Search NASA⌕ Search

SEARCH · Search NASA

Results for “Large load interconnection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Eastern Interconnection Wide-Area Oscillation Assessment and Study Report

To meet the government mandates such as Renewable Portfolio Standards (RPS), conventional synchronous generators with rotating mass are being displaced by inverter-based resources (IBRs), leading to high penetration of renewable energy sources (RES). As a result, the inherent properties and characteristics of the transformed generation mix may significantly impact the grid behaviour, and it is of paramount significance that the impact and the consequences of the resource mix change is thoroughly understood to adopt measures to maintain reliable grid operations. Of great concern is the inter-area low-frequency oscillation, which usually propagates through a large region and has a system-wide impact. Such oscillations may lead to unnecessary or inadvertent tripping of generators, that may be simply reacting to the oscillation originating from geographically remote sites. Such tripping of generators can lead to cascading outages, system split and load loss events. Over the years, several system-wide oscillation events have been observed across all three North American interconnections. This project titled Wide-area Oscillation Assessment and Trending Study, sponsored by the Office of Electricity (OE) of the Department of Energy (DOE), aims to conduct the required research to capture and investigate the potential changes in wide-area oscillatory performance of the system as a result of resource mix transition. The Pacific Northwest National Laboratory (PNNL) conducted this research and technical staff of Federal Energy Regulatory Commission (FERC) served as advisors to the project. The primary objective of this study is to assess whether there are significant trends in the power system wide-area oscillatory behaviours, as a result of the generation-mix changes due to the increased penetration of RES in the U.S. Eastern Interconnection (EI). The analysis presented in this report can serve as reference for future grid planning and operation of the EI system. This research conducted in this project evaluates the wide-area oscillatory behaviour of the EI, using a model-based approach for potential future resource mixes, and the measurement-based analysis with 21-month phasor measurement unit (PMU) time series. The oscillation modes in EI system along with the impact of the changes of the generation mix on the frequency and damping ratio (DR) of the oscillations have been studied.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design of a fault tolerant airborne digital computer. Volume 2: Computational requirements and technology

This final report summarizes the work on the design of a fault tolerant digital computer for aircraft. Volume 2 is composed of two parts. Part 1 is concerned with the computational requirements associated with an advanced commercial aircraft. Part 2 reviews the technology that will be available for the implementation of the computer in the 1975-1985 period. With regard to the computation task 26 computations have been categorized according to computational load, memory requirements, criticality, permitted down-time, and the need to save data in order to effect a roll-back. The technology part stresses the impact of large scale integration (LSI) on the realization of logic and memory. Also considered was module interconnection possibilities so as to minimize fault propagation.

Ratner, R. S.↗

A machine learning-based fast frequency response control for a VSC-HVDC system

An HVDC system can realize a very fast frequency response to the disturbed system under a contingency because its active power control is decoupled from the frequency deviation. However, most of existing HVDC frequency control strategies are coupled with system primary frequency control and secondary frequency control. Since the traditional system frequency control is dominated by the thermal generators, the advantage of the fast response of the HVDC system is not made fully used. The development of a frequency response estimation based on a machine learning algorithm provides another approach to improve the frequency response capability of the HVDC system. Different from other frequency deviation tracking strategies, a machine learning based HVDC frequency response control can directly increase the power flow of a HVDC system by estimation of the system generator or load lost. In this paper, a fast frequency response control using a HVDC system for a large power system disturbance based on the multivariate random forest regression (MRFR) algorithm is proposed. The simulation is carried out with an integrated power system model based on the North American interconnections. The simulation results indicate that the proposed MRFR based frequency response control can significantly improve the frequency low point during an event, while stabilizing the frequency in advance.

