Search NASA⌕ Search

SEARCH · Search NASA

Results for “LIABILITIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Construction and application of a questionnaire for the social scientific investigation of environmental noise effects

A social psychological questionnair has been developed to study the effects of environmental noise and was applied to 636 people living in 19 different areas of Hamburg. The theoretical foundations and the statistical means employed in its development are described. Four main reactions to noise are isolated statistically, and it is determined that these are moderated by several intervening variables, chief of which are coping capacity for noise, the perceived dangerousness of the noise souce, other daily loads and the individual's liability.

Guski, R.↗

NASA and the practice of space law

The paper discusses the need for increased awareness in space law due to advances in space technology and a trend toward commercialization of space. A list of national and international treaties, conventions, agreements, laws, and regulations relevant to space activities is presented. NASA lawyers specialize in international and municipal laws that affect the NASA space mission; an example of the lawyers working with insurance companies in negotiating the first Space Shuttle liability policy is provided. The increased participation of the public sector in space activities, for example, the commercialization of the Space Shuttle transportation system, is examined.

Hosenball, S. N.↗

Evaluation of the usefulness of various simulation technology options for TERPS enhancement

Current approved terminal instrument procedures (TERPS) do not permit the full exploitation of the helicopter's unique flying characteristics. Enhanced TERPS need to be developed for a host of non-standard landing sites and navigation aids. Precision navigation systems such as microwave landing systems (MLS) and the Global Positioning System (GPS) open the possibility of curved paths, steep glide slopes, and decelerating helicopter approaches. This study evaluated the feasibility, benefits, and liabilities of using helicopter cockpit simulators in place of flight testing to develop enhanced TERPS criteria for non-standard flight profiles and navigation equipment. Near-term (2 to 5 year) requirements for conducting simulator studies to verify that they produce suitable data comparable to that obtained from previous flight tests are discussed. The long-term (5 to 10 year) research and development requirements to provide necessary modeling for continued simulator-based testing to develop enhanced TERPS criteria are also outlined.

Phatak, A. V.↗

A study of factors related to commercial space platform services

In the past four years, the issue of the commercial development of space has come to the forefront of the U. S. national space policy. Though the Administration, Congress and NASA have all shown strong support for encouraging the private sector to become more actively involved in the commercial utilization of space, the question remains whether they must do more to foster the creation and development of a viable U. S. commercial space industry. Marketing aspects, insurance and risk loss, tax related factors, space transportation, termination liability, institutional barriers, and procurement laws and regulations are discussed.

Hosenball, S. N.↗

The Space Station - Past, present and future with some thoughts on some legal questions that need to be addressed

The history of the concept of a space station is briefly considered, taking into account a story written by Hale (1869), quantitative work provided by Oberth and Tsiolkovsky, von Braun, and the U.S. decision regarding the establishment of a space station. Arguments in favor of constructing a space station are related to the utility of a laboratory in earth orbit, the importance of a repair and maintenance base for satellites, the provision of capabilities for the commercial utilization of space, and the employment of a space station as a staging base for missions to the moon, Mars, and, possibly, the asteroids. Plans for the implementation of the Space Station concept are discussed, taking into account also legal issues involved in such an implementation. Attention is given to questions regarding the applicability of the Liability convention, U.S. domestic law, the domestic law of other countries, and four treaties.

Hosenball, S. N.↗

Proposed upgrade of the Deep Space Network research and development station

Continued exploration of the solar system will require continued evolution of capabilities to support deep space communication and navigation. That evolution will rely, as it has in the past, on the development, demonstration, and field testing of communication and navigation technologies. The existing Deep Space Network (DSN) research and development station, DSS 13, at the Venus site, Goldstone, California was instrumental in those prior developments. However, the present antenna is no longer able to provide the necessary support for technology. The 26 meter antenna has good performance at S-band, fair performance at X-band, but is unusable at the anticipated Ka-band. It is not suitable for conversion to beam waveguides, and is not usable as a test bed for demonstrating high efficiency because of structural pliancy. Additionally, its size and age are increasingly a liability in demonstrations. A 34 meter beam waveguide version of the existing DSN high efficiency (HEF) antennas was proposed for FY-88 Construction of Facilities budget. The antenna is to be built at the Venus site, adjacent to the old antenna, and serve as the DSN research and development antenna through the end of the century.

