Search NASA⌕ Search

SEARCH · Search NASA

Results for “MAR Assessments”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Assessment of Mars Exploration Rover landing site predictions.

Comprehensive analyses of remote sensing data during the three-year effort to select the Mars Exploration Rover landing sites at Gusev crater and at Meridiani Planum correctly predicted the atmospheric density profile during entry and descent and the safe and trafficable surfaces explored by the two rovers. The Gusev crater site was correctly predicted to be a low-relief surface that was less rocky than the Viking landing sites but comparably dusty. A dark, lowalbedo, flat plain composed of basaltic sand and haematite with very few rocks was expected and found at Meridiani Planum. These results argue that future efforts to select safe landing sites based on existing and acquired remote sensing data will be successful. In contrast, geological interpretations of the sites based on remote sensing data were less certain and less successful, which emphasizes the inherent ambiguities in understanding surface geology from remotely sensed data and the uncertainty in predicting exactly what materials will be available for study at a landing site.

Zurek, R. W.↗

Assessment of Mars Pathfinder Landing Site Predictions

Remote sensing data at scales of kilometers and an Earth analog were used to accurately predict the characteristics of the Mars Pathfinder landing site at a scale of meters. The surface surrounding the Mars Pathfinder lander in Ares Vallis appears consistent with orbital interpretations that it would be a rocky plain composed of materials deposited by catastrophic floods.

Mars↗

EDL Simulation Results for the Mars 2020 Landing Site Safety Assessment

The Mars 2020 rover is NASA’s next flagship mission, set to explore Mars in search of scientific evidence of past microbial life. Importantly, the rover will also, for the first time, have the ability to collect and cache rock and soil samples for retrieval and return to laboratories here on Earth. A key step in the development of the Mars 2020 mission is the selection of a suitable landing site with the largest likelihood of meeting scientific goals. This decision is a complex and critical one that requires close interaction between the scientific and engineering communities. The chosen landing site must be both scientifically interesting — providing the project with the greatest possible chance of gathering credible and defendable scientific evidence — and also safe enough to attempt a landing in the first place. Thus, arguably one of the most important undertakings of the Entry, Descent, and Landing (EDL) team, is to effectively enumerate, quantify, and communicate the landing risks to all of the stakeholders. The culmination of this effort is the Landing Site Safety Assessment, which is a review commissioned by the project, presided over by the EDL Standing Review Board, and attended by management and science stakeholders, in which the EDL team communicates their assessment of the associated landing risks and the statistical probability of a successful landing at each of the final candidate landing sites. This paper summarizes the results of high-fidelity computer simulations of the Mars 2020 EDL sequence used in this assessment. From an EDL performance perspective, all four candidates offer similar level of robustness, which is in-family with Mars Science Laboratory (MSL). However, two new features of the Mars 2020 EDL sequence – range trigger and Terrain-Relative Navigation (TRN) – dramatically enhance the capability of the EDL system to safely land at landing sites with much more rugged terrain than ever before considered. This has allowed the landing site selection for Mars 2020 to proceed in a manner that has been unprecedentedly weighted more heavily toward scientific interest and less heavily on engineering constraints. With TRN, the overall probability of success is predicted to be approximately 99% for all of the candidates.

