Search NASA⌕ Search

SEARCH · Search NASA

Results for “MONITOR”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Developing the Tools for Geologic Repository Monitoring - Andra's Monitoring R and D Program - 12045

The French Safety Guide recommends that Andra develop a monitoring program to be implemented during repository construction and conducted until (and possibly after) closure, in order to confirm expected behavior and enhance knowledge of relevant processes. To achieve this, Andra has developed an overall monitoring strategy and identified specific technical objectives to inform disposal process management on evolutions relevant to both the long term safety and reversible, pre-closure management of the repository. Andra has launched an ambitious R and D program to ensure that reliable, durable, metrologically qualified and tested monitoring systems will be available at the time of repository construction in order to respond to monitoring objectives. After four years of a specific R and D program, first observations are described and recommendations are proposed. The results derived from 4 years of Andra's R and D program allow three main observations to be shared. First, while other industries also invest in monitoring equipment, their obvious emphasis will always be on their specific requirements and needs, thus often only providing a partial match with repository requirements. Examples can be found for all available sensors, which are generally not resistant to radiation. Second, the very close scrutiny anticipated for the geologic disposal process is likely to place an unprecedented emphasis on the quality of monitoring results. It therefore seems important to emphasize specific developments with an aim at providing metrologically qualified systems. Third, adapting existing technology to specific repository needs, and providing adequate proof of their worth, is a lengthy process. In conclusion, it therefore seems prudent to plan ahead and to invest wisely in the adequate development of those monitoring tools that will likely be needed in the repository to respond to the implementers' and regulators' requirements, including those agreed and developed to respond to potential stakeholder expectations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Used nuclear fuel dry storage cask materials monitoring system: a proof of concept to deploy retrieve monitoring equipment - 15504

The cask materials monitoring system is a proof-of-concept to deploy and retrieve monitoring equipment. The system is an airlock-type system that is bolted to the cask fill/drain port. It consists of the following major components: (1) a monitoring module that contains the equipment for monitoring the cask environment, (2) a sliding shield plug that provides radiation shielding throughout the deployment and retrieval of the monitoring equipment module, (3) a primary seal flange that is permanently installed on the cask that provides cask boundary confinement, and (4) a containment tube that provides the airlock function providing cask confinement when the primary seal is broken. In this proof-of-concept development, corrosion coupons were selected as the monitoring equipment for deployment into a spent nuclear fuel cask. However, the system has the potential for a variety of uses. The integration of a camera deployment system into the cask materials monitoring system will permit inspection of used nuclear fuel while maintaining cask atmosphere. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Paint and Oil Locker, SWMU 067 Southern Treatment Area Air Sparge System Construction Completion and Performance Monitoring and Paint and Oil Locker, Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Report Kennedy Space Center, Florida

This Air Sparge (AS) System Construction Completion, Performance Monitoring, and Long-Term Monitoring (LTM) Report presents activities conducted at the Paint and Oil Locker (POL) (Solid Waste Management Unit [SWMU] 067) and Supply Warehouse #3 (SW3) (SWMU 088) sites located at the Kennedy Space Center (KSC), Florida. Activities include implementation and Year 1 (Quarters [Q] 1 through 4) and Q5 operation, maintenance, and monitoring (OM&M) activities and performance monitoring results for the AS Interim Measure (IM) in the POL Southern Treatment Area, LTM results for the POL Northern Area and SW3, and supplemental direct push technology (DPT) sampling at both sites to support the LTM and performance monitoring programs. The timeframe for activities included in this report extends from August 2019 to August 2022. The scope for these sites currently includes two main components, which are documented within this report: (1) LTM at SW3 and POL Northern Area where an AS system began operation at these sites in May 2009 and June 2013, respectively, and subsequently turned off for both sites in March 2018 (during the previous reporting period); and (2) Active AS operations and performance monitoring in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The AS IM in the POL Southern Treatment Area was implemented between 2019 and 2021 to treat a chlorinated solvent groundwater plume that resulted from historic operations supporting the National Aeronautics and Space Administration’s (NASA) Space Program. The objective of the AS IM is to remediate groundwater within the treatment zone to support transition to monitored natural attenuation (MNA). The overall Corrective Action objective is to reduce concentrations of trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2- dichloroethene (tDCE), and vinyl chloride (VC) present in groundwater to levels below their respective State of Florida Groundwater Cleanup Target Levels (GCTLs). The AS IM was installed in the POL Southern Treatment Area to target the high concentration plume (HCP), which includes a source zone (SZ) area where TCE was found to exceed 11,000 micrograms per liter (µg/L), and extend to a depth of 30 feet below land surface (bls).

