Search NASA⌕ Search

SEARCH · Search NASA

Results for “MISSILES, GUIDED - RANGE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

38 records · Page 3

Nuclear Safety [Vol. 36, No. 2, July-December 1995]

Nuclear Safety is a journal that covers significant issues in the field of nuclear safety. Its primary scope is safety in the design, construction, operation, and decommissioning of nuclear power reactors worldwide and the research and analysis activities that promote this goal, but it also encompasses the safety aspects of the entire nuclear fuel cycle, including fuel fabrication, spent-fuel processing and handling, and nuclear waste disposal, the handling of fissionable materials and radioisotopes, and the environmental effects of all these activities. Table of Contents for this issue follows. THE CHORNOBYL ACCIDENT: 195 The Chornobyl Accident Revisited, Part III: Chernobyl Source Term Release Dynamics and Reconstruction of Events During the Active Phase, A. R. Sich; GENERAL SAFETY CONSIDERATIONS: 218 Second ANS Workshop on the Safety of Soviet-Designed Nuclear Power Plants, R. A. Bari; 234 Elements of a Nuclear Criticality Safety Program, C. M. Hopper; 243 Rickover, Excellence, and Criticality Safety Programs, R. E. Wilson; ACCIDENT ANALYSIS: 249 Transient Analysis of the PIUS Advanced Reactor Design with the TRAC-PF1/MOD2 Code, B. E. Boyack, J. L Steiner, S. C. Harmony, H. J. Stumpf, and J. F. Lime; 278 The Hierarchy-By-Interval Approach to Identifying Important Models that Need Improvement in Severe-Accident Simulation Codes, T. J. Heames, M. Khatib-Rahbar, J. E. Kelly, R. P. Jenks-Johnson, and Y.-S. Chen; 290 RELAP5/MOD3 Code Coupling Model, R. P. Martin; 299 Missiles Caused by Severe Pressurized-Water Reactor Accidents, R. Krieg; DESIGN FEATURES: 310 Validation of COMMIX with Westinghouse AP-600 PCCS Test Data, J. G. Sun, T. H. Chien, J. Ding, and W T. Sha; ENVIRONMENTAL EFFECTS: 321 Spent Nuclear Fuel Characterization for a Bounding Reference Assembly for the Receiving Basin for Off-Site Fuel, S. D. Kahook, R. L. Garrett, L. R. Canas, and M J. Beckum; OPERATING EXPERIENCES: 332 Reactor Shutdown Experience, Compiled by J. W. Cletcher; U.S. NUCLEAR REGULATORY COMMISSION INFORMATION AND ANALYSES: 335 Reactor Coolant System Blowdown at Wolf Creek on September 17, 1994, J. V. Kauffman and S. L. Israel; RECENT DEVELOPMENTS: 344 Reports, Standards, and Safety Guides, D. S. Oueener; 349 Proposed Rule Changes as of June 30, 1995; ANNOUNCEMENTS: 320 Symposium on Acceptability of Risk From Radiation—Application to Manned Space Flight; 320 24th DOE/NRC Nuclear Air Cleaning and Treatment Conference; 361 Radiation Biology and Radiation Protection— Modern Developments and Tendencies in Radiation Biology; 362 1997 IEEE Sixth Conference on Human Factors and Power Plants; 354 The Authors; 360 Reviewers of Nuclear Safety, Vol. 36.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Probabilistic Risk Assessment Procedures Guide for NASA Managers and Practitioners (Second Edition)

Probabilistic Risk Assessment (PRA) is a comprehensive, structured, and logical analysis method aimed at identifying and assessing risks in complex technological systems for the purpose of cost-effectively improving their safety and performance. NASA's objective is to better understand and effectively manage risk, and thus more effectively ensure mission and programmatic success, and to achieve and maintain high safety standards at NASA. NASA intends to use risk assessment in its programs and projects to support optimal management decision making for the improvement of safety and program performance. In addition to using quantitative/probabilistic risk assessment to improve safety and enhance the safety decision process, NASA has incorporated quantitative risk assessment into its system safety assessment process, which until now has relied primarily on a qualitative representation of risk. Also, NASA has recently adopted the Risk-Informed Decision Making (RIDM) process [1-1] as a valuable addition to supplement existing deterministic and experience-based engineering methods and tools. Over the years, NASA has been a leader in most of the technologies it has employed in its programs. One would think that PRA should be no exception. In fact, it would be natural for NASA to be a leader in PRA because, as a technology pioneer, NASA uses risk assessment and management implicitly or explicitly on a daily basis. NASA has probabilistic safety requirements (thresholds and goals) for crew transportation system missions to the International Space Station (ISS) [1-2]. NASA intends to have probabilistic requirements for any new human spaceflight transportation system acquisition. Methods to perform risk and reliability assessment in the early 1960s originated in U.S. aerospace and missile programs. Fault tree analysis (FTA) is an example. It would have been a reasonable extrapolation to expect that NASA would also become the world leader in the application of PRA. That was, however, not to happen. Early in the Apollo program, estimates of the probability for a successful roundtrip human mission to the moon yielded disappointingly low (and suspect) values and NASA became discouraged from further performing quantitative risk analyses until some two decades later when the methods were more refined, rigorous, and repeatable. Instead, NASA decided to rely primarily on the Hazard Analysis (HA) and Failure Modes and Effects Analysis (FMEA) methods for system safety assessment.

Stamatelatos,Michael↗