Search NASA⌕ Search

SEARCH · Search NASA

Results for “MISO”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Deployment Feasibility Futures Analysis of Natural Gas Combined Cycle with Carbon Capture in Five U.S. Regions

A broad suite of technologies will be required to enable the United States to meet the current goal of a zero-carbon power sector by 2035, while continuing to provide the U.S. consumer with reliable, secure, stable, and affordable electricity. This study was conducted to evaluate the competitiveness of a natural gas combined cycle (NGCC) with carbon capture and storage (CCS) in five independent system operating areas, the PJM interconnection (PJM) regional transmission organization, Midcontinent Independent System Operator (MISO), Western Electricity Coordinating Council’s (WECC) Northwest Power Pool (NWPP) region, the Electric Reliability Council of Texas (ERCOT) and the SERC Reliability Corporation (SERC) in the 2030 to 2035 time horizon. The modeling and simulation efforts focused on determining the dispatch characteristics and the economic feasibility of constructing an NGCC plant with CCS in each of those regions. The analysis indicates that a NGCC system with CCS can be economically viable in the ERCOT and PJM regions. Additional revenue stream and/or capacity payments are required in MISO, NWPP, and SERC to enable successful commercial deployment of a NGCC with CCS.

Pickenpaugh, Gavin↗

LAF-Net: A Deep Residual and Cross-Attention Framework for Day-Ahead Load Forecasting: Preprint

Accurate day-ahead load forecasting is essential for reliable power system operations and market efficiency. System operators such as the Midcontinent Independent System Operator (MISO) rely on forecasts from multiple vendors, yet combining them effectively remains a persistent challenge due to vendor-specific biases. This paper presents a novel LSTM-Attention Fusion Network with Error Representation (LAF-Net) that enhances day-ahead hourly load forecasting through deep residual learning and multi-modal cross-attention. The proposed model builds a historical error memory from past vendor performance and dynamically queries it with future hour context to generate adaptive, hour-specific trust weights for each vendor. A bounded residual correction further refines forecasts by mitigating systematic and temporally localized errors. Tested on real MISO LBA data with multi-vendor forecasts, LAF-Net consistently outperforms the best vendor baseline across all 38 LBAs, achieving more than a 40% reduction in system-level mean absolute error (MAE) during peak load hours relative to the best vendor baseline.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Power Market Primers

The National Energy Technology Laboratory (NETL) has developed a series of primers on independent system operators (ISOs) and regional transmission organizations (RTOs). The primers primarily explore the history, workings, and types of electricity markets composing the seven ISOs/RTOs in the United States (U.S.) (Exhibit 1-1). The primer series includes sixteen documents. A general introduction to ISOs/RTOs is given in Independent System Operators and Regional Transmission Organizations. Specific details about the seven existing ISOs/RTOs in the United States are given in seven additional primers: California Independent System Operator, ERCOT Independent System Operator, ISO New England Regional Transmission Operator, MISO Regional Transmission Operator, New York Independent System Operator, PJM Regional Transmission Operator, and Southwest Power Pool, Inc. These primers provide a history of each ISO/RTO, short explanations of products and services (different types of electricity markets) offered by ISO/RTO, and the ISO/RTO generation mix. Readers who are not familiar with the different types of markets and their mechanisms can find basic information in six additional primers titled: Power Markets, Energy Market, Capacity Market, Comparisons of Different ISO/RTO Capacity Market Structures, Ancillary Services, and Financial Transmission Rights. Additionally, the primer North American Electric Reliability Corporation introduces the electric reliability organization, which is responsible for reliability of the bulk power system and Federal Energy Regulatory Commission introduces the federal commission responsible for overseeing the nation's electric power markets and related energy and financial markets and issuing market related rules and regulations. All the primers are very short and concise documents. They are accompanied by a Glossary of Terms in which many of the technical terms used in these primers are defined.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ARPA-E PERFORM datasets

Time-coincident load, wind, and solar data including actual and probabilistic forecast datasets at 5-min resolution for ERCOT, MISO, NYISO, and SPP. Wind and solar profiles are supplied for existing sites as well as planned sites based on interconnection queue projects as of 2021. For ERCOT actuals are provided for 2017 and 2018 and forecasts for 2018, and for the remaining ISOs actuals are provided for 2018 and 2019 and forecasts for 2019. There datasets were produced by NREL as part of the ARPA-E PERFORM project, an ARPA-E funded program that aim to use time-coincident power and load seeks to develop innovative management systems that represent the relative delivery risk of each asset and balance the collective risk of all assets across the grid. For more information on the datasets and methods used to generate them see https://github.com/PERFORM-Forecasts/documentation.

