Search NASA⌕ Search

SEARCH · Search NASA

Results for “Lunar human exploration”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Micro-Logistics Analysis for Human Space Exploration

Traditionally, logistics analysis for space missions has focused on the delivery of elements and goods to a destination. This type of logistics analysis can be referred to as "macro-logistics". While the delivery of goods is a critical component of mission analysis, it captures only a portion of the constraints that logistics planning may impose on a mission scenario. The other component of logistics analysis concerns the local handling of goods at the destination, including storage, usage, and disposal. This type of logistics analysis, referred to as "micro-logistics", may also be a primary driver in the viability of a human lunar exploration scenario. With the rigorous constraints that will be placed upon a human lunar outpost, it is necessary to accurately evaluate micro-logistics operations in order to develop exploration scenarios that will result in an acceptable level of system performance.

Cirillo, William↗

Moon to Mars (M2M) Habitation Considerations: A Snap Shot As of January 2022

The following NASA Technical Memorandum (TM) is intended to provide a snapshot in time of NASA’s current considerations (ground rules and assumptions, functional allocations, logistics) for habitation systems for the lunar surface (non-roving) and Mars transits. As NASA continues to refine the reference designs to meet the needs of an evolving architecture, it is expected that this information will also be updated as a result. Where appropriate, relevant publicly released documents will be referenced to provide further detail. NASA’s human lunar exploration plan under the Artemis program calls for achieving the goal of sending the first woman and first person of color to the surface of the Moon in the mid- 2020s and working toward sustainable exploration by the end of the decade. Working with both commercial and international partners, NASA will establish a permanent human presence on the Moon to uncover new scientific discoveries and lay the foundation for private companies to build a lunar economy. Longer duration missions on the lunar surface and in lunar orbit will also serve as a test bed for technologies to support future Mars exploration campaigns. The agency will use what we learn on the Moon to prepare for humanity's next giant leap – sending astronauts to Mars. NASA intends to establish a sustained lunar presence with the development of the Artemis Base Camp to prove technologies and capabilities that will one day enable humans to live and work on Mars, beginning with core elements including the Lunar Terrain Vehicle (LTV), the Pressurized Rover (PR), the lunar Surface Habitat (SH), power systems, and in-situ resource utilization (ISRU) systems. For in space operations and eventual transport of humans to Mars, NASA will utilize a Mars Transit Habitat (TH). Following deployment, the TH will complete a series of longer duration missions and shakedown testing while docked at Gateway, leveraging Gateway’s habitation redundancy for safety measures. Proposed Gateway-TH missions will far exceed the longest duration cislunar human missions to date. They will be the first operational readiness tests of our long-duration deep space systems, and of the split crew (two crew on the surface, two crew in space) operations that are vital to the approach for the first human Mars mission. Both the SH and TH are major architectural elements of NASA’s Moon to Mars (M2M) approach, each with very different concepts of operation. The SH is intended for use on the lunar surface as a home for astronauts, surface operations base, science facility, hub for communications, extravehicular activity (EVA) equipment repair site, waste processing facility, and supply hub. It serves as an enabler for a sustained surface presence and preparation for partial gravity operations during Mars missions. The SH will be designed to be self-sufficient for operations on the lunar surface. The SH will independently provide several functions, including its own power generation, energy storage capability, sleep quarters, hygiene areas, work areas, and dining areas. It will be capable of communicating with surface assets, orbital assets, and directly with Earth ground stations. It is planned to operate with two crew in the habitat for ~28- day stays with crew swap-outs in which the PR crew of two trades places with the habitat crew. During the swap-out, the habitat will nominally support four crew for a short period of time. For contingency scenarios, the habitat must also be capable of supporting four crew for up to 7 days. The TH will be designed to be capable of up to ~1,200-day Mars missions with the ability to carry all food and supplies needed to support a crew of four for this duration. An assumed Mars mission profile for the TH is to carry crew and supplies for ~850-day roundtrips between Earth and Mars orbit that allows 30-day stays on the Martian surface. To test the systems for this long journey, the TH will be used to extend the duration of missions at Gateway, enabling the orbiting outpost to be used as a Mars analog. These analog missions will be accomplished by attaching the TH to Gateway and conducting lunar surface operations from the TH. The TH may also need to perform free-flying shakedown missions to test out all systems prior to leaving for Mars. The habitat provides many critical functions including: a contingency airlock, crew quarters, galley, hygiene areas, safe haven capability, and science equipment. It can receive docked items from either axial end or on a radial port.

