Search NASA⌕ Search

SEARCH · Search NASA

Results for “Large load”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Real-time sensor measurements to evaluate impacts of load cycling on high-temperature fire-side corrosion in a PC boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at Coalfired Power Plants

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Full-scale Demonstration of Multi-process Sensor at a Cycling PC-fired Boiler

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Combustion Performance and Emissions Optimization Through Integration of a Miniaturized High-Temperature Multi Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

42 ENGINEERING↗

Development of Miniaturized High-Temperature Multi-Process Monitoring System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings.

20 FOSSIL-FUELED POWER PLANTS↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution of wall conditions in utility boilers. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of a coal-fired utility boiler in this project but can be applied to many other industries and applications as well. The new sensor design, leveraging the existing electrochemical noise-based monitoring system, is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data can be transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, five mMPMS were installed at a full-scale pulverized coal-fired plant, Basin Electric Power Cooperative’s Leland Olds Unit 1. The systems were demonstrated over a 6-week period during typical operation. Sensor measurements of deposit thickness were validated during the demonstration and subsequently leveraged to determine sensor-based boiler cleaning strategies. These strategies have the benefit of reduced thermal stresses on boiler tubes from over-cleaning and improved boiler water management. At the end of the project, continued development of the sensor technology was carried out at PacifiCorp’s Hunter Station. REI leveraged the permanent installation of the mMPMS in Unit 3 made possible by DOE funding on a separate program. The work at Hunter Plant focused on application of machine learning and artificial intelligence-based models for integration of sensor signals into control and optimization of Hunter Unit 3 processes.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

High-Temperature Multi-Process Sensor Development and Demonstration at a Full-scale PC Combustion System

The main objective of this research program is to design, manufacture, and demonstrate a miniaturized, multi-process, monitoring system (mMPMS) for boiler condition management and easy system deployment to obtain a higher spatial resolution. This system will facilitate a Condition-Based Maintenance (CBM) philosophy that actively monitors the health of assets to predict and prevent failures and maximize availability and generating capacity at a reduced cost. CBM systems can provide boiler data that the advanced process control (APC) system can utilize for plant performance optimization, which is increasingly relevant as coal power plants shift from predominantly base-load operation to predominantly transient operation involving large load swings. The mMPMS is based on an electrochemical sensor that provides a real-time indication of the risk of damage to key locations in the radiant or convective section of a coal-fired boiler such as metal loss rates, heat flux, metal surface temperature, and deposit thickness. These indications can be utilized to optimize boiler performance as well as improve boiler availability in conjunction with corresponding operating conditions. This monitoring system was developed and tested in the high-temperature regions of coal-fired utility boilers in this project but can be applied to many other industries and applications as well. This project leveraged the existing electrochemical noise-based monitoring system and the new sensor design is small enough to be installed through the webbing of the waterwalls without the need for long shut-downs to bend tubes and to make it feasible to obtain high spatial resolution in the boiler. Data is transferred to the plant distributed control system (DCS) and any other control system. The sensor body that houses the sensor assembly was designed to ensure good conductive contact with boiler tubes to ensure the sensor is held at an identical temperature to the tube surface temperature. The data acquisition and signal conditioning modules were redesigned into a small footprint with optimized cooling of the module. System software was developed specifically for the new signal conditioning module and is compatible with plant PLCs. After the preliminary testing at a pilot-scale facility, the three mMPMS were installed at a full-scale pulverized coal-fired plant, PacifiCorp’s Hunter 3. The systems were demonstrated over 20,000 hours at the plant during regular operation. Also, the sensor data was fed to the plant’s advanced process control system to evaluate the corrosion control by the operation changes and utilized to understand the impacts of load cycling with different ramping up and down speeds. At the end of the project, the systems were converted to the permanent installation at the power plant to be used with the advanced process control system installed at the plant.

Advanced Sensors, Corrosion, Ash Deposition, Optim↗

Fifth-degree elastic energy for predictive continuum stress–strain relations and elastic instabilities under large strain and complex loading in silicon

Materials under complex loading develop large strains and often phase transformation via an elastic instability, as observed in both simple and complex systems. Here, we represent a material (exemplified for Si I) under large Lagrangian strains within a continuum description by a 5th-order elastic energy found by minimizing error relative to density functional theory (DFT) results. The Cauchy stress—Lagrangian strain curves for arbitrary complex loadings are in excellent correspondence with DFT results, including the elastic instability driving the Si I → II phase transformation (PT) and the shear instabilities. PT conditions for Si I → II under action of cubic axial stresses are linear in Cauchy stresses in agreement with DFT predictions. Such continuum elastic energy permits study of elastic instabilities and orientational dependence leading to different PTs, slip, twinning, or fracture, providing a fundamental basis for continuum physics simulations of crystal behavior under extreme loading.

