RD53A: A large-scale prototype chip for the phase II upgrade in the serially powered HL-LHC pixel detectors

The phase II upgrade of the HL-LHC experiments within the LHC intends to deepen the studies of the Higgs boson and to allow the discovery of further particles by adding an integrated luminosity of about 4000 fb -1 over 10 years of operation. This upgrade would overwhelm the installed pixel detector readout chips with higher hit rates and radiation levels than ever before. To match these extreme requirements the RD53 collaboration, a joint effort between ATLAS and CMS, developed RD53A, a new generation pixel detector readout chip prototype manufactured in a 65 nm CMOS technology. It is half the size of the final pixel chips and designed to meet requirements in the face of 3 GHz/cm 2 hit rate after irradiation to 500 Mrad. The detector is able to use 50×50 μm 2 or 25×100 μm 2 pixels with high readout speed of up to 4 links per chip with 1.28 Gbit/s each. Shunt–LDO regulators integrated on the bottom of the chip provide the required voltages to the two power domains, analog and digital. These regulators enable serial powering of the pixel modules, which is the only feasible, radiation hard scheme to ensure acceptable power cable losses and to stay within the material budget for the future pixel detectors. Finally, an overview of the status and challenges of serial powering and the Shunt–LDO regulator development will be given.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Ka-Band Link Study and Analysis for a Mars Hybrid RF/Optical Software Defined Radio

The integrated radio and optical communications (iROC) project at the NASA Glenn Research Center (GRC) is investigating the feasibility of a hybrid RF and optical communication subsystem for future deep space missions. The hybrid communications subsystem enables the advancement of optical communications while simultaneously mitigating the risk of infusion by combining an experimental optical transmitter and telescope with a reliable Ka-band RF transmitter and antenna. The iROC communications subsystem seeks to maximize the total data return over the course of a potential 2-year mission in Mars orbit beginning in 2021. Although optical communication by itself offers potential for greater data return over RF, the reliable Ka-band link is also being designed for high data return capability in this hybrid system. A daily analysis of the RF link budget over the 2-year span is performed to optimize and provide detailed estimates of the RF data return. In particular, the bandwidth dependence of these data return estimates is analyzed for candidate waveforms. In this effort, a data return modeling tool was created to analyze candidate RF modulation and coding schemes with respect to their spectral efficiency, amplifier output power back-off, required digital to analog conversion (DAC) sampling rates, and support by ground receivers. A set of RF waveforms is recommended for use on the iROC platform.

communication↗

A Novel Reconfigurable GaN Based Fully Solid-State Microwave Power Module for Communications/Radar Applications

In this paper, we present as a proof-of-concept (POC) the design, integration, and performance of a novel reconfigurable GaN based fully solid-state MPM. The module synergistically integrates diplexers, pre-amplifiers, multistage medium power amplifiers (MPAs), SPDT switches, and CW/Pulsed high power amplifiers (HPAs) with a voltage sequencer, a DC blanking controller, and a low voltage electronic power conditioner. The POC SSMPM operates at both S-band and X-band to serve multiple roles. The SSMPM can be reconfigured to deliver Psat of 39 dBm (8 W CW) at S-band, Psat of 46 dBm (40 W CW) at X-band, and Psat of >50 dBm (>100 W Pulsed) at X-band. Lastly, our link budget calculations indicate that the SSMPM with Psat = 40 W when coupled to a 10 cm X-band transmit antenna on a low Earth orbiting (900 km) satellite can close a 1 Gbps (QPSK) data downlink to a 1 m receive antenna on ground with 3 dB margin.

Simons, Rainee N.↗

Enhancing Autonomous Satellite Communication Systems with Weather-Aware Scheduling and Reconfiguration

