Search NASA⌕ Search

SEARCH · Search NASA

Results for “LAND RECLAMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Impact of using paper mill sludge for surface-mine reclamation on runoff water quality and plant growth

Paper mills generate large amounts of solid waste consisting of fibrous cellulose, clay, and lime. Paper mill Sludge (PMS) can improve reclamation of surface-coal mines where low pH and organic-carbon levels in the spoil cover material can inhibit revegetation. When applied at high rates, however, PMS may adversely impact the quality of surface runoff. Therefore, we applied PMS at 0, 224, and 672 dry Mg ha{sup -1} to 22.1 x 4.6-m plots at a recently mined site and monitored runoff for a total of 13 mo. The zero-rate plots served as controls and received standard reclamation consisting of mulching with hay and fertilization at planting. Compared to the control plots, PMS reduced runoff fourfold to sixfold and decreased erosion from 47 Mg ha{sup -1} to < 1 Mg ha{sup -1}. Most of the reduction occurred in the 2.5 mo before the plots were planted. Flow-weighted average dissolved oxygen concentrations in runoff from plots at the 224 and 672 Mg ha{sup -1} rates, however, were much lower ({<=} 0.4 vs. 8.2 mg L{sup -1}) and chemical oxygen demand (COD) was much higher for the 672 Mg ha{sup -1} rate plots than the control plots during the pre-plant period (7229 vs. 880 mg L{sup -1}). There were few noteworthy differences in water quality among treatments post-planting, but plant dry-matter yields were greater for the PMS plots than for the controls. The 672 Mg ha{sup -1} rate did not increase COD or nutrient loads compared to the 224 Mg ha{sup -1} rate and may have more persistent beneficial effects by increasing soil organic carbon levels and pH to a greater extent.

01 COAL, LIGNITE, AND PEAT↗

GrayQb Single-Faced Version 2 Open Environment Test - 16344

The GrayQb{sup TM} Single Faced Version 2 (SF2) is a non-destructive examination device developed to generate radiation contour maps showing source locations and relative radiological levels present in an area under examination. This device allows for characterization of radioactively contaminated areas such as hot cells, gloveboxes, small and large rooms, hallways, and waste tanks. The goal of GrayQb{sup TM} (pronounced 'Gray Cube') is to provide a low cost easily deployable device to aid in the process of decontamination and decommissioning (D and D). The GrayQb{sup TM} SF2 device is approximately a six inch cube weighing seven (7) pounds composed of a tungsten shield with integrated collimator, radiation imaging medium (Phosphor Storage Plate), and digital camera. This paper details the design upgrades incorporated into the new version of the GrayQb{sup TM} SF2 device and the characterization testing of this upgraded device. Device results from controlled testing performed at the Savannah River Site (SRS) Health Physics Instrument Calibration Laboratory (HPICL) are presented, as well as results from the open environment field testing performed in the E-Area Low Level Waste Storage Area. Follow on work performed deploying the GrayQb SF2 device at the Hanford Plutonium Reclamation Facility (PRF) to assist in the radiological characterization of the canyon will also be presented. Testing of the redesigned GrayQb{sup TM} SF2 device demonstrated its ability to detect low energy isotopes, e.g. Am-241 and Pu-238, not only indoors in controlled environments with well-defined source locations, but also in open environment field areas with a significant high energy background. Additionally, it was demonstrated that the device could detect higher energy isotopes (Cs-137 and Co-60) in a controlled setting and with additional testing and/or modifications to device and software, would likely be able to detect these isotopes in the open environment field testing. Follow on 2015 work performed at Hanford proved GrayQb to be a useful tool in the radiological characterization of the PRF canyon. Distribution tendencies of the radiological hot spots were identified that provided insights which will assist in more efficient planning of the continued D and D effort. Hot spots were identified which can be targeted during the future D and D effort and used as markers during the NDA assessment to quantify the radiological environment. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Numerical study of radiation effect on the municipal solid waste combustion characteristics inside an incinerator

