Search NASASearch

SEARCH · Search NASA

Results for “Lunar Infrastructure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Lunar Prospecting Using Thermal Wadis and Compact Rovers: Infrastructure for Surviving the Lunar Night - Part A

Recent missions have confirmed the existence of water and other volatiles on the Moon, both in permanently-shadowed craters and elsewhere. Non-volatile lunar resources may represent significant additional value as infrastructure or manufacturing feedstock. Characterization of lunar resources in terms of abundance concentrations, distribution, and recoverability is limited to in-situ Apollo samples and the expanding remote-sensing database. This paper introduces an approach to lunar resource prospecting supported by a simple lunar surface infrastructure based on the Thermal Wadi concept of thermal energy storage and using compact rovers equipped with appropriate prospecting sensors and demonstration resource extraction capabilities. Thermal Wadis are engineered sources of heat and power based on the storage and retrieval of solar-thermal energy in modified lunar regolith. Because Thermal Wadis keep compact prospecting rovers warm during periods of lunar darkness, the rovers are able to survive months to years on the lunar surface rather than just weeks without being required to carry the burdensome capability to do so. The resulting lower-cost, long-lived rovers represent a potential paradigm breakthrough in extra-terrestrial prospecting productivity and will enable the production of detailed resource maps. Integrating resource processing and other technology demonstrations that are based on the content of the resource maps will inform engineering economic studies that can define the true resource potential of the Moon. Once this resource potential is understood quantitatively, humans might return to the Moon with an economically sound objective including where to go, what to do upon arrival, and what to bring along.

Sacksteder, Kurt R.

The Behavior of High-Velocity Dust Generated by Lander Plumes in the Lunar Environment

Lunar lander plumes have been determined to generate fine ejecta at speeds exceeding 2 km/s [1], and recent work [2] has shown that Escape Velocity Domain (EVD) ejecta may remain in orbit for extended periods of time. By confining this study to expected near-term lunar activity and the known cone of dust generated by lunar landings, the behavior of high-velocity dust is characterized in an effort to understand its impact on orbiting lunar infrastructure such as the Gateway as well as the footprint of reimpacting dust on the lunar surface. In addition to the regular 3-body gravitation effects, the effects of Solar Radiation Pressure and charge are both quantified and modeled.

Lunar

Applications and Benefits of GNSS for Lunar Exploration

This paper explores the role of Global Navigation Satellite Systems (GNSS) in NASA's lunar exploration plans. Robust position, navigation and timing (PNT) at the Moon will rely on a variety of measurement sources, each with its own advantages and disadvantages. The best navigation solution will depend on mission type, the phase within each mission, the state of lunar infrastructure development at the time and a host of other considerations. No single method will provide all PNT for all scenarios, but GNSS offers a continuously available, flight-proven source of navigation and timing with unique features that make it a valuable option. As NASA launches a new era of lunar exploration missions in 2021, development of the supporting navigation architecture is underway. This paper describes the role GNSS could or will play in the components of NASA's lunar exploration plans: the Artemis missions designed to return humans to the lunar surface, the Gateway platform orbiting near the Moon that will host astronauts as well as science and technology payloads, and the robotic lander missions administered by the Commercial Lunar Payload Services (CLPS) program. GNSS-based autonomous navigation has the potential to dramatically expand lunar exploration capabilities. Through the use of GNSS and GNSS-like augmentations, navigation performance could be improved while simultaneously reducing operational complexity relative to conventional, ground-based navigation methods. As NASA begins to implement its lunar exploration plans this year and assemble the enabling communications and navigation infrastructure, GNSS will provide an important part of the diverse measurements required for robust lunar PNT.