NASA currently provides communication support to over 100 satellite missions, and the agency is driving developments in Ka-band communications and network management automation to support additional future missions. At Ka-band frequencies, rain can degrade a communication link by more than 10 dB, which may be mitigated by agile scheduling and data rate control. We present a weather forecasting module for Ka-band communications that is intended to be used in an autonomous network management service that employs machine-to-machine scheduling systems for dynamic user access opportunities. Our forecasting module (NIMBUS) runs on AWS Cloud, consumes the freely and publicly available NOAA MRMS precipitation rate dataset (1km x 1km x 2-min), produces 30-minute Nowcasts using the pySTEPS algorithm, and publishes high level ground station specific link quality predictions. We evaluate two potential NIMBUS outputs, a binary classifier that predicts rain attenuation greater than 3 dB and a rain attenuation estimator, and we backtest these outputs using one year of power measurement data collected from observations of the geostationary ANIK F2 satellite’s Ka-band beacon. We report, with a 30-minute lead time, a binary classifier accuracy of 84% and an estimator RMSE of 1.67 dB. Additionally, we discuss how the NIMBUS module could be incorporated into a user-initiated service framework to enable weather-aware scheduling and reconfiguration. Operating a static link budget with minimal link margin can increase network operation costs by creating additional scheduling tasks due to failed packets, which may require human intervention and/or lead to inefficient asset utilization. The proposed system aims to increase throughput by reducing link margin, while mitigating increases in network operations costs by leveraging autonomous machine-to-machine scheduling, shortened prediction lead times, and advances in precipitation Nowcasting.

satellite communications↗

Demonstration of Multi-Gbps Data Rates at Ka-Band Using Software-Defined Modem and Broadband High Power Amplifier for Space Communications

The paper presents the first ever research and experimental results regarding the combination of a software-defined multi-Gbps modem and a broadband high power space amplifier when tested with an extended form of the industry standard DVB-S2 and LDPC rate 9/10 FEC codec. The modem supports waveforms including QPSK, 8-PSK, 16-APSK, 32-APSK, 64-APSK, and 128-QAM. The broadband high power amplifier is a space qualified traveling-wave tube (TWT), which has a passband greater than 3 GHz at 33 GHz, output power of 200 W and efficiency greater than 60 percent. The modem and the TWTA together enabled an unprecedented data rate at 20 Gbps with low BER of 10(exp -9). The presented results include a plot of the received waveform constellation, BER vs. E(sub b)/N(sub 0) and implementation loss for each of the modulation types tested. The above results when included in an RF link budget analysis show that NASA s payload data rate can be increased by at least an order of magnitude (greater than 10X) over current state-of-practice, limited only by the spacecraft EIRP, ground receiver G/T, range, and available spectrum or bandwidth.

Simons, Rainee N.↗

Calibration and Performance Measurements for the NASA Deep Space Network Aperture Enhancement Project (DAEP)

The NASA Deep Space Network (DSN) has recently constructed two new 34-meter antennas at the Canberra Deep Space Communications Complex (CDSCC). These new antennas are part of the larger DAEP project to add six new 34-meter antennas to the DSN, including two in Madrid, three in Canberra and one in Goldstone (California). The DAEP project included development and implementation of several new technologies for the S, X, Ka (26 GHz) and Ka (32 GHz) -band uplink and downlink electronics, as previously reported. The electronics upgrades were driven by several different considerations, including parts obsolescence, cost reduction, improved reliability and maintainability, and capability to meet future performance requirements. The new antennas are required to support TT&C links for all of the NASA deep-space spacecraft, as well as for several international partners. Some of these missions, such as Voyager 1 and 2, have very limited link budgets, which results in demanding requirements for system G/T performance. These antennas are also required to support radio science missions with several spacecraft, which dictate some demanding requirements for spectral purity, amplitude stability and phase stability for both the uplink and downlink electronics. After completion of these upgrades, a comprehensive campaign of tests and measurements took place to characterize the electronics and calibrate the antennas. Radiometric measurement techniques were applied to characterize, calibrate, and optimize the performance of the antenna parameters. These included optical and RF high-resolution holographic and total power radiometry techniques. These techniques, which are described in the article, resulted in the highest antenna aperture efficiency in the DSN, of 66% achieved, at the highest operating frequency of the antenna, which is Ka-Band (32-GHz). The other measurements and results described include antenna noise temperature, photogrammetry and holography alignment of antenna panels, beam-waveguide mirrors, and subreflector, antenna aperture efficiencies and G/T versus frequency, and antenna pointing models. The first antenna (DSS-35) was entered into operations in October, 2014 and the 2nd antenna (DSS-36) in October, 2016. This paper describes the measurement techniques and results of the testing and calibration for both antennas, along with the driving requirements.