Habitat↗

The Wizard Staff Mobile Tool for Human Exploration on the Lunar Surface

The Wizard Staff is a rechargeable, battery powered mobile tool with multiple uses for lunar surface exploration. It supports human activity as a surface survey tool, provides external illumination to enhance safety, delivers networking, communications, and navigation functions to remote sites, and assists crew rescue with an emergency beacon and rigid splint structure.

Wizard Staff↗

The Wizard Staff: A Mobile Tool Supporting Human Exploration on The Lunar Surface

The Wizard Staff is a rechargeable, battery powered mobile tool with multiple uses for lunar surface exploration. It supports human activity as a surface survey tool, provides external illumination to enhance safety, delivers networking, communications, and navigation features to remote sites, and assists crew rescue with an emergency beacon and rigid splint structure. As a survey tool, it assists crewed geologic field site exploration with external lights, cameras, and LiDAR to illuminate, map, and record the sample collection process. As a relay station, it provides a surface intranet communications and navigation node for extended exploration far from the lander or habitation module. A separately developed Search-and-Rescue (SAR) handheld device can broadcast a signal to the Gandalf Staff containing crew position and biometric data. The staff then formats the message and sends it orbiting satellite(s) for emergency response via the LunaNET on a dedicated frequency similar to terrestrial applications using an Emergency Position-Indicating Radiobeacon (EPIRB). The staff is designed with an upper and lower segment. Components in the upper segment are the LiDAR, external lighting arrays, cameras, communications equipment, intelligence devices, and user interface for crew operations. The lower segment is a set of FeLiPO4 battery cells packed into the 2” diameter carbon fiber tube. When the battery pack is discharged, a spring connector (designed for the dusty lunar environment) easily disconnects the two segments for replacement with another fully charged battery pack. The lower segment can be used for Incapacitated Crew Rescue (ICR) as a rigid splint. As a stand-alone science platform, the Wizard Staff provides infrastructure for instruments and sensors to record the lunar environment over long periods of time. After a crew installs the components on the lunar surface, the platform delivers data to the lunar lander or base station for analysis. The stand-alone mode requires an auxiliary power source (e.g. solar array) and energy storage system (e.g. battery), so it could also be used as an electrical recharging station. A working prototype of Wizard Staff has been developed with collaboration between NASA (JSC, MSFC, and GSFC), Texas Space Technology Applications and Research (T STAR), and Texas A&M University (TAMU) using $300k of innovation funding in FY’21 and FY’22. The functional staff weights 36# on Earth (6# on the Moon), stands 2.1m tall and delivers external lighting with an array of 40 LED bulbs generating 1460 Lux at 2m range (near field), or 2 Lux at 50m (far field).

Gandalf Staff↗

NASA Space Launch System Prepares for Key Hotfire Test Before Vehicle Integration

NASA this year is working toward the final major integrated hardware and avionics test for its Space Launch System (SLS), the agency’s new super heavy-lift vehicle to send large, strategic payloads to the Moon, Mars and beyond. As the backbone of the Artemis human lunar exploration program, Artemis I SLS operations will then shift to the launch site and integration for the inaugural mission. For this final major test of the first vehicle NASA has built exclusively for deep space exploration since the Saturn V, a NASA/Boeing/Aerojet Rocketdyne team will conduct the final core stage “green run” test at NASA's Stennis Space Center with a dramatic firing of all four core stage engines. This test will validate the operation of the stage structures, main propulsion system, engines, avionics, and software. Following data review, stage inspection, and refurbishment, the stage will be barged to NASA’s Kennedy Space Center to continue integration of the Artemis I launch vehicle. Already underway is assembly of the mission’s five-segment solid rocket boosters. The mission’s upper stage and spacecraft adapters also are staged at the launch site ready for integration. Even as the Artemis I SLS proceeds toward launch later this year, the Artemis II and Artemis III vehicles are coming together, with core stages, engines, boosters, upper stage, and payload accommodations in various stages of manufacturing and/or processing. Planning is also underway for additional core stages and a new, more powerful upper stage that will increase lunar payload mass. SLS is the anchor transportation leg of a plan for sustained human exploration of the Moon, including the first human landing later in the decade. This paper will discuss SLS progress to date and expected 2021 milestones.

