics will be discussed in this thesis: the synthetization of the kicking pulse, the design and optimization of the deflecting QWR multi-integer harmonic frequency resonator and the fabrication and bench measurements of a half scale copper prototype. In the kicking pulse synthetization part, we begin with the Fourier Series expansion of an ideal square pulse, and get a Flat-Top waveform which will give a uniform kick over the bunch length of the kicked electron bunches, thus the transverse emittance of these kicked electron bunches can be maintained. By using two identical kickers with the betatron phase advance of 180 degree or its odd multiples, the residual kick voltage wave slopes at the unkicked bunch position will be totally cancelled out. Flat-Top waveform combined with two kicker scheme, the transverse emittance of the cooling electron bunches will be conserved during the whole injection, recirculation, and ejection processes. In the cavity design part, firstly, the cavity geometry is optimized to get high transverse shunt impedance thus less than 100 W of RF losses on the cavity wall can be achieved for all these 10 harmonic modes. To support all these 10 harmonic modes, group of four QWRs are adopted with the mode distribution of 5:3:1:1. In the multi-frequency cavities such as the five-mode-cavity and the three-mode-cavity, tunings are required to achieve the design frequencies for each mode. Slight segments of taper design on the inner conductor help to get the frequencies to be exactly on the odd harmonic modes. Stub tuners equal to the number of resonant modes are inserted to the outer conductor wall to compensate the frequency shifts due manufacturing errors and other perturbations during the operation such as the change of the cavity temperature. Single loop couple is designed for all harmonic modes in each cavity. By adjusting its loop size, position and rotation, it is possible to get the fundamental mode critical coupled and other higher harmonic modes slightly over coupled. A broadband circulator will be considered for absorbing the reflected power. Finally in this part, multipole field components due to the asymmetric cylindrical structure around the beam axis of the cavity as well as the beam-induced higher order mode (HOM) issues will be analyzed and discussed in this thesis. A half-scale copper prototype cavity (resonant frequencies from 95.26 MHz to 857.34 MHz) was fabricated to validate the electromagnetic characteristics. With this half scale prototype, the tuning processes of multiple harmonic frequencies, unloaded quality factor measurements of each mode, and bead-pull measurements are performed. The bench measurement results matched well with the simulation results, which have validated our cavity design and construction methods. Finally, a simple mode combining experiment with five separate signal generators was performed on this prototype cavity and the desired fast rise/fall time (1.2 ns), high repetition rate (95.26 MHz) waveform was captured, which finally proved our design of this ultrafast harmonic kicker.

43 PARTICLE ACCELERATORS↗

Current status of the electron transport line from RCS to ESR: RTE line

The electron injection system of the U.S. Electron-Ion Collider (EIC) is located outside of the RHIC tunnel. Electrons beams accelerated by the Rapid Cycling Synchrotron (RCS) must be transported to the Electron Storage Ring (ESR), which resides within the RHIC tunnel. To accomplish this, a dedicated beam transport line, referred to as RTE (RCS-to-ESR) line is being designed. The proposed conceptual design comprises three main sections; RCS extraction, a vertical bend and dispersion suppression region, and ESR injection matching. The extraction section uses pulsed kickers and septum magnets to achieve a total deflection angle of 3 degrees. To align the injection section with ESR, the beamline must provide a vertical elevation of 1.68 m, and an array of FODO cells is used to suppress the vertical dispersion. The total length of the RTE line is approximately 133 m, and this paper presents the current design status and considerations for this transport line.

Accelerator Physics↗

RHIC Injection Kicker Measurement and Emittance Growth Simulation

RHIC operations with gold beams at energies below the design injection energy of 10.5 GeV/N requires the injection of long bunches to mitigate the effects of IBS and space charge [1]. Bunch lengths can be up to 60 ns in length at 3.85 GeV/N (to be compared to normal 35 ns proton bunch e s at 25 GeV). Injection of such long bunches requires revisiting the details of the injection magnet pulse to insure sufficient transfer efficiency from the AGS to RHIC. This note details beam-based measurements of the deflection provided by the injection kicker magnet as a function of bunch arrival time using two different terminating resistors: a 25 Ω resistor, which has been standard for several years, and a 40 Ω resistor, which more nearly represents a matched termination. The measured deflection curves are then used as inputs into a simple simulation to estimate the effects of the kicker rise time and shape (flatness) on the transverse emittance of the injected and circulating bunches. The simulat ions indicate that there is a 12 % intrinsic vertical emittance growth associated with the standard 25 Ω kicker configuration not only for the long low energy bunches, but also for nominal 35 ns long polarized proton bunches at the nominal 25 GeV injection energy.