David Way↗

The Mars Environmental Compatibility Assessment MECA Abrasion Tool

The Mars Environmental Compatibility Assessment (MECA) experiment, an instrument suite to be flown on Mars Surveyor 2001, will include a tool for doing simple mineralogical scratch and streak tests on particles from the Martian regolith. The Abrasion Tool will be applied to particles that adhere to highly polished substrates of various hardnesses. Granular soil components will be subjected to a compressive force of about 3 N using a leaf spring. The spring will be applied with a paraffin actuator capable of a 0.76 mm throw to achieve a maximum displacement of about 7.5 mm at the tip of the tool. The pressure per grain will be dependent on the grain size, the number of grains that adhere to the substrate and the number of grains in compression. The pressure per particle is expected to be on the order of 100 MPa - 1 GPa. The MECA sample wheel containing the substrates will be rotated after the particles are placed in compression to produce scratches or pits. A primary goal of the Abrasion Tool is to identify quartz (Mohs' hardness = 7) using substrates of varying hardnesses. Quartz is considered hazardous to future human explorers of Mars because it can cause silicosis of the lungs if it is of respirable size. It is also hazardous to machinery, structures, and space suits because of its ability to abrade and scratch surfaces. Since large quantities of minerals harder than quartz are not expected, any scratches produced on polished quartz substrates might be reasonably attributed to quartz particles, although there may be minerals such as impact metamorphic diamond in the soils. Careful calibration of the tool will be necessary to ensure that grains are not overloaded; for example, a steel ball pressed into glass will produce a Hertzian fracture, even though it is softer than glass. Other minerals, such as magnetite (Mohs'hardness = 6.5) have been shown to scratch glass ceramics such as Zerodur (Mohs' hardness = 6.5). Thus, minerals can be differentiated: note that regardless of the mineral species, if any particle is harder than 6.5 it will certainly be an interesting discovery for both planetary geology and human exploration concerns. The scratches will be identified using the 6X optical microscope and profiled with the atomic force microscope included in the MECA instrument suite. Analysis of the scratch morphology will yield evidence concerning the shape of the particle responsible for producing each scratch. For example, angular grains should leave vertical cracks with microconchoidal lateral chipping, while rounded grains might leave chattermarks, or nested partial Hertzian cracks. Particle shape can thus be inferred from these indentation modes, as well as material hardness. In addition, particle size information may also be available if pits caused by rolling particles can be identified. Converse to scratching, the minerals may be crushed at their contact points, and be smeared onto the target substrates to leave what geologists refer to as "streaks". These are coldwelded trails of mineral material that have structure and color indicative of mineral composition. The AFM will determine the morphology of these streaks, while the microscope will ascertain the color. On the harder substrates, we might expect streaking to dominate; on the softer substrates, scratching may dominate. Progressions of material interactions across the substrate selection will be a valuable source of data for mineral discrimination. It should also be noted that many minerals have coatings (such as iron oxides), and these will have to be differentiated from the host mineral grains; laboratory tests will establish the effects of such coatings on the scratch results. Finally, we note that the microscope will provide corroborative data regarding likely mineral species by grain shapes, fracture patterns, surface textures, colr, and UV fluorescence reactions.

Kuhlman, K. R.↗

The Mars Environmental Compatibility Assessment (MECA) Abrasion Tool

The Mars Environmental Compatibility Assessment (MECA) experiment, an instrument suite to be flown on Mars Surveyor 2001, will include a tool for doing simple mineralogical scratch and streak tests on particles from the Martian regolith. The Abrasion Tool will be applied to particles that adhere themselves to highly polished substrates of various hardnesses. Granular soil components will be subjected to a compressive force of about 3 N using a leaf spring. The spring will be applied with a paraffin actuator capable of a 0.76 mm throw to achieve a maximum displacement of about 7.5 mm at the tip of the tool. The pressure per grain will be dependent on the grain size, the number of grains that adhere to the substrate and the number of grains in compression. The pressure per particle is expected to be on the order of 100 MPa - 1 GPa. The MECA sample wheel containing the substrates will be rotated after the particles are placed in compression to produce scratches or pits. A primary goal of the Abrasion Tool is to identify quartz (Mohs' hardness = 7) using substrates of varying hardnesses. Quartz is considered hazardous to future human explorers of Mars because it can cause silicosis of the lungs if it is of respirable size. It is also hazardous to machinery, structures, and space suits because of its ability to abrade and scratch surfaces. Since large quantities of minerals harder than quartz are not expected, any scratches produced on polished quartz substrates might be reasonably attributed to quartz particles, although there may be minerals such as impact metamorphic diamond in the soils. Careful calibration of the tool will be necessary to ensure that grains are not overloaded; for example, a steel ball pressed into glass will produce a Hertzian fracture, even though it is softer than glass. Other minerals, such as magnetite (Mohs' hardness = 6.5) have been shown to scratch glass ceramics such as Zerodur (Mohs' hardness = 6.5). Thus, minerals can be differentiated: note that regardless of the mineral species, if any particle is harder than 6.5 it will certainly be an interesting discovery for both planetary geology and human exploration concerns. The scratches will be identified using the 6X optical microscope and profiled with the atomic force microscope included in the MECA instrument suite. Analysis of the scratch morphology will yield evidence concerning the shape of the particle responsible for producing each scratch. For example, angular grains should leave vertical cracks with microconchoidal lateral chipping, while rounded grains might leave chatter marks, or nested partial Hertzian cracks. Particle shape can thus be inferred from these indentation modes, as well as material hardness. In addition, particle size information may also be available if pits caused by rolling particles can be identified. Converse to scratching, the minerals may be crushed at their contact points, and be smeared onto the target substrates to leave what geologists refer to as "streaks". These are cold-welded trails of mineral material that have structure and color indicative of mineral composition. The AFM will determine the morphology of these streaks, while the microscope will ascertain the color. On the harder substrates, we might expect streaking to dominate; on the softer substrates, scratching may dominate. Progressions of material interactions across the substrate selection will be a valuable source of data for mineral discrimination. It should also be noted that many minerals have coatings (such as iron oxides), and these will have to be differentiated from the host mineral grains; laboratory tests will establish the effects of such coatings on the scratch results. Finally, we note that the microscope will provide corroborative data regarding likely mineral species by grain shapes, fracture patterns, surface textures, color, and UV fluorescence reactions. Additional information is contained in the original extended abstract.