Bruce R. Askins↗

Liquid Oxygen/Liquid Methane Propulsion and Cryogenic Advanced Development

Exploration Systems Architecture Study conducted by NASA in 2005 identified the liquid oxygen (LOx)/liquid methane (LCH4) propellant combination as a prime candidate for the Crew Exploration Vehicle Service Module propulsion and for later use for ascent stage propulsion of the lunar lander. Both the Crew Exploration Vehicle and Lunar Lander were part the Constellation architecture, which had the objective to provide global sustained lunar human exploration capability. From late 2005 through the end of 2010, NASA and industry matured advanced development designs for many components that could be employed in relatively high thrust, high delta velocity, pressure fed propulsion systems for these two applications. The major investments were in main engines, reaction control engines, and the devices needed for cryogenic fluid management such as screens, propellant management devices, thermodynamic vents, and mass gauges. Engine and thruster developments also included advanced high reliability low mass igniters. Extensive tests were successfully conducted for all of these elements. For the thrusters and engines, testing included sea level and altitude conditions. This advanced development provides a mature technology base for future liquid oxygen/liquid methane pressure fed space propulsion systems. This paper documents the design and test efforts along with resulting hardware and test results.

Klem, Mark D.↗

The Lunar IceCube EM-1 Mission: Prospecting the Moon for Water Ice

Lunar IceCube is a NASA nanosatellite mission designed to prospect, locate, and measure volumes and composition of water ice deposits and other volatiles on the Moon in support of future exploitation by robots and human explorers. Lunar IceCube is one of several public -private partnerships selected under NASA's Next Space Technologies for Exploration Partnerships Broad Agency Announcement for the development of advanced exploration systems. Among the first small satellites planned to explore deep space, Lunar IceCube, along with the 12 other Exploration Mission One (EM -1) missions will help lay a foundation for future small-scale planetary missions. In addition to providing useful scientific data, Lunar IceCube will help inform NASA's strategy for sending humans farther into the solar system.

Benjamin K. Malphrus↗

Draft LunaNet Interoperability Specification

This document, along with its companion documents, provides the basis for a comprehensive set of requirements for operation of a lunar communications and navigation network capable of interoperating with other networks compliant with the Lunar Network (LunaNet). LunaNet will include Earth ground stations and orbiting spacecraft and will provide services to human exploration, lunar science, and space technology missions. LunaNet will start with a simple architecture of a few nodes to meet the needs of the early missions and evolve to meet the growing needs of a sustained lunar presence. All relay network services are not expected to be met by a single spacecraft, or node. The expectation is that the needs of users will be met through a combination of interoperable systems provided by NASA, international partners, and commercial providers. Interoperability across this network-of-networks can be achieved through negotiation of mutually-agreed-upon standards that will be reflected in this document and in the specifications defined by other participants in the cooperative lunar network. This document was written and reviewed by NASA and the European Space Agency (ESA).

LunaNet↗

Draft LunaNet Interoperability Specification

This document, along with its companion documents, provides the basis for a comprehensive set of requirements for operation of a lunar communications and navigation network capable of interoperating with other networks compliant with the Lunar Network (LunaNet). LunaNet will include Earth ground stations and orbiting spacecraft and will provide services to human exploration, lunar science, and space technology missions. LunaNet will start with a simple architecture of a few nodes to meet the needs of the early missions and evolve to meet the growing needs of a sustained lunar presence. All relay network services are not expected to be met by a single spacecraft, or node. The expectation is that the needs of users will be met through a combination of interoperable systems provided by NASA, international partners, and commercial providers. Interoperability across this network-of-networks can be achieved through negotiation of mutually-agreed-upon standards that will be reflected in this document and in the specifications defined by other participants in the cooperative lunar network. This document was written and reviewed by NASA and the European Space Agency (ESA).

