Search NASA⌕ Search

SEARCH · Search NASA

Results for “Leak Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

REGULATORY TESTING AND 3D SCANNING METHODOLOGY OF THE DPP-1 TYPE SHIPPING CONTAINER FOR NCT AND HAC TESTS

The safe transportation of radioactive material using appropriately designed and certified transportation packages is important to protect the public and environment. In the United States of America all transportation of radioactive material is regulated by the Department of Transportation (DOT) along with input by the Nuclear Regulatory Commission (NRC). All packages that contain radioactive material requires that it be transported and regulated by the requirements set by the DOT Class 7 hazardous material transportation. Federal regulations place strict administrative controls on the transport of radioactive materials. The two main goals for transporting radioactive materials are 1. Safety should be the primarily focused on the package because it is the first line of defense. 2. Package integrity should be directly related to the degree of the hazard of the radioactive material contents. The two-part goal ensures that the right package is used. Type B packages are designed to transport radioactive materials with the highest level of radioactivity. Examples of material transported in Type B packagings include spent nuclear fuel, high-level radioactive waste, and high concentrations of other radioactive materials. The purpose of this test protocol is to determine the effects of drop and thermal testing on package performance in a Type B shipping package (DPP-1). Required physical tests for the DPP-1 package include free drop, crush, puncture, penetration, compression, vibration, water spray, water immersion, and thermal. The preparation, regulatory testing, and post-test evaluation of a Type B shipping package tested to the 10 CFR 71.71 and 10 CFR 71.73 requirements will be presented. Six packages were tested and the responses when subjected to the HAC sequence of free drop, puncture, and thermal tests according to 10 CFR 71.73(c)(1), (c)(2), (c)(3) and (c)(4) were measured. The Free Drop, Crush and Puncture tests were performed at the NTRC in Knoxville, TN, and the Thermal tests were performed Southwest Research Institute in San Antonio, TX. The test units were subjected to a pre-operational leak testing before the NCT and HAC tests and a post-operational leak test and a helium leak test once regulatory testing was complete. Finally, all test units were scanned with a handheld blue light scanner to capture a 3D CAD geometry of the test units in the deformed shape. The handheld scanner provided the most effective and reliable way to acquire accurate 3D measurements of the test unit. The scanned geometry was sectioned in areas with deformation and the cross-section profile was measured to determine accurate and repeatable results of the deformed shape of the test units.

Martinez, Oscar↗

USING AN ADAPTER TO PERFORM THE CHALFANT-STYLE CONTAINMENT VESSEL PERIODIC MAINTENANCE LEAK RATE TEST

Recently the Packaging Technology and Pressurized Systems (PT&PS) organization at the Savannah River National Laboratory was asked to develop an adapter for performing the leak-rate test of a Chalfant-style containment vessel. The PT&PS organization collaborated with designers at the Department of Energy's Pantex Plant to develop the adapter currently in use for performing the leak-rate testing on the containment vessels. This paper will give the history of leak-rate testing of the Chalfant-style containment vessels, discuss the design concept for the adapter, give an overview of the design, and will present results of the testing done using the adapter.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

316L Stainless Steel Wire Arc Additive Manufacturing and Characterization for Potential SNF Canister Production

In this paper, 316L stainless steel (316L SS) straight walls, curved walls, and vessels were printed by wire arc additive manufacturing (WAAM) using the 316L SS welding wire, to demonstrate the feasibility of spent nuclear fuel (SNF) canisters using this advanced manufacturing technique. Helium leak test with leak tight criteria of 1 × 10-7 ref-cc/s were performed on printed vessels with various wall thickness, and testing pressures were from 0.345 MPa (50 psi) to 1.724 MPa (250 psi). Printed wall microstructures were characterized using optical microscopy (OM) and scanning electron microscopy (SEM). Tensile specimens were machined out from printed walls along the length, height, and thickness directions, respectively, and tested at different temperature conditions, room temperature, 80 °C, 150 °C and 250 °C, respectively. Results showed t hat, all five WAAM-printed canisters with different thickness passed the helium leaktight criteria of radioactive materials containers by the ANSI N14.5; Dispersed micrometer-level size inclusions/voids were observed at printed wall cross sections, dendritic microstructures were found with grain size variation through the welding torch shifting direction, and very small amount of δ-ferrite and σ-phase were also observed in those cross sections; The printed walls were ductile, all tensile specimens broke with large plastic deformation/elongation and without brittle failure, and printed specimens yield strengths and tensile strengths under room temperature and 80 °C conditions are higher than minimum values of 316L SS for pressure vessels and for general applications at room temperature required by the ASTM standard, respectively.

