Search NASA⌕ Search

SEARCH · Search NASA

Results for “MANAGEMENT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Space Station Freedom - Configuration management approach to supporting concurrent engineering and total quality management

Some experiences of NASA configuration management in providing concurrent engineering support to the Space Station Freedom program for the achievement of life cycle benefits and total quality are discussed. Three change decision experiences involving tracing requirements and automated information systems of the electrical power system are described. The potential benefits of concurrent engineering and total quality management include improved operational effectiveness, reduced logistics and support requirements, prevention of schedule slippages, and life cycle cost savings. It is shown how configuration management can influence the benefits attained through disciplined approaches and innovations that compel consideration of all the technical elements of engineering and quality factors that apply to the program development, transition to operations and in operations. Configuration management experiences involving the Space Station program's tiered management structure, the work package contractors, international partners, and the participating NASA centers are discussed.

Gavert, Raymond B.↗

Program/Project Management Resources: A collection of 50 bibliographies focusing on continual improvement, reinventing government, and successful project management

These Program/Project Management Resource Lists were originally written for the NASA project management community. Their purpose was to promote the use of the NASA Headquarters Library Program/Project Management Collection funded by NASA Headquarters Code FT, Training & Development Division, by offering introductions to the management topics studied by today's managers. Lists were also written at the request of NASA Headquarters Code T, Office of Continual improvements, and at the request of NASA members of the National Performance Review. This is the second edition of the compilation of these bibliographies; the first edition was printed in March 1994.

Michaels, Jeffrey↗

Engineering Management Capstone Project EM 697: Compare and Contrast Risk Management Implementation at NASA and the US Army

NASA at Marshall Space Flight Center (MSFC) and the U.S. Army at Redstone Arsenal were analyzed to determine whether they were successful in implementing their risk management program. Risk management implementation surveys were distributed to aid in this analysis. The scope is limited to NASA S&MA (Safety and Mission Assurance) at MSFC, including applicable support contractors, and the US Army Engineering Directorate, including applicable contractors, located at Redstone Arsenal. NASA has moderately higher risk management implementation survey scores than the Army. Accordingly, the implementation of the risk management program at NASA is considered good while only two of five of the survey categories indicated that the risk management implementation is good at the Army.

Brothers, Mary Ann↗

The Development of the Multi-Center Traffic Management Advisor (MCTMA): Traffic Flow Management Research in a Multi-Facility Environment

The Traffic Management Advisor (TMA) is a decision-support tool for traffic managers and air traffic controllers that provides traffic flow visualization and other flow management tools. TMA creates an efficiently sequenced and safely spaced schedule for arrival traffic that meets but does not exceed specified airspace system constraints. TMA is being deployed at selected facilities throughout the National Airspace System in the US as part of the FAA's Free Flight Phase 1 program. TMA development and testing, and its current deployment, focuses on managing the arrival capacity for single major airports within single terminal areas and single en route centers. The next phase of development for this technology is the expansion of the TMA capability to complex facilities in which a terminal area or airport is fed by multiple en route centers, thus creating a multicenter TMA functionality. The focus of the multi-center TMA (McTMA) development is on the busy facilities in the Northeast comdor of the US. This paper describes the planning and development of McTMA and the challenges associated with adapting a successful traffic flow management tool for a very complex airspace.

Lee, Katharine K.↗

Managing Fault Management Development

As the complexity of space missions grows, development of Fault Management (FM) capabilities is an increasingly common driver for significant cost overruns late in the development cycle. FM issues and the resulting cost overruns are rarely caused by a lack of technology, but rather by a lack of planning and emphasis by project management. A recent NASA FM Workshop brought together FM practitioners from a broad spectrum of institutions, mission types, and functional roles to identify the drivers underlying FM overruns and recommend solutions. They identified a number of areas in which increased program and project management focus can be used to control FM development cost growth. These include up-front planning for FM as a distinct engineering discipline; managing different, conflicting, and changing institutional goals and risk postures; ensuring the necessary resources for a disciplined, coordinated approach to end-to-end fault management engineering; and monitoring FM coordination across all mission systems.