LunaNet↗

Lunar Dust Mitigation Technology Development

NASA s plans for implementing the Vision for Space Exploration include returning to the moon as a stepping stone for further exploration of Mars, and beyond. Dust on the lunar surface has a ubiquitous presence which must be explicitly addressed during upcoming human lunar exploration missions. While the operational challenges attributable to dust during the Apollo missions did not prove critical, the comparatively long duration of impending missions presents a different challenge. Near term plans to revisit the moon places a primary emphasis on characterization and mitigation of lunar dust. Comprised of regolith particles ranging in size from tens of nanometers to microns, lunar dust is a manifestation of the complex interaction of the lunar soil with multiple mechanical, electrical, and gravitational effects. The environmental and anthropogenic factors effecting the perturbation, transport, and deposition of lunar dust must be studied in order to mitigate it s potentially harmful effects on exploration systems. This paper presents the current perspective and implementation of dust knowledge management and integration, and mitigation technology development activities within NASA s Exploration Technology Development Program. This work is presented within the context of the Constellation Program s Integrated Lunar Dust Management Strategy. The Lunar Dust Mitigation Technology Development project has been implemented within the ETDP. Project scope and plans will be presented, along with a a perspective on lessons learned from Apollo and forensics engineering studies of Apollo hardware. This paper further outlines the scientific basis for lunar dust behavior, it s characteristics and potential effects, and surveys several potential strategies for its control and mitigation both for lunar surface operations and within the working volumes of a lunar outpost.

Hyatt, Mark J.↗

SILVER: Surface Imaging for Lunar Volatiles, Resources, and Exploration

The Surface Imaging for Lunar Volatiles, Exploration, and Resources (SILVER) instrument is a proposed imaging investigation for the 2008 Lunar Reconnaissance Orbiter (LRO) mission. SILVER and its experienced Measurement Team will prepare for and support future lunar human exploration activities, especially landing site identification and certification on the basis of potential resources. SILVER combines a high-resolution pushbroom visible imaging channel (SILVER-HR) and a wide-field-of-view (45 deg) framing imaging channel (SILVER-WF). SILVER-HR will obtain a single-detector 6 km imaging swath of 12,228 pixels at 0.5 m/pixel to image greater than 100 sq km target areas from 50 km altitude, imaging greater than 15% the lunar surface during a 1 year nominal mission. SILVER-HR has excellent stray-light rejection and its imaging detector has selectable time delay integration (TDI) with up to 128 stages for extreme low-light sensitivity, permitting direct imaging of permanently shadowed polar regions in scattered sunlight or earthshine. SILVER-WF will obtain geodetic framing images in a 2048 x 2048 format at 20m/pixel, with 60% along-track overlap stereo for imaging context and for derivation of a global digital elevation model of meter-scale lunar topography.

Pappalardo, R. T.↗

NASA's Space Launch System Begins Integration, Stacking in Preparation for Artemis I Launch