42 ENGINEERING↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2021 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2021, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 1,400 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 90% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (676 GW) and battery storage (~420 GW) are – by far – the fastest growing resources in the queues; combined they accounted for nearly 85% of new capacity entering the queues in 2021. Substantial wind (247 GW) capacity is also seeking interconnection, 31% of which is for offshore projects (77 GW). In total, about 930 GW of zero-carbon generating capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 286 GW of solar hybrids (primarily solar+battery) and 19 GW of wind hybrids are currently active in the queues; nearly half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 23% of the projects seeking connection from 2000 to 2016 have subsequently been built. Completion percentages appear to be declining and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: for the regions with available data, the typical duration from connection request to commercial operation increased from ~2.1 years for projects built in 2000-2010 to ~3.7 years for those built in 2011-2021.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2022 [Slides]

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While most projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2022, as well as data on "operational" and "withdrawn" projects where those data are available. We find that the amount of new electric capacity in these queues is growing dramatically, with over 2,000 gigawatts (GW) of total generation and storage capacity now seeking connection to the grid (over 95% of which is for zero-carbon resources like solar, wind, and battery storage). Solar (947 GW) and battery storage (~680 GW) are – by far – the fastest growing resources in the queues; combined they accounted for over 80% of new capacity entering the queues in 2022. Substantial wind (300 GW) capacity is also seeking interconnection, 38% of which is for offshore projects (113 GW). In total, about 1,250 GW of zero-carbon generating capacity is currently seeking transmission access, as is 82 GW of natural gas capacity. Hybrids projects (co-locating multiple generation and/or storage types) comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 457 GW of solar hybrids (primarily solar+battery) and 24 GW of wind hybrids are currently active in the queues; over half of battery storage in the queues is paired with generation. However, much of this proposed capacity will be withdrawn from the queues and not built. Among a subset of queues for which data are available, only 21% of the projects (and 14% of capacity) seeking connection from 2000 to 2017 have been built as of the end of 2022. Additionally, interconnection wait times are on the rise: The typical duration from connection request to commercial operation increased from <2 years for projects built in 2000-2007 to nearly 4 years for those built in 2018-2022 (with a median of 5 years for projects built in 2022).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Climate Influences on Capacity Expansion Planning with Application to the Western U.S

Electric power system planners utilize a variety of planning tools to inform decisions concerning generation and transmission additions to the electric grid, the need for operational changes, and to evaluate potential stressors on the system. Numerous factors contribute to the planning process including projected fuel and technology costs, policy and load profiles. There is also a growing recognition of the interdependency of the electric grid with other natural and engineered systems. Here we explore how future climate change and hydropower operability might influence decisions related to electricity capacity expansion planning and operations. To do so we assemble a multi-model framework. Specifically, water resource modeling is used to simulate climate impacts on future water supply for thermoelectric and hydropower generation. Separately, temperature impacts on electricity load are evaluated. Together, these climate factors spatially constrain a capacity expansion model that projects generation and transmission additions to the grid. The projected new capacity-builds are then evaluated on their operations, reliability, and cost under average and extreme climate conditions using production cost modeling. This coupled framework is demonstrated on the electric grid in the Western U.S., supporting capacity expansion planning by WECC, the North American Electric Reliability Corporation (NERC) regional entity responsible for reliability assurance of the Western Interconnection. This region was selected in part because the West is unique in that it has high potential for renewable penetrations and is experiencing large retirements/displacements of baseload resources, primarily coal, leading to possible operational challenges in terms of changing resource mix and the need for resource flexibility. Toward this challenge, planning scenarios encompass a range of alternative energy, climate and drought futures. In this context we explore answers to two strategic questions: 1) How does changing climate influence electricity expansion planning (generation and transmission) and future operations, including type and capacity of new builds, system reliability, cost and environmental impacts? 2) How does the representation of hydropower in the modeling framework influence the evaluation of bulk power system operations? Results indicate that climate has a measurable influence on recommendations concerning the capacity, type and location of new generation and transmission additions, with up to 17 GW additional capacity needed by 2038 to meet peak loads (~6.6% increase over capacity-builds based on historical climate). The extent of additional infrastructure needs is strongly influenced by future water availability for hydropower and the potential deployment of demand response technologies. Systems designed for future climate conditions were found to maintain high system reliability under a range of electricity and water availability scenarios (including significant drought), with minimal system curtailments. Additional capacity needs due to higher load tend to increase cumulative 20-year investment and operating costs by $\$$5-$\$$17 billion and generation costs increase by 9 to 19%. Finally, changing the representation of hydropower flexibility has a relatively small influence on capacity expansion in the Western Interconnection through 2038, but hydropower flexibility impacts generation costs to a similar extent as climate.