Smith, Joel G.↗

Simulating Instrument Helicopter Takeoffs And Landings

Advantages and disadvantages of computer-based simulations reviewed. Report reviews current methods for evaluation of TERP's. Discusses feasibility, benefits, liabilities of substitution of electronically controlled flight-simulation equipment for flight tests.

Phatak, Anil V.↗

Insurance and indemnification implications of future space projects

NASA options regarding insurance and indemnification policies as they relate to NASA customers and contractors are described. The foundation for the discussion is the way in which NASA is planning to return the Space Shuttle fleet to safe flight as well as current U.S. policy concerning future uses of the Shuttle fleet. Issues discussed include: the nature of the Shuttle manifest; the policy regarding property damage or destruction; insurance against liability to third parties; the reduction of the scope of the risk to be insured; NASA as the insurer; a sharing arrangement between the user and NASA; and contractors and subcontractors involved in Shuttle operations.

O'Brien, John E.↗

A piloted simulation study of data link ATC message exchange

Data link Air Traffic Control (ATC) and Air Traffic Service (ATS) message and data exchange offers the potential benefits of increased flight safety and efficiency by reducing communication errors and allowing more information to be transferred between aircraft and ground facilities. Digital communication also presents an opportunity to relieve the overloading of ATC radio frequencies which hampers message exchange during peak traffic hours in many busy terminal areas. A piloted simulation study to develop pilot factor guidelines and assess potential flight crew benefits and liabilities from using data link ATC message exchange was completed. The data link ATC message exchange concept, implemented on an existing navigation computer Control Display Unit (CDU) required maintaining a voice radio telephone link with an appropriate ATC facility. Flight crew comments, scanning behavior, and measurements of time spent in ATC communication activities for data link ATC message exchange were compared to similar measures for simulated conventional voice radio operations. The results show crew preference for the quieter flight deck environment and a perception of lower communication workload.

Waller, Marvin C.↗

Design for validation: An approach to systems validation

Every complex system built is validated in some manner. Computer validation begins with review of the system design. As systems became too complicated for one person to review, validation began to rely on the application of adhoc methods by many individuals. As the cost of the changes mounted and the expense of failure increased, more organized procedures became essential. Attempts at devising and carrying out those procedures showed that validation is indeed a difficult technical problem. The successful transformation of the validation process into a systematic series of formally sound, integrated steps is necessary if the liability inherent in the future digita-system-based avionic and space systems is to be minimized. A suggested framework and timetable for the transformtion are presented. Basic working definitions of two pivotal ideas (validation and system life-cyle) are provided and show how the two concepts interact. Many examples are given of past and present validation activities by NASA and others. A conceptual framework is presented for the validation process. Finally, important areas are listed for ongoing development of the validation process at NASA Langley Research Center.

Carter, William C.↗

Commercial ELV services and the National Aeronautics and Space Administration - Concord or discord?

In implementation of the U.S. policy to foster and encourage the commercial expendable launch vehicle (ELV) industry, tensions have developed between the industry and U.S. Government agencies in two distinct areas: industry use of government facilities and government purchase of commercial ELV services. The reasons for the tensions and discrete legal problems for each area are identified and discussed. Specifically, in the use of government facilities area, issues of insurance and indemnification for third-party liability and government property, concerns over priority and scheduling, and dispute-resolution procedures are discussed. In the area of government purchase of ELV launch services, a comparison is made between a launch service purchase and prior procurement practice. In all areas, the conclusion is reached that while problems still exist, they generally are understood and great progress has been made toward their resolution.

Frankle, Edward A.↗

Report of the NASA lunar energy enterprise case study task force

The Lunar Energy Enterprise Cast Study Task Force was formed to determine the economic viability and commercial business potential of mining and extracting He-3 from the lunar soil for use in earth-based fusion reactors. In addition, the Solar Power Satellite (SPS) and the Lunar Power Station (LPS) were also evaluated because they involve the use of lunar materials and could provide energy for lunar-based activities. The Task Force considered: (1) the legal and liability aspects of the space energy projects; (2) the long-range terrestrial energy needs and options; (3) the technical maturity of the three space energy projects; and (4) their commercial potential. The use of electricity is expected to increase, but emerging environmental concerns and resource availability suggest changes for the national energy policy. All three options have the potential to provide a nearly inexhaustible, clean source of electricity for the U.S. and worldwide, without major adverse impacts on the Earth's environment. Assumption by industry of the total responsibility for these energy projects is not yet possible. Pursuit of these energy concepts requires the combined efforts of government and industry. The report identifies key steps necessary for the development of these concepts and an evolving industrial role.