36 MATERIALS SCIENCE↗

Fifth-degree elastic energy for predictive continuum stress-strain relations and elastic instabilities under large strain and complex loading in silicon

Materials under complex loading develop large strains and often phase transformation via an elastic instability, as observed in both simple and complex systems. Here, we represent a material (exemplified for Si I) under large Lagrangian strains within a continuum description by a 5th-order elastic energy found by minimizing error relative to density functional theory (DFT) results. The Cauchy stress—Lagrangian strain curves for arbitrary complex loadings are in excellent correspondence with DFT results, including the elastic instability driving the Si I → II phase transformation (PT) and the shear instabilities. PT conditions for Si I → II under action of cubic axial stresses are linear in Cauchy stresses in agreement with DFT predictions. Such continuum elastic energy permits study of elastic instabilities and orientational dependence leading to different PTs, slip, twinning, or fracture, providing a fundamental basis for continuum physics simulations of crystal behavior under extreme loading.

Levitas, Valery↗

Data Centers and Digital Assurance Workshop 3 – Mitigations for Digital Assurance Risks

The third session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort, held on November 18, 2025, focused on developing mitigation strategies for digital assurance risks identified in previous workshops. Hosted by Idaho National Laboratory (INL) and ScottMadden, the session emphasized the application of Cyber-Informed Engineering (CIE) to data center infrastructure, particularly at the utility–data center interface. Participants revisited and ranked key digital assurance risks, including architecture and interface weaknesses, governance gaps, and AI-enabled threats. The workshop introduced the 12 principles of CIE, advocating for consequence-focused design, engineered controls, and secure information architecture to proactively reduce cyber-physical vulnerabilities. These principles were applied to critical data center systems such as power distribution, UPS, cooling, SCADA/BMS, and grid-forming batteries. The session also addressed governance challenges at the interconnection boundary, highlighting the need for clear roles in telemetry sharing, firmware management, and trip settings. Special attention was given to emerging risks from behind-the-meter (BTM) generation, including reverse-power flow and the integration of small modular reactors (SMRs), which shift data centers from large loads to complex generation nodes. Participants explored how interconnection agreements can serve as enforceable instruments for digital assurance, and reviewed gaps in current standards such as NERC CIP, IEC 62443, and IEEE 1547. The workshop concluded with pathways to standardization, including model agreement language, state-level programs, and expanded NERC guidance. INL also presented tools and frameworks for secure procurement and supplier risk management, reinforcing the need for integrated engineering and policy solutions to secure the evolving data center–grid ecosystem. Session 3 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Measurement Adequacy for Monitoring Data Center Oscillations

Artificial intelligence (AI) training data centers with periodic load profiles can induce sustained grid oscillations across a wide frequency range, making accurate monitoring essential for reliable power system operation. This report evaluates the adequacy of existing measurement systems for monitoring such oscillations, focusing on phasor measurement units (PMUs) and point-on-wave (POW) measurement systems. The analysis shows that while PMUs are highly effective for monitoring low-frequency electromechanical oscillations, they have inherent limitations in accurately representing higher-frequency oscillations due to constraints imposed by reporting rates and the bandwidth of phasor estimation filters. Even when configured with higher reporting rates, the filtering inherent in the phasor estimation process can significantly attenuate oscillation magnitudes, potentially leading to underestimation of oscillatory behavior. This has important implications for compliance and performance monitoring of large loads. To address the limitations associated with PMU-based monitoring, the report examines the use of high-resolution POW measurements, which can capture oscillations across a broader frequency range. However, continuous POW monitoring introduces practical challenges related to large data volumes, communication bandwidth, and real-time data processing. For this reason, the report also discusses emerging approaches that use POW measurements as a complementary capability alongside PMUs to improve observability of oscillations from large data center loads.

47 OTHER INSTRUMENTATION↗

Ground heat exchanger design tool with rowwise placement of boreholes

Simulation-based design tools have been used since the late 1980s for designing ground heat exchangers (GHE) used with ground source heat pump (GSHP) systems. The ground heat exchanger simulations used in these tools rely on thermal response functions known as g-functions. Because of the significant computational burden in computing g-functions for even a single configuration, the design tools have relied on libraries of pre-computed g-functions. These g-functions were available for standard configuration shapes, such as lines, rectangles, open rectangles, L-shapes, and U-shapes. Standard shapes are often sub-optimal. For any building on a site, the available land may preclude use of a standard shape. For large GSHP systems with significantly imbalanced annual heat rejection and extraction loads, large rectangular fields may experience significant heat build-up (or heat draw-down) in the interior of the field. This paper describes a new ground heat exchanger design tool capable of automatically selecting and sizing both standard and irregular configurations. The focus of this paper is a method for creating, selecting and sizing irregular configurations where the available land area and "no-go" zones are described as irregular polygons.

