SEARCH · Search NASA
Results for “Management planning”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Wildlife Management Plan for the Oak Ridge Reservation
This document outlines a plan for management of the wildlife resources on the US Department of Energy’s (DOE’s) Oak Ridge Reservation. Management includes wildlife population control through restoration of wildlife species; preservation, management, and enhancement of wildlife habitats; coordination of wildlife studies and characterization of areas, hunting, trapping, removal, and habitat manipulation; wildlife damage control; and law enforcement. Wildlife resources are divided into several categories, each with a specific set of objectives and procedures to attain the goals. These objectives are management of (1) wildlife habitats to ensure that all resident wildlife species exist on the Reservation in viable numbers; (2) focal species to promote healthy populations on designated land units; (3) game species for research, education, recreation, and public safety; (4) the Three Bend Scenic and Wildlife Management Refuge Area; (5) nuisance wildlife, including nonnative species, to achieve adequate population control for the maintenance of health and safety on the Reservation; (6) sensitive species (i.e., state or federally listed as Endangered, Threatened, Of Special Concern, or In Need of Management) through preservation and protection of both the species and habitats critical to the survival of those species; and (7) wildlife disease. Achievement of the objectives is a joint effort between Oak Ridge National Laboratory and the Tennessee Wildlife Resources Agency (TWRA) through agreements between DOE and the University of Tennessee (UT)-Battelle LLC, between TWRA and DOE, and between Tennessee Department of Environment and Conservation (TDEC) and DOE. Implementation of objectives is to be informed by leading-edge research and a strong collaborative approach between UT-Battelle and TWRA.
Groundwater Protection Program Management Plan For The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee
This document presents the Groundwater Protection Program (GWPP) management plan for the U.S. Department of Energy (DOE) Y-12 National Security Complex (hereafter referenced as Y-12). The Y-12 GWPP functions as the primary point-of-contact for groundwater-related issues at Y-12, provides stewardship of the extensive network of groundwater monitoring wells at Y-12, and serves as a resource for technical expertise, support, and historical data for groundwater-related activities at Y-12. These organizational functions each serve the primary programmatic purpose of the GWPP, which is to ensure that groundwater monitoring activities within areas under Y-12 administrative control provide representative data in compliance with the multiple purposes of applicable state and federal regulations, DOE orders, and the corporate policies of Babcock & Wilcox Technical Services Y-12 LLC (hereafter referenced as B&W Y-12), the Y-12 management and operations (M&O) contractor for DOE. B&W Y-12 is a new corporate name, assumed in January 2007, for the company formerly known as BWXT Y-12, L.L.C., hereafter referenced as BWXT. This GWPP management plan addresses the requirements of DOE Order 450.1A Environmental Protection Program (hereafter referenced as DOE O 450.1A), which emphasize a site-wide approach for groundwater protection at each DOE facility through implementation of groundwater surveillance monitoring. Additionally, this plan addresses the relevant and applicable GWPP elements and goals described in the DOE O 450.1A technical guidance documents issued in June 2004 (DOE 2004) and May 2005 (DOE 2005). This GWPP management plan is a 'living' document that is reviewed annually, revised and reissued every three years, and is formatted to provide for updating individual sections independent of the rest of the document. Section 2 includes a short description of the groundwater system at Y-12, the history of groundwater monitoring at Y-12 and the corresponding evolution of the GWPP, and an overview of ongoing Y-12 groundwater monitoring activities. Section 3 describes the key elements of the GWPP management strategy. Organizational roles and responsibilities of GWPP personnel are outlined in Section 4. Section 5 presents an overview of the GWPP project plans for applicable programmatic elements. Section 6 lists the reports, plans, and documents that are referenced for technical and administrative details.
Natural Resource Management Plan for Brookhaven National Laboratory
The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory’s mission. The philosophy or guiding principles of the NRMP include stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is reviewed and updated every five years. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered species documented on site (Appendices A, B and C).