Rochblatt, David J.↗

International two-way satellite time transfers using INTELSAT space segment and small Earth stations

The satellite operated by the International Telecommunications Satellite Organization (INTELSAT) provides new and unique capabilities for the coordinates of international time scales on a world wide basis using the two-way technique. A network of coordinated clocks using small earth stations collocated with the scales is possible. Antennas as small as 1.8 m at K-band and 3 m at C-band transmitting powers of less than 1 W will provide signals with time jitters of less than 1 ns existing spread spectrum modems. One way time broadcasting is also possible, under the INTELSAT INTELNET system, possibly using existing international data distribution (press and financial) systems that are already operating spread spectrum systems. The technical details of the satellite and requirements on satellite earth stations are given. The resources required for a regular operational international time transfer service are analyzed with respect to the existing international digital service offerings of the INTELSAT Business Service (IBS) and INTELNET. Coverage areas, typical link budgets, and a summary of previous domestic and international work using this technique are provided. Administrative procedures for gaining access to the space segment are outlined. Contact information for local INTELSAT signatories is listed.

Veenstra, Lester B.↗

Direct Data Distribution From Low-Earth Orbit

NASA Lewis Research Center (LeRC) is developing the space and ground segment technologies necessary to demonstrate a direct data distribution (1)3) system for use in space-to-ground communication links from spacecraft in low-Earth orbit (LEO) to strategically located tracking ground terminals. The key space segment technologies include a K-band (19 GHz) MMIC-based transmit phased array antenna, and a multichannel bandwidth- and power-efficient digital encoder/modulate with an aggregate data rate of 622 Mb/s. Along with small (1.8 meter), low-cost tracking terminals on the ground, the D3 system enables affordable distribution of data to the end user or archive facility through interoperability with commercial terrestrial telecommunications networks. The D3 system is applicable to both government and commercial science and communications spacecraft in LEO. The features and benefits of the D3 system concept are described. Starting with typical orbital characteristics, a set of baseline requirements for representative applications is developed, including requirements for onboard storage and tracking terminals, and sample link budgets are presented. Characteristics of the transmit array antenna and digital encoder/modulator are described. The architecture and components of the tracking terminal are described, including technologies for the next generation terminal. Candidate flights of opportunity for risk mitigation and space demonstration of the D3 features are identified.

Budinger, James M.↗

Evaluation of Physical Security Risk for Potential Implementation of FLEX using Dynamic Simulation Methods

The requirements for United States nuclear power plants to maintain a large onsite physical security force contribute to their large operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability Program Physical Security Pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. This pathway will analyze and minimize the conservatisms built into current security postures in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within this pathway has successfully developed a dynamic force-on-force (FOF) modeling framework using various computer simulation tools and integrated them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an overview of lessons learned in applying a dynamic computational framework that links results from a commercially available FOF simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework. Previous reports described how a user could integrate their plant-specific FOF models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as Computer Aided Fault Tree Analysis System or Systems Analysis Programs for Hands-on Integrated Reliability Evaluations, and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance of the use of the framework. Such an assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants. NOTE: The work performed in this report is based on a generic EMRALD model with actual plant data used for the analysis. However, only the generic model and general results of the analysis are in the report. No plant’s sensitive information is discussed in this report. The discussion shows examples of insights that can be obtained from the MASS-DEF methodology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

An Evaluation of The Dynamic Physical Security Risk Assessment Methodology for Fleet-Wide Applications

The requirements for U.S. nuclear power plants to maintain a large onsite physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This integrated process for physical security analysis is named Modeling and Analysis for Safety Security using Dynamic EMRALD Framework (MASS-DEF). This document provides an update on the progress in applying the MASS-DEF process to an operating commercial nuclear power plant as well as additional industry feedback regarding use of the tool for other physical security risk-informed topics. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, and integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5 or MAAP. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report is an update the progress of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report also provides an update to the procedural guidance for the MASS-DEF process and an overview of the generic models available for use by utilities. This report does not contain any plant’s sensitive information and/or safeguards information. This study’s purpose was to verify that the results achieved using generic models are similar to actual plant results and refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Plant-specific Model and Data Analysis using Dynamic Security Modeling and Simulation