5-min data↗

The combined value of wind and solar power forecasting improvements and electricity storage

As the penetration rates of variable renewable energy increase, the value of power systems operation flexibility technology options, such as renewable energy forecasting improvements and electricity storage, is also assumed to increase. In this work, we examine the value of these two technologies, when used independently and concurrently, for two real case studies that represent the generation mixes for the California and Midcontinent Independent System Operators (CAISO and MISO). Since both technologies provide additional system flexibility they reduce operational costs and renewable curtailment for both generation mixes under study. Interestingly, the relative impacts are quite similar when both technologies are used together. Though both flexibility options can solve some of the same issues that arise with high penetration levels of renewables, they do not seem to significantly increase or decrease the economic potential of the other technology.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Impact of battery degradation on energy arbitrage revenue of grid-level energy storage

This study investigates the representation of battery degradation in grid level energy storage applications. In particular, we focus on energy arbitrage, as this is a potential future large-scale application of energy storage and there is limited existing research combining the modelling of battery degradation and energy storage arbitrage. We implement two different representations of battery degradation within an energy arbitrage model, and show that degradation has a strong impact on battery energy storage system (BESS) profitability. In a case study using historical electricity market prices from the MISO electricity market in the United States, we find that the achievable net present value (at an interest rate of 10%) for a battery system with a C-rate of 1C dropped from 358 /kWh in the case considering no degradation to 194-314 /kWh depending on the battery degradation model and assumptions for end of life (EOL) criteria. This corresponds to a reduction in revenue due to degradation in the 12-46% range.Furthermore, we find that reducing the cycling of the bat-tery via introducing a penalty cost in the objective function of the energy arbitrage optimization model can improve the profitability over the life of the BESS.

25 ENERGY STORAGE↗

A New Simple-to-Configure Self-Perturbing Multivariable Extremum-Seeking Controller

This paper presents a new stochastic relay-based extremum-seeking controller (ESC) for multi-input-single-output (MISO) systems. The algorithm was developed with the goal of simplifying configuration to enable easier deployment to real-world problems. A solution is developed first for a static map and then adapted for a general class of dynamic systems. The number of configurable parameters is one per input channel for the static case and only one additional parameter is needed for the dynamic version. The problem of gradient identifiability is solved via the use of stochastic relay gains and a simple stability proof for the static case is presented. Simulation tests demonstrate the performance of the strategy for optimizing both static and dynamic systems.

Salsbury, Timothy [BATTELLE (PACIFIC NW LAB)]↗

Occupant-driven end use load models for demand response and flexibility service participation of residential grid-interactive buildings

As demand response becomes increasingly used as a tool to support improved grid flexibility, it is important to consider that there are many potential types of energy end uses that may be used to support such flexibility. Residential appliances, often accounting for 30 % or more of residential energy use, are a currently untapped source of demand flexibility, particularly when aggregated together across homes. To date there has been very limited analysis of residential appliances for use as grid-interactive loads. As such, this research uses disaggregated energy end use data for 564 households, to model the electricity demand flexibility potential of the use of residential dishwashers, clothes washers, clothes dryers, ovens, and ranges (oven + stovetop) on both weekdays and weekends. This includes both at the building level, as well as aggregated to the grid level, specifically the Midcontinent Independent System Operator (MISO) region. This study was divided into two parts. Part 1 focuses on determining appliance-level loads, and Part 2, which involves aggregation to the grid. Findings suggest that among the studied appliances, clothes dryers provide the greatest demand reduction potential for most times of the day, followed by dishwashers and clothes washers. The maximum potential reduction for clothes dryers is found to be approximately at 11:00 a.m. and this potential sustains throughout most of the daytime period. When considering the willingness of households to participate, based on a survey of households in the Midwest region, clothes dryers still have the most potential for demand reduction. The availability of appliances for load modulation on weekdays and weekends indicates similar load reduction potential for all appliances. Overall, the results of this study suggest that there is an opportunity for shifting appliance usage to optimize grid efficiency and enhance demand response strategies.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Fungi and Industrial Biotechnology – A special issue for an amazing kingdom