13 HYDRO ENERGY↗

Measurement-informed Dynamic Aggregation of Distribution Systems

This paper proposes a measurement-informed dynamic aggregation methodology in order to create equivalent representations of distribution systems that are compatible with large-scale transmission analysis. By optimizing an equivalent feeder parameters using time-series measurements of active power, reactive power, and voltage at the Point of Interconnection (POI), the approach yields simplified yet dynamically accurate equivalents. Implemented in PSCAD with models of photovoltaic–battery systems, three-phase motors, and static loads, the method employs hybrid differential evolution and bounded least-squares optimization laying the foundation for for real-time state estimation and optimized sensor placement in distribution networks.

Ahmed, Kazi Ishrak [University of Tennessee, Knoxv↗

Kinetics and Structure of Superagglomerates Produced by Silane and Acetylene

The evolution of smoke in a laminar diffusion flame involves several steps. The first step is particle inception/nucleation in the high-temperature fuel-rich region of the flame followed by surface growth and coagulation/coalescence of the small particles. As the primary spheres grow in size and lose hydrogen, the colliding particles no longer coalesce but retain their identity as a cluster of primary spheres, termed an agglomerate. Finally, in the upper portion of the flame, the particles enter an oxidizing environment which may lead to partial or complete burnout of the agglomerates. Currently there is no quantitative model for describing the growth of smoke agglomerates up to superagglomerates with an overall dimension of 10 microns and greater. Such particles are produced during the burning of acetylene and fuels containing benzene rings such as toluene and polystyrene. In the case of polystyrene, smoke agglomerates in excess of 1 mm have been observed "raining" out from large fires. Evidence of the formation of superagglomerates in a laminar acetylene/air diffusion flame has been recently reported. Acetylene was chosen as the fuel since the particulate loading in acetylene/air diffusion flames is very high. Photographs were obtained by Sorensen using a microsecond xenon lamp of the "stream" of soot just above the flame. For low flow rates of acetylene, only submicrometer soot clusters are produced and they give rise to the homogeneous appearance of the soot stream. When the flow rate is increased to 1.7 cu cm/s, soot clusters up to 10 microns are formed and they are responsible for the graininess and at a flow rate of 3.4 cu cm/s, a web of interconnected clusters as large as the width of the flame is seen. This interconnecting web of superagglomerates is described as a gel state by Sorensen et al (1998). This is the first observation of a gel for a gas phase system. It was observed that this gel state immediately breaks up into agglomerates due to buoyancy induced turbulence and gravitational sedimentation.

Mulholland, G. W.↗

Explicit modeling and computational load distribution for concurrent processing simulation of the space station

Two important aspects of concurrent processing under development at TRW are discussed. These are: (1) the derivation of explicit mathematical models of multibody dynamic systems, and (2) a balanced computational load distribution (BCLD) among loosely coupled computational units (processors) of a concurrent processing system. The developed methodologies are demonstrated by way of an application to the Phase 1 of the Space Station - a task being performed by TRW under NASA/JSC contract NAS9-17778. The mathematical model of the Space Station consists of three interconnected flexible bodies capable of undergoing large, rigid-body motion with respect to each other. Body 1 is the main central body and contains the pressurized modules inboard of the two Alpha gimbals. Bodies 2 and 3 are the starboard and port bodies connected to Body 1 at the Alpha gimbals and include all components on the transverse booms outboard of the Alpha gimbals (including the solar arrays). The control systems in the model maintain Body 1 in a prescribed 3-axis attitude control mode, while producing large-angle rotations of the flexible solar arrays to position them normal to the sun-line.

Gluck, R.↗

YBCO-on-Kapton: Material for High-Density Quan-tum Computer Interconnects with Ultra-Low Thermal Conductance

Development of practical quantum computers would require 1000's of qubits and equally large number of read-outs, bias and drive lines. New materials that combine low passive loss and good RF properties are needed. In this study we report performance of signal interconnects comprised of high-temperature YBCO films that are exfoliated from a metal substrate and transferred to a E-Kapton tape. The technology offers low-loss transition be-tween 60 K to sub-mK environments and interfacing with off-shelf flexible silicon electronics. We demonstrate < 1 dB/m at-tenuation at 6 GHz at 77 K. The microstrip assemblies demon-strated no degradation upon multiple cycles to liquid Nitrogen and conduction cooling down to 18 K. We discuss designs of a practical high-density signal cable with passive heat load well below 1 μW per line. The YBCO-on-Kapton technology offers a practical pathway to large error-corrected quantum computing systems.