Spitler, Jeffery↗

MHD stability and disruptions in the SPARC tokamak

SPARC is being designed to operate with a normalized beta of $β_N$ = 1.0, a normalized density of $n_G$ = 0.37 and a safety factor of $q_{95}$ ≈ 3.4, providing a comfortable margin to their respective disruption limits. Further, a low beta poloidal $β_p$ = 0.19 at the safety factor $\textit{q}$ = 2 surface reduces the drive for neoclassical tearing modes, which together with a frozen-in classically stable current profile might allow access to a robustly tearing-free operating space. Although the inherent stability is expected to reduce the frequency of disruptions, the disruption loading is comparable to and in some cases higher than that of ITER. The machine is being designed to withstand the predicted unmitigated axisymmetric halo current forces up to 50 MN and similarly large loads from eddy currents forced to flow poloidally in the vacuum vessel. Runaway electron (RE) simulations using GO+CODE show high flattop-to-RE current conversions in the absence of seed losses, although NIMROD modelling predicts losses of ~80 %; self-consistent modelling is ongoing. A passive RE mitigation coil designed to drive stochastic RE losses is being considered and COMSOL modelling predicts peak normalized fields at the plasma of order 10 –2 that rises linearly with a change in the plasma current. Massive material injection is planned to reduce the disruption loading. A data-driven approach to predict an oncoming disruption and trigger mitigation is discussed.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Review of Wave Energy Converter Power Take-Off Systems, Testing Practices, and Evaluation Metrics: Preprint

While the field of wave energy has been the subject of numerical simulation, scale model testing, and precommercial project testing for decades, wave energy technologies remain in the early stages of development and must continuing proving themselves as a promising modern renewable energy field. One of the difficulties that wave energy systems have been struggling to overcome is the design of highly efficient energy conversion systems that can convert the mechanical power, derived from the oscillation of wave activated bodies, into another useful product. Often the power take-off (PTO) is defined as the single unit responsible for converting mechanical power into another usable form such as electricity, pressurized fluid, compressed air, and others. The PTO, and the entire power conversion chain (PCC), is of great importance as it affects not only how efficient wave power is converted into electricity, but also contributes to the mass, size, structural dynamics, and levelized cost of energy (LCOE) of the wave energy converter (WEC). Unlike wind and solar, there is no industrial standard device, or devices, for wave energy conversion and this diversity is transferred to the PTO system. The majority of current WEC PTO systems incorporate a mechanical or hydraulic drive train, power generator, and an electrical control system. The challenge of WEC PTO designs is designing a mechanical-to-electrical component that can efficiently convert irregular, bi-directional, low frequency and low alternating velocity wave motions. While gross average power levels can be predicted in advance, the variable wave elevation input has to be converted into smooth electrical output and hence usually necessitates some type of energy storage system, such as battery storage, accumulator super capacitors, etc., or other means of compensation such as an array of devices. One of the primary challenges for wave energy converter systems is the fluctuating nature of wave resources, which require WEC components to be designed to handle loads (i.e. torques, forces, and powers) that are many times greater than the average load. This approach requires a much greater PTO capacity than the average power output and indicates a higher cost. In addition, supporting mechanical coupling and or gearing can be added to the PCC to help alleviate the difficulties with transmission and control of fluctuating large loads with low frequencies (indicative of wave forcing) into smaller loads at higher frequencies (optimum for conventional electrical machine design) can quickly increase the complexity of the PCC which could result in a greater number of failure modes and increased maintenance costs. All of the previous points demonstrate how the PTO influences WEC dynamics, reliability, performance and cost which are critical design factors. This paper further explores these topics by providing a review of the state-of-the-art PTO systems currently under development, how these novel PTO systems are tested and derisked prior to precommercial deployment, and the evaluation metrics historically used to differentiate between PTO designs and how they can be improved to support control co-design focused development of wave energy systems.

laboratory testing↗

Data Centers and Digital Assurance Workshop 2 – Prioritizing Digital Assurance Challenges, Session 2