This special issue of Industrial Biotechnology is focused on fungi. Fungi play a diverse and important role in industrial biotechnology. The first US biotechnology patent was made in 1896 by Takamine for production of digestive enzymes by the fungus, Aspergillus oryzae (Bennett and Baker, 2008). The fact that this patent makes use of A. orzyae enzymes is especially fitting as this organism and other koji fungi have been used for centuries in the preparation of Asian foods and beverages that include but are not limited to soy sauce, miso and sake (Abe and Gomi, 2008). The first half of the 20th century saw industrial bioprocesses that used fungi for the production of organic acids and antibiotics. We continue to develop fungal systems for production of medicines, enzymes, biofuels and renewable chemistry (Baker et al., 2008; Grigoriev et al., 2011). In recent decades we have seen advances in fungal genetics, genomics and molecular biology. These advances, driven in part by the needs of industry in a number of areas have had profound implications for fungal biotechnology.

biotechnology, fungi, Aspergillus, Trichoderma↗

Regulatory Policy and Markets for Energy Storage in North America

The last 5 years have been one of the most exciting times for the energy storage industry. We have seen significant advancements in the regulatory process to make accommodations for valuing and monetizing energy storage for what it provides to the grid. The most impactful regulatory decision for the energy storage industry has come from California, where the California Public Utilities Commission issued a decision that mandates procurement requirements of 1.325 GW for energy storage to 3 investor-own utilities in 4 stages: in 2014, 2016, 2018, and 2020. Furthermore, at the Federal level, FERC’s Order 755, requires the transmission operators to develop pay for performance tariffs for ancillary services. This has had direct impact on the market design of US competitive wholesale markets and the monetization of fast responding grid assets. While this order is technology neutral, it clearly plays into the fast-responding capability of energy storage technologies. Today PJM, CAISO, MISO, NYISO, and NE-ISO have implemented Order 755 and offer new tariff for regulation services based on pay-for-performance principles. Furthermore, FERC Order 784, issued in July 2013 requires transmission providers to consider speed and accuracy in determining the requirements for ancillary services. In November 2013, FERC issued Order 972, which revises the small generator interconnection agreement which declares energy storage as a power source. This order puts energy storage on par with existing generators. This paper will discuss the implementation of FERC’s Pay for Performance Regulation order at all ISOs in the U.S. under FERC regulatory authority (this excludes ERCOT). Also discussed will be the market impacts and overall impacts on the NERC regulation performance indexes. The paper will end with a discussion on the California and Ontario, Canada procurement mandates and the opportunity that it may present to the energy storage industry.

Kintner-Meyer, Michael CW↗

Grid Edge Visibility: Gaps and a Road Map

Behind-The-Meter (BTM) resources at the grid edge are rapidly becoming an important component of the electric grid, requiring a substantial reconfiguration of traditional grid practices, such as policy changes, market redesign, and infrastructure upgrades. This adjustment is challenged by the fact that, by definition, grid edge elements are not easily observable by grid control entities. Increasing the visibility of these resources is therefore an important goal, one that is experiencing much research and discussion by various power system stakeholders. For example, policy makers are analyzing the tradeoffs of using grid edge meters to impose charges on grid edge electricity generation. System operators, such as the Midcontinent Independent System Operator (MISO) in the United States, can identify visibility information on the electrical location and the size of the grid edge resources as a critical consideration across the transmission-and-distribution (T&D) spectrum. This article summarizes the challenges and needs of grid entities resulting from the introduction of grid edge resources as well the gaps in the extant grid edge visibility frameworks.

behind-the-meter↗

Transmission Constraint Filtering in Large-Scale Security-Constrained Unit Commitment

When solving the security-constrained unit commitment problem, one of the most complicating factors is handling the large number of transmission constraints, corresponding to both base case and N - 1 line contingency scenarios. Although it is well known that only a few of these constraints need to be enforced, identifying this critical subset of constraints efficiently remains a challenge. In this letter, we propose a novel and simple iterative contingency-screening procedure that is able to eliminate 99.4% of the constraints selected by existing iterative methods, allowing for the solution of much larger-scale problems. We report computational results in realistic instances with up to 6468 buses and 9000 transmission lines. Furthermore, the method was also independently implemented and evaluated at MISO, where it performed faster than alternative methods.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Adding Data Management Services to Parallel File Systems