San Juan National Forest Land Management Planning Support System (LMPSS) requirements definition
The role of remote sensing data as it relates to a three-component land management planning system (geographic information, data base management, and planning model) can be understood only when user requirements are known. Personnel at the San Juan National Forest in southwestern Colorado were interviewed to determine data needs for managing and monitoring timber, rangelands, wildlife, fisheries, soils, water, geology and recreation facilities. While all the information required for land management planning cannot be obtained using remote sensing techniques, valuable information can be provided for the geographic information system. A wide range of sensors such as small and large format cameras, synthetic aperture radar, and LANDSAT data should be utilized. Because of the detail and accuracy required, high altitude color infrared photography should serve as the baseline data base and be supplemented and updated with data from the other sensors.
Federal Water Management Planning Manual
FEMP developed this Federal Water Management Planning Manual to provide a resource for designing a comprehensive water management program. The manual describes strategies to optimize water use at federal facilities, use water balance analysis methods, identify design elements and procurement best practices, and expand use of alternative water.
Dose planning management of patients undergoing salvage whole brain radiation therapy after radiosurgery
Dose or treatment planning management is necessary for the re-irradiation of intracranial relapses after focal irradiation, radiosurgery, or stereotactic radiotherapy. The current clinical guidelines for metastatic brain tumors are the use of focal irradiation if the patient presents with 4 lesions or less. Salvage treatments with the use of whole brain radiation therapy (WBRT) can then be used to limit disease progression if there is an intracranial relapse. However, salvage WBRT poses a number of challenges in dose planning to limit disease progression and preserve neurocognitive function. This work presents the dose planning management that addresses a method of delineating previously treated volumes, dose level matching, and the dose delivery techniques for WBRT.
Nuclear Posture Review and Stockpile Stewardship Management Plan [Slides]
This presentation provides an overview of the 2018 Nuclear Posture Review (NPR)m Stockpile Stewardship and Management Plan (SSMP), and the Nuclear Posture Review and Stockpile Stewardship Management Plan group project.
Updated Medical Waste Management Plans and Emergency Action Plans for the Lawrence Livermore National Laboratory Main Site
Attached are the updated Medical Waste Management Plans and Emergency Action Plans for Lawrence Livermore National Laboratory’s (LLNL) Biosafety Level 2 (BSL-2) facilities and Biosafety Level 3 (BSL-3) facility. A redline version of each document has also been provided. Minor changes such as facility personnel, contact information, and titles for those that support onsite Biosafety Labs at LLNL have been made to the document. It should be noted that the most recent versions of the Medical Waste Large Quantity Generator Registration Application Form and Medical Waste Management Plan were incorporated and sourced from the Alameda County Department of Environmental Health website.
A management plan for systems assurance during phases A, B, C, and D
Management plan for systems assurance in NASA PROGRAM
Risk Management Plan and Risk Register for Design Low-Power Wave Energy Converter for Non-Grid Applications
Risk Registers for major subsystems completed according to the methodology described in the Risk Management Plan [DE-EE0008627 D1.2 Risk Management Plan PD v1.1 07-19-2019.pdf], also included here.
Development of Level 1b Calibration and Validation Readiness, Implementation and Management Plans for GOES-R
A complement of Readiness, Implementation and Management Plans (RIMPs) to facilitate management of post-launch product test activities for the official Geostationary Operational Environmental Satellite (GOES-R) Level 1b (L1b) products have been developed and documented. Separate plans have been created for each of the GOES-R sensors including: the Advanced Baseline Imager (ABI), the Extreme ultraviolet and X-ray Irradiance Sensors (EXIS), Geostationary Lightning Mapper (GLM), GOES-R Magnetometer (MAG), the Space Environment In-Situ Suite (SEISS), and the Solar Ultraviolet Imager (SUVI). The GOES-R program has implemented these RIMPs in order to address the full scope of CalVal activities required for a successful demonstration of GOES-R L1b data product quality throughout the three validation stages: Beta, Provisional and Full Validation. For each product maturity level, the RIMPs include specific performance criteria and required artifacts that provide evidence a given validation stage has been reached, the timing when each stage will be complete, a description of every applicable Post-Launch Product Test (PLPT), roles and responsibilities of personnel, upstream dependencies, and analysis methods and tools to be employed during validation. Instrument level Post-Launch Tests (PLTs) are also referenced and apply primarily to functional check-out of the instruments.