Kuhlman, K. R.↗

Comments on the MIT Assessment of the Mars One Plan

The MIT assessment of the Mars One mission plan reveals design assumptions that would cause significant difficulties. Growing crops in the crew chamber produces excessive oxygen levels. The assumed in-situ resource utilization (ISRU) equipment has too low a Technology Readiness Level (TRL). The required spare parts cause a large and increasing launch mass logistics burden. The assumed International Space Station (ISS) Environmental Control and Life Support (ECLS) technologies were developed for microgravity and therefore are not suitable for Mars gravity. Growing food requires more mass than sending food from Earth. The large number of spares is due to the relatively low reliability of ECLS and the low TRL of ISRU. The Mars One habitat design is similar to past concepts but does not incorporate current knowledge. The MIT architecture analysis tool for long-term settlements on the Martian surface includes an ECLS system simulation, an ISRU sizing model, and an analysis of required spares. The MIT tool showed the need for separate crop and crew chambers, the large spare parts logistics, that crops require more mass than Earth food, and that more spares are needed if reliability is lower. That ISRU has low TRL and ISS ECLS was designed for microgravity are well known. Interestingly, the results produced by the architecture analysis tool - separate crop chamber, large spares mass, large crop chamber mass, and low reliability requiring more spares - were also well known. A common approach to ECLS architecture analysis is to build a complex model that is intended to be all-inclusive and is hoped will help solve all design problems. Such models can struggle to replicate obvious and well-known results and are often unable to answer unanticipated new questions. A better approach would be to survey the literature for background knowledge and then directly analyze the important problems.

Mars mission↗

Human Mars Mission: Transportation Assessment

The first Human Mars Mission is being projected to take place during the 2011 and 2013 / 2014 Mars opportunities. Two cargo flights will leave for Mars during the first opportunity, one to Mars orbit and the second to the surface, to prepare the descent transportation, landing site reconnaissance, and ascent vehicle and propellant for the crew arriving during the following opportunity. Each trans-Mars injection (TMI) stack will consist of a payload portion (currently coming in at 60 to 84 metric tonnes) and a TMI propulsion stage (currently coming in at 68-156 mt loaded with propellant) for performing the departure ΔVs for the appropriate Mars trajectories. Three different options are being considered for the system(s) that will comprise the TMI stage for each stack and will perform ΔVs that range from 848 meters/second (m/sec) to 4232 m/sec as required by the trajectory (with gravity losses and various performance margins included). Liquid oxygen (LOx) / liquid hydrogen (LH 2 ) and LOx / liquid methane (LCH 4 ) are the propellant options for other transportation elements utilized for descent, ascent, and trans-Earth injection (TEI) in these Mars architectures. This paper will discuss the current applications of the necessary transportation stages to a human Mars mission and project the implications these various options have on an exploration visit to Mars.

