Search NASA⌕ Search

SEARCH · Search NASA

Results for “Launch operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Commonality of Ground Systems in Launch Operations

NASA is examining the utility of requiring a certain degree of commonality in both flight and ground systems in the Constellation Program. While the benefits of commonality seem obvious in terms of minimizing upfront development and long-term operations and maintenance costs, success in real, large-scale engineering systems used to support launch operations is relatively unknown. A broad literature review conducted for this paper did not yield a single paper specifically addressing the application of commonality for ground systems at any launch site in the United States or abroad. This paper provides a broad overview of the ground systems, captures historical and current application of commonality at the launch site, and offers suggestions for additional research to further develop commonality approaches.

Quinn, Shawn M.↗

Cost effective launch operations of the SSME

The Space Shuttle Main Engine (SSME) represents the beginning of reusable rocket engine operations in the space transportation system (STS). Steps taken to reduce the overall cost of flight operations of the SSME by improving turnaround operations, extending the life of the engine, and improving the cost effectiveness of overhaul operations at the Canoga Park home plant are described. Ground certification testing to ensure safe launch operations is described, as well as certification extension testing that leads to a service life equivalent to 40 flights. The proven flight record of the SSME, which has demonstrated the utility of the SSME as a key component of America's space transportation system, is discussed.

Klatt, F. P.↗

Automatically calibrating admittances in KATE's autonomous launch operations model

This report documents a 1000-line Symbolics LISP program that automatically calibrates all 15 fluid admittances in KATE's Autonomous Launch Operations (ALO) model. (KATE is Kennedy Space Center's Knowledge-based Autonomous Test Engineer, a diagnosis and repair expert system created for use on the Space Shuttle's various fluid flow systems.) As a new KATE application, the calibrator described here breaks new ground for KSC's Artificial Intelligence Lab by allowing KATE to both control and measure the hardware she supervises. By automating a formerly manual process, the calibrator: (1) saves the ALO model builder untold amounts of labor; (2) enables quick repairs after workmen accidently adjust ALO's hand valves; and (3) frees the modeler to pursue new KATE applications that previously were too complicated. Also reported are suggestions for enhancing the program: (1) to calibrate ALO's TV cameras, pumps, and sensor tolerances; and (2) to calibrate devices in other KATE models, such as the shuttle's LOX and Environment Control System (ECS).

Morgan, Steve↗

Assessment of Atmospheric Winds Aloft during NASA Space Shuttle Program Day-of-Launch Operations

The Natural Environments Branch at the National Aeronautics and Space Administration s Marshall Space Flight Center monitors the winds aloft at Kennedy Space Center in support of the Space Shuttle Program day of launch operations. High resolution wind profiles are derived from radar tracked Jimsphere balloons, which are launched at predetermined times preceding the launch, for evaluation. The spatial (shear) and temporal (persistence) wind characteristics are assessed against a design wind database to ensure wind change does not violate wind change criteria. Evaluations of wind profies are reported to personnel at Johnson Space Center.

Decker, Ryan K.↗

Pre- and post-launch operation of the Resolve soft X-ray spectrometer onboard the XRISM satellite

Resolve is a high-resolution X-ray spectrometer onboard the X-Ray Imaging and Spectroscopy Mission (XRISM), launched on September 6 (UT), 2023. The Resolve has performed better than its required spectral resolution (7 eV at full width at half maximum at 6 keV), both on the ground and in orbit, and has been confirmed to have comparable performance to the soft X-ray spectrometer onboard the ASTRO-H (Hitomi) satellite. The focal plane is composed of an array of microcalorimeter detectors operated at 50 mK to achieve the required energy resolution, and the cooling system is designed to satisfy the lifetime requirement of over 3 years. The focal plane and cooling system are contained in a vacuum-insulated dewar. The cooling system is equipped with a two-stage adiabatic demagnetization refrigerator (ADR) that uses superfluid liquid helium (LHe) as its heat sink. The system includes a third ADR stage that can be used to provide the heat sink when the helium is exhausted. A Joule–Thomson cooler and several two-stage Stirling coolers are used to reduce the heat load on the LHe. During pre-launch operations, we carried out a superfluid LHe top-off operation. The resultant amount of LHe onboard Resolve was over 35 L before launch, which is sufficient to meet the lifetime requirement. During post-launch operation, the LHe vent valve was opened 5 min after launch during rocket acceleration, and the cryocoolers were turned on after several orbits, as planned, which established stable cooling within the dewar. Pre- and post-launch operations for the Resolve instrument were planned around multiple constraints from launch vehicle operations; all were successfully completed, and the launch requirements were fully met.

X-Ray Imaging and Spectroscopy Mission↗

Tropospheric Wind Monitoring During Day-of-Launch Operations for NASA's Space Shuttle Program

The Environments Group at the National Aeronautics and Space Administration's Marshall Space Flight Center monitors the winds aloft above Kennedy Space Center (KSC) in support of the Space Shuttle Program day-of-launch operations. Assessment of tropospheric winds is used to support the ascent phase of launch. Three systems at KSC are used to generate independent tropospheric wind profiles prior to launch; 1) high resolution jimsphere balloon system, 2) 50-MHz Doppler Radar Wind Profiler (DRWP) and 3) low resolution radiosonde system. All independent sources are compared against each other for accuracy. To assess spatial and temporal wind variability during launch countdown each jimsphere profile is compared against a design wind database to ensure wind change does not violate wind change criteria.

