Search NASA⌕ Search

SEARCH · Search NASA

Results for “Loop Heat Pipe”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

39 records · Page 3

Preliminary Design of Reactor Cavity Cooling System for a Horizontal Compact HTGR

The Horizontal Compact High Temperature Gas Reactor (HC-HTGR) is being designed by a multi-disciplinary team of nuclear, mechanical, and structural engineers under the support of a DOE-NE Advanced Reactor Demonstration Program’s Advanced Reactor Concepts-20 (ARC-20) award. The objective of this ARC-20 project is to deliver a conceptual design for the proposed MIGHTR in 3 years and support its commercialization as a safe and low-cost HTGR. Argonne National Laboratory (Argonne) is responsible for the design and analysis of the reactor cavity cooling system (RCCS) as a safety system for passive decay heat removal of the reactor concept. This report documents the preliminary design study of the RCCS for the HC-HTGR. It includes the establishment of the design requirements, a high-level design study by initial scoping calculations, and preliminary performance calculations of the HC-HTGR RCCS design. Design requirements for the HC-HTGR RCCS have been established to guide preliminary design activities and scoping performance calculations. Initial scoping calculations including estimation of the water inventory, estimation of HVAC thermal capability, and a parametric study on loop dimensions by standalone RCCS analysis. Based on scoping calculation results, a set of baseline dimensions of the HC-HTGR RCCS was derived. A water panel modeling approach was investigated to explore various potential design options for the water panel under consideration for the HC-HTGR RCCS using RELAP5-3D. A test case study was performed to assess the prediction capability of two modeling approaches. The results were compared with CFD simulations conducted in constant RPV temperature and heat flux boundary conditions. It confirms the capability of the RELAP5-3D modeling approach to include all important heat transfer mechanisms expected in the HC-HTGR RCCS operation conditions. Then, a reference RELAP5-3D model for the 1/8 th of a compartment of the preliminary design of the HC-HTGR RCCS was developed. A preliminary performance analysis was conducted to evaluate single-phase natural circulation performance with different top tank temperature values and panel conduction performance in various operation conditions. From single-phase natural circulation performance analysis, the system operation mode was investigated in normal operating and limiting design conditions. It showed operation mode in a subcooled state with a proper top tank water cooling system. Parasitic heat loss by both internal air flow and RCCS was estimated, showing it satisfies maintaining below target maximum heat loss of the HC-HTGR RCCS. From the panel conduction performance analysis, two candidate materials for the riser tube such as carbon steel and stainless steel were compared in the thermal performance of HC-HTGR RCCS. From a single water panel test compared with CFD simulation results, it was confirmed that the current capability of the RELAP5-3D modeling approach for the water panel predicts the thermal conduction of two different materials of the water panel. Then, system-level thermal performance analysis was performed for 1/8 th of the compartment of the preliminary HC-HTGR RCCS design. It was first observed that the current preliminary HC-HTGR RCCS design had minimal impact on the overall thermal performance of the water panel by changing pipe material from carbon steel to stainless steel. From Argonne’s effort on the ongoing water-based NSTF testing program, several considerations other than the thermal performance point of view were addressed to be considered in selecting pipe materials.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

FY24 Report on Water NSTF Testing: Lower Tank Inlet Piping Configuration

The following report serves as a summary of the accomplishments and testing results by the Natural convection Shutdown heat removal Test Facility (NSTF) experimental program over the past 12-month period. A major activity included reconfiguration of the chimney piping geometry which altered the discharge position into the tank from the original 50% tank height to a new lower position at a 10.9% tank height. This modification increases the volume of available coolant thus extending long-term operating capacity, however also results in a decreased liquid driving head which has the potential to reduce the natural circulation efficiency and decrease overall performance. Examination of the tradeoffs for these two configurations is an area of interest for RCCS designers and drove planned test activities this year. Ten matrix tests were performed in FY24, totaling 195 hours of heated operations and 12.9 MWh of electrical heating throughout the year, with eight classified as Accepted per NQA-1 and two classified as Trending. Testing prior to the facility reconfiguration examined the facility response to throttling at the tank inlet, demonstrating increased sensitivity of flow instabilities to throttling within the two-phase region when compared to throttling at the lower sensitivity single-phase inlet region. Testing after the chimney reconfiguration began with a baseline test at conditions of 80% inventory fill and prototypic thermal power input of 2.1 MW t . In addition to establishing a reference for nominal system behavior and performance, repeat testing with multiple subsequent runs demonstrated strong repeatability between tests performed at the same conditions in this new configuration. These tests also examined if influences would occur to system behavior with installation of new higher-resolution instrumentation within the upper chimney. In this critical region where boiling and flashing phenomena dominate, the test results provided confidence that the new instrumentation does not uncharacteristically influence the observed behaviors. An inventory parametric series was then initiated to examine system behavior with the new chimney configuration at six varying initial inventory levels, ranging from high 80% to low 20% fill. Two-phase oscillations with similar peak and mean flow rates were observed when comparing to the previous mid tank configuration. Generally, similar system response trends with inventory were also observed, such as two phase oscillations suppressing as inventories were lowered. However, in one absolute inventory comparison at the highest fill of 80%, flow oscillations saw a gradual growth over the 4 hours of two-phase operation in the new lower tank inlet configuration, opposite of the gradual dampening observed in the mid tank inlet configuration. This can be attributed to, in part, a greater hydrostatic head pressure above the two-phase discharge region where the boiling front is developed. Furthermore, the change resulted in greater sensitivity to liquid degassing phenomena during single-phase heating, causing loop instabilities to form which trigged moderate flow degradation during the period approaching saturation and boiling conditions. This behavior had been observed previously under some conditions but was a common occurrence in recent testing with the newer lower tank inlet configuration. Initial observations from these first data sets suggest an overall larger window of stability for the mid tank inlet configuration compared to the lower tank inlet. Lastly, the lowest inventory fill test was repeated over an extended testing window to examine depletion behavior. Natural circulation flow and effective heat removal performance were observed during most of the testing period; only after the tank became fully drained (0% fill) did flow stagnate and violent geysering events occur. This early observation confirms one relative advantage over the mid tank inlet configuration, which stagnated under comparable conditions at ~20% inventory remaining in the tank.

42 ENGINEERING↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