Tang, Wei↗

FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{sup reg.} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200--350 F. Room temperature leak test failures have been experienced in 5 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30--48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200--300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the O-rings displayed a compression set ranging from 51--95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350--400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests that CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures is needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

42 ENGINEERING↗

FIFTH INTERIM STATUS REPORT: MODEL 9975 PCV O-RING FIXTURE LONG-TERM LEAK PERFORMANCE

A series of experiments to monitor the aging performance of Viton{reg_sign} GLT O-rings used in the Model 9975 package has been ongoing for six years at the Savannah River National Laboratory. Sixty-seven mock-ups of 9975 Primary Containment Vessels (PCVs) were assembled and heated to temperatures ranging from 200 to 450 F. They were leak-tested initially and have been tested at nominal six month intervals to determine if they meet the criterion of leaktightness defined in ANSI standard N14.5-97. Fourteen additional tests were initiated in 2008 with GLT-S O-rings heated to temperatures ranging from 200 to 400 F. High temperature aging continues for 36 GLT O-ring fixtures at 200-350 F. Room temperature leak test failures have been experienced in 6 of the GLT O-ring fixtures aging at 300 and 350 F, and in all 3 of the GLT O-ring fixtures aging at higher temperatures. No failures have yet been observed in GLT O-ring fixtures aging at 200 F for 30-48 months, which is still bounding to O-ring temperatures during storage in KAMS. High temperature aging continues for 6 GLT-S O-ring fixtures at 200-300 F. Room temperature leak test failures have been experienced in all 8 of the GLT-S O-ring fixtures aging at 350 and 400 F. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 or 300 F for 19 months. For O-ring fixtures that have failed the room temperature leak test and been disassembled, the Orings displayed a compression set ranging from 51-95%. This is significantly greater than seen to date for packages inspected during KAMS field surveillance (23% average). For GLT O-rings, service life based on the room temperature leak rate criterion is comparable to that predicted by compression stress relaxation (CSR) data at higher temperatures (350-400 F). While there are no comparable failure data yet at aging temperatures below 300 F, extrapolations of the data for GLT O-rings suggests the CSR model predictions provide a conservative prediction of service life relative to the leak rate criterion. Failure data at lower temperatures are needed to verify this apparent trend. Insufficient failure data exist currently to perform a similar comparison for GLT-S O-rings. Aging and periodic leak testing will continue for the remaining fixtures.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Detection of gas leakage

A method of detecting leaks and measuring volumes as well as a device, the Power-free Pump Module (PPM), provides a self-contained leak test and volume measurement apparatus that requires no external sources of electrical power during leak testing or volume measurement. The PPM is a portable, pneumatically-controlled instrument capable of generating a vacuum, calibrating volumes, and performing quantitative leak tests on a closed test system or device, all without the use of alternating current (AC) power. Capabilities include the ability is to provide a modest vacuum (less than 10 Torr) using a venturi pump, perform a pressure rise leak test, measure the gas's absolute pressure, and perform volume measurements. All operations are performed through a simple rotary control valve which controls pneumatically-operated manifold valves.

47 OTHER INSTRUMENTATION↗

Detection of gas leakage

A method of detecting leaks and measuring volumes as well as an apparatus, the Power-free Pump Module (PPM), that is a self-contained leak test and volume measurement apparatus that requires no external sources of electrical power during leak testing or volume measurement, where the invention is a portable, pneumatically-controlled instrument capable of generating a vacuum, calibrating volumes, and performing quantitative leak tests on a closed test system or device, all without the use of alternating current (AC) power. Capabilities include the ability is to provide a modest vacuum (less than 10 Torr), perform a pressure rise leak test, measure the gas's absolute pressure, and perform volume measurements. All operations are performed through a simple rotary control valve which controls pneumatically-operated manifold valves.