Benjamin W Ashman

An Integrated Architecture Study for Autonomous Lunar Construction

Lunar construction is an expanding field within NASA’s Moon to Mars objectives that presents many challenges and requires innovative and reliable forms of autonomous operations on the surface of the Moon to further the technologies needed for human space exploration. Marshal Space Flight Center’s (MSFC) Advanced Concepts Office (ACO) addressed Lunar Infrastructure Objective LI-4 l by developing a Pre-Phase A, integrated architecture to inform a demonstration for lunar construction operations. The ACO study traded three architectures that would survey and prepare a construction area to build a landing pad out of lunar regolith using MMPACT (Moon-to-Mars Planetary Autonomous Construction Technology) platforms, rovers, and navigation outposts. The main trades examined navigation for the system/architecture, options for rover navigation, battery vs continuous tether power for the MMPACT robotic arm, and assigning site prep functionality to the rovers vs the platforms. Results of the study determined that the best options for the scenario provided would be local navigation (more accurate and continuous), a combination of Light Detection and Ranging (LiDAR) for initial site mapping with subsequent Smart Video Guidance Sensors (SVGS) to save power for construction, and using tethered power to decrease mission duration. The team also concluded that assigning site prep functionality to either the rovers or the platforms has benefits and challenges; future studies could explore having that functionality on both the rovers and platforms. Lastly, the team provided a Concept of Operations (ConOps) timeline that can be used in real-time ground demonstrations to explore the mission timeline, construction processes, autonomous operations, and communication systems that can be tested using MSFC’s lunar regolith field and Lunar Utilization Control Area (LUCA).

Sarah Triana

A Study of Layered Structural Configurations as Thermal and Impact Shielding of Lunar Habitats

The focus of this study is the analysis of a proposed multilayer material configuration as lunar habitat shielding so as to assess its ability to resist temperature extremes and impact. In order to resist this environmental hazard, the analysis will compare various configurations of potential shielding layers using both in-situ resource utilization (ISRU) and Earth-based materials. The technology for implementation of in-situ resources in construction is developing, though not yet able to produce a functional lunar habitat. As the lunar infrastructure is developed, ISRU techniques for manufacturing and construction may become more viable. Therefore, both types of materials are considered due to potential for application towards both near-term and long-term commencements of habitat construction. The thermal analysis in this paper utilizes the nonlinear heat equation to produce a depth-dependent temperature gradient from the habitat exterior to the interior that changes continuously with time during the lunar diurnal cycle. Static loading conditions meant to simulate the impact force of a 77.9 g meteorite were used to analyze the ability of a proposed multilayer shielding configuration to resist impact. A thermal stress analysis was performed to observe the effects of heat transfer through the proposed multilayer configuration. The results of this study should be useful in determining the potential for implementation of efficient shielding layers for the initial lunar base.

Layered systems

A lunar venture

As the Earth's space station is in its final stages of design, the dream of a permanent manned space facility is now a reality. Despite this monumental achievement, however, man's quest to extend human habitation further out into space is far from being realized. The next logical step in space exploration must be the construction of a permanent lunar base. This lunar infrastucture can, in turn, be used as a staging ground for further exploration of the remote regions of the solar system. As outlined by the National Aeronautics and Space Administration, the lunar base program consists of three exploratory and implementation phases. In response to the technological and facility requirements of Phase 1 and 2 of this program, the Aerospace Vehicle Design Program of the University of Virgina (UVA) is proud to present a preliminary design for such a lunar infrastructure. This study is a comprehensive evaluation of the mission requirements as well as the design criteria for space vehicles and facilities. The UVA Lunar Venture is a dual system that consists of a lunar space station and a fleet of lunar landers/transporters. With such a design, it is demonstrated that all initial exploratory and construction requirements for the lunar base can be efficiently satisfied. Additionally, the need for such a dual system is justified both from a logistic and economic standpoint.

Lee, Joo Ahn

Experimental Considerations for Ground-Based Testing of Lunar Construction Technologies

NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities - Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans - Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed - Ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities - Use of Taguchi methods [1] will minimize the number of needed experiments to explore critical input parameter

Moon

LUNAR REGOLITH:SMALL SCALE ROBOTIC SITE PREPARATION AND GEOTECHNICAL EXPERIMENTSWITH SCOOPS

NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities. Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans. Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed. The use of ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities. In addition, the use of Taguchi methods will minimize the number of needed experiments to explore critical input parameters.