Highlights: • A 3-D model for the MSW incinerator with preheated air was developed. • Gas radiative properties were obtained from a statistical narrow-band model. • Non-gray body radiation model can provide more accurate simulation results. - Abstract: Due to its advantages of high degree volume reduction, relatively stable residue, and energy reclamation, incineration becomes one of the best choices for Municipal Solid Waste (MSW) disposal. However, detailed measurements of temperature and gas species inside a furnace are difficulty by conventional experimental techniques. Therefore, numerical simulation of MSW incineration in the packed bed and gas flow field was applied. In this work, a three dimensional (3-D) model of incinerator system, including flow, heat transfer, detailed chemical mechanisms, and non-gray gas models, was developed. Radiation from the furnace wall and the flame formed above the bed is of importance for drying and igniting the waste. The preheated air with high temperature is used for the MSW combustion. Under the conditions of high temperature and high pressure, MSW combustion produces a variety of radiating gases. The wavelength-depend radiative properties of flame adopted in non-gray radiation model were obtained from a statistical narrow-band model. The influence of radiative heat transfer on temperature, flow field is researched by adiabatic model (without considering radiation), gray radiation model, and non-gray radiation model. The simulation results show that taking into account the non-gray radiation is essential.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rehabilitation of semi-arid coal mine spoil bank soils with mine residues and farm organic by-products

A method of rehabilitating coal mine soils was studied under the conditions of a semi-arid climate, lack of topsoil but availability of farm by-products in NE Spain. The objectives of the research were to assess a new method in order to achieve a suitable substrate for the establishment of native vegetation, to evaluate environmental impacts associated with the reclamation process, and to determine the time necessary to integrate the treated area into the surrounding environment. Eight plots (10 x 35 m{sup 2}) were established in September 1997. Substrate combinations of two types of mine spoil (coal dust and coarse-sized material), two levels of pig slurry (39 and 94 Mg ha{sup -1}dry-wt), and cereal straw (0 and 15 Mg ha{sup -1}) were applied. Monitoring of select physical and chemical soil properties and vegetation characteristics was performed from 1997 until 2005. The bulk density and the saturated hydraulic conductivity measured did not limit plant development and water availability. Initial substrate salinity (1.37 S m{sup -1}) decreased with time and in the long term did not limit plant colonization to salinity-adapted species. Initial nitrate concentration was 298 mg kg{sup -1}, but was reduced significantly to acceptable values in 3 years (55 mg kg{sup -1}) and the measured pH (7.6) was maintained at the level of initial spoil values. Vegetation cover reached up to 90%. In the treated area, spontaneous vegetation cover (15 to 70%) colonized the nonsown areas widely. In the medium term, vegetation cover tended to be higher in plots with a thicker layer of coal dust material and the higher slurry rate. Soil rehabilitation and environmental reintegration, taking into account soil and vegetation indicators, was possible in the studied area with low cost inputs using residual materials from mining activities and animal husbandry by-products.

01 COAL, LIGNITE, AND PEAT↗

Emissions of ammonia and greenhouse gases during combined pre-composting and vermicomposting of duck manure

Highlights: • Earthworms significantly decreased emissions of N{sub 2}O and CH{sub 4}, but had a marginal effect on CO{sub 2} emission. • NH{sub 3}, N{sub 2}O, and CH{sub 4} emissions were significantly reduced by reed straw and zeolite, CO{sub 2} emission was increased by reed straw. • Combined pre-composting and vermicomposting with reed straw and zeolite would be recommended for disposal of duck manure. - Abstract: Combined pre-composting and vermicomposting has shown potential for reclamation of solid wastes, which is a significant source of ammonia (NH{sub 3}), and greenhouse gases (GHG), including nitrous oxide (N{sub 2}O), methane (CH{sub 4}), and carbon dioxide (CO{sub 2}). Earthworms and amendments may both affect physico-chemical characteristics that control gas-producing processes, and thus affect NH{sub 3} and GHG emissions. Here, we used two-way ANOVA to test the effects of addition of reed straw and combined addition of reed straw and zeolite on NH{sub 3} and GHG emissions during pre-composting of duck manure, either with or without a follow-up phase of vermicomposting. Results showed that cumulative N{sub 2}O, CH{sub 4}, and CO{sub 2} emissions during pre-composting and vermicomposting ranged from 92.8, 5.8, and 260.6 mg kg{sup −1} DM to 274.2, 30.4, and 314.0 mg kg{sup −1} DM, respectively. Earthworms and amendments significantly decreased N{sub 2}O and CH{sub 4} emissions. Emission of CO{sub 2} was not affected by earthworms, but increased in responses to addition of reed straw. Cumulative NH{sub 3} emission ranged from 3.0 to 8.1 g kg{sup −1} DM, and was significantly decreased by reed straw and zeolite addition. In conclusion, combined pre-composting and vermicomposting with reed straw and zeolite addition would be strongly recommended in mitigating emissions of N{sub 2}O, CH{sub 4}, and NH{sub 3} from duck manure. Moreover, this method also provides nutrient-rich products that can be used as a fertilizer.