McDougal, John M.↗

A Vehicle Management End-to-End Testing and Analysis Platform for Validation of Mission and Fault Management Algorithms to Reduce Risk for NASAs Space Launch System

The engineering development of the National Aeronautics and Space Administration's (NASA) new Space Launch System (SLS) requires cross discipline teams with extensive knowledge of launch vehicle subsystems, information theory, and autonomous algorithms dealing with all operations from pre-launch through on orbit operations. The nominal and off-nominal characteristics of SLS's elements and subsystems must be understood and matched with the autonomous algorithm monitoring and mitigation capabilities for accurate control and response to abnormal conditions throughout all vehicle mission flight phases, including precipitating safing actions and crew aborts. This presents a large and complex systems engineering challenge, which is being addressed in part by focusing on the specific subsystems involved in the handling of off-nominal mission and fault tolerance with response management. Using traditional model-based system and software engineering design principles from the Unified Modeling Language (UML) and Systems Modeling Language (SysML), the Mission and Fault Management (M&FM) algorithms for the vehicle are crafted and vetted in Integrated Development Teams (IDTs) composed of multiple development disciplines such as Systems Engineering (SE), Flight Software (FSW), Safety and Mission Assurance (S&MA) and the major subsystems and vehicle elements such as Main Propulsion Systems (MPS), boosters, avionics, Guidance, Navigation, and Control (GNC), Thrust Vector Control (TVC), and liquid engines. These model-based algorithms and their development lifecycle from inception through FSW certification are an important focus of SLS's development effort to further ensure reliable detection and response to off-nominal vehicle states during all phases of vehicle operation from pre-launch through end of flight. To test and validate these M&FM algorithms a dedicated test-bed was developed for full Vehicle Management End-to-End Testing (VMET). For addressing fault management (FM) early in the development lifecycle for the SLS program, NASA formed the M&FM team as part of the Integrated Systems Health Management and Automation Branch under the Spacecraft Vehicle Systems Department at the Marshall Space Flight Center (MSFC). To support the development of the FM algorithms, the VMET developed by the M&FM team provides the ability to integrate the algorithms, perform test cases, and integrate vendor-supplied physics-based launch vehicle (LV) subsystem models. Additionally, the team has developed processes for implementing and validating the M&FM algorithms for concept validation and risk reduction. The flexibility of the VMET capabilities enables thorough testing of the M&FM algorithms by providing configurable suites of both nominal and off-nominal test cases to validate the developed algorithms utilizing actual subsystem models such as MPS, GNC, and others. One of the principal functions of VMET is to validate the M&FM algorithms and substantiate them with performance baselines for each of the target vehicle subsystems in an independent platform exterior to the flight software test and validation processes. In any software development process there is inherent risk in the interpretation and implementation of concepts from requirements and test cases into flight software compounded with potential human errors throughout the development and regression testing lifecycle. Risk reduction is addressed by the M&FM group but in particular by the Analysis Team working with other organizations such as S&MA, Structures and Environments, GNC, Orion, Crew Office, Flight Operations, and Ground Operations by assessing performance of the M&FM algorithms in terms of their ability to reduce Loss of Mission (LOM) and Loss of Crew (LOC) probabilities. In addition, through state machine and diagnostic modeling, analysis efforts investigate a broader suite of failure effects and associated detection and responses to be tested in VMET to ensure reliable failure detection, and confirm responses do not create additional risks or cause undesired states through interactive dynamic effects with other algorithms and systems. VMET further contributes to risk reduction by prototyping and exercising the M&FM algorithms early in their implementation and without any inherent hindrances such as meeting FSW processor scheduling constraints due to their target platform - the ARINC 6535-partitioned Operating System, resource limitations, and other factors related to integration with other subsystems not directly involved with M&FM such as telemetry packing and processing. The baseline plan for use of VMET encompasses testing the original M&FM algorithms coded in the same C++ language and state machine architectural concepts as that used by FSW. This enables the development of performance standards and test cases to characterize the M&FM algorithms and sets a benchmark from which to measure their effectiveness and performance in the exterior FSW development and test processes. This paper is outlined in a systematic fashion analogous to a lifecycle process flow for engineering development of algorithms into software and testing. Section I describes the NASA SLS M&FM context, presenting the current infrastructure, leading principles, methods, and participants. Section II defines the testing philosophy of the M&FM algorithms as related to VMET followed by section III, which presents the modeling methods of the algorithms to be tested and validated in VMET. Its details are then further presented in section IV followed by Section V presenting integration, test status, and state analysis. Finally, section VI addresses the summary and forward directions followed by the appendices presenting relevant information on terminology and documentation.