R. P. Mueller

Lunar Regolith: Small Scale Robotic Site Preparation and Geotechnical Experiments with Scoops

- NASA’s Moon-To-Mars Planetary Autonomous Construction Technology (MMPACT) project seeks to research, develop, and demonstrate lunar surface construction capabilities. - Quantification of lunar regolith’s geotechnical properties allows for effective prediction of forces and displacement during excavation and construction and is critical to facilitating regolith sintering capabilities all of which benefit lunar infrastructure plans. - Knowledge of shear strength, Mohr-Coulomb cohesion, angle of internal friction, bearing strength, bulk density, etc. is needed. - The use of ground-based testing of various lunar simulants with relevant hardware (e.g., robotic arm tools) enables validation of technology choices, tool paths, and lunar surface construction activities. - In addition, the use of Taguchi methods [1] will minimize the number of needed experiments to explore critical input parameters. - The Jet Propulsion Lab is preparing to fly the COLDarm payload on a CLPS lunar mission with a geotechnical measurement scoop

Regolith

3GPP Telecommunications Technology on the Moon

Under NASA’s Artemis program, NASA is planning to send astronauts back to the Moon in the next couple of years. Near term missions will be analogous but much more sophisticated versions of the last couple of Apollo missions. However, unlike Apollo, this time NASA intends to put the infrastructure in place to support long term human presence and eventual industrialization of the Moon. To make this vision a reality, NASA plans to collaborate with commercial and international partners as much as possible as opposed to developing, building, and operating equipment on its own. Lunar infrastructure will eventually be built over time by many organizations, public and private, to support sustained human exploration, science, and industrial activities. Obviously, this vision for the future will be impossible without a robust lunar communications and navigation system that can support many users with varying degrees of services. On Earth, most people are very familiar with the 3rd Generation Partnership Project (3GPP) 5G mobile telecommunications technology. NASA’s Space Technology Mission Directorate and NASA’s Space Communications and Navigation office would like to see a lunar communications and navigation network with similar capabilities to the cellular communication networks most of us enjoy today. Building such a network will require participation by many organizations. This paper will provide an overview of NASA’s interest in using 5G and beyond on the lunar surface; it will also describe current work based on 3GPP standards within NASA or funded by NASA, such as Nokia’s upcoming Tipping Point demonstration of 4G / LTE on the lunar surface.

Bernard Edwards

Beamed Energy and Communications Optical Node (BEACON) Demonstrator

Due to long shadow periods (2 weeks or greater) on the south pole, concepts to raise solar arrays to a sufficient height at specific locations have shown the capability to provide power to surface users for much longer periods. Such a tower can also provide a 3rd Generation Partnership Project (3GPP) service for users up to 10 km away, dependent on terrain. An option to deliver power, albeit with low efficiency, using a laser beam coupled with the tower height could provide mobile and fixed users power during darkness, reducing their battery requirements. A demonstration of these technologies in the lunar environment is crucial to support future Artemis campaigns as well as potential emerging lunar infrastructures. A demonstrator design of a 15 m deployed boomon the south pole has been shown to enable both the gathering of kilowatts of power and the provision of 3GPP relay and backhaul given an appropriate lunar location. Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanently shadowed regions (PSR) where solar power is not available. In this work, the Compass team performed a conceptual engineering design study of a near-term laser surface-to-surface power beaming and relay station using a tower to simultaneously carry the power source (Vertical Solar Array Technologies (VSAT)[1]), the 3GPP relay antenna, and the laser telescope.

Deployable solar array tower laser beamed power 3G

Beamed Energy and Communications Optical Node (BEACON) Demonstrator

Due to long shadow periods (2 weeks or greater) on the south pole, concepts to raise solar arrays to a sufficient height at specific locations have shown the capability to provide power to surface users for much longer periods. Such a tower can also provide a 3rd Generation Partnership Project (3GPP) service for users up to 10 km away, dependent on terrain. An option to deliver power, albeit with low efficiency, using a laser beam coupled with the tower height could provide mobile and fixed users power during darkness, reducing their battery requirements. A demonstration of these technologies in the lunar environment is crucial to support future Artemis campaigns as well as potential emerging lunar infrastructures. A demonstrator design of a 15 m deployed boomon the south pole has been shown to enable both the gathering of kilowatts of power and the provision of 3GPP relay and backhaul given an appropriate lunar location. Using a laser to send power to a photovoltaic receiver has been proposed to transmit electrical power on the moon, particularly for applications such as powering a rover in near-polar permanently shadowed regions (PSR) where solar power is not available. In this work, the Compass team performed a conceptual engineering design study of a near-term laser surface-to-surface power beaming and relay station using a tower to simultaneously carry the power source (Vertical Solar Array Technologies (VSAT)[1]), the 3GPP relay antenna, and the laser telescope.