The objective of this project, called DAMASC for “Data Management in Scientific Computing”, is to coalesce data management with parallel file system management to present a declarative interface to scientists for managing, querying, and analyzing extremely large data sets efficiently and predictably. Managing extremely large data sets is a key challenge of exascale computing. The overhead, energy, and cost of moving massive volumes of data demand designs where computation is close to storage. In current architectures, compute/analysis clusters access data in a physically separate parallel file system and largely leave it scientist to reduce data movement. Over the past decades the high-end computing community has adopted middleware with multiple layers of abstractions and specialized file formats such as NetCDF-4 and HDF5. These abstractions provide a limited set of high-level data processing functions, but have inherent functionality and performance limitations: middleware that provides access to the highly structured contents of scientific data files stored in the (unstructured) file systems can only optimize to the extent that file system interfaces permit; the highly structured formats of these files often impedes native file system performance optimizations. We are developing Damasc, an enhanced high-performance file system with native rich data management services. Damasc will enable efficient queries and updates over files stored in their native byte-stream format while retaining the inherent performance of file system data storage via declarative queries and updates over views of underlying files. Damasc has four key benefits for the development of data-intensive scientific code: (1) applications can use important data-management services, such as declarative queries, views, and provenance tracking, that are currently available only within database systems; (2) the use of these services becomes easier, as they are provided within a familiar file-based ecosystem; (3) common optimizations, e.g., indexing and caching, are readily supported across several file formats, avoiding effort duplication; and (4) performance improves significantly, as data processing is integrated more tightly with data storage. Our key contributions are: SciHadoop which explores changes to MapReduce assumption by taking advantage of semantics of structured data while preserving MapReduce’s failure and resource management; DataMods which extends common abstractions of parallel file systems so they become programmable such that they can be extended to natively support a variety of data models and can be hooked into emerging distributed runtimes such as Stanford’s Legion; and Miso which combines Hadoop and relational data warehousing to minimize time to insight, taking into account the overhead of ingesting data into data warehousing.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Models and methods for assessing the value of HVDC and MVDC technologies in modern power grids

This report reflects the results of U.S. Department of Energy’s (DOE) Grid Modernization project 0074 “Models and methods for assessing the value of HVDC [high-voltage direct current] and MTDC [multi-terminal direct current] technologies in modern power grids.” The work was done by the Pacific Northwest National Laboratory (PNNL) and Oak Ridge National Laboratory (ORNL) in cooperation with Mid-Continent Independent System Operator (MISO) and Siemens. The main motivation of this study was to show the benefit of using direct current (DC) systems larger than those in existence today as they overlap with the alternating current (AC) systems. Proper use of their flexibility in terms of active/reactive power control and fast response can provide much-needed services to the grid at the same time as moving large blocks of energy to take advantage of cost diversity. Ultimately, the project’s success will enable decision-makers and investors to make well-informed decisions regarding this use of DC systems. This project showed the technical feasibility of HVDC macrogrid for frequency control and congestion relief in addition to bulk power transfers. Industry-established models for commonly used technologies were employed, along with high-fidelity models for recently developed HVDC converter technologies; like the modular multilevel converters (MMCs), a voltage source converters (VSC). Models for General Electric Positive Sequence Load Flow (GE PSLF) and Siemens Power System Simulator (PSS/E), widely used analysis programs, were for the first time adapted to include at the same time both Western Electricity Coordinating Council (WECC) and Eastern Interconnection (EI), the two largest North American interconnections. The high-fidelity models and their control were developed in detail for MMC system and extended to HVDC systems in point-to-point and in three-node multi-terminal configurations. Using a continental-level mixed AC-DC grid model, and using a HVDC macrogrid power flow and transient stability model, the results showed that the HVDC macrogrid relieved congestion and mitigated loop flows in AC networks, and provided up to 24% improvement in frequency responses. These are realistic studies, based on the 2025 heavy summer and EI multi-regional modeling working group (MMWG) 2026 summer peak cases. This work developed high-fidelity models and simulation algorithms to understand the dynamics of MMC. The developed models and simulation algorithms are up to 25 times faster than the existing algorithms. Models and control algorithms for high-fidelity models were designed and tested for point-to-point and multi-terminal configurations. The multi-terminal configuration was tested connecting simplified models of EI, WI, and Electric Reliability Council of Texas (ERCOT). The developed models showed up to 45% improvement in frequency response with the connection of all the three asynchronous interconnections in the United States using fast and advanced DC technologies like the multi-terminal MMC-DC system. Future work will look into developing high-fidelity models of other advanced DC technologies, combining high-fidelity models with the continental-level model, incorporating additional services. More scenarios involving large-scale HVDC and MTDC will be evaluated.