Lands with Wilderness Characteristics, Resource Management Plan Constraints, and Land Exchanges: Cross-Jurisdictional Management and Impacts on Unconventional Fuel Development in Utah's Uinta Basin
Utah is rich in oil shale and oil sands resources. Chief among the challenges facing prospective unconventional fuel developers is the ability to access these resources. Access is heavily dependent upon land ownership and applicable management requirements. Understanding constraints on resource access and the prospect of consolidating resource holdings across a fragmented management landscape is critical to understanding the role Utah’s unconventional fuel resources may play in our nation’s energy policy. This Topical Report explains the historic roots of the “crazy quilt” of western land ownership, how current controversies over management of federal public land with wilderness character could impact access to unconventional fuels resources, and how land exchanges could improve management efficiency. Upon admission to the Union, the State of Utah received the right to title to more than one-ninth of all land within the newly formed state. This land is held in trust to support public schools and institutions, and is managed to generate revenue for trust beneficiaries. State trust lands are scattered across the state in mostly discontinuous 640-acre parcels, many of which are surrounded by federal land and too small to develop on their own. Where state trust lands are developable but surrounded by federal land, federal land management objectives can complicate state trust land development. The difficulty generating revenue from state trust lands can frustrate state and local government officials as well as citizens advocating for economic development. Likewise, the prospect of industrial development of inholdings within prized conservation landscapes creates management challenges for federal agencies. One major tension involves whether certain federal public lands possess wilderness character, and if so, whether management of those lands should emphasize wilderness values over other uses. On December 22, 2010, Secretary of the Interior Ken Salazar issued Secretarial Order 3310, Protecting Wilderness Characteristics on Lands Managed by the Bureau of Land Management. Supporters argue that the Order merely provides guidance regarding implementation of existing legal obligations without creating new rights or duties. Opponents describe Order 3310 as subverting congressional authority to designate Wilderness Areas and as closing millions of acres of public lands to energy development and commodity production. While opponents succeeded in temporarily defunding the Order’s implementation and forcing the Bureau of Land Management (BLM) to adopt a more collaborative approach, the fundamental questions remain: Which federal public lands possess wilderness characteristics and how should those lands be managed? The closely related question is: How might management of such resources impact unconventional fuel development within Utah? These questions remain pressing independent of the Order because the BLM, which manages the majority of federal land in Utah, is statutorily obligated to maintain an up-to-date inventory of federal public lands and the resources they contain, including lands with wilderness characteristics. The BLM is also legally obligated to develop and periodically update land use plans, relying on information obtained in its public lands inventory. The BLM cannot sidestep these hard choices, and failure to consider wilderness characteristics during the planning process will derail the planning effort. Based on an analysis of the most recent inventory data, lands with wilderness characteristics — whether already subject to mandatory protection under the Wilderness Act, subject to discretionary protections as part of BLM Resource Management Plan revisions, or potentially subject to new protections under Order 3310 — are unlikely to profoundly impact oil shale development within Utah’s Uinta Basin. Lands with wilderness characteristics are likely to v have a greater impact on oil sands resources, particularly those resources found in the southern part of the state. Management requirements independent of lands with wilderness characteristics far overshadow the challenges posed by wilderness issues. Wilderness character issues aside, a need to improve management integration remains. In researching past efforts to manage across the fragmented landscape we found that unilateral actions have been deeply divisive and engendered distrust among those impacted by the action. This distrust can linger for decades. Collaborative efforts, whether intended to protect lands, foster development, or do both, can represent an attractive alternative to unilateral action. Such collaborative efforts are more likely to succeed when they respond to strong incentives to act, evidence widespread involvement and support, and benefit from a committed champion. Projects are all but certain to fail where participants overreach or one of these elements is missing. For more than three decades, the state and federal government have cooperatively pursued land exchanges in order to “block up” isolated state trust lands and eliminate inholdings. These efforts can advance both conservation and development objectives, and are generally conducted in conjunction with efforts to protect extraordinary federal lands. Congress recognized the value of such exchanges and, as part of the Energy Policy Act of 2005, directed the Department of the Interior to pursue land exchanges as a means of facilitating environmentally responsible oil shale and oil sands recovery. But land exchanges are not without their challenges. Federal law requires equalizing the value of the lands and resources to be exchanged, and various means of equalizing value have been attempted. More flexible approaches have a higher likelihood of success, but are often criticized as resulting in an economic windfall for one party. Today challenges associated with appraisal and valuation stand as the most significant obstacles in the way of large-scale exchanges. Greater reliance on revenue sharing provisions that prevent an economic windfall to one party and avoid challenges inherent in valuing oil shale and oil sands resources may mark a promising path forward. The success or failure of these efforts could profoundly impact both the prospect of unconventional fuel development and wilderness character protection.