Lunar Relay

NASA Envisioned Future Priorities for In Situ Resource Utilization

A major objective of the United States National Aeronautics and Space Administration’s Artemis program is to create a sustainable human lunar exploration program through the establishment of lunar infrastructure and commercial space operations. A key aspect in achieving this objective is characterizing the resources that exist on the Moon and Mars, and learning how to utilize them to create products for crew, power, transportation, and infrastructure growth. Commonly known as In Situ Resource Utilization (ISRU), the ability to make products from local materials instead of bringing everything from Earth has the potential to significantly reduce mission costs, mass, risks, and dependency on Earth. To achieve this vision, NASA’s Space Technology Mission Directorate (STMD) established a strategic framework, called the Strategic Technology Architecture Roundtable (STAR) process, to coordinate development of critical capabilities around four major Thrusts (Go, Land, Live, and Explore). To guide and drive the development of critical mission capabilities, the STAR process involves establishing a ‘grand vision’ known as an Envisioned Future for each of these capabilities. For ISRU, the Envisioned Future is “Scalable ISRU production/utilization capabilities including sustainable commodities on the lunar and Mars Surface”. This paper will discuss the STAR process, and the strategic plan and near-term priorities for achieving the ISRU Envisioned Future.

In Situ Resources Utilization

A Self Contained Method for Safe and Precise Lunar Landing

The return of humans to the Moon will require increased capability beyond that of the previous Apollo missions. Longer stay times and a greater flexibility with regards to landing locations are among the many improvements planned. A descent and landing system that can land the vehicle more accurately than Apollo with a greater ability to detect and avoid hazards is essential to the development of a Lunar Outpost, and also for increasing the number of potentially reachable Lunar Sortie locations. This descent and landing system should allow landings in more challenging terrain and provide more flexibility with regards to mission timing and lighting considerations, while maintaining safety as the top priority. The lunar landing system under development by the ALHAT (Autonomous precision Landing and Hazard detection Avoidance Technology) project is addressing this by providing terrain-relative navigation measurements to enhance global-scale precision, an onboard hazard-detection system to select safe landing locations, and an Autonomous GNC (Guidance, Navigation, and Control) capability to process these measurements and safely direct the vehicle to this landing location. This ALHAT landing system will enable safe and precise lunar landings without requiring lunar infrastructure in the form of navigation aids or a priori identified hazard-free landing locations. The safe landing capability provided by ALHAT uses onboard active sensing to detect hazards that are large enough to be a danger to the vehicle but too small to be detected from orbit, given currently planned orbital terrain resolution limits. Algorithms to interpret raw active sensor terrain data and generate hazard maps as well as identify safe sites and recalculate new trajectories to those sites are included as part of the ALHAT System. These improvements to descent and landing will help contribute to repeated safe and precise landings for a wide variety of terrain on the Moon.

Paschall, Stephen C., II

Germinating the 2050 Cis-Lunar Econosphere

In early 2013, Marshall Space Flight Center's upper management chartered a diverse team for a six-week 'sprint' to speculate (in a disciplined manner) and paint (with broad brush strokes) a picture of how earth, space, and public/private entities might be operating and relating to each other... in the year 2100. Two 12-person groups of civil servants, one with members having 15 years or less of NASA experience and the other with more senior members, worked independently and then compared and integrated their conclusions. In 2014, the 'Space 2100' team, with some new team members and different group boundaries, ran a longer sprint to a) develop more detailed estimates of the operations and economics of space activities in the vicinity of the Earth and Moon in the 2050 time frame, b) identify evolutionary paths, barriers, and opportunities, and c) suggest actions and philosophies to enable and invigorate progress towards the vision. This paper explores Space 2100's first two sprints and their projections of NASA's role in what will likely be a highly networked, international space industry and cis-lunar infrastructure.

Scott, David W.