54 ENVIRONMENTAL SCIENCES↗

Phytoremediation of sewage sludge contaminated by trace elements and organic compounds

Highlights: • Sewage sludge reclamation by poplar, willow, eucalyptus and sunflower was evaluated. • A species-specific response in trace element (TE) extraction was observed. • Sunflower was the best candidate for As, Cu, and Zn phytoextraction. • Eucalyptus seems a promising candidate for Pb and Cr phytoextraction. • All species were able to decrease organic pollutant concentration. Phytoremediation is a green technique being increasingly used worldwide for various purposes including the treatment of municipal sewage sludge (MSS). Most plants proposed for this technique have high nutrient demands, and fertilization is often required to maintain soil fertility and nutrient balance while remediating the substrate. In this context, MSS could be a valuable source of nutrients (especially N and P) and water for plant growth. The aim of this study was to determine the capacity willow (Salix matsudana, cv Levante), poplar (Populus deltoides × Populus nigra, cv Orion), eucalyptus (Eucalyptus camaldulensis) and sunflower (Helianthus annuus) to clean MSS, which is slightly contaminated by trace elements (TEs) and organic pollutants, and to assess their physiological response to this medium. In particular, we aimed to evaluate the TE accumulation by different species as well as the decrease of TEs and organic pollutants in the sludge after one cropping cycle and the effect of MSS on plant growth and physiology. Since MSS did not show any detrimental effect on the biomass yield of any of the species tested, it was found to be a suitable growing medium for these species. TE phytoextraction rates depended on the species, with eucalyptus showing the highest accumulation for Cr, whereas sunflower exhibited the best performance for As, Cu and Zn. At the end of the trial, some TEs (i.e. Cr, Pb and Zn), n-alkanes and PCBs showed a significant concentration decrease in the sludge for all tested species. The highest Cr decrease was observed in pots with eucalyptus (57.4%) and sunflower (53.4%), whereas sunflower showed the highest Cu decrease (44.2%), followed by eucalyptus (41.2%), poplar (16.2%) and willow (14%). A significant decrease (41.1%) of Pb in the eucalyptus was observed. Zn showed a high decrease rate with sunflower (59.5%) and poplar (52%) and to a lesser degree with willow (35.3%) and eucalyptus (25.4%). The highest decrease in n-alkanes concentration in the sludge was found in willow (98.3%) and sunflower (97.3%), whereas eucalyptus has the lowest PCBs concentration (91.8%) in the sludge compared to the beginning of the trial. These results suggest new strategies (e.g. crop rotation and intercropping) to be adopted for a better management of this phytotechnology.