47 OTHER INSTRUMENTATION↗

Tritium Aging of Regenerated LANA.75

Tritium Aging of Regenerated LANA.75 is a multi-year project. Activities include: tritium aging of a LANA.75 sample regenerated in 2018, regenerating a second tritium-aged LANA.75 sample, and verifying the thermal stability of LANA.75 under regeneration conditions. During FY19, the Task Technical Plan (TTP) addendum providing testing guidance for monitoring tritium aging of the regenerated LANA.75 sample was approved. A desorption isotherm at 150 °C was collected on the regenerated LANA.75 sample. A second desorption isotherm at 150 °C is scheduled to be collected along with additional desorption isotherms at 80 and 120 °C. Fabrication, pressure testing, and leak testing of the high temperature test cell for regeneration of the second tritium-aged LANA.75 sample was completed. Selection of the second LANA.75 sample to be regenerated is anticipated in FY20. Thermal stability testing of LANA.75 material was completed. Hydrogen desorption isotherms at 80, 100 and 120 °C were collected prior to and after a lengthy annealing process (200 hours combined over two weeks) at 750 °C. The isotherms showed similar performances for all temperatures. However, the plateau region for the isotherms after the annealing process were flatter, suggesting that the annealing process was beneficial to the hydride. Sample analyses, including XRD, SEM, ICP and particle size distribution, are ongoing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Final Report: Part 1. In-Place Filter Testing Instrument for Nuclear Material Containers. Part 2. Canister Filter Test Standards for Aerosol Capture Rates.

A portable instrument has been developed to assess the functionality of filter sand o-rings on nuclear material storage canisters, without requiring removal of the canister lid. Additionally, a set of fifteen filter standards were procured for verifying aerosol leakage and pressure drop measurements in the Los Alamos Filter Test System. The US Department of Energy uses several thousand canisters for storing nuclear material in different chemical and physical forms. Specialized filters are installed into canister lids to allow gases to escape, and to maintain an internal ambient pressure while containing radioactive contaminants. Diagnosing the condition of container filters and canister integrity is important to ensure worker and public safety and for determining the handling requirements of legacy apparatus. This report describes the In-Place-Filter-Tester, the Instrument Development Plan and the Instrument Operating Method that were developed at the Los Alamos National Laboratory to determine the “as found” condition of unopened storage canisters. The Instrument Operating Method provides instructions for future evaluations of as-found canisters packaged with nuclear material. Customized stainless steel canister interfaces were developed for pressure-port access and to apply a suction clamping force for the interface. These are compatible with selected Hagan-style and SAVY-4000 storage canisters that were purchased from NFT (Nuclear Filter Technology, Golden, CO). Two instruments were developed for this effort: an initial Los Alamos POC (Proof-of-Concept) unit and the final Los Alamos IPFT system. The Los Alamos POC was used to create the Instrument Development Plan: (1) to determine the air flow and pressure characteristics associated with canister filter clogging, and (2) to test simulated configurations that mimicked canister leakage paths. The canister leakage scenarios included quantifying: (A) air leakage due to foreign material (i.e. dust and hair) fouling of o-rings, (B) leakage through simulated cracks in o-rings, and (C) air leakage due to inadequately tightened canister lids. The Los Alamos POC instrument determined pertinent air flow and pressure quantities, and this knowledge was used to specify a customized Isaac® (Z axis, Salt Lake City, UT) leak test module. The final Los Alamos IPFT (incorporating the Isaac® leak test module) was used to repeat the tests in the Instrument Development Plan (with simulated filter clogging tests and canister leak pathway tests). The Los Alamos IPFT instrument is capable of determining filter clogging and leak rate conditions, without requiring removal of the container lid. The IPFT measures pressure decay rate from 1.7E-03 in WC/sec to 1.7E-01 in WC/sec. On the same unit scale, helium leak testing of canisters has a range from 5.7E-07 in WC/sec to 1.9E-03 in WC/sec. For a 5-quart storage canister, the IPFT measures equivalent leak flow rates from 0.03 to 3.0 cc/sec. The IPFT does not provide the same sensitivity as helium leak testing, but is able to gauge the assembled condition of as-found and in-situ canisters.

61 RADIATION PROTECTION AND DOSIMETRY↗

Testing and Qualification of Molybdenum Subcapsule Welds for MiniFuel Experiments

This report documents the testing and qualification efforts for welding molybdenum components to support MiniFuel irradiation campaigns. Other details such as general weld parameters, weld joint geometries, and performance limits are also provided in this report. The American Welding Society’s specifications were used to select the nondestructive and destructive tests, which include: gross and fine leak testing, internal pressure proof testing, and creating metallographic mounts of welds. Leak testing and metallographic mounts provide qualitative information about the weld integrity, while the proof testing indicated pressure/usage limits of the molybdenum subcapsule. Based on the testing results provided in the is report, the capsule can be exposed to an internal pressure of at least 20.7 MPa (3000 psi). A sealed capsules is also capable of withstanding the 3.2 MPa (468 psi) external hydrostatic operating pressure of the High Flux Isotope Reactor.