TCE↗

Scalable Hybrid Classification-Regression Solution for High-Frequency Nonintrusive Load Monitoring

Residential buildings with the ability to monitor and control their net-load (sum of load and generation) can provide valuable flexibility to power grid operators. We present a novel multiclass nonintrusive load monitoring (NILM) approach that enables effective net-load monitoring capabilities at high-frequency with minimal additional equipment and cost. The proposed machine learning based solution provides accurate multiclass state predictions while operating at a faster timescale (able to provide a prediction for each 60- Hz ac cycle used in US power grid) without relying on event-detection techniques. We also introduce an innovative hybrid classification-regression method that allows for the prediction of not only load on/off states but also individual load operating power levels. A test bed with eight residential appliances is used for validating the NILM approach. Results show that the overall method has high accuracy, good scaling and generalization properties.

feature extraction↗

Y-12 Groundwater Protection Program Monitoring Optimization Plan For Groundwater Monitoring Wells At The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee (Figure A.1). The plan describes the technical approach that will be implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well (Section 2.0). Under this approach, wells granted 'active' status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling (Section 3.0), whereas wells granted 'inactive' status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP (Section 3.0). Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans and procedures (Section 4.0). This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes (Figure A.1): the Bear Creek Hydrogeologic Regime (Bear Creek Regime), the Upper East Fork Poplar Creek Hydrogeologic Regime (East Fork Regime), and the Chestnut Ridge Hydrogeologic Regime (Chestnut Ridge Regime). The Bear Creek Regime encompasses a section of Bear Creek Valley (BCV) immediately west of Y-12. The East Fork Regime encompasses most of the Y-12 process, operations, and support facilities in BCV and, for the purposes of this plan, includes a section of Union Valley east of the DOE Oak Ridge Reservation (ORR) boundary along Scarboro Road. The Chestnut Ridge Regime encompasses a section of Chestnut Ridge directly south of Y-12 that is bound on the west by a surface drainage feature (Dunaway Branch) and on the east by Scarboro Road. For this plan, the Chestnut Ridge Regime includes an area known as the South Campus Facility that is located west of Scarboro Road and south of Bethel Valley Road. The GWPP maintains an extensive database of construction details and related information for the monitoring wells in each hydrogeologic regime (including wells that have been destroyed or intentionally plugged and abandoned); the most recent hardcopy version of the database was issued in February 2003 (BWXT Y-12, L.L.C. [BWXT] 2003). As specified in the Y-12 GWPP Management Plan (Babcock & Wilcox Technical Services Y-12, LLC [B&W Y-12] 2009a), this plan will be reviewed and updated every three years.

54 ENVIRONMENTAL SCIENCES↗

Water Oxidation and Oxygen Monitoring by Cobalt-Modified Fluorine-Doped Tin Oxide Electrodes

Electrocatalytic water oxidation occurs at fluoride-doped tin oxide (FTO) electrodes that have been surface-modified by addition of Co(II). On the basis of X-ray photoelectron spectroscopy and transmission electron microscopy measurements, the active surface site appears to be a single site or small-molecule assembly bound as Co(II), with no evidence for cobalt oxide film or cluster formation. On the basis of cyclic voltammetry measurements, surface-bound Co(II) undergoes a pH-dependent 1e(-)/1H(+) oxidation to Co(III), which is followed by pH-dependent catalytic water oxidation. O-2 reduction at FTO occurs at -0.33 V vs NHE, allowing for in situ detection of oxygen as it is formed by water oxidation on the surface. Controlled-potential electrolysis at 1.61 V vs NHE at pH 7.2 resulted in sustained water oxidation catalysis at a current density of 0.16 mA/cm(2) with 29 000 turnovers per site over an electrolysis period of 2 h. The turnover frequency for oxygen production per Co site was 4 s(-1) at an overpotential of 800 mV at pH 7.2. Initial experiments with Co(II) on a mesoporous, high-surface-area nanoFTO electrode increased the current density by a factor of similar to 5

Kent, CA↗

Soil Organic Carbon Change Monitored Over Large Areas

Managing agricultural soils to increase SOC storage is a significant, immediately available, low-cost option for mitigating CO2 emissions, with the technical potential to sequester as much as 800 Tg CO2/yr in the US (~13% of US CO2 emissions) [Lal et al., 2003] and 5000 Tg CO2/yr globally (~17% of global CO2 emissions) [Smith et al., 2007].