54 ENVIRONMENTAL SCIENCES↗

Erosion Challenges at the L-Bar Disposal Site - 19561

The L-Bar, New Mexico, Disposal Site is located in the northeast corner of Cibola County, 10 miles north of Laguna, and was the former site of a uranium mill and underground mine. The mill operated from 1977 to 1981 where a total of 1.9 x 10{sup 6} tonnes (2.1 million tons) of ore was processed. Solid and liquid byproduct, or tailings, from the milling process were impounded behind a dam constructed of native weathered Mancos Shale, which is a predominant geologic formation in the area. The tailings were encapsulated in place, and the resulting 40.5-hectare (100-acre) engineered disposal cell was completed in 2000. The 299-hectare (738-acre) Uranium Mill Tailings Radiation Control Act Title II site was transferred to the US Department of Energy (DOE) Office of Legacy Management under a US Nuclear Regulatory Commission general license in 2004. During reclamation activities, channels were designed and constructed into the surrounding weathered shale to protect the disposal cell from high-precipitation events. Due to the highly erodible soils and anticipated sediment deposition into the diversion channels, a sediment trap was also excavated. By excavating the channels and sediment trap, the local base elevation was altered, which exacerbated erosional forces. Recontouring surrounding drainage basins during the reclamation activities also promoted erosion by reducing natural rock armoring and vegetation that aids in soil stability. To compound the erosion issue, the L-Bar site is susceptible to short-duration, high-intensity, localized convective storms. Because the local geomorphology includes soils consisting of weathered shale, these precipitation events are not conducive to absorption into the soils, but rather to sheet flows that follow topography and concentrate in lower elevation areas where flow volumes and velocities increase. These factors result in the formation of deeply incised gullies and promote soil piping, which is an important geomorphic process in the widening of arroyos and the advancement of head-cutting, evident at the L-Bar site and surrounding areas. At the first annual inspection by DOE in 2005, it was noted that extensive erosion was occurring upgradient of the sediment trap. DOE determined that the design of the site's drainage system was the cause of extensive erosion. It is believed that by lowering the base elevation of the local drainage system through excavation of the sediment trap, the geomorphic response common to fluvial systems in a semiarid environment has increased the incision and remobilization of sediment downstream. Over time, these sediments would be deposited in the channels, which are designed to divert runoff away from the disposal cell, effectively limiting their capacities. The development of alluvial fans on one side of the channel directs flows to the opposite side of the channel, presenting the risk of cutting into the side slopes of the disposal cell. In addition, the upstream migrating gullies could intersect access roads and create hazards for adjacent stakeholders, including their grazing livestock. Current estimates conclude that potential offsite impacts could occur within the next 20 years, with gully migrations of up to 19 meters (63 feet) per year. In 2009, several erosion-control structures were constructed to reduce runoff velocities and ease the elevation differential created by the construction of the sediment trap and diversion channels. The first measurable storm events after construction occurred in August and September 2011, where one structure washed out and another structure was bypassed when runoff breached an earthen berm. DOE has conducted site assessments, continues to monitor erosion, and has applied lessons learned in the process of evaluating options to repair or modify the structures to stabilize the site and prevent potential short-term damage to adjacent properties as well as long-term damage to the disposal cell. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Salinity and sodicity of weathered minesoils in Northwestern New Mexico and Northeastern Arizona

Evolving relationships between electrical conductivity (EC) and sodium adsorption ratio (SAR) in reconstructed soils at surface mines have been insufficiently documented in the literature. Some minesoils (i.e., rootzone material) are classified as saline, sodic, or saline-sodic and are considered unsuitable for revegetation. Weatherable minerals such as calcite and gypsum are common in alkaline minesoils and on dissolution tend to mitigate elevated SAR levels by maintaining or increasing electrolytes in the soil and providing sources of exchangeable calcium and magnesium. Topsoils (i.e., coversoils) contribute to mitigation of sodic conditions when soluble cations are translocated from coversoils into the underlying minesoils. This study evaluated the weathering characteristics of minesoils sites from three surface coal mines in northwestern New Mexico and northeastern Arizona. Minesoils were grouped into 11 classes based on EC and SAR. After 6 to 14 yr, differences between upper and lower halves of the coversoils suggest general increases occurred with EC, SAR, chloride (Cl{sup -}), and sulfate (SO{sub 4}{sup 2-}) with depth. Within the reclaimed minesoils, there were several significant (P < 0.05 or < 0.10) relationships among EC and SAR that related to Minesoil Class. Lower SAR levels with corresponding increases in EC compared to baseline minesoils were more apparent in upper minesoil depths (0-5 and 5-15 cm). Minesoil anion concentrations suggested coversoil leachates and gypsum dissolution influenced EC and SAR chemistry. Over time, chemical changes have increased the apparent stability of the saline and sodic reclaimed minesoils studied thereby reducing risks associated with potential aggregate slaking and clay particle dispersion.