Mars Missions↗

Mars Reconnaissance Orbiter Operational Aerobraking Phase Assessment

The Mars Reconnaissance Orbiter (MRO) was inserted into orbit around Mars on March 10, 2005. After a brief delay, it began the process of aerobraking - using the atmospheric drag on the vehicle to reduce orbital period. The aerobraking phase lasted approximately 5 months (April 4 to August 30, 2006), during which teams from the Jet Propulsion Laboratory, Lockheed Martin Space Systems Corporation, and NASA Langley Research Center worked together to monitor and maneuver the spacecraft such that thermal margin on the solar arrays was maintained while schedule margin was upheld to provide a final local mean solar time (LMST) at ascending node of 3:00pm on the final aerobraking orbit. This paper will focus on the contribution of the flight mechanics team at NASA Langley Research Center (LaRC) during the aerobraking phase of the MRO mission.

Prince, Jill L.↗

Assessment of Potential Mars Relay Network Enhancements

In anticipation of increased demands on Mars relay services, including planned arrivals of NASA’s InSight Lander in November 2018, and of NASA’s Mars 2020 rover and ESA’s ExoMars Rover & Surface Platform mission in Feb-Mar.2021, we have assessed a number of potential modifications and upgrades to Mars relay orbiters and quantified their impacts in terms of key relay support metrics, to support NASA and ESA programmatic decisions. Specific areas of investigation include: 1) implementation of “split-pass” relay capability for support to collocated landers, 2) modifications of the extended mission orbit for the Mars Atmosphere and Volatile EvolutioN Mission (MAVEN), and 3) introduction of Low-Density Parity Check (LDPC) coding. We report here on each of these potential upgrades, quantify the performance implications each would have on future Mars relay services in the context of future mission support scenarios, and provide a status on implementation.

Wenkert, Daniel↗

Winter Storm Zones on Mars

Preferred regions of weather activity in Mars' winter middle latitudes-so called 'storm zones' are found in a general circulation model of Mars' atmospheric circulation. During northern winter, these storm zones occur in middle latitudes in the major planitia (low-relief regions) of the western and eastern hemisphere. In contrast, the highlands of the eastern hemisphere are mostly quiescent. Compared to Earth's storm zones where diabatic heating associated with land-sea thermal contrasts is crucial, orography on Mars is fundamental to the regionalization of weather activity. Future spacecraft missions aimed at assessing Mars' climate and its variability need to include such regions in observation strategies.

Hollingsworth, J. L.↗

Mars Surveyor Program '01 Mars Environmental Compatibility Assessment wet chemistry lab: a sensor array for chemical analysis of the Martian soil

The Mars Environmental Compatibility Assessment (MECA) instrument was designed, built, and flight qualified for the now canceled MSP (Mars Surveyor Program) '01 Lander. The MECA package consisted of a microscope, electrometer, material patch plates, and a wet chemistry laboratory (WCL). The primary goal of MECA was to analyze the Martian soil (regolith) for possible hazards to future astronauts and to provide a better understanding of Martian regolith geochemistry. The purpose of the WCL was to analyze for a range of soluble ionic chemical species and electrochemical parameters. The heart of the WCL was a sensor array of electrochemically based ion-selective electrodes (ISE). After 20 months storage at -23 degrees C and subsequent extended freeze/thawing cycles, WCL sensors were evaluated to determine both their physical durability and analytical responses. A fractional factorial calibration of the sensors was used to obtain slope, intercept, and all necessary selectivity coefficients simultaneously for selected ISEs. This calibration was used to model five cation and three anion sensors. These data were subsequently used to determine concentrations of several ions in two soil leachate simulants (based on terrestrial seawater and hypothesized Mars brine) and four actual soil samples. The WCL results were compared to simulant and soil samples using ion chromatography and inductively coupled plasma optical emission spectroscopy. The results showed that flight qualification and prolonged low-temperature storage conditions had minimal effects on the sensors. In addition, the analytical optimization method provided quantitative and qualitative data that could be used to accurately identify the chemical composition of the simulants and soils. The WCL has the ability to provide data that can be used to "read" the chemical, geological, and climatic history of Mars, as well as the potential habitability of its regolith.

Non-NASA Center↗

The Mars Environmental Compatibility Assessment (MECA)

Originally selected for the HEDS dust & soil payload for the 2001 Mars Surveyor Lander, The Mars Environmental Compatibility Assessment (MECA) has now been completed, tested, and is ready for flight. This paper will review the four MECA instruments.