Germinating the 2050 Cis-Lunar Econosphere

In early 2013, the Marshall Space Flight Center (MSFC) Director and MSFC's Office of Strategic Analysis and Communications (OSAC) chartered a diverse team for a six-week "sprint" to speculate (in a disciplined manner) and paint (with broad brush strokes) a picture of how earth, space, and public/private entities might be operating and relating to each other...in the year 2100. Two 12-person groups of civil servants, one with members having 15 years or less of NASA experience and the other with more senior members, worked independently and then compared and integrated their conclusions. In 2014, the "Space 2100" team, with some new team members and different group boundaries, ran a longer sprint to a) develop more detailed estimates of the operations and economics of space activities in the vicinity of the Earth and Moon in the 2050 time frame, b) identify evolutionary steps and viable paths needed to make that a reality, and c) recommend actions to enable and invigorate those steps. This paper explores Space 2100's first two sprints and their projections of NASA's role in what will likely be a highly networked international space industry and cis-lunar infrastructure.

Scott, David W.

In-situ Lunar Launch and Landing Pad Construction with Regolith-Thermoset Polymer Composite Materials

Lunar launch and landing pads are necessary to mitigate risks to lander/ascent vehicles and surrounding surface assets from rocket plume ejected regolith. The current state of the art of landing and launching from the lunar surface is to land/launch on unprepared regolith surfaces. Significant risks exist for the larger landers proposed for the Artemis Program due to higher thrust levels leading to increased ejecta and cratering, presence of co-located assets in the ejecta path, and potential strict surface levelness requirements for tall vehicles.

Launch Pad

ISRU-Based Robotic Construction Technologies For Lunar And Martian Infrastructures

Economically viable and reliable building systems and tool sets are being sought, examined and tested for extraterrestrial infrastructure buildup. This project utilizes a unique architecture weaving the robotic building construction technology with designs for assisting rapid buildup of initial operational capability Lunar and Martian bases. The project intends to develop and test methodologies to construct certain crucial infrastructure elements in order to evaluate the merits, limitations and feasibility of adapting and using such technologies for extraterrestrial application. High priority infrastructure elements suggested by our NASA advisors to be considered include landing pads and aprons, roads, blast walls and shade walls, thermal and micrometeorite protection shields and dust-free platforms utilizing the well-known insitu resource utilization (ISRU) strategy. Current extraterrestrial settlement buildup philosophy holds that in order to minimize the materials needed to be flown in, at great transportation costs, strategies that maximize the use of locally available resources must be adopted. Tools and heavy equipment flown as cargo from Earth are proposed to build required infrastructure to support future missions and settlements on the Moon and Mars. Several unique systems including the Lunar Electric Rover, the unpressurized Chariot rover, the versatile light-weight crane and Tri-Athlete cargo transporter as well as the habitat module mockups and a new generation of spacesuits are undergoing coordinated tests at NASAs D-RATS. This project intends to draw up a detailed synergetic plan to utilize these maturing systems coupled with modern robotic fabrication technologies based primarily on 3D Printing, tailored for swift and reliable Lunar and Martian infrastructure development. This project also intends to increase astronaut safety, improve buildup performance, ameliorate dust interference and concerns, and reduce time-to-commission, all in an economic manner. The goal stated in our Phase I proposal was a high fidelity demonstration at D-RATS to be conducted at the conclusion of the Phase II study. In the course of the Phase I study, however, it became clear that such demonstration was neither possible (due to the maximum Phase II budget limitation and the cost of NASA assets and related overhead expenses to support such demonstrations), nor necessary (due to NASA's low TRL expectation of Phase II results). These important facts were revealed to us only after interacting with the NIAC administrators and meetings with potential future partners at JPL and KSC. Accordingly, it was decided by the team that in order to make best use of resources we should investigate novel directions in the adaptation of our fabrication technologies by using in-house laboratories and to produce truly useful technologies and data, and then proceed with high fidelity demonstration at a later opportunity when sufficient resources become available. Furthermore, we have recognized that in addition to our building scale 3D printing technology called Contour Crafting, variations of some of our other fabrication technologies under development are suitable for construction of infrastructure elements such as regolith based ceramic tiles and hence we have decided to include some related preliminary research in this Phase II proposal.

Extraterrestrial