The Artemis era of human lunar exploration is nearing take-off as NASA’s new super heavy-lift launch vehicle, the Space Launch System (SLS), begins stack-ing and integration operations in mid-2020 at Kennedy Space Center (KSC) in Florida. With a planned upgrade path to progressively more powerful vehicles and availability in crew and cargo configurations, SLS provides a unique and flexible launch solution to send crew, large-scale infrastructure and robotic probes to deep space. The SLS Block 1 vehicle, the initial variant to fly, is optimized for lunar missions with a proven propulsion system consisting of four liquid hydrogen (LH2)/liquid oxygen (LOX)-fed RS-25 engines and twin five-segment solid rocket boosters (SRBs). The Block 1 vehicle can also be outfitted with an industry-standard 5 m-class payload fairing (the “cargo” configuration) and will launch at least 27 metric tons (t) of mass to trans-lunar injection (TLI). SLS is the backbone of NASA’s Artemis program, which will return the agency’s human spaceflight program to the Moon for the first time since 1972. For the Artemis I mission, SLS will send an uncrewed Orion spacecraft to TLI, where it will enter a distant retrograde lunar orbit and fly 38,000 nmi past the Moon – farther than any spacecraft built for humans has ever traveled. The SLS Block 1 vehicle for Artemis I completed manufacturing in 2019. Several elements, including the upper stage, have been delivered to the Exploration Ground Systems (EGS) program at KSC and are being prepped for integration and stack-ing. The five-segment solid rocket boosters – the largest and most powerful ever built for flight – are also complete. The booster motor segments for the Artemis I flight are scheduled to ship from prime contractor Northrop Grumman’s Utah facilities and begin stacking and integration at KSC in June 2020. The SLS core stage is the largest rocket stage NASA has ever built in terms of volume and height, and includes the avionics and the tanks that feed cryogenic propellant to the four RS-25s (formerly Space Shuttle Main Engines [SSMEs]). They have been modified with an updated controller and nozzle insulation to protect them from the hotter launch environment. The SLS core stage is currently being test-ed at NASA’s Stennis Space Center (SSC) in a series of “green run” tests to verify it meets design and performance requirements. Following the green run test series, which is scheduled to culminate with a full-duration hot-fire of the four RS-25 engines, the core stage will ship to KSC and be stacked between the sol-id rocket boosters in the Vehicle Assembly Building (VAB). Integration of the vehicle will continue with the upper stage, known as the Interim Cryogenic Propulsion Stage (ICPS) and the Launch Vehicle Stage Adapter (LVSA) on the core stage. Another adapter, the Orion Stage Adapter (OSA), connects SLS to Orion and provides housing for 13 6U CubeSat payloads manifested on Artemis I. The CubeSats will be released in deep space after Orion separates from the vehicle, and the flight marks the first ride share opportunity for independent small-sats to deep space. The second major SLS variant to come online, Block 1B, replaces the single-engine ICPS with a four-engine LH2/LOX Exploration Upper Stage (EUS). This more powerful upper stage, along with other vehicle up-grades, will enable the Block 1B vehicle to launch 38-42 t to TLI, depending on crew or cargo configuration. The final evolution of the vehicle, Block 2, will onramp evolved solid rocket boosters to increase mass to TLI to 43-46 t, de-pending on crew or cargo configuration. The Block 1B/Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing in 19.1 m or 27.4 m lengths, to provide unprecedented volume for payloads. With the initial Block 1 vehicle completely manufactured and the core stage in final testing before shipping to KSC, the SLS Program and its industry partners have made significant progress manufacturing subsequent vehicles. For the second Block 1 vehicle, the solid rocket motor segments are complete, as are the RS-25 engines with controllers. All five major components of the Artemis II core stage – the forward skirt, LOX and LH2 tanks, intertank and engine section – are manufactured and technicians are installing subsystems at NASA’s rocket factory, Michoud Assembly Facility. The RL-10 engine for the Artemis II ICPS is complete and panels have been machined for its LH2 tank. In addition, panels are machined for the vehicle’s two adapters, with welding scheduled to begin in summer 2020. Flight hard-ware is also in production for the third SLS vehicle, with several booster motor segments cast. The pace of development on the EUS has increased, with the goal to complete Critical Design Review (CDR) in December 2020. Several EUS test rings have been machined at Michoud. The EUS is designed to exe-cute a variety of missions – human spaceflight, deployment of deep-space infra-structure, or high-C3 missions to the outer solar system – with crew and cargo configurations available beginning in the mid-2020s. The near-term goal for the nation’s powerful new space exploration asset, however, is to launch the Arte-mis program, and send the first woman and the next man to the lunar surface. At the Astrodynamics Specialist Conference, the SLS program will update the community on the progress of the initial Block 1 vehicle in final green run test-ing, integration and stacking. In addition, this paper will provide an update to the community on the manufacturing status of subsequent Block 1 and Block 1B vehicles.