24 POWER TRANSMISSION AND DISTRIBUTION↗

An Evaluation of Electricity Net Load Profiles and the Baseload Generation Concept

This paper investigates the amount of baseload generation that would be displaced due to renewable resources being implemented to meet state renewable portfolio standards (RPS) in the following regions: the Midwest Independent System Operator (MISO), the PJM regional transmission organization (RTO), the Electric Reliability Council of Texas (ERCOT), and the California ISO (CAISO). Modeling of these regions was done in Promod, a security constrained economic dispatch (SCED) model, for the years 2016-2030, to compare scenarios with and without the two primary intermittent renewable resources (solar and wind) attributable to the RPS regulations implemented in each state. In addition, a new statistical approach was developed for evaluating the variability in net load shapes caused by these two intermittent resources. The load variability index (LVI) was developed to apply to the hourly net load profiles for each day as a means of comparing variability in net loads.

14 SOLAR ENERGY↗

RAVIS: Resource Forecast and Ramp Visualization for Situational Awareness - An Introduction to the Open-Source Tool and Use Cases

The Resource Forecast and Ramp Visualization for Situational Awareness (RAVIS) is an open-source tool for visualizing variable renewable resource forecasts and ramp alerts for significant up/down ramps in renewable resource and the consequent net-load. The modular dashboard of RAVIS contains configurable panes for viewing- probabilistic time series forecasts, ramp event alerts on the look-ahead timeline, spatially resolved resource sites and forecasts, and system simulation and market clearing data such as transmission lines utilization, nodal prices and available generation flexibility. RAVIS uses a technology suite that is assembled to provide optimum visualization facility while maintaining a wide pool of potential deployment and client environments. The tool is designed to take advantage of web application technologies, open source visualization libraries and tooling. Utilizing this technology will enable deployment in any environment, using any operating system, and is scalable to much higher spatial and temporal scales of visualization. As a prototype of the tool and demonstrating a use case of variable renewable integration, RAVIS currently integrates site-specific solar power forecasts in the California Independent System Operator (CAISO) and Mid-continent ISO (MISO) footprint from the IBM WattSun forecasting platform, and also superimposes market simulation data for CAISO footprint from as in-house NREL market clearing tool. The tool has the ability to alert the viewer for excessive up or down ramps for both individual solar sites as well as regionally aggregated net-load ramps, and alerts can also be qualified with respect to available flexible generation. This report will provide an introduction to the RAVIS tool, and summarize the above mentioned capabilities, typical use cases and possible extensions of the tool. The RAVIS development team believes there are likely to be high economic and reliability benefits of integrating probabilistic forecasts of variable renewables into control center visualizations and improved ramp events situational awareness for system operators and forecasting teams in the ISOs and electric utilities in comparison with their business as usual practices.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Queued Up: Characteristics of Power Plants Seeking Transmission Interconnection As of the End of 2020