47 OTHER INSTRUMENTATION↗

Enhanced dynamic equivalent identification method of large-scale power systems using multiple events

The increasing complexity of the interconnected power system makes high-fidelity dynamic simulation models computationally more intensive. To improve computation efficiency, model reduction techniques have been investigated to only preserve the dynamics in a limited area of interest (study area), while deriving equivalent representation for the external area. For this purpose, a measurement-based reduction approach using system identification techniques has been previously proposed. Accordingly, external areas are represented by dynamic equivalent loads using transfer function estimation. In this paper, in order to enhance the accuracy of the reduced model in preserving dynamics of the study area, multiple “grid” events of different types and at different locations are considered for identifying the parameters of the equivalent loads. Additionally, case studies are carried out in the NPCC 140-bus system. Comparisons are made between multiple events training and single event training, highlighting the advantages of the proposed method in providing a better representation of the grid dynamics under different operating conditions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Enhanced Dynamic Equivalent Identification Method of Large-Scale Power Systems Using Multiple Event

The increasing complexity of the interconnected power system makes high-fidelity dynamic simulation models computationally more intensive. To improve computation efficiency, model reduction techniques have been investigated to only preserve the dynamics in a limited area of interest (study area), while deriving equivalent representation for the external area. For this purpose, a measurement-based reduction approach using system identification techniques has been previously proposed. In that case, external areas are represented by dynamic equivalent loads using transfer function estimation. In this paper, in order to enhance the accuracy of the reduced model in preserving dynamics of the study area, multiple “grid” events of different types and at different locations are considered for identifying the parameters of the equivalent loads. Case studies are carried out in the NPCC 140-bus system. Comparison are made between multiple events training and single event training, highlighting the advantages of the proposed method in providing a better representation of the grid dynamics under different operating conditions.

Xue, Yaosuo↗

Large Power Transformer Supply Chain Gap Analysis and Domestic Content Strategies for Hydropower Rehabilitation: Supplemental Report

Large Power Transformers (LPTs) are indispensable to U.S. hydropower operations, serving as generator step-up (GSU) units that interconnect hydro facilities to the transmission grid. Yet the LPT supply chain faces mounting stress from aging infrastructure, limited domestic production, and long lead times. Currently, more than 80% of LPT demand is met through imports, with primary suppliers including Mexico, South Korea, Brazil, Austria, and Canada. Domestic manufacturers supply only about 20% of units, constrained by bottlenecks in high-grade Grain-Oriented Electrical Steel (GOES), copper conductors, bushings, and on-load tap changers (OLTCs). Hydropower rehabilitation projects in particular face additional challenges due to custom design requirements, remote siting, and regulatory needs around domestic content. Regional cost disparities, driven by transportation logistics, labor markets, and import price volatility, further exacerbate project risks. To address these vulnerabilities, coordinated action is required: strengthening domestic capacity for GOES and secondary components, developing near-site assembly hubs, and leveraging IRS domestic content safe harbors to incentivize U.S. manufacturing. This addendum refines the 2024 NREL Hydropower Supply Chain Gap Analysis by focusing specifically on critical issues related to LPT domestic manufacturing capacity and key considerations for hydropower developers and asset owners.

13 HYDRO ENERGY↗

Managing Solar Photovoltaic Integration in the Western United States: Power System Flexibility Requirements and Supply