The requirements for U.S. nuclear power plants to maintain a large on-site physical security force contribute to their high operational costs. The cost of maintaining the current physical security posture is approximately 10% of the overall operation and maintenance budget for commercial nuclear power plants. The goal of the Light Water Reactor Sustainability (LWRS) program’s physical security pathway is to develop tools, methods, and technologies and provide the technical basis for an optimized physical security posture. The conservatisms built into current security postures may be analyzed and minimized in order to reduce security costs while still ensuring adequate security and operational safety. The research performed at Idaho National Laboratory within LWRS program’s physical security pathway has successfully developed a dynamic force-on-force modeling framework using various computer simulation tools and integrating them with the dynamic assessment Event Modeling Risk Assessment using Linked Diagrams (EMRALD) tool. This document provides an update on the progress in applying a dynamic computational framework that links results from a commercially available force-on-force simulation tool, a commercially available thermal-hydraulic tool, and EMRALD to an operating commercial nuclear power plant. This report is only a summary of the progress and does not contain specific modeling results as those contain sensitive security information. This process of including plant procedures and multiple analysis results is being called Modeling and Analysis for Safety Security using Dynamic EMRALD Framework or MASS-DEF. Previous reports described how a user could integrate their plant-specific force-on-force models with the dynamic simulation tool EMRALD, model operator actions, integrate with probabilistic risk assessment tools, such as CAFTA (Computer Aided Fault Tree Analysis System) or SAPHIRE (Systems Analysis Programs for Hands-on Integrated Reliability Evaluations), and with thermal-hydraulic tools, such as RELAP-5. Previous reports applied various combinations of available simulations codes with EMRALD using generic plant models to demonstrate how to perform the analysis. This report documents the results of applying the dynamic computational framework to an actual nuclear facility using their security scenarios and timelines. This report does not contain any plant's sensitive information and/or Safeguards Information. The purpose of this study was to verify that results achieved using generic models are similar to actual plant results and to refine our guidance on the use of the framework. This assessment enables further analysis, such as what-if scenarios and staff-reduction evaluation, thereby optimizing physical security at plants.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

670-GHz Down- and Up-Converting HEMT-Based Mixers

A large category of scientific investigation takes advantage of the interactions of signals in the frequency range from 300 to 1,000 GHz and higher. This includes astronomy and atmospheric science, where spectral observations in this frequency range give information about molecular abundances, pressures, and temperatures of small-sized molecules such as water. Additionally, there is a minimum in the atmospheric absorption at around 670 GHz that makes this frequency useful for terrestrial imaging, radar, and possibly communications purposes. This is because 670 GHz is a good compromise for imaging and radar applications between spatial resolution (for a given antenna size) that favors higher frequencies, and atmospheric losses that favor lower frequencies. A similar trade-off applies to communications link budgets: higher frequencies allow smaller antennas, but incur a higher loss. All of these applications usually require converting the RF (radio frequency) signal at 670 GHz to a lower IF (intermediate frequency) for processing. Further, transmitting for communication and radar generally requires up-conversion from IF to the RF. The current state-of-the-art device for performing the frequency conversion is based on Schottky diode mixers for both up and down conversion in this frequency range for room-temperature operation. Devices that can operate at room temperature are generally required for terrestrial, military, and planetary applications that cannot tolerate the mass, bulk, and power consumption of cryogenic cooling. The technology has recently advanced to the point that amplifiers in the region up to nearly 1,000 GHz are feasible. Almost all of these have been based on indium phosphide pseudomorphic high-electron mobility transistors (pHEMTs), in the form of monolithic microwave integrated circuits (MMICs). Since the processing of HEMT amplifiers is quite differ en t from that of Schottky diodes, use of Schottky mixers requires separate MMICs for the mixers and amplifiers. Fabrication of all the down-/up-conversion circuitry on single MMICs, using a ll-HEMT circuits, would constitute a major advance in circuit simplicity.