Source record↗

Photovoltaic superiority for Space Station Freedom power in the 21st century

Complete power systems capable of delivering 75 kW of continuous power in low earth orbit have been compared. Performance, liabilities, and advantages are discussed for a shielded nuclear system, a solar dynamic system, and photovoltaic systems, both current Freedom Si design and near-term GaAs/Ge with NaS storage. System components include power generation, storage (if required), heat rejection, power conversion and distribution, structural support, and shielding (if required). Performance parameters indicate the substantial advantage of the GaAs/Ge photovoltaic system, which does not require altering the support structure of the current Freedom design.

Bailey, Sheila G.↗

Real-time earthquake monitoring: Early warning and rapid response

A panel was established to investigate the subject of real-time earthquake monitoring (RTEM) and suggest recommendations on the feasibility of using a real-time earthquake warning system to mitigate earthquake damage in regions of the United States. The findings of the investigation and the related recommendations are described in this report. A brief review of existing real-time seismic systems is presented with particular emphasis given to the current California seismic networks. Specific applications of a real-time monitoring system are discussed along with issues related to system deployment and technical feasibility. In addition, several non-technical considerations are addressed including cost-benefit analysis, public perceptions, safety, and liability.

Source record↗

An analysis of Space Shuttle countdown activities: Preliminaries to a computational model of the NASA Test Director

Before all systems are go just prior to the launch of a space shuttle, thousands of operations and tests have been performed to ensure that all shuttle and support subsystems are operational and ready for launch. These steps, which range from activating the orbiter's flight computers to removing the launch pad from the itinerary of the NASA tour buses, are carried out by launch team members at various locations and with highly specialized fields of expertise. The liability for coordinating these diverse activities rests with the NASA Test Director (NTD) at NASA-Kennedy. The behavior is being studied of the NTD with the goal of building a detailed computational model of that behavior; the results of that analysis to date are given. The NTD's performance is described in detail, as a team member who must coordinate a complex task through efficient audio communication, as well as an individual taking notes and consulting manuals. A model of the routine cognitive skill used by the NTD to follow the launch countdown procedure manual was implemented using the Soar cognitive architecture. Several examples are given of how such a model could aid in evaluating proposed computer support systems.

John, Bonnie E.↗

Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

Source record↗

Contribution to the theory of propeller vibrations

This report presents a calculation of the torsional frequencies of revolving bars with allowance for the air forces. Calculation of the flexural or bonding frequencies of revolving straight or tapered bars in terms of the angular velocity of revolution. Calculation on the basis of Rayleigh's principle of variation. There is also a discussion of error estimation and the accuracy of results. The author then provides an application of the theory to screw propellers for airplanes and the discusses the liability of propellers to damage through vibrations due to lack of uniform loading.

Liebers, F↗

Regenerating using aqueous cleaners with ozone and electrolysis

A new process converts organic oil and grease contaminates in used water based cleaners into synthetic surfactants. This permits the continued use of a cleaning solution long after it would have been dumped using previously known methods. Since the organic soils are converted from contaminates to cleaning compounds the need for frequent bath dumps is totally eliminated. When cleaning solutions used in aqueous cleaning systems are exhausted and ready for disposal, they will always contain the contaminates removed from the cleaned parts and drag-in from prior cleaning steps. Even when the cleaner is biodegradable these contaminants will frequently cause the waste cleaning solution to be a hazardous waste. Chlorinated solvents are rapidly being replaced by aqueous cleaners to avoid the new ozone-depletion product-labeling-law. Many industry standard halocarbon based solvents are being completely phased out of production, and their prices have nearly tripled. Waste disposal costs and cradle-to-grave liability are also major concerns for industry today. This new process reduces the amount of water and chemicals needed to maintain the cleaning process. The cost of waste disposal is eliminated because the water and cleaning compounds are reused. Energy savings result by eliminating the need for energy currently used to produce and deliver fresh water and chemicals as well as the energy used to treat and destroy the waste from the existing cleaning processes. This process also allows the cleaning bath to be maintained at the peak performance of a new bath resulting in decreased cycle times and decreased energy consumption needed to clean the parts. This results in a more efficient and cost effective cleaning process.

Mcginness, Michael P.↗