As penetrations of variable renewable energy generation technologies such as wind and solar photovoltaics (PV) continue to increase across the United States, greater uncertainty and variability in the net load often lead to a concern about how power systems may adapt. Managing the system net load (i.e., load minus contribution from variable generation technologies) may become more challenging with increasing variable generation, as the magnitude and frequency of net ramps increase. However, there is inherent flexibility in power systems through the conventional generator fleet (under least-cost unit commitment and economic dispatch), less-conventional generation sources (e.g., storage, demand response, concentrating solar power with thermal energy storage), and imports and exports with neighbors. In this analysis, we create an open-source tool to analyze the flexibility of the results of a specific commercial unit commitment and economic dispatch tool (PLEXOS), but the code can be applied generically as well. The tool assesses the flexibility requirements (or demand) of a system through a net load analysis. The constraints and limitations of each generator are then considered to determine the availability (or supply) of flexibility. Then, the supply and demand of flexibility are compared to gain a more complete picture of potential flexibility concerns. We apply this open-source tool to high-penetration PV scenarios constructed for three focus regions in the western United States defined using the Resource Planning Model (RPM) capacity expansion modeling tool: RPM-OR, RPM-CO, and RPM-AZ. Generally, we find few flexibility concerns, as the western United States represents a large and interconnected power system with significant inherent flexibility. In addition, the PV scenarios we analyzed are overbuilt on capacity, leaving plenty of ramping ability on the system. We do find that for each focus region, the impact of imports on meeting ramping needs is essential. This means the PV integration in each focus region impacts the entire rest of the system. Each system has different dominant sources of flexibility. The conventional generator fleet (especially coal and gas combined-cycle technologies) as well as less-conventional sources such as storage are all shown to be important sources of flexibility. The scenarios evaluated here were designed to study the planning and operations impact of high solar penetration in each of three focus regions. However, none of the three focus regions likely will deploy PV in isolation, meaning the ability of imports and exports to provide flexibility may be considerably different in scenarios with strong PV deployment in every region. Overall, we intend that the framework we present here will be useful in future analysis of other system evolutions to identify whether and how flexibility may constrain the successful deployment of variable generation technologies.

14 SOLAR ENERGY↗

Electromagnetic Transient Modeling of Large Data Centers for Grid-Level Studies: Beta Release

The magnitude and complexity of electricity usage patterns from large data centers are having significant impacts on the operation and dynamics of the power grid; grid operators and planners require a range of specialized data center models to properly evaluate these impacts and specify technical solutions as needed. Towards addressing this need, Pacific Northwest National Laboratory (PNNL) has developed a library of electromagnetic transient (EMT) models for grid-level studies of data centers called the data center model library (DML). This report describes how the DML was created and how it may properly be used. This report details the DML’s beta release, completed in July 2026. This is a revision and expansion of the alpha release, which was made available in January 2026 The models present in the DML are generic models; subject matter expertise and additional technical data are needed to modify these models before they can represent any real data center. However, they will significantly reduce the level of effort required to develop site-specific models and can serve as a common starting point to guide industry towards a more refined consensus. Most of the models within DML are dedicated to representing the power electronics interfaces commonly used in modern data centers, such as double-conversion uninterruptible power supplies and single-phase power factor correction converters. These models are intended for use in grid-level studies and are a simplified aggregation of many small components. That said, background material on the physical and electrical design of large data centers is provided as companion material so that users can be aware of many of the details which have been omitted or streamlined as a matter of practical necessity. Additionally, guidance on the application of EMT analysis for data center interconnection studies is provided, which aids users in identifying when the DML is necessary and what sort of additional model development may be necessary for conducting real-world studies.

electromagnetic transients↗

Energy Infrastructure Futures: A Multiscale Evaluation of Projected Power Plant Siting Across the Western Interconnection

The US Western Interconnection is facing unprecedented challenges in the form of less predictable peak demand, increasingly diverse generating resources, and fast-growing loads due to the onset of artificial intelligence, hyperscale computing, and electrification. Projecting where future generation may be developed is critical to maintaining a robust and resilient electric grid under this mounting uncertainty and variability. Using an integrated multisectoral, multiscale modeling framework that links a human-Earth systems model, an hourly load model, a geospatial power plant siting model, and an hourly grid operations model, we evaluate the power plant landscape evolution under eight alternative futures between 2020 and 2055. These futures represent a wide but plausible range of atmospheric conditions, emissions constraints, and economic, technological, and population growth assumptions. We find that local-level development can vary substantially both by generation type and capacity buildout across these futures. Specific regions of the Western Interconnection are projected to see large amounts of capacity development regardless of the future scenario. We additionally determine that projected power plant locations are more heavily influenced by the cost to interconnect to the electric grid than the locational energy value.