01 COAL, LIGNITE, AND PEAT↗

Aggregate-associated carbon and nitrogen in reclaimed sandy loam soils

Minimal research has been conducted on aggregate, C, and N in coarse-textured soils used to reclaim surface coal mine lands. Furthermore, little is known about the contribution different plant communities make to the recovery of aggregation in these soils. Two chronosequences of semiarid reclaimed sites with sandy loam soils were sampled under shrub- and grass-dominated communities. Aggregation, aggregate fractions, and associated C and N were measured. No definitive trends of increasing macroaggregates between sites were observed undershrubs; however, macro- and microaggregation was greater in the 16-yr-old (0.20 and 0.23 kg aggregate kg{sup -1} soil, respectively) than in the 5-yr-old soils (0.02 and 0.08 kg aggregate kg{sup -1} soil, respectively) under grasses. Although C and N concentrations were drastically reduced (50-75%) with mining activity between the <1-yr-old and native soils, aggregate C and N concentrations tinder shrubs and grasses were similar to each other and to the native soils in the 5-yr-old site. Sods under grass in the 16-yr-old site had lower available and aggregate-occluded C and N concentrations than the 5-yr-old site, while C and N concentrations did not change between 5- and 16-yr-old soils under shrubs. Conversely, aggregate C and N pool sizes under shrubs and grasses both increased with site age to conditions similar to those observed in the native soil. Reclaimed shrub site soils had consistently higher C concentrations in the older reclaimed sites (10 and 16 yr old) than the soils under grasses, indicating greater accumulation and retention of C and N in organic material under shrub than grass communities in semiarid reclaimed sites.

01 COAL, LIGNITE, AND PEAT↗

Dose Assessment of Los Alamos National Laboratory-Derived Residual Radionuclides in Soils within C Tracts (C-2, C-3, and C-4) for Land Transfer Decisions

Three separate Sampling and Analysis Plans (SAPs) were prepared for tracts C-2, C-3, and C-4. The objective of sampling was to confirm, within the stated statistical confidence limits, that the mean levels of potential radioactive residual contamination in soils in the C Tracts are documented, in appropriate units, and are below the 15 mrem/y (150 μSv/y) Screening Action Levels (SALs). Results show that radionuclide concentration upper-bound 95% confidence levels were close to background levels, with the exception of Pu-239 and Cs-137 being slightly elevated above background, and all measurements were below the ALs and meet the real property release criteria for future construction or recreational use. A follow-up ALARA analysis showed that the costs of cleanup of the soil in areas of elevated concentration and confirmatory sampling would far exceed any benefit from dose reduction.

54 ENVIRONMENTAL SCIENCES↗

Sampling and Analysis Plan for Assessment of LANL-Derived Residual Radionuclides in Soils within Tract A-16-e for Land Conveyance

Public Law 105-119 directs the U.S. Department of Energy (DOE) to convey or transfer parcels of land to the Incorporated County of Los Alamos or their designees and to the Department of Interior, Bureau of Indian Affairs, in trust for the Pueblo de San Ildefonso. Los Alamos National Security is tasked to support DOE in conveyance and/or transfer of identified land parcels no later than September 2022. Under DOE Order 458.1, Radiation Protection of the Public and the Environment (O458.1, 2013), and Los Alamos National Laboratory (LANL) implementing Policy 412 (P412, 2014a), real property with the potential to contain residual radioactive material must meet the criteria for clearance and release to the public. This Sampling and Analysis Plan (SAP) investigates Tract A-16-e and proposes 50 project-specific soil samples for use in radiological clearance decisions consistent with LANL Procedure ENV-ES-TP-238 (2015a) and guidance in the Multi-Agency Radiation Survey and Site Investigation Manual (MARSSIM, 2000).

54 ENVIRONMENTAL SCIENCES↗

Evaluating Cumulative Ecosystem Response to Restoration Projects in the Columbia River Estuary, Annual Report 2007

The goal of this multi-year study (2004-2010) is to develop a methodology to evaluate the cumulative effects of multiple habitat restoration projects intended to benefit ecosystems supporting juvenile salmonids in the lower Columbia River and estuary. Literature review in 2004 revealed no existing methods for such an evaluation and suggested that cumulative effects could be additive or synergistic. Field research in 2005, 2006, and 2007 involved intensive, comparative studies paired by habitat type (tidal swamp vs. marsh), trajectory (restoration vs. reference site), and restoration action (tide gate vs. culvert vs. dike breach). The field work established two kinds of monitoring indicators for eventual cumulative effects analysis: core and higher-order indicators. Management implications of limitations and applications of site-specific effectiveness monitoring and cumulative effects analysis were identified.