Brown, David J.↗

COSMOGRAIL: the COSmological MOnitoring of GRAvItational Lenses: XVI. Time delays for the quadruply imaged quasar DES J0408–5354 with high-cadence photometric monitoring* [COSMOGRAIL XVI: Time delays for the quadruply imaged quasar DES J0408–5354 with high-cadence photometric monitoring]

Here, we present time-delay measurements for the new quadruple imaged quasar DES J0408–5354, the first quadruple imaged quasar found in the Dark Energy Survey (DES). Our result is made possible by implementing a new observational strategy using almost daily observations with the MPIA 2.2 m telescope at La Silla observatory and deep exposures reaching a signal-to-noise ratio of about 1000 per quasar image. This data qualityallows us to catch small photometric variations (a few mmag rms) of the quasar, acting on temporal scales much shorter than microlensing, and hence making the time delay measurement very robust against microlensing. In only seven months we very accurately measured one of the time delays in DES J0408–5354: Δt(AB) = –112.1 ± 2.1 days (1.8%) using only the MPIA 2.2 m data. In combination with data taken with the 1.2 m Euler Swiss telescope, we also measured two delays involving the D component of the system Δt(AD) = –155.5 ± 12.8 days (8.2%) and Δt(BD) = –42.4 ± 17.6 days (41%), where all the error bars include systematics. Turning these time delays into cosmological constraints will require deep Hubble Space Telescope (HST) imaging or ground-based adaptive optics (AO), and information on the velocity field of the lensing galaxy.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Monitoring the effectiveness of floodplain habitat restoration: A review of methods and recommendations for future monitoring

Abstract Floodplains are some of the most ecologically important and human‐impacted habitats throughout the world. Large efforts are underway in North America, Europe, Australia, and elsewhere to restore floodplain habitats, not only to increase fish and aquatic biota but to restore ecological diversity. As the scale, number, and complexity of floodplain restoration projects has increased, so has the need for rigorous monitoring and evaluation to demonstrate effectiveness and guide future floodplain restoration efforts. Moreover, technological advances in remote sensing, genetics, and fish marking have been evolving rapidly and there is need to update guidance on the best methods for monitoring physical and biological response to floodplain restoration. A comprehensive review of the restoration literature located 180 papers that specifically examined the effectiveness of various floodplain restoration techniques. The various methods that were historically and currently used to evaluate the physical (channel and floodplain morphology, sediment, flow, water quality [temperature and nutrients]) and biological (fish, invertebrates, and aquatic and riparian plants) effectiveness of floodplain restoration were reviewed and used to provide recommendations for future monitoring. For each major physical and biological monitoring method, we discuss their importance, how they have historically been used to evaluate floodplain restoration, newer methodologies, and limitations or advantages of different methodologies and approaches. We then discuss monitoring the effectiveness of small (<2 km in main channel length) and large (>2 km of main channel length) floodplain projects, with recommendations for various study designs, parameters, and monitoring methodologies. This article is categorized under: Water and Life > Conservation, Management, and Awareness Water and Life > Methods

Roni, Philip↗

Spectral induced polarization monitoring of induced calcite precipitation in subsurface sediments