Proposed large-scale electric generation and storage projects must apply for interconnection to the bulk power system via interconnection queues. While many projects that apply for interconnection are not subsequently built, data from these queues nonetheless provide a general indicator for mid-term trends in developer interest. Berkeley Lab compiled and analyzed data from all seven ISOs/RTOs in concert with 35 non-ISO utilities, representing an estimated 85% of all U.S. electricity load. We include all "active" projects in these generation interconnection queues through the end of 2020, as well as data on "completed" and "withdrawn" projects for five of the ISOs (CAISO, ISO-NE, MISO, NYISO, PJM). We find that the total capacity active in the queues is growing year-over-year, with over 750 GW of generation and an estimated 200 GW of storage capacity as of the end of 2020. Solar (462 GW) accounts for a large – and growing – share of generator capacity in the queues. Substantial wind (209 GW) capacity is also in development, 29% of which is for offshore projects (61 GW). In total, about 680 GW of zero-carbon capacity is currently seeking transmission access, as is 74 GW of natural gas capacity. Hybrids now comprise a large – and increasing – share of proposed projects, particularly in CAISO and the non-ISO West. 159 GW of solar hybrids (primarily solar+battery) and 13 GW of wind hybrids are currently active in the queues. However, much of this proposed capacity will not ultimately be built. Among a subset of queues for which data are available, only 24% of the projects seeking connection from 2000 to 2015 have subsequently been built. Completion percentages appear to be declining, and are even lower for wind and solar than other resources. Additionally, wait times are on the rise: in four ISOs, the typical duration from connection request to commercial operation increased from ~1.9 years for projects built in 2000-2009 to ~3.5 years for those built in 2010-2020. There are growing calls for queue reform to reduce cost, lead times, and speculation.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Land-Based Wind Market Report: 2021 Edition

The U.S. Department of Energy's 2021 edition of its land-based wind market report provides an overview of key trends in the U.S. wind power market, with a focus on 2020. You can find a report, data file and presentation on the Files tab, below. Additionally, several data visualizations are available on the Visualizations tab. Highlights of this year’s update include: -Wind comprises a growing share of electricity supply: U.S. wind power capacity grew at a record pace in 2020, with 25 billion dollars invested in 16.8 GW of capacity. Wind energy output rose to account for more than 8% of the entire nation’s electricity supply, and is more than 20% in 10 states. At least 209 GW of wind are seeking transmission interconnection; 61 GW of this capacity are offshore wind and 13 GW are hybrid plants that pair wind with storage or PV. -Wind project performance has increased over time: The average capacity factor among recently built projects was over 40%, considerably higher than projects built earlier. The highest capacity factors are seen in the interior ‘wind belt’ of the country. -Turbines continue to get larger: Improved plant performance has been driven by larger turbines mounted on taller towers and featuring longer blades. In 2010, no turbines employed blades that were 115 meters in diameter or larger, but in 2020, 91% of newly installed turbines featured such rotors. Proposed projects indicate that total turbine height will continue to rise. -Low wind turbine pricing has pushed down installed project costs over the last decade: Wind turbine prices are averaging 775–850 dollars/kW. The average installed cost of wind projects in 2020 was 1,460 dollars/kW, down more than 40% since the peak in 2010, though stable for the last three years. The lowest costs were found in Texas and the (non-ISO) West. -Wind energy prices remain low, around 20 dollars/MWh in the interior of the country: After topping out at 70 dollars/MWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped. In the interior ‘wind belt’ of the country, recent pricing is around 20 dollars/MWh. In the West and East, prices tend to average 30 dollars/MWh or more. These prices, which are possible in part due to federal tax support, fall below the projected future fuel costs of gas-fired generation. -Wind PPA prices are often attractive compared to wind’s grid-system market value: The value of wind in wholesale power markets is affected by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind declined in 2020, following natural gas prices lower and averaging under 15 dolalrs/MWh in ERCOT, MISO, NYISO and SPP; higher values were seen in CAISO, ISO-NE and PJM. -The average levelized cost of wind energy is down to 33 dollars/MWh: Levelized costs, which exclude the impacts of federal tax incentives, vary across time and geography, but the national average stood at 33 dollars/MWh in 2020—down substantially historically, though consistent with the previous two years. Levelized costs were lowest in ERCOT, SPP, and the (non-ISO) West. -The health and climate benefits of wind in 2020 were larger than its grid-system value, and the combination of all three far exceeds the current levelized cost of wind: Wind generation reduces power-sector emissions of carbon dioxide, nitrogen oxides, and sulfur dioxide. These reductions, in turn, provide public health and climate benefits that vary regionally, but together are economically valued at an average of 76 dollars/MWh-wind nationwide in 2020. -The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>85%), towers (60-75%), and blades and hubs (30-50%), but is much lower for most components internal to the nacelle.

17 WIND ENERGY↗