Trevino, Luis↗

Airborne Trajectory Management (ABTM): A Blueprint for Greater Autonomy in Air Traffic Management

The aviation users of the National Airspace System (NAS) - the airlines, General Aviation (GA), the military and, most recently, operators of Unmanned Aircraft Systems (UAS) - are constrained in their operations by the design of the current paradigm for air traffic control (ATC). Some of these constraints include ATC preferred routes, departure fix restrictions and airspace ground delay programs. As a result, most flights cannot operate on their most efficient business trajectories and a great many flights are delayed even getting into the air, which imposes a significant challenge to maintaining efficient flight and network operations. Rather than accepting ever more sophisticated scheduling solutions to accommodate the existing constraints in the airspace, a series of increasingly capable airborne technologies, integrated with planned improvements in the ground system through the Federal Aviation Administration (FAA) Next Generation Air Traffic Management System (NextGen) programs, could produce much greater operational flexibility for flight path optimization by the aviation system users. These capabilities, described in research coming out of NASA's Aeronautics Research Mission Directorate, can maintain or improve operational safety while taking advantage of air and ground NextGen technologies in novel ways. The underlying premise is that the nation's physical airspace is still abundant and underused, and that the delays and inefficient flight operations resulting from artificial structure in airspace use and procedural constraints on those operations may not be necessary for safe and efficient flight. This article is not an indictment of today's NAS or the people who run it. Indeed, it is an exceptional achievement that Air Traffic Management (ATM) - the complex human/machine conglomeration of communications, navigation and surveillance equipment and the rules and procedures for controlling traffic in the airspace - has both the capacity and enables the degree of efficiency in air travel that it does. But it is also true that sixty years of the "radar religion" (i.e., reliance on radar-based command and control) has produced several generations of ATM system operators and researchers who believe that introducing automation within the existing functional structure of ATM is the only way to "modernize" the system. Even NextGen, which began as a proposal for "transformational" change in the way ATC is performed, has morphed over the last decade and a half to become just the inclusion of Global Positioning System (GPS) for navigation, Automatic Dependent Surveillance Broadcast (ADS-B) for surveillance, and Data Communications (Data Comm) for communications, while still operating in rigidly structured airspace with human controllers being responsible for separation and traffic flow management (TFM) within defined sectors of airspace, using the same horizontal separation standards that have been in use since raw primary radar was introduced in the 1950s. No system as massive as the current NAS ATM can be replaced with a better system while simultaneously meeting the transportation and other aviation needs of the nation. A new generation of more flexible operations must emerge and yet coexist in harmony with the current operation (i.e., share the same airspace without segregation), thereby enabling a long-term transformation to take place in the way increasing numbers of flights are handled. Market forces will be the ultimate driver of this transformation, and investment realities mandate that real benefits must accrue to the first operators to adopt these new capabilities. In fact, the kinds of missions envisioned in the emerging world of UAS operations, unachievable under conventional ATM, demand that this transformation take place. Airborne Trajectory Management (ABTM) is proposed as a series of transformational steps leading to vastly increased flexibility in flight operations and capacity in the airspace to accommodate many varied airspace uses while improving safety. As will be described, ABTM enables the gradual emergence of a new paradigm for user-based trajectory management in ATM that brings tangible benefits to equipped operators at every step while leveraging the air and ground investments of NextGen. There are five steps in this ABTM transformation.1 NASA has extensively studied the first and last of these steps, and a roadmap of increasing capabilities and benefits is proposed for bridging between these operational concepts.

Cotton, William B.↗

Human Interfaces and Management of Information (HIMI) Challenges for “In-time” Aviation Safety Management Systems (IASMS)

The envisioned transformation of the National Airspace System to integrate an In-time Aviation Safety Management System(IASMS)to assure safety in Advanced Air Mobility(AAM)brings unprecedented challenges to the design of human interfaces and management of safety information. Safety in design and operational safety assurance are critical factors for how humans will interact with increasingly autonomous systems. The IASMS Concept of Operations builds from traditional commercial operator safety management and scales in complexity to AAM. The transformative changes in future aviation systems pose potential new critical safety risks with novel types of aircraft and other vehicles having different performance capabilities, flying in increasingly complex airspace, and using adaptive contingencies to manage normal and non-normal operations. These changes compel development of new and emerging capabilities that enable innovative ways for humans to interact with data and manage information. In-creasing complexity of AAM corresponds with use of predictive modeling, data analytics, machine learning, and artificial intelligence to effectively address known hazards and emergent risks. The roles of humans will dynamically evolve in increments with this technological and operational evolution. The interfaces for how humans will interact with increasingly complex and assured systems designed to operate autonomously and how information will need to be presented are important challenges to be resolved.