Co-precipitation of contaminants within the crystalline structure of calcite is a promising natural attenuation or remedial technology being considered at contaminated sites. We explore the sensitivity of the spectral induced polarization (SIP) method to induced calcite precipitation in natural sediments as a path forward to non-invasively monitor these sites. We performed time-lapse column experiments using phased (I-IV) injections over 40 days on natural sediments from the Hanford Site (Washington State, USA). In the phased injections, abiotic calcite precipitation was induced and confirmed to have occurred. Previous work in glass beads and homogeneous sand was limited to high frequency detection of calcite, however in this work we observed the development of two polarization mechanisms, one at high frequency (>100 Hz) and one at low frequency (< 100 Hz). Based on the characteristic frequencies from the SIP high and low frequency regimes, characteristic length scales (L) were computed where the adsorption mode of Na+ versus Ca2+ was compared by using diffusion coefficients corresponding to Na+ versus an arithmetically averaged value for Na+ and Ca2+. Using the diffusion coefficient of Na+, the high frequency L was found to correlate well with the size of the calcite crystals. The low frequency L correlated well with the individual natural sediment grain sizes within the columns. During late experimental times (day 36 and 40), the characteristic low frequency in two of the experimental columns shifted to lower frequencies (<0.001 Hz) which may signify SIP sensitivity of the formed calcite with the sediment grains. In field applications, the development of a low frequency polarization length scale to monitor calcite precipitation is promising for field monitoring applications, however further laboratory work needs to be performed to examine the SIP sensitivity of calcite formation in the presence of to natural sediments

calcium carbonate, calcite, precipitation, spectra↗

Power and Communications Hardware-in-the-Loop CPS Architecture and Platform for DER Monitoring and Control Applications: Preprint

The rapid growth of distributed energy resources (DERs) has prompted increasing interest in the monitoring and control of DERs through hybrid smart grid communications. The deployment of communications and computation has transformed the traditional physical power grid into a smart cyber-physical system (CPS). To fully understand the interdependency between physical grid and cyber netowrks, this study designed a power and communications hardware-in-the-loop (PCommHIL) CPS architecture, which enables the flexible verification of DER monitoring and control with hybrid communications architectures and Internet protocols. Design, development and case study of a PCommHIL testbed for the DER coordination are discussed in detail, and the proposed platform integrates DER devices, Advanced Metering Infrastructures (AMIs), and a suite of hybrid communications networks for distribution automation applications. Case study on DER situational awareness and Volt-Var control validates the efficacy of this proposed PCommHIL platform with hybrid communications designs. Results show that the HAN communication technologies play a critical role in hybrid designs and it is the bottleneck for DER applications. High performance communication technologies are highly recommended to be applied in the HAN for enhanced monitoring and real-time control of DERs.

AMIs↗

Condition monitoring and anomaly detection in cyber-physical systems

The modern industrial environment is equipping myriads of smart manufacturing machines where the state of each device can be monitored continuously. Such monitoring can help identify possible future failures and develop a cost-effective maintenance plan. However, it is a daunting task to perform early detection with low false positives and negatives from the huge volume of collected data. This requires developing a holistic machine learning framework to address the issues in condition monitoring of high priority components and develop efficient techniques to detect anomalies that can detect and possibly localize the faulty components. This paper presents a comparative analysis of recent machine learning approaches for robust, cost-effective anomaly detection in cyber-physical systems. While detection has been extensively studied, very few researchers have analyzed the localization of the anomalies. We show that supervised learning outperforms unsupervised algorithms. For supervised cases, we achieve near-perfect accuracy of 98% (specifically for tree-based algorithms). In contrast, the best-case accuracy in the unsupervised cases was 63%—the area under the receiver operating characteristic curve (AUC) exhibits similar outcomes as an additional metric.

Marfo, William↗

Independent dose per monitor unit review of eight U.S.A. proton treatment facilities

Purpose: Compare the dose per monitor unit at different proton treatment facilities using three different dosimetry methods. Methods: Measurements of dose per monitor unit were performed by a single group at eight facilities using 11 test beams and up to six different clinical portal treatment sites. These measurements were compared to the facility reported dose per monitor unit values. Results: Agreement between the measured and reported doses was similar using any of the three dosimetry methods. Use of the ICRU 59 N{sub D,w} based method gave results approximately 3% higher than both the ICRU 59 N{sub X} and ICRU 78 (TRS-398) N{sub D,w} based methods. Conclusions: Any single dosimetry method could be used for multi-institution trials with similar conformity between facilities. A multi-institutional trial could support facilities using both the ICRU 59 N{sub X} based and ICRU 78 (TRS-398) N{sub D,w} based methods but use of the ICRU 59 N{sub D,w} based method should not be allowed simultaneously with the other two until the difference is resolved.

62 RADIOLOGY AND NUCLEAR MEDICINE↗