43 PARTICLE ACCELERATORS↗

Eight Pulse Performance of DARHT Axis II - Preliminary Results

The DARHT-II accelerator produces a 1.65-kA, 17-MeV beam in a 1600-ns pulse. Standard operation of the DARHT Axis II accelerator involves extracting four short pulses from the 1.6 us long macro-pulse produced by the LIA. The four short pulses are extracted using a fast kicker in combination with a quadrupole septum magnet and then transported for several meters to a high-Z material target for conversion to x-rays for radiography. The ability of the DARHT Axis 2 kicker to produce more than the standard four pulse format has been previously demonstrated. This capability was developed to study potential risks associated with beam transport during an initial commissioning phase at low energy (8 MeV) and low current (1.0 kA).The ability of the kicker to deliver more than four pulses to the target has been realized for many years. This note describes the initial results demonstrating this capability.

43 PARTICLE ACCELERATORS↗

Design and test of the RHIC CMD10 abort kicker

In recent RHIC operational runs, planned and unplanned pre-fire triggered beam aborts have been observed that resulted in quenches of SC main ring magnets, indicating a weakened magnet kick strength due to beam-induced ferrite heating. An improvement program was initiated to reduce the longitudinal coupling impedance with changes to the ferrite material and the eddy-current strip geometry. Results of the impedance measurements and of magnet heating tests with CMD10 ferrite up to 190°C are reported. All 10 abort kickers in the tunnel have been modified and were provided with a cooling system for the RUN 15.

43 PARTICLE ACCELERATORS↗

Achieve Long G10 Kicker Pulse Tops for Au Run at Low Energies (BES-II)

The G10 magnets are a set of four ferrite kickers in the AGS used to extract beam into the AtR (and typically on to RHIC). A single G10 module current pulse is about 400 ns long with little pulse flattop. Each module has an individual delay trigger, which can be manipulated to change the time spacing between these 4 pulses to form different sum pulses. We will describe several configurations for extraction at different energies below the nominal AGS to RHIC transfer energy (~9.8 GeV/n).

43 PARTICLE ACCELERATORS↗

Injection/Extraction Studies In The Non-scaling FFAG For The Neutrino Factory

The Neutrino Factory is under intensive study in the framework of the International Design Study for future precision neutrino oscillation physics. According to the current baseline the major part of muon acceleration is foreseen to take part in the non-scaling fixed field alternating gradient (NS-FFAG) ring. The NS-FFAG lattice design was recently modified to accommodate long straight sections necessary for the injection/extraction systems. The length of the long drift was optimized minimizing the necessary septum field, which according to present studies needs to be below 2 T. The injection/extraction schemes allowing to reuse the kickers for both signs of muons are presented. The design of the kicker system based on current technology is discussed. The preliminary design of a septum magnet focused on minimization of the stray field leakage is studied.

43 PARTICLE ACCELERATORS↗

Damping Ring Kickers

The principle of the design of these magnets was discussed in CN-72. Fig. 1 shows what the total system looks like. Such a system was completed last January and since then we have been evaluating its performance.

ACCSYS↗

Design of the EIC hadron storage ring stripline injection kicker with a novel impedance tuning capability

The Electron-Ion Collider (EIC), to be built at Brookhaven National Laboratory, will be a high luminosity (~10 34 cm –2 s –1 ) nuclear science facility. To facilitate EIC experiments, the existing yellow ring of the Relativistic Heavy Ion Collider (RHIC) will be reconfigured to serve as the Hadron Storage Ring (HSR). Designing a stripline injection kicker for the HSR beams, with high magnetic rigidity (~ 82 Tm), poses some technical challenges due to the required large pulsed voltage with long flattop duration, very fast rise time, expected shorter bunch spacing, and potential heating due to higher peak current. In addition, minimizing impedance mismatch in the transition region between the feedthrough and the stripline electrode is challenging. This paper focuses on the mechanical design and optimization of the HSR injection kicker, highlighting a novel impedance tuning capability achieved through an innovative kicker aperture adjustment mechanism. We comprehensively cover the design, including impedance optimization (both beam coupling and characteristic), beam-induced heating, and thermal analysis, and investigation of the maximum electric field due to high voltage signal excitation to ensure safe and reliable operation.

43 PARTICLE ACCELERATORS↗