Search NASASearch

SEARCH · Search NASA

Results for “Launch Support”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Certification of Upper Air Sounding System to Support NASA Launch Operations

A new upper air sounding system (Vaisala MW51) has been installed at the United States Space Force’s Eastern Range (ER). The NASA Marshall Space Flight Center’s Natural Environments Branch has assessed MW51 test data from the ER to certify the new system for use in Artemis Program launch operations. Certification criteria are based on legacy system capabilities and vehicle design environments, and include criteria for wind, temperature, and relative humidity, as well as effective vertical resolution (EVR) of wind data. The test data consists of near simultaneous (within 15 seconds) releases of two MW51 sondes and one legacy system sonde. Difference statistics (root mean square) between MW51 and legacy system wind, temperature, and relative humidity data are assessed against the certification criteria. Wind data from dual MW51 releases are used in spectral/coherence analyses to assess the EVR criteria. The MW51 system must demonstrate it meets these criteria to be used in NASA Artemis launch operations.

Frank Leahy

Flight Dynamics Mission Support and Quality Assurance Process

This paper summarizes the method of the Computer Sciences Corporation Flight Dynamics Operation (FDO) quality assurance approach to support the National Aeronautics and Space Administration Goddard Space Flight Center Flight Dynamics Support Branch. Historically, a strong need has existed for developing systematic quality assurance using methods that account for the unique nature and environment of satellite Flight Dynamics mission support. Over the past few years FDO has developed and implemented proactive quality assurance processes applied to each of the six phases of the Flight Dynamics mission support life cycle: systems and operations concept, system requirements and specifications, software development support, operations planing and training, launch support, and on-orbit mission operations. Rather than performing quality assurance as a final step after work is completed, quality assurance has been built in as work progresses in the form of process assurance. Process assurance activities occur throughout the Flight Dynamics mission support life cycle. The FDO Product Assurance Office developed process checklists for prephase process reviews, mission team orientations, in-progress reviews, and end-of-phase audits. This paper will outline the evolving history of FDO quality assurance approaches, discuss the tailoring of Computer Science Corporations's process assurance cycle procedures, describe some of the quality assurance approaches that have been or are being developed, and present some of the successful results.

Oh, InHwan

Launch site payload ground support factors in Space Shuttle launch operations

This paper addresses several of the major factors in support of the Space Shuttle payload ground processing operations at the launch site. In particular, the factors of payload facility and transportation capabilities are addressed. The paper begins with an overview of payload ground processing. It discusses the specific facilities which support payload operations and outlines their roles in the activity. The transportation elements which are utilized at the launch site are then discussed. The paper concludes with a number of issues and concerns which impact the support of Shuttle payload ground processing.

Schuiling, Roelof L.

Advanced passive radiator for spaceborne cryogenic cooling

A novel design to improve the cooling capability of spaceborne cryogenic passive radiators is described. The design is based on the use of lightweight angled radiation shields, low-conductance structural supports, and a separate detachable launch-support system to reduce the parasitic heat leaks from the warm spacecraft to the cold radiator. The effectiveness of this design is demonstrated by thermal-vacuum-chamber experiments which indicate that the angled-radiation-shield assembly has an effective emittance that is an order of magnitude lower than that of the best multilayer insulation used in flight. Performance predictions based on the experiments and analytical model indicate that an advanced passive-radiator design based on this technology would be between 10 and 57% of the size and 10 and 36% of the mass of the best state-of-the-art passive radiators and would make lower temperatures (< 60 K) and larger heat loads practical. The cooling requirements of many new spaceborne instruments could be accommodated by application of this new passive-radiator design.

Steven Bard

NASA Langley Research Center Systems Analysis & Concepts Directorate Participation in the Exploration Systems Architecture Study

The NASA Langley Research Center (LaRC) Systems Analysis & Concepts Directorate (SACD) began studying human exploration missions beyond low Earth orbit (LEO) in the year 1999. This included participation in NASA s Decadal Planning Team (DPT), the NASA Exploration Team (NExT), Space Architect studies and Revolutionary Aerospace Systems Concepts (RASC) architecture studies that were used in formulating the new Vision for Space Exploration. In May of 2005, NASA initiated the Exploration Systems Architecture Study (ESAS). The primary outputs of the ESAS activity were concepts and functional requirements for the Crewed Exploration Vehicle (CEV), its supporting launch vehicle infrastructure and identification of supporting technology requirements and investments. An exploration systems analysis capability has evolved to support these functions in the past and continues to evolve to support anticipated future needs. SACD had significant roles in supporting the ESAS study team. SACD personnel performed the liaison function between the ESAS team and the Shuttle/Station Configuration Options Team (S/SCOT), an agency-wide team charged with using the Space Shuttle to complete the International Space Station (ISS) by the end of Fiscal Year (FY) 2010. The most significant of the identified issues involved the ability of the Space Shuttle system to achieve the desired number of flights in the proposed time frame. SACD with support from the Kennedy Space Center performed analysis showing that, without significant investments in improving the shuttle processing flow, that there was almost no possibility of completing the 28-flight sequence by the end of 2010. SACD performed numerous Lunar Surface Access Module (LSAM) trades to define top level element requirements and establish architecture propellant needs. Configuration trades were conducted to determine the impact of varying degrees of segmentation of the living capabilities of the combined descent stage, ascent stage, and other elements. The technology assessment process was developed and implemented by SACD as the ESAS architecture was refined. SACD implemented a rigorous and objective process which included (a) establishing architectural functional needs, (b) collection, synthesis and mapping of technology data, and (c) performing an objective decision analysis resulting in technology development investment recommendations. The investment recommendation provided budget, schedule, and center/program allocations to develop required technologies for the exploration architecture, as well as the identification of other investment opportunities to maximize performance and flexibility while minimizing cost and risk. A summary of the trades performed and methods utilized by SACD for the Exploration Systems Mission Directorate (ESAS) activity is presented along with how SACD is currently supporting the implementation of the Vision for Space Exploration.