54 ENVIRONMENTAL SCIENCES↗

Fifth Annual Report: 2008 Pre-Construction Eelgrass Monitoring and Propagation for King County Outfall Mitigation

This is the fifth and final report in a series documenting progress of the pre-construction eelgrass restoration and mitigation activities for the proposed King County Brightwater marine outfall, discharging to Puget Sound near Point Wells, Washington. King County began implementing a multiyear eelgrass monitoring and restoration program in 2004, with the primary goal of returning intertidal and shallow subtidal habitat and eelgrass to pre-construction conditions, after construction of the outfall. Major eelgrass mitigation program elements include: a) pre-construction monitoring, i.e., documenting initial eelgrass conditions and degree of fluctuation over a 5 year period prior to construction, b) eelgrass transplanting, including harvesting, offsite propagation and stockpiling of local plants for post-construction planting, and c) post-construction planting and subsequent monitoring, occurring in 2009 and beyond. The overall program is detailed in the Eelgrass Restoration and Biological Resources Implementation Workplan (King County 2008).

54 ENVIRONMENTAL SCIENCES↗

DOI Use of AVIRIS Data in Natural Resources Management: A Technology Transfer Project Status Report

A meeting was held in December 1996, attended by representatives from Department of the Interior (DOI) and National Aeronautical and Space Administration (NASA) at the request of Department of the Interior Secretary, Bruce Babbitt and NASA, Administrator Director Dan Goldin, to discuss the use of hyperspectral systems and related remote sensing technologies in addressing environmental issues of environmental importance to the (DOI). It was determined that NASA/DOI Coordination be established, comprised of representatives from each agency, designated to address the environmental issues and resulting technologies. A steering committee was formed consisting of representatives from NASA Headquarters, NASA PI's from University California-Davis, University of Colorado-Boulder, University of New Hampshire and DOI Bureaus (Indian Affairs, Land Management, Reclamation, National Park Service, and US Geological Survey).

Getter, James R.↗

Energy and environment legislative digest 2008

This Digest (published every year) is a compilation of energy and environmental legislation enacted by the Southern States Energy Board's 18 member states and territories during the 2008 legislative session.

01 COAL, LIGNITE, AND PEAT↗

Challenges of mine remediation programmes in developing countries - a life cycle perspective - 15371

This paper analyses some challenges of environmental rehabilitation (ER) projects in developing countries that the authors have encountered over the past two decades in many parts of the world, discusses the reasons and proposes ways to mitigate them. In the life cycle of an ER project, some stages that are particularly decisive for the lasting rehabilitation success are considered here: (1) site characterisation/baseline studies, (2) justification and development of remediation objectives, site end states and a remediation strategy, and (3) the after-care phase. This paper argues that the time available in many ER projects in developing countries using international funding is very often insufficient, and discusses the reasons for some of the most important bottlenecks: (1) time realistically required to produce thorough baseline data and obtain historic site information that are indispensable to develop a robust remediation design, (2) lack of an adequate legal and regulatory framework, overlapping and/or conflicting provisions of national standards and discrepancies with international best practice, (3) unmanaged stakeholder expectations regarding the actual health and environmental risks, justification and prioritisation of remedial actions, and the achievable remediation end state. Insufficient resources for after-care, monitoring and, if required, corrective action is another major issue that, in the experience of the authors, jeopardises the sustainability of remediation success. Consequently by applying the lessons learnt from previous ER projects in developing (and developed) countries and taking them on board during the programming phase of new ER projects, international funding agencies could greatly help to avoid these obstacles. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Surface mining and reclamation effects on flood response of watersheds in the central Appalachian Plateau region - article no. W04407

Surface mining of coal and subsequent reclamation represent the dominant land use change in the central Appalachian Plateau (CAP) region of the United States. Hydrologic impacts of surface mining have been studied at the plot scale, but effects at broader scales have not been explored adequately. Broad-scale classification of reclaimed sites is difficult because standing vegetation makes them nearly indistinguishable from alternate land uses. We used a land cover data set that accurately maps surface mines for a 187-km{sup 2} watershed within the CAP. These land cover data, as well as plot-level data from within the watershed, are used with HSPF (Hydrologic Simulation Program-Fortran) to estimate changes in flood response as a function of increased mining. Results show that the rate at which flood magnitude increases due to increased mining is linear, with greater rates observed for less frequent return intervals. These findings indicate that mine reclamation leaves the landscape in a condition more similar to urban areas rather than does simple deforestation, and call into question the effectiveness of reclamation in terms of returning mined areas to the hydrological state that existed before mining.

01 COAL, LIGNITE, AND PEAT↗