Steve Creech↗

Goals and Strategies for the Human Lunar Reference Architecture

The presentation examines common goals for human lunar exploration and strategic guidance. Three major sections include illustrative example goals, introduction to the GPoD campaign, and GPoD overview. The first section includes slides about strategic view of partnerships, the moon as a stepping stone and a uniquely preserved record, human-robotic partnership, innovative engagement, strategic considerations, and evaluation of campaigns against common goals. The second section examines campaigns considered, the philosophy of GPoD, GPoD campaign phase definitions, and GPoD design decision points. The third section examines lunar exploration capabilities, extended stay-relocation exploration mode, notional campaign destinations for GPoD, early robotics phase, development of the GPoD early robotics phase, polar exploration/system validation phase, polar relocatability phase, non-polar relocatability phase, long duration phase, and return to evaluation of campaigns.

Seaman, Calvin H.↗

NASA’s Space Launch System: Building A Capability for Science and Exploration

NASA’s Space Launch System, designed for human exploration of deep space and offering enabling benefits for a variety of science missions, is entering the final stages of preparation for its first launch, while simultaneously making progress toward future missions. SLS offers robust payload mass, volume, and characteristic energy that can be used not only for human exploration but for a variety of science missions, including probes to the outer solar system and beyond. In addition, while the vehicle is optimized to be a super-heavy lifter for lunar orbit as a staging area for the lunar surface or Mars, the addition of commercially available propulsion systems as third and/or fourth stages allows SLS to deliver unmatched performance for ultra-high C3 missions. Studies show that while the baseline SLS Block 2 vehicle can deliver about 8 t directly to the Jovian system at a C3 of 83, the addition of a Centaur upper stage would raise that mass to more than 15 t. The New Horizons spacecraft, with mass less than 0.5 t, launched toward Pluto with a record C3 of 158 km2/sec2. By comparison, an SLS Block 2 with an Orion 30B and Star 48BV payload stages could launch equivalent mass to a C3 more than double that of the New Horizons launch. (While the study has been conducted based on contemporary cryo stages and solid stages, this analysis provides real-world data for the range of performance this capability enables even as the specific stages available evolve.) Studies have shown it may be possible to reach 80-90 AU within a decade. The initial Block 1 vehicle for the first launch, Artemis I, is completely manufactured and all the elements are at NASA’s Kennedy Space Center (KSC) with the exception of the core stage, and manufacturing is in progress for the next several flights. Following the completion of the Green Run test series at NASA’s Stennis Space Center, the Artemis I core stage will be refurbished and delivered to KSC for stacking for launch in the second half of 2021. With the Artemis I vehicle fully manufactured and assembly of solid rocket boosters beginning, NASA and its industry partners have made significant progress manufacturing successive vehicles. Hardware for the next two launches is currently in production. NASA is committed to SLS as a key component of its launch architecture. Agency planning manifests outline the launch vehicle’s role in human lunar exploration over the next decade as it moves from its Block1 configuration to its intermediate Block 1B configuration and its ultimate Block 2 configuration.In addition, NASA has issued contracts with prime contractors for SLS hardware for delivery well into the 2030s.

Robert W. Stough↗

The Moon is a Planet Too: Lunar Science and Robotic Exploration

The first decades of the 21st century will be marked by major lunar science and exploration activities. The Moon is a witness to 4.5 billion years of solar system history, recording that history more completely and more clearly than any other planetary body. Lunar science encompasses early planetary evolution and differentiation, lava eruptions and fire fountains, impact scars throughout time, and billions of years of volatile input. I will cover the main outstanding issues in lunar science today and the most intriguing scientific opportunities made possible by renewed robotic and human lunar exploration. Barbara is a planetary scientist at NASA s Marshall Space Flight Center. She studies meteorites from the Moon, Mars and asteroids and has been to Antarctica twice to hunt for them. Barbara also works on the Mars Exploration Rovers Spirit and Opportunity and has an asteroid named after her. She is currently helping the Lunar Precursor Robotics Program on the Lunar Mapping and Modeling Project, a project tasked by the Exploration System Mission Directorate (ESMD) to develop maps and tools of the Moon to benefit the Constellation Program lunar planning. She is also supporting the Science Mission Directorate s (SMD) lunar flight projects line at Marshall as the co-chair of the Science Definition Team for NASA s next robotic landers, which will be nodes of the International Lunar Network, providing geophysical information about the Moon s interior structure and composition.