Mongird, Kendall↗

Latency Hiding in Dynamic Partitioning and Load Balancing of Grid Computing Applications

The Information Power Grid (IPG) concept developed by NASA is aimed to provide a metacomputing platform for large-scale distributed computations, by hiding the intricacies of highly heterogeneous environment and yet maintaining adequate security. In this paper, we propose a latency-tolerant partitioning scheme that dynamically balances processor workloads on the.IPG, and minimizes data movement and runtime communication. By simulating an unsteady adaptive mesh application on a wide area network, we study the performance of our load balancer under the Globus environment. The number of IPG nodes, the number of processors per node, and the interconnected speeds are parameterized to derive conditions under which the IPG would be suitable for parallel distributed processing of such applications. Experimental results demonstrate that effective solution are achieved when the IPG nodes are connected by a high-speed asynchronous interconnection network.

Das, Sajal K.↗

Phasor-Measurement-Unit-Based Data Analytics Using Digital Twin and PhasorAnalytics Software

A major objective of this project was to apply GE’s commercial machine learning and data analytics toolsets to large-scale, real-world, anonymized Phasor Measurement Unit (PMU) datasets in order to extract signatures, correlated and/or causal factors, and precursor patterns associated with significant power system phenomena. The project had a particular emphasis on extraction of insights relevant to asset health monitoring, real-time load modeling and cybersecurity monitoring. Additionally, the team was directed to undertake a comprehensive data quality analysis for the provided datasets and encouraged to estimate the ‘machine-learning readiness’ of the datasets by documenting any major obstacles to the application of commercial machine learning algorithms. To accomplish the aforementioned objectives, the project team’s work centered around the identification of key event signatures and application of the identified event signatures for event detection and event classification. The industry-validated, semi-supervised machine learning strategy employed for event signature identification involved several major tasks, including data-preprocessing, generation of an overabundance of features, normal data identification, normality modeling, and event signature identification through a methodical, quantitative ranking of features in order of relevance to each studied event type. Throughout the project, data quality issues and mitigation techniques were investigated. In this report, insights are provided regarding the readiness of the provided synchrophasor datasets for application of machine learning and data analytics. The methodologies employed for this technical strategy are summarized in this report. With regards to data preprocessing and feature generation, the provided Training and Test Datasets were ingested into GE’s big data environment. Subsequently, the team applied bad data cleansing and data imputation scripts, event detection scripts, and application programming interfaces (APIs) to the datasets for convenient data access. The project team completed development and validation of dozens of physics-based, statistics-based and transformation-based feature functions used for the extraction of over 60 synchrophasor features. Using a new parallel feature generation technology developed on this project, over 60 features have been rapidly generated for the full two years’ worth of Training and Test Dataset data associated with both the Eastern and Western interconnects. Even accommodating for temporal down-sampling inherent to the feature extraction procedure, this parallel feature generation activity resulted in a massive feature set with a storage requirement approximately equal to that of the raw training dataset itself. With regards to normal data identification and normality modeling, a normality model was built using the feature data extracted from the Training Dataset and iteratively refined subsequent to incremental adjustments and expansions of the Training Dataset feature data. With respect to event characterization and signature identification, an event signature identification pipeline was developed and used in conjunction with the normality model to identify over 15 event signatures for key event categories within the Training Dataset. The identified event signatures were used to characterize hundreds of key events in terms of relative severity, duration, and location of the event. An investigation was undertaken to identify correlated and causal factors involved in transformer events. A separate investigation into temporal trends in ring-down analysis results was undertaken to determine possible associations between system dynamics and various other factors such as loading, season or year. To validate the identified event signatures, additional work was undertaken to develop signature-based anomaly detection and classification tools suitable for convenient application to the synchrophasor datasets. The anomaly detection and classification tools, suitable for online application, were then applied to the entirety of the Eastern Interconnect Training and Test Datasets. Performance of the event detection and classification tools was evaluated upon receipt of the Test Dataset event logs (i.e., the labels for events contained in the Test Dataset), and promising results were obtained despite several challenges (documented herein) associated with application of supervised or semi-supervised machine learning methods to large-scale, anonymized datasets. Finally, the detection and classification tools were used to detect, classify, and characterize thousands of new events not included in the original event logs provided by the DOE within both the Training and Test Datasets.

24 POWER TRANSMISSION AND DISTRIBUTION↗