Keyes, Jennifer

Environmentally-Preferable Launch Coatings

The Ground Systems Development and Operations (GSDO) Program at NASA Kennedy Space Center (KSC), Florida, has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described as the launch support and infrastructure modernization program in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of NASA and the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion protecting coatings for launch facilities and ground support equipment (GSE). The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. The project compares coating performance of the selected alternatives to existing coating systems or standards.

ground support equipment

Environmentally Preferable Coatings for Structural Steel Project

The Ground Systems Development and Operations (GSDO) Program at NASA John F. Kennedy Space Center (KSC) has the primary objective of modernizing and transforming the launch and range complex at KSC to benefit current and future NASA programs along with other emerging users. Described a the "launch support and infrastructure modernization program" in the NASA Authorization Act of 2010, the GSDO Program will develop and implement shared infrastructure and process improvements to provide more flexible, affordable, and responsive capabilities to a multi-user community. In support of the GSDO Program, the objective of this project is to determine the feasibility of environmentally friendly corrosion resistant coatings for launch facilities and ground support equipment. The focus of the project is corrosion resistance and survivability with the goal to reduce the amount of maintenance required to preserve the performance of launch facilities while reducing mission risk. Number of facilities/structures with metallic structural and non-structural components in a highly corrosive environment. Metals require periodic maintenance activity to guard against the insidious effects of corrosion and thus ensure that structures meet or exceed design or performance life. The standard practice for protecting metallic substrates in atmospheric environments is the application of corrosion protective coating system.

Technology Portfolio System

Launch site integration for mixed fleet operations

Launch site impacts and integration planning issues are presented to support launch operations for a mixed vehicle fleet (manned and cargo). Proposed ground systems and launch site configurations are described. Prelaunch processing scenarios and schedules are developed for candidate launch vehicles. Earth-to-orbit (ETO) vehicle architectures are presented to meet future launch requirements, including the Space Exploration Initiative (SEI). Flight vehicle design recommendations to enhance launch processing are discussed. The significance of operational designs for future launch vehicles is shown to be a critical factor in planning for mixed fleet launch site operations.

Scott, L. P.

Space Launch System Day of Launch Loads for Artemis I

NASA’s Space Launch System (SLS) was successfully launched on November 16, 2022. During the years leading up to the first flight, Artemis I, a DOLILU (Day of Launch I-Load Update) process was developed to design, verify, and upload the first stage flight trajectory on day-of-launch to ensure a safe flight. The evaluation of integrated vehicle loads is a key component of the DOLILU process. The SLS Artemis I DOL loads project has involved methodology development, software development, software testing and certification, operator training, and simulation and launch support. The resulting DOL process successfully calculated loads for all launch opportunities within the window, with the robust nature of the process contributing to all opportunities being go for loads.

SLS

The evolution of the Tracking and Data Relay Satellite System /TDRSS/

Certain limitations of a ground-based network of remote tracking stations for communications with spacecraft are to be overcome by making use of a space-based network. Studies related to the development of a Tracking and Data Relay Satellite System (TDRSS) are discussed. The TDRSS is to function as an integral part of the post-1980 NASA Spaceflight Tracking and Data Network (STDN). The TDRSS will consist of two operational Tracking and Data Relay (TDR) spacecraft separated by at least 130 deg in longitude. According to current planning, the STDN will also include five ground-based sites, for support of users with orbital altitudes greater than approximately 2000 km, and two launch support sites.

Godfrey, R. D.