Schlecht, Enrich T.↗

Systematic Analysis of Drivers and Barriers of Cross-Sectorial Learning Between Nuclear and Oil and Gas Decommissioning Projects - 20139

Project and megaproject management in the energy sector have historically focused on the planning and delivery of the construction of infrastructure. Therefore, policies are predominantly oriented to support the construction of infrastructure rather than its decommissioning. However, globally, several facilities have reached (or will soon reach) their end-of-life and need to be decommissioned. These facilities span across the energy sector, including nuclear power plants and oil and gas rigs, whose decommissioning present unprecedented techno-socio-economic challenges. Moreover, globally, their decommissioning cost is estimated to reach hundreds of billions of US dollars and this budget keeps increasing, with limited knowledge-transfer across industries to mitigate the spiraling increase of this figure. Cross-sectorial knowledge-transfer is a way to tackle this matter and improve the planning and delivery of decommissioning and waste management projects. The aim of this research is to build a road-map based on cross-sectorial industrial experience, designed to promote the sharing of good practices between projects both within and across industries dealing with major decommissioning and waste management challenges. To reach this aim, the tacit knowledge of senior practitioners on several large scale nuclear and oil and gas decommissioning projects is made explicit by the means of semi-structured interviews, systematically analyzed through directed content analysis. The results of this analysis include a list of good practices that could and should be transferred to nuclear decommissioning projects, including the need to promote the adoption of incentives explicitly linked to the project deliverables, and to develop long-term plans to support smooth transition from operations to decommissioning. Suggestions about how the knowledge-transfer can be promoted within and across organizations are also discussed. In this way, this research provides practical guidance for project managers and policymakers on how to support the planning and delivery of projects with improved performance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Quantifying Capital Cost Reduction Pathways for Advanced Nuclear Reactors

The framework developed in this study is provided both as an excel sheet (https://inl.gov/content/uploads/2023/11/Nuclear-Reactor-Cost-Reduction-Pathway-Spreadsheet-Tool.xlsx) and a Python (Jupyter) Notebook (link: https://github.com/accert-dev/ACCERT/tree/main/Cost%20Reduction). Capital cost considerations are one of the primary inhibitors to the large-scale deployment of nuclear power plants. While it is widely accepted that first units will likely be expensive and relatively uncompetitive, it is reasonable to expect that subsequent units, built in relative quick succession, will be cheaper as they benefit from the so-called “learning effects”. However, the large degree of uncertainty associated with this parameter renders it challenging for first movers to invest in the first few expensive units. To resolve this impasse, the U.S. Department of Energy’s Advanced Nuclear Liftoff study advocated for the formation of large, committed order books of plants of the same technology to spread the costs across several units and kickstart the nuclear supply chain. The study also advocated best practices for avoiding overruns and keeping reactors on budget. This report builds on these key recommendations by attempting to quantify specific pathways toward cost reduction for nuclear energy. A capital cost estimation framework was built to untangle the effect of learning into a subset of key cost drivers, referred to as “levers”. Collectively, the choice of these levers is intended to reflect the decision-making of high-level stakeholders like plant owners and the government. In addition to the size of the firm orderbook, these levers included (a) cost drivers that are most often attributed to cost overruns such as architect/engineering (A/E) proficiency, construction proficiency, procurement service proficiency, design completion prior to the start of construction, and design maturity, and (b) cost reduction strategies such as modular construction, cross-site standardization, safety classification of the reactor building, and of the balance of plant. Two advanced reactor designs were leveraged as use cases and bottom-up cost estimates made with assumptions consistent with a well-executed first-of-a-kind project (WE-FOAK, i.e., almost no overruns) were used as baselines for the models. Cost correlations were surveyed from the literature to determine the impact of important variables on projected timelines and costs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Record-breaking 2020 summer marine heatwaves in the western North Pacific

Record-breaking marine heatwaves (MHWs) occurred in the western North Pacific during the summer of 2020. These unprecedented MHWs were consistent with favorable large-scale conditions that are linked to an anomalous western North Pacific subtropical high (WNPSH), resulting mainly from sea surface temperature (SST) anomalies across the tropical oceans. In addition, a moderate La Niña-like pattern was also conducive to transporting warm seawater to the western North Pacific. Mixed-layer heat budgets suggest that surface heat flux contributed to the SST anomaly in the western subtropical Pacific. In contrast, oceanic heat advection dominanted in the South China Sea and the western equatorial Pacific. Numerical model experiments indicated that the tropical Indian Ocean SST anomalies were responsible for the enhanced WNPSH. The increased zonal SST gradient across the tropical Pacific also played an important role. Inter-ocean interactions can modulate climate variability through ocean-atmospheric coupling and deserve more attention when predicting MHWs within the context of global warming. Additionally, it is critical to consider MHWs as a powerful tool in detecting acute, intense thermal stress events in the coral bleaching pre-warning system.