Hecht, M. H.↗

The MSP 2001 Mars Environmental Compatibility Assessment (MECA)

A chemical analysis of soil-water mixtures and the first microscopic images of martian soil will be among the results to be returned by the Mars Environmental Compatibility Assessment (MECA) payload on the Mars Surveyor Program 2001 Lander. Sponsored by the Human Exploration and Development of Space (HEDS) enterprise, MECA's primary goal is to evaluate potential geochemical and environmental hazards that may confront future martian explorers, and to guide HEDS scientists in the development of high fidelity Mars soil simulants. As a survey of soil properties, the MECA data set will also be rich in information relevant to basic geology, paleoclimate, and exobiology. The integrated MECA payload contains a wet-chemistry laboratory, a microscopy station, an electrometer to characterize the electrostatics of the soil and its environment, and arrays of material patches to study the abrasive and adhesive properties of soil grains. MECA is allocated a mass of 10 kg and a peak power usage of 15 W within an enclosure of 35 x 25 x 15 cm. The Wet Chemistry Laboratory (WCL) consists of four identical cells that will accept samples from surface and subsurface regions accessible to the Lander's robotic arm, mix them with water, and perform extensive analysis of the solution. Ion-selective electrodes and related sensors will evaluate total dissolved solids, redox potential, pH, and the concentration of many soluble ions and gases. Cyclic voltammetry will address oxidants, and anodic stripping voltammetry will probe potentially hazardous trace metals. MECA's microscopy station combines optical and atomic-force microscopy (AFM) in a controlled illumination environment to image dust and soil particles from millimeters to nanometers in size. Careful selection of substrates and an abrasion tool allows experimental study of size distribution, adhesion, abrasion, hardness, color, shape, aggregation, magnetic and other properties. Mounted on the end of the robot arm, MECA's electrometer consists of four types of sensors: an electric field meter, several triboelectricity monitors, an ion gauge, and a thermometer. Tempered only by ultra-violet- light-induced ions and a low-voltage break-down threshold, the dry, cold, dusty martian environment presents an imposing electrostatic hazard to both robots and humans. In addition, the electrostatic environment is key to transport of dust and, consequently, martian meteorology. MECA will also observe natural dust accumulation on engineering materials. Viewed with the robot arm camera, the abrasion and adhesion plates are strategically placed to allow direct observation of the inter-action between materials and soils on a macroscopic scale. Materials of graded hardness are placed directly under the robot arm scoop to sense wear and soil hardness. A second array, placed on the lander deck, is deployed after the dust plume of landing has settled. It can be manipulated in a primitive fashion by the arm, first having dirt deposited on it from the scoop and subsequently shaken clean. Dust accumulation as a function of conductivity, magnetic field strength, and other parameters will be explored. The MECA instruments described above will assess potential hazards that the Martian soil might present to human explorers and their equipment. In addition, MECA will provide information on the composition of ancient surface water environments, observing microscopic evidence of geological (and biological?) processes, inferring soil and dust transport, comminution and weathering mechanisms, and characterizing soil horizons that might be encountered during excavation. Additional information is contained in the original extended abstract.

Hecht, M. H.↗

NASA's Human Lunar Landing Strategy

In response to the 2018 White House Space Policy Directive-1 to lead an innovative and sustainable lunar exploration, and to the Vice President’s March 2019 direction to do so by 2024, NASA is working to establish humanity's presence on and around the Moon by: 1) sending payloads to its surface, 2) assembling the Gateway outpost in orbit, and 3) conducting the first human lunar landings since 1972. NASA’s Artemis program is implementing a multi-faceted and coordinated agency-wide approach with a focus on the lunar South Pole. The Artemis missions will demonstrate new technologies, capabilities and business approaches needed for future exploration, including Mars. Assessing options to accelerate development of systems, NASA is utilizing public-private engagements to develop and demonstrate capabilities that meet the agency’s human space exploration objectives while stimulating the commercial space industry. Utilizing efforts across mission directorates, the Artemis effort will benefit from programs such as the Science Mission Directorate’s Commercial Lunar Payloads Services program and the Space Technology Mission Directorate’s Tipping Point partnerships for Moon and Mars technologies. This paper will discuss the strategic landscape for NASA's exploration campaign, the agency's approach to accessing the lunar surface with an affordable human-rated landing system, current status and role of U.S. industry, and future plans.

Human landing system↗