42 ENGINEERING↗

Impact of elliptical boreholes on in situ stress estimation from leak-off test data

We developed an inversion technique to determine in situ stresses for elliptical boreholes of arbitrary trajectory. In this approach, borehole geometry, drilling-induced fracture information, and other available leak-off test data were used to construct a mathematical model, which was in turn applied to finding the inverse of an overdetermined system of equations. The method has been demonstrated by a case study in the Appalachian Basin, USA. The calculated horizontal stresses are in reasonable agreement with the reported regional stress study of the area, although there are no field measurement data of the studied well for direct calibration. The results also indicate that 2% of axis difference in the elliptical borehole geometry can cause a 5% difference in minimum horizontal stress calculation and a 10% difference in maximum horizontal stress calculation.

42 ENGINEERING↗

RH Packaging Maintenance Manual (Rev. 0)

This document provides instructions for performing (1) Inner containment vessel (IV) and outer containment vessel (OC) maintenance leakage rate test on packaging seals and corresponding seal surfaces using a nondestructive helium (He) leak test; (2) IV and OC periodic leakage rate test using nondestructive He leak test; and (3) IV and OC structural pressure tests.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Model 9975 O-Ring Fixture Long-Term Leak Performance (FY2020 Status Report)

Leak testing experiments to monitor the aging performance of Viton GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. In addition, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. No failures have yet been observed in GLT O-ring fixtures aging at 200 °F for 12 to 14 years or aging at 270 °F for 8.5 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 and 250 °F for 10 to 10.5 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicates margin remains for O-rings still in service. Aging and periodic leak testing will continue for the remaining PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY2025 Status Report: Model 9975 O Ring Fixture Long-Term Leak Performance

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package have been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The mock-up PCV fixtures are leak tested periodically, and all GLT O-ring fixtures aged at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aged at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years of aging without failure. Two of these retired fixtures were returned to testing and heated to 350 °F to evaluate the impact of additional heating at higher temperature for aged O-rings. Fixture #20 failed after 3 months while fixture #18 failed after 9 months at 350 °F. These O-rings demonstrated that aged and in-service O-rings can continue to be used, even at higher temperatures, after being in storage, and their leak performance are consistent with other samples at 350 °F. There has been one GLT O-ring fixture which failed after 13.4 years of aging at 200 °F. However, 20 other GLT O-rings aging at 200 °F have remained leak-tight for over 16.9 years and remain in test. There are two GLT O-ring fixtures at 270 °F; one fixture has failed after 12.9 years while the other fixture remains in test after 12.5 years. All GLT-S O-ring fixtures aged at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 250 °F for 14.9 years, while one GLT-S O-ring fixture failed after 12.4 years at 200 °F. The leak testing data to date suggest the GLT and GLT-S O-rings aging in the K-Area Complex (KAC) storage at temperatures of 158 °F might maintain a leak-tight seal for up to 59 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in KAC. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 24 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Review of Aging Data on EPDM O-Rings in the H1616 Shipping Package

Currently, all H1616 shipping package containers undergo annual re-verification testing, including containment vessel leak testing to verify leak-tightness (<1 x 10 -7 ref cc/sec air) as per ANSI N14.5. The purpose of this literature review is to supplement aging studies currently being performed by SRNL on the EPDM O-rings to provide the technical basis for extending annual re-verification testing for the H1616 shipping package and to predict the life of the seals at bounding service conditions. The available data suggest that the EPDM O-rings can retain significant mechanical properties and sealing force at or below bounding service temperatures (169 °F or 76 °C) beyond the 1 year maintenance period. Interpretation of available data suggests that a service life of at least 2 years and potentially 4-6 years may be possible at bounding temperatures. Seal lifetimes at lower, more realistic temperatures will likely be longer. Being a hydrocarbon elastomer, EPDM O-rings may exhibit an inhibition period due to the presence of antioxidants. Once antioxidants are consumed, mechanical properties and seal performance could decline at a faster rate. Testing is being performed to validate the assumptions outlined in this report and to assess the long-term performance of O-ring seals under actual service conditions.