Lawrence J Prinzel↗

Incorporating Residential Smart Electric Vehicle Charging in Home Energy Management Systems

Electric vehicles (EVs) are expected to drastically increase residential electricity consumption and could provide a significant source of flexible demand. Aggregating smart EV charge controllers with other smart home devices through a home energy management system can lead to more optimal outcomes that benefit homeowners, utilities, and grid operators. Control strategies should consider occupant convenience by accounting for the need for fully charged EVs near the EV departure time. In this paper, we develop an EV charging framework that accounts for occupant convenience using OCHRE, a residential energy model, and foresee, a home energy management system. We simulate a community with high EV penetration and show that integrated, smart EV charging reduces peak demand and smooths night-time energy consumption. Simulation results show that the proposed control strategy nearly eliminates peak period EV charging and reduces the daily peak demand from EVs by 23%.

ADVANCED PROPULSION SYSTEMS,ENERGY CONSERVATION, C↗

Thermal Management System for an Electric Machine with Additively Manufactured Hollow Conductors with Integrated Heat Pipes: Preprint

This paper discusses steps taken to size a thermal management system for an aircraft propulsion electric machine containing additively manufactured coils integrated with heat pipes aimed at boosting its specific power. Experimental setups are used to size and characterize heat pipes for the application and 3D thermal FEA is used to determine optimum heat transfer coefficient of convective boundaries. Geometric details of fin-based surface area enhancement required to reach target combined overall heat transfer coefficient (U) and surface area (A) performance (UA) in W/K, is worked out for relevant boundaries and the resulting UA is verified in 3D thermal FEA. Thermal management system's UA (by extension specific power) sensitivity to coolant temperature is explored and temperature distribution plots of optimized machine components are presented and discussed.

additive manufacturing↗

Evaluation of Integrated Demand Management Looking into Strategic & Tactical Flow Management

The motivation behind Integrated Demand Management (IDM) research is to explore possible improvements to United States National Airspace System (NAS) performance that could be realized through procedural integration of strategic traffic flow management capabilities, such as the Collaborative Trajectory Options Program (CTOP), and tactical capabilities, such as Time Based Flow Management (TBFM). An initial IDM concept for clear weather operations was developed and evaluated for potential benefits, including efficiency, delay reduction, predictability and throughput, and to identify any major issues that might represent a showstopper for a fielded application. Newark Liberty International Airport (EWR) arrival operations provided a use case for concept development. EWR uses miles-in-trail (MIT) metering to regulate demand into TBFM during high volume operations, and short-haul flights are often penalized with excessive, last-minute ground delays when the overhead stream is saturated. IDM addresses this problem by replacing MIT conditioning with CTOP to better manage the demand delivery to the TBFM entry points. A quasi-real time high-fidelity simulation that would normally involve participants was conducted using heuristic-based procedures that mimicked operators behaviors instead. Five total conditions were compared: two baseline conditions with MIT delivery to TBFM entry points using two different TBFM settings; and three IDM conditions: one with airborne speed control using an Required Time of Arrival (RTA) capability, a second without RTA, and a third with no wind forecast errors. Results suggest that the IDM concept can deliver traffic more efficiently by shifting the delays from airborne to ground for both RTA and non-RTA conditions, while maintaining a target throughput rate. The results also suggest that with good predictability of airport capacity, excessive TBFM ground delay can be minimized by applying more strategic CTOP delay, increasing predictability for the airline operators. Overall, the results indicate that the implementation of an IDM concept under clear weather conditions can improve NAS system performance. Future IDM research aims to expand the concept to address demandcapacity imbalance d severe weather.