Coral bleaching↗

Feedback from International Decommissioning Planning Projects - 20269

Decommissioning of Nuclear Power Plants is an increasing reality in many countries with nuclear power. Already many years before final shutdown, planning of the decommissioning work is usually started in order to understand for example the costs, waste volume capacity and licensing work needed. In many countries it is required to have a final decommissioning plan before any decommissioning work is allowed to start. Westinghouse has been involved in international decommissioning planning for more than 30 years, where the first 20 years was mostly funding and preliminary plans due to that decommissioning was many years away. However, as many more plants are now moving into decommissioning, the focus has shifted to final decommissioning plans with budgets instead of funding plans, strategic decisions instead of choices, waste volume specifications instead of estimates and a defined approach instead of what ifs. Westinghouse has developed a methodology based on the planning and execution of many decommissioning projects in Europe, America and Asia. That international experience and understanding helps the customers to adopt a systematic planning process where strategy development is done with the end state in mind, where the goals are clearly outlined and the starting point described. The process and steps to reach the desired end state need to be clearly defined and all options/alternatives evaluated from a cost/benefit point of view. This is followed by a thorough and quantitative risk analysis in order to give solid recommendations and credible conclusions. One important feedback has been that real decommissioning experience from reference projects is invaluable for an efficient and timely progress in order not to spend unnecessary time and effort on understanding the barriers and links between different activities in decommissioning. Skilled project managers or engineers can drive the project forward, but without decommissioning experience previously gained, valuable lessons learned are not used and the same mistakes can be made again. Many utilities have invested in knowledge transfer from other decommissioning projects through site visits, exchange programs and supplier meetings, which is a valuable asset and way of implementing lessons learned from performed decommissioning projects into the planning process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The NASA Beyond Einstein Program

Einstein's legacy is incomplete, his theory of General relativity raises -- but cannot answer --three profound questions: What powered the big bang? What happens to space, time, and matter at the edge of a black hole? and What is the mysterious dark energy pulling the Universe apart? The Beyond Einstein program within NASA's Office of Space Science aims to answer these questions, employing a series of missions linked by powerful new technologies and complementary approaches towards shared science goals. The Beyond Einstein program has three linked elements which advance science and technology towards two visions; to detect directly gravitational wave signals from the earliest possible moments of the BIg Bang, and to image the event horizon of a black hole. The central element is a pair of Einstein Great Observatories, Constellation-X and LISA. Constellation-X is a powerful new X-ray observatory dedicated to X-Ray Spectroscopy. LISA is the first spaced based gravitational wave detector. These powerful facilities will blaze new paths to the questions about black holes, the Big Bang and dark energy. The second element is a series of competitively selected Einstein Probes, each focused on one of the science questions and includes a mission dedicated resolving the Dark Energy mystery. The third element is a program of technology development, theoretical studies and education. The Beyond Einstein program is a new element in the proposed NASA budget for 2004. This talk will give an overview of the program and the missions contained within it.

White, Nicholas E.↗

Simultaneous Optical Links with the Inter-Satellite Omnidirectional Optical Communicator

As the onboard data volume for smaller platforms such as CubeSats increases, Radio Frequency (RF) communications systems may be unable to adequately support the required downlink demand. Optical communications (lasercom) systems can relieve the data bottleneck as they can support higher data throughput than RF for comparable Size, Weight, and Power (SWaP). Lasercom crosslinks are of particular interest for spacecraft swarms and constellations because they enable additional mission robustness for distributed science observations and remote sensing applications. The Inter-Satellite Omnidirectional optical Communicator (ISOC) is capable of supporting simultaneous lasercom crosslinks between multiple spacecraft at separations of up to thousands of kilometers in orbit. The ISOC architecture features a truncated dodecahedron chassis containing an array of photodetectors and gimbal-less MEMS mirrors, enabling full-duplex communications. The main objectives of the ISOC terminal include: 1) full sky coverage, 2) Gbps data rates, and 3) the ability to maintain multiple simultaneous links. We show ISOC can support up to 12 simultaneous links with the current architecture at 1-Gbps at 200-km separation with 10-9 BER. Compared to current lasercom transceivers (i.e., point-to-point), ISOC offers increased throughput performance for similar SWaP. A detailed link budget for both scenarios is presented, and the limiting factors for maximum number of simultaneous links are discussed.

Cahoy, Kerri↗