42 ENGINEERING↗

Microstructure and deformation mode of a stainless steel rupture disc exposed to sodium-water reaction

This paper deals with microstructural studies carried out on an austenitic stainless steel rupture disc which was exposed to sodium-water reaction. The rupture disc was part of a leak simulator put in a micro leak test section which was used to study the 'self wastage' of steam generator tubes. During micro leak testing, the rupture disc failed exhibiting a linear crack at a much lower pressure of 10 MPa rather than bursting open at the higher designed pressure of 15 MPa. The failed rupture disc revealed different microstructural features on the inner (steam exposed) and outer (sodium exposed) surfaces. Using microstructure as the signature, the temperature experienced by the rupture disc was predicted as {>=} 1273 K. Evidence for the exposure of the rupture disc to highly exothermic sodium-water reaction was obtained in the form of sodium rich debris, microcracks and deformation bands. Detailed transmission electron microscopy revealed the nature of deformation bands as deformation twins which is not a preferred failure mode for austenitic stainless steels.

36 MATERIALS SCIENCE↗

Forensic Analysis of Faulted NSTX-U Inner Poloidal Field Coil

The failure of the NSTX-U PF1A upper coil suspended plasma operations during the project's first operational campaign after commissioning. Initial nondestructive testing and examination of the failed coil was followed by extensive nondestructive radiography. Destructive testing facilitated visual borescope/videoscope inspection through the cooling path, vacuum testing, and electrical testing of every conductor segment. One conductor cooling path visually evidenced a void through the sidewall of the cooling path in a layer-to-layer region. The identified void in the conductor cooling path was not proximal to a braze or joggle. Electrical testing indicated that the voided conductor segment was a member of a group of 14 conductor segments that evidenced low-resistance connectivity. Four braze joints and two lead segments were subjected to 400-lbf/in 2 hydrostatic pressure testing followed by helium leak testing and evidenced that there were no detectable leaks in the tested cooling path segments. The faulted region was proximal to the center of the coil pack and evidenced historical electrical pitting and molten conductor debris. Samples of the epoxy resin insulation system were extracted and analyzed with dynamic mechanical analysis and differential scanning calorimetry techniques. Epoxy resin insulation samples were subjected to immersion testing per ASTM D570. Metallurgical samples were extracted from the coil pack conductors and subjected to hardness testing and grain structure analysis. The base material testing results indicated no abnormalities. In conclusion, the coil incipient failure was determined to most likely have resulted from conductive material located between conductor and insulation layers.

25 ENERGY STORAGE↗

Model 9975 O Ring Fixture LongTerm Leak Performance (FY2021 Status Report)

Leak testing experiments to monitor the aging performance of Viton® GLT and GLT-S O-rings used in the model 9975 shipping package has been ongoing since 2004 at Savannah River National Laboratory. Seventy tests using mock-up 9975 primary containment vessels (PCVs) with GLT O-rings were assembled and heated to temperatures ranging from 200 to 450 °F. Due to material substitution, fourteen tests with GLT-S O-rings were initiated in 2008 and heated to temperatures ranging from 200 to 400 °F. The conditioning temperatures are elevated compared to the calculated maximum O-ring temperature in a 9975 package in storage, 158 °F, to accelerate aging and enable observations of O-ring failures in a reasonable time frame. The fixtures are leak tested periodically and all GLT O-ring fixtures aging at 350 °F or above have failed to maintain a leak-tight seal. Eight GLT O-ring fixtures aging at 300 °F have failed after 2.8 to 5.7 years at temperature while the remaining fixtures at 300 °F were retired from testing following more than five years without failure. There has been one GLT O-ring fixture which failed after 13.4 years aging at 200 °F. However, 19 other GLT O-rings aging at 200 °F have remained leak-tight for over 14 years and remain in test. No failures have yet been observed in GLT O-ring fixtures aging at 270 °F for 9.5 years. All GLT-S O-ring fixtures aging at 300 °F or above have failed their leak test. No failures have yet been observed in GLT-S O-ring fixtures aging at 200 and 250 °F for 11.5 years. Data from the O-ring fixtures are generally consistent with results from compression stress-relaxation testing, and provide confidence in the predictive models based on those results. However, uncertainty exists in extrapolating these elevated temperature results to the lower temperatures of interest for normal storage in K-Area Complex (KAC). Oxygen consumption testing, which includes results from temperatures near KAC normal storage temperatures, is ongoing to provide further confidence and corroborate these extrapolations. The collective data from these test efforts suggest the minimum O-ring service life at KAC normal storage conditions should be at least 34 years for GLT and GLT-S O-rings. Measurement of compression set in O-rings removed from failed fixtures, compared to that from KAC surveillance O-rings, indicate significant margin remains for O-rings still in service in 9975 packages in KAC. Aging and periodic leak testing will continue for the remaining 26 mock-up PCV fixtures.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