Time-Based Flow Management (TBFM)↗

How Management and Leadership Training Can Impact a Health System: Evaluation Findings From a Public Health Management Training Program in Cambodia

In 2017, the National Institute of Public Health in Cambodia collaborated with the U.S. Centers for Disease Control and Prevention to provide management and leadership training for 20 managers and senior staff from 10 health centers. We conducted a mixed methods evaluation of the program's outcomes and impact on the graduates and health centers. From June 2018 (baseline) to January 2019 (endpoint), we collected data from a competency assessment, observational visits, and interviews. From baseline to endpoint, all 20 participants reported increased competence in seven management areas. Comparing baseline and endpoint observational visits, we found improvements in leadership and governance, health workforce, water, sanitation, and hygiene, and health centers' use of medical products and technologies. When evaluating the improvements made by participants against the World Health Organization's key components of a well-functioning health system, the program positively contributed toward building four of the six components—leadership and governance, health information systems, human resources for health, and service delivery. While these findings are specific to the context of Cambodian health centers, we hope this evaluation adds to the growing body of research around the impact of skilled public health management on health systems.

60 APPLIED LIFE SCIENCES↗

Simulations of Continuous Descent Operations with Arrival-management Automation and Mixed Flight-deck Interval Management Equipage

Air traffic management simulations conducted in the Airspace Operations Laboratory at NASA Ames Research Center have addressed the integration of trajectory-based arrival-management automation, controller tools, and Flight-Deck Interval Management avionics to enable Continuous Descent Operations (CDOs) during periods of sustained high traffic demand. The simulations are devoted to maturing the integrated system for field demonstration, and refining the controller tools, clearance phraseology, and procedures specified in the associated concept of operations. The results indicate a variety of factors impact the concept's safety and viability from a controller's perspective, including en-route preconditioning of arrival flows, useable clearance phraseology, and the characteristics of airspace, routes, and traffic-management methods in use at a particular site. Clear understanding of automation behavior and required shifts in roles and responsibilities is important for controller acceptance and realizing potential benefits. This paper discusses the simulations, drawing parallels with results from related European efforts. The most recent study found en-route controllers can effectively precondition arrival flows, which significantly improved route conformance during CDOs. Controllers found the tools acceptable, in line with previous studies.

arrival management↗

Integrating the PanDA Workload Management System with the Vera C. Rubin Observatory

The Vera C. Rubin Observatory will produce an unprecedented astronomical data set for studies of the deep and dynamic universe. Its Legacy Survey of Space and Time (LSST) will image the entire southern sky every three to four days and produce tens of petabytes of raw image data and associated calibration data over the course of the experiment’s run. More than 20 terabytes of data must be stored every night, and annual campaigns to reprocess the entire dataset since the beginning of the survey will be conducted over ten years. The Production and Distributed Analysis (PanDA) system was evaluated by the Rubin Observatory Data Management team and selected to serve the Observatory’s needs due to its demonstrated scalability and flexibility over the years, for its Directed Acyclic Graph (DAG) support, its support for multi-site processing, and its highly scalable complex workflows via the intelligent Data Delivery Service (iDDS). PanDA is also being evaluated for prompt processing where data must be processed within 60 seconds after image capture. This paper will briefly describe the Rubin Data Management system and its Data Facilities (DFs). Finally, it will describe in depth the work performed in order to integrate the PanDA system with the Rubin Observatory to be able to run the Rubin Science Pipelines using PanDA.

79 ASTRONOMY AND ASTROPHYSICS↗

A Management Information System Model for Program Management

The development of a model to simulate the information system of a program management type of organization is reported. The model statistically determines the following parameters: type of messages, destinations, delivery durations, type processing, processing durations, communication channels, outgoing messages, and priorites. The total management information system of the program management organization is considered, including formal and informal information flows and both facilities and equipment. The model is written in General Purpose System Simulation 2 computer programming language for use on the Univac 1108, Executive 8 computer. The model is simulated on a daily basis and collects queue and resource utilization statistics for each decision point. The statistics are then used by management to evaluate proposed resource allocations, to evaluate proposed changes to the system, and to identify potential problem areas. The model employs both empirical and theoretical distributions which are adjusted to simulate the information flow being studied.

Shipman, D. L.↗

Management: A bibliography for NASA managers

This bibliography lists 706 reports, articles, and other documents introduced into the NASA scientific and technical information system in 1984. Entries, which include abstracts, are arranged in the following categories: human factors and personnel issues; management theory and techniques; industrial management and manufacturing; robotics and expert systems; computers and information management; research and development; economics, costs, and markets; logistics and operations management; reliability and quality control; and legality, legislation, and policy. Subject, personal author, corporate source, contract number, report number, and accession number indexes are included.

Source record↗