NASA Support for Commercial Crew Launch Capabilities

Since the earliest days of U.S. human spaceflight, NASA’s Marshall Space Flight Center in Huntsville, Alabama, has played a key role in American crew launch capability, from engineering support for the first Mercury-Redstone launches, to the Saturn launches to the Moon, through Shuttle and now Artemis. Today, Marshall brings that expertise gained through decades of crewed space launches to NASA’s Commercial Crew Program (CCP), providing launch vehicle engineering and programmatic support. The team’s responsibilities have included human certification of commercial launch systems for the CCP missions, including Atlas V and Falcon 9, and verifying each launch vehicle complies with flight certification. MSFC provides expertise in nearly all aspects of launch vehicle design and performance including solid motors and liquid engines, stage propulsion, thrust vector control, structural and dynamics, safety and mission assurance. During each commercial crew launch, an engineering support team is on console at Marshall’s Huntsville Operations Support Center, which has provided launch operations support since Apollo, providing real-time oversight to safety standards for the vehicle and verifying data. Launch vehicle support for Commercial Crew has come as a paradigm shift for the MSFC team, inspiring new approaches that leverage expertise and best practices from past NASA-developed launch vehicle missions, while at the same time providing new synergies from work with commercial partners on CCP. This paper will explore the role that the Marshall launch vehicle services team plays in the Commercial Crew Program, as well as lessons learned from the program that will continue to benefit a new era of spaceflight partnerships.

Commercial Crew

Atlas Centaur 77 GOES-J Wet Dress Rehearsal at Cape Canaveral Air Station

A Wet Dress Rehearsal (WDR) was successfully run on Atlas/Centaur 77 launch vehicle. The WDR verifies the launch readiness of the vehicle, the launch support equipment at the pad and in the blockhouse, the countdown procedure, and the launch countdown operations of the Eastern Range. During this countdown test liquid hydrogen, liquid oxygen and RP-1 propellants are aboard the vehicle, verifying the structural integrity of the Atlas first stage and Centaur upper stage tanks.

Source record

MesoNAM Verification Phase II

The 45th Weather Squadron Launch Weather Officers use the 12-km resolution North American Mesoscale model (MesoNAM) forecasts to support launch weather operations. In Phase I, the performance of the model at KSC/CCAFS was measured objectively by conducting a detailed statistical analysis of model output compared to observed values. The objective analysis compared the MesoNAM forecast winds, temperature, and dew point to the observed values from the sensors in the KSC/CCAFS wind tower network. In Phase II, the AMU modified the current tool by adding an additional 15 months of model output to the database and recalculating the verification statistics. The bias, standard deviation of bias, Root Mean Square Error, and Hypothesis test for bias were calculated to verify the performance of the model. The results indicated that the accuracy decreased as the forecast progressed, there was a diurnal signal in temperature with a cool bias during the late night and a warm bias during the afternoon, and there was a diurnal signal in dewpoint temperature with a low bias during the afternoon and a high bias during the late night.

Watson, Leela R.

Space Shuttle Dynamic Integrated Tests - Concept and results for STS-1

It is pointed out that ground tests, which involve end-to-end checks of various subsystems often by stimulating an input device and examining the resultant effect, do not exercise dynamically all subsystem interactions encountered during a real flight. The development and implementation of the Dynamic Integrated Test (DIT) for the Space Transportation System, patterned on the ASIST (Avionics System Integration Self Test) concept, are examined. It is noted that the complete hardware-software data paths which are utilized in flight simply do not exist until the vehicle is assembled. The integrated test is considered necessary in order to verify the integrity of these paths, that is, to establish that proper connections have been made, that correct polarity is maintained, and that no unexpected interference is generated. As a result of four tests carried out on the Space Transportation System, hardware and software problems, both on-board the vehicle and within the launch support complex, were identified and resolved. Significant return was also realized in the training of the launch and flight crews.

Brody, S.

Challenges of space medical operations and life sciences management

The Kennedy Space Center (KSC) has been the premier launch and landing site for America's space program since the early 1960s. Visitors are cognizant of space vehicles, processing facilities and launch pads which are treasured national resources. However, most are unaware of the unique organization which supports launch and landing activities and manages the center's occupational medicine, environmental health, ecological and environmental monitoring functions, as well as human and plant research programs. Management of this multifaceted organization can be complex because funding its different functions comes from a number of sources. Additionally the diverse disciplines of personnel present a special challenge in maintaining professional competencies while assuring efficiency in cyclical operations. This article explains the organization's structure and reviews some of its accomplishments.

Haddad, S. G.

Using Discrete Event Simulation to Model Integrated Commodities Consumption for a Launch Campaign of the Space Launch System

In May 2013, NASA's GSDO Program requested a study to develop a discrete event simulation (DES) model that analyzes the launch campaign process of the Space Launch System (SLS) from an integrated commodities perspective. The scope of the study includes launch countdown and scrub turnaround and focuses on four core launch commodities: hydrogen, oxygen, nitrogen, and helium. Previously, the commodities were only analyzed individually and deterministically for their launch support capability, but this study was the first to integrate them to examine the impact of their interactions on a launch campaign as well as the effects of process variability on commodity availability. The study produced a validated DES model with Rockwell Arena that showed that Kennedy Space Center's ground systems were capable of supporting a 48-hour scrub turnaround for the SLS. The model will be maintained and updated to provide commodity consumption analysis of future ground system and SLS configurations.

Commodities