Cohen, Barbara↗

NASA Systems Analysis and Concepts Directorate Mission and Trade Study Analysis

Mission analysis, as practiced by the NASA Langley Research Center's Systems Analysis and Concepts Directorate (SACD), consists of activities used to define, assess, and evaluate a wide spectrum of aerospace systems for given requirements. The missions for these systems encompass a broad range from aviation to space exploration. The customer, who is usually another NASA organization or another government agency, often predefines the mission. Once a mission is defined, the goals and objectives that the system will need to meet are delineated and quantified. A number of alternative systems are then typically developed and assessed relative to these goals and objectives. This is done in order to determine the most favorable design approaches for further refinement. Trade studies are performed in order to understand the impact of a requirement on each system and to select among competing design options. Items varied in trade studies typically include: design variables or design constraints; technology and subsystem options; and operational approaches. The results of trade studies are often used to refine the mission and system requirements. SACD studies have been integral to the decision processes of many organizations for decades. Many recent examples of SACD mission and trade study analyses illustrate their excellence and influence. The SACD-led, Agency-wide effort to analyze a broad range of future human lunar exploration scenarios for NASA s Exploration Systems Mission Directorate (ESMD) and the Mars airplane design study in support of the Aerial Regional-scale Environment Survey of Mars (ARES) mission are two such examples. This paper describes SACD's mission and trade study analysis activities in general and presents the lunar exploration and Mars airplane studies as examples of type of work performed by the SACD.

Ricks, Wendell↗

A Collection of Technical Papers

Papers presented at the 6th Space Logistics Symposium covered such areas as: The International Space Station; The Hubble Space Telescope; Launch site computer simulation; Integrated logistics support; The Baikonur Cosmodrome; Probabalistic tools for high confidence repair; A simple space station rescue vehicle; Integrated Traffic Model for the International Space Station; Packaging the maintenance shop; Leading edge software support; Storage information management system; Consolidated maintenance inventory logistics planning; Operation concepts for a single stage to orbit vehicle; Mission architecture for human lunar exploration; Logistics of a lunar based solar power satellite scenario; Just in time in space; NASA acquisitions/logistics; Effective transition management; Shuttle logistics; and Revitalized space operations through total quality control management.

Source record↗

Digital communication constraints in prior space missions

Digital communication is crucial for space endeavors. Jt transmits scientific and command data between earth stations and the spacecraft crew. It facilitates communications between astronauts, and provides live coverage during all phases of the mission. Digital communications provide ground stations and spacecraft crew precise data on the spacecraft position throughout the entire mission. Lessons learned from prior space missions are valuable for our new lunar and Mars missions set by our president s speech. These data will save our agency time and money, and set course our current developing technologies. Limitations on digital communications equipment pertaining mass, volume, data rate, frequency, antenna type and size, modulation, format, and power in the passed space missions are of particular interest. This activity is in support of ongoing communication architectural studies pertaining to robotic and human lunar exploration. The design capabilities and functionalities will depend on the space and power allocated for digital communication equipment. My contribution will be gathering these data, write a report, and present it to Communications Technology Division Staff. Antenna design is very carefully studied for each mission scenario. Currently, Phased array antennas are being developed for the lunar mission. Phased array antennas use little power, and electronically steer a beam instead of DC motors. There are 615 patches in the phased array antenna. These patches have to be modified to have high yield. 50 patches were created for testing. My part is to assist in the characterization of these patch antennas, and determine whether or not certain modifications to quartz micro-strip patch radiators result in a significant yield to warrant proceeding with repairs to the prototype 19 GHz ferroelectric reflect-array antenna. This work requires learning how to calibrate an automatic network, and mounting and testing antennas in coaxial fixtures. The purpose of this activity is to assist in the set-up of phase noise instrumentation, assist in the process of automated wire bonding, assist in the design and optimization of tunable microwave components, especially phase shifters, based on thin ferroelectric films, and learn how to use commercial electromagnetic simulation software.

Yassine, Nathan K.↗