The second session of the TADA (Technical Assistance for Digital Assurance) Data Centers Cohort, held on November 10, 2025, focused on prioritizing digital assurance challenges at the intersection of data centers and the electric grid. Building on the foundational concepts introduced in Workshop 1, this session deepened the application of the Threat–Vulnerability–Consequence (TVC) framework and emphasized the urgency of addressing cybersecurity, supply chain integrity, and operational reliability. Participants explored the growing convergence of digital and physical systems, the expanding attack surface due to global supply chain dependencies, and the implications of AI-driven load behavior. Real-world incidents—including the Volt Typhoon campaign and vulnerabilities in Solarman and Deye platforms—were analyzed to illustrate the risks of unpatched systems, insecure APIs, and inadequate vendor oversight. Key themes included architecture and interface weaknesses, governance gaps, and human and procedural shortcomings. The workshop also examined the evolving regulatory landscape, highlighting new federal mandates around Foreign Entity of Concern (FEOC) compliance and large-load reliability standards. Through interactive exercises, stakeholders ranked and mapped digital assurance risks from their respective perspectives—utilities, operators, and vendors—laying the groundwork for mitigation strategies and shared accountability models to be developed in Workshop 3. Session 2 of 3.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Adoption of AI in the Utility T&D Sector: Use Cases, Consequence, Assessment and Benefits

Digital transformation and utilization of artificial intelligence (AI) in the electric grid are fundamentally changing the industry’s approach to common problems and enabling a broader paradigm shift in grid planning and operations. The change in approach is circularly both enabling and driving modernization, with load growth and reliable management of data center and AI infrastructure shifting away from planning approaches with relatively predictable behaviors and toward a mix of consumer and industrial choices that surpass human cognitive abilities to process. This movement has potential to condition humans to not understand the system on which the AI depends, while requiring it for development of the necessary infrastructure. Approaches which would address most likely grid conditions and events, such as faults, aging of equipment, and weather, now must also account for large loads which shift not based upon weather or time of day, but the computational load. Quantifying computational load is independent of the traditional grid forecasting variables, where a data center’s aggregate load is determined by user and AI system behavior and decoupled from normal grid planning and operations. AI is both the cause and solution for these challenges, with new grid planning tools integrating massive amounts of decisions into frameworks.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Investigation on Tuning Power–Frequency Droop for Improved Grid–Forming Inverter and Synchronous Generator Transient Load Sharing

Poor transient load sharing has been observed during the parallel operation of synchronous generators (SGs) and droop-controlled grid-forming (GFM) inverter-based resources (IBRs) in islanded microgrids. This can result in overcurrent protections, causing the inverters to trip, which leads to the collapse of voltage and frequency. In this article, small-signal analysis supported by electromagnetic transients (EMTs) simulation is performed on a detailed model of a microgrid containing IBRs and an SG to identify underdamped modes and their sensitivities to the power–frequency (P-F) droop parameter. Further EMT simulation of a more complex microgrid model with multiple GFM IBRs and SGs is performed to determine whether trends identified from the modal analysis extend to cases where the number of SGs in operation may vary. The objective is to investigate the effectiveness of tuning this parameter to reduce the likelihood of overcurrents in response to load and generation disturbances. The work uncovers both fast and slow modes of concern. Primarily, the findings show that increasing the P-F droop value improves the damping of the slower mode while degrading the damping of the faster mode, leading to an upper limit on the damping improvement of the GFM IBR output current. In EMT simulations of the more complex microgrid, the greatest damping improvement still exhibits significant maximum overshoot. Furthermore, the optimal value of the P-F droop parameter is sensitive to the number of SGs in operation. The conclusion is that tuning the P-F droop parameter is not an effective means to avoid the overcurrent tripping of GFM IBRs during response to large load or generation disturbances when operating in parallel to SGs in islanded microgrids.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Wire arc additive manufactured A36 steel performance for marine renewable energy systems

Additive manufacturing has established itself to be advantageous beyond small-scale prototyping, now supporting full-scale production of components for a variety of applications. Despite its integration across industries, marine renewable energy technology is one largely untapped application with potential to bolster clean energy production on the global scale. Wave energy converters (WEC) are one specific facet within this realm that could benefit from AM. As such, wire arc additive manufacturing (WAAM) has been identified as a practical method to produce larger scale marine energy components by leveraging cost-effective and readily available A36 steel feedstock material. The flexibility associated with WAAM can benefit production of WEC by producing more complex structural geometries that are challenging to produce traditionally. Additionally, for large components where fine details are less critical, the high deposition rate of WAAM in comparison to traditional wrought techniques could reduce build times by an order of magnitude. In this context of building and supporting WEC, which experience harsh marine environments, an understanding of performance under large loads and corrosive environments must be understood. Hence, WAAM and wrought A36 steel tensile samples were manufactured, and mechanical properties compared under both dry and corroded conditions. Here, the unique microstructure created via the WAAM process was found to directly correlate to the increased ultimate tensile and yield strength compared to the wrought condition. Static corrosion testing in a simulated saltwater environment in parallel with electrochemical testing highlighted an outperformance of corroded WAAM A36 steel than wrought, despite having a slighter higher corrosion rate. Ultimately, this study shows how marine energy systems may benefit from additive manufacturing components and provides a foundation for future applications of WAAM A36 steel.

36 MATERIALS SCIENCE↗