Decker, Ryan↗

Orbital transfer vehicle launch operations study. Volume 1: Executive summary

The purpose was to use the operational experience at the launch site to identify, describe and quantify the operational impacts of the various configurations on the Kennedy Space Center (KSC) and/or space station launch sites. Orbital Transfer Vehicle (OTV) configurations are being developed/defined by contractor teams. Lacking an approved configuration, the KSC Study Team defined a Reference Configuration to be used for this study. This configuration then become the baseline for the identification of the facilities, personnel and crew skills required for processing the OTV in a realistic manner that would help NASA achieve the lowest possible OTV life cycle costs. As the study progressed, researchers' initial apraisal that the vehicle, when delivered, would be a sophisticated, state-of-the-art vehicle was reinforced. It would be recovered and reused many times so the primary savings to be gained would be in the recurring-cycle of the vehicle operations--even to the point where it would be beneficial to break from tradition and make a significant expenditure in the development of processing facilities at the beginning of the program.

Source record↗

Orbital transfer vehicle launch operations study. Processing flows. Volume 3

The Orbit Transfer Vehicle (OTV) processing flow and Resource Identification Sheets (RISs) for the ground based orbit transfer vehicle and for the space based orbit transfer vehicle are the primary source of information for the rest of the Kennedy Space Center (KSC) OTV Launch Operations Study. Work is presented which identifies KSC facility requirements for the OTV Program, simplifies or automates either flow though the application technology, revises test practices and identifies crew sizes or skills used. These flows were used as the primary point of departure from current operations and practices. Analyses results were documented by revising the appropriate RIS page.

Source record↗

LDSD POST2 Simulation and SFDT-1 Pre-Flight Launch Operations Analyses

The Low-Density Supersonic Decelerator (LDSD) Project's first Supersonic Flight Dynamics Test (SFDT-1) occurred June 28, 2014. Program to Optimize Simulated Trajectories II (POST2) was utilized to develop trajectory simulations characterizing all SFDT-1 flight phases from drop to splashdown. These POST2 simulations were used to validate the targeting parameters developed for SFDT- 1, predict performance and understand the sensitivity of the vehicle and nominal mission designs, and to support flight test operations with trajectory performance and splashdown location predictions for vehicle recovery. This paper provides an overview of the POST2 simulations developed for LDSD and presents the POST2 simulation flight dynamics support during the SFDT-1 launch, operations, and recovery.

Bowes, Angela L.↗

Pegasus (trademark) launch operations and the PegaStar integrated spacecraft bus

The Pegasus air launched space booster, which successfully flew its maiden flight on 5 Apr. 1990, provides the international satellite community with a flexible cost effective means for delivering small payloads into low Earth orbit. The vehicle's simple, robust design and horizontal integration methods ensure maximum reliability and significantly reduce launch base infrastructure requirements. The vehicle's air launched approach and ability to launch over open ocean regions provide unmatched flexibility in launch location and approach used to ensure range safety. The PegaStar integrated spacecraft bus, which complements the Pegasus launch system, can provide a turnkey means for delivering instrument and sensor packages into low Earth orbit and providing extended (5 to 10 year) on orbit operational support. Pegasus and PegaStar are described, including payload interfaces, delivery capability; integration methods, facility and ground support equipment requirements; and typical launch operations.

Mosier, Marty↗

Apollo Saturn 511 effluent measurements from the Apollo 16 launch operations: An experiment

An experiment was performed in conjunction with the Apollo 16 launch to define operational and instrumentational problems associated with launch-vehicle exhaust effluent monitoring. Ground and airborne sampling were performed for CO, CO2, hydrocarbons, and particulates. Sampling systems included filter pads and photometers for particulates and whole-air grab samples for gases. Launch debris was identified in the particulate samples at ground level(taken immediately after launch) and in the airborne measurements (taken 40 to 50 minutes after launch approximately 40 km downwind of the pad). Operational problems were identified and included the need for higher instrumentation mobility and the need for real-time sampling instrumentation as opposed to collection-type samples such as the whole-air grab sample.

Gregory, G. L.↗

An Outlook for the Twenty First Century as to Launch Operations, Facilities, and Systems

A discussion of launch systems for the 21st century is presented. The following launch systems are mentioned: the European Ariane family; the Japanese H-1 and H-2; the U.S.'s Titan, Delta, Atlas, and Space Shuttle; the Chinese Long March 4; and the USSR's Mir, Proton, and Zenit. Systems currently under investigation, including the Assured Crew Return Vehicle, Personnel Launch Systems, and Single Stage to Orbit (SSTO), are discussed. Automated operations, low Earth orbit, and reliability are addressed. Standards that were acceptable for ballistic missiles will not be acceptable for future launch vehicles. The achievement of significantly higher levels of reliability is seen as the challenge.

Loftus, Joseph P., Jr.↗