Distribution Integrity Management Plan (DIMP): Los Alamos National Laboratory Natural Gas Distribution System
This document is the distribution integrity management plan (Plan) for the Los Alamos National Laboratory (LANL) Natural Gas Distribution System. This Plan meets the requirements of 49 CFR Part 192, Subpart P Distribution Integrity Management Programs (DIMP) for the LANL Natural Gas Distribution System. This Plan was developed by reviewing records and interviewing LANL personnel. The records consist of the design, construction, operation and maintenance for the LANL Natural Gas Distribution System. The records system for the LANL Natural Gas Distribution System is limited, so the majority of information is based on the judgment of LANL employees; the maintenance crew, the Corrosion Specialist and the Utilities and Infrastructure (UI) Civil Team Leader. The records used in this report are: Pipeline and Hazardous Materials Safety Administration (PHMSA) 7100.1-1, Report of Main and Service Line Inspection, Natural Gas Leak Survey, Gas Leak Response Report, Gas Leak and Repair Report, and Pipe-to-Soil Recordings. The specific elements of knowledge of the infrastructure used to evaluate each threat and prioritize risks are listed in Sections 6 and 7, Threat Evaluation and Risk Prioritization respectively. This Plan addresses additional information needed and a method for gaining that data over time through normal activities. The processes used for the initial assessment of Threat Evaluation and Risk Prioritization are the methods found in the Simple, Handy Risk-based Integrity Management Plan (SHRIMP™) software package developed by the American Pipeline and Gas Agency (APGA) Security and Integrity Foundation (SIF). SHRIMP™ uses an index model developed by the consultants and advisors of the SIF. Threat assessment is performed using questions developed by the Gas Piping Technology Company (GPTC) as modified and added to by the SHRIMP™ advisors. This Plan is required to be reviewed every 5 years to be continually refined and improved. Records for all piping system installed after the effective date of this Plan will be captured and retained in the UI records documentation system. Primary Utility Asbuilts are maintained by Utilities Mapping (UMAP) and additional records are maintained on the N drive. Engineering Change Notices (ECNs) are stored on the N drive under configuration management and kept up by Utilities and Infrastructure Division Office (UI-DO). Records include, at a minimum, the location where new piping and appurtenances are installed and the material of which they are constructed.
Invasive Plant Species Management Plan for Los Alamos National Laboratory (Rev.3)
Native species are plants and animals that continually occupy a natural range without direct or indirect introduction and/or care by humans. They are adapted to the environmental conditions and processes of the ecosystem in which they reside. A species introduced into a novel ecosystem can either exploit that ecosystem and thrive or be unable to survive in that ecosystem (Hobbs et al. 2006). Alien or non-native species are species that are intentionally or accidentally introduced into a novel ecosystem and are capable of living and propagating within the physical parameters of that ecosystem. Invasive species is a species that is non-native (or alien) to the ecosystem under consideration and a noxious species are those whose introduction causes or is likely to cause economic or environmental harm. The term invasive species is applicable to plants and animals alike; however, this invasive species management plan currently focuses on invasive vegetation. Invasive plant species are usually capable of rapid colonization of disturbed ground, such as after a change in wildfire regime intensity and frequency (Reilly et al. 2020) or anthropogenic ground disturbance (Burke and Grime 1996; Hobbs and Huenneke 1992). Climate change facilitates the spread and establishment of many alien species and creates new opportunities for them to become invasive (Turbelin and Catford 2021). As climate change impacts increase in the coming decades, we may see in an increase in invasive species establishment. See a list of definitions of terms pertinent to this document in Appendix A: Definitions. Los Alamos National Laboratory (LANL) hosts populations of non-native and invasive species all typical of the northern New Mexico region (Martin 2004; NMDA 2020). By implementing an invasive species management plan, LANL will have readily accessible management strategies for invasive species that are found on-site. The benefits of managing invasive species include a decrease in wildland fire risks, an increase in soil productivity, an increase in (productive or beneficial) wildlife habitat, an increase in water quantity and quality, and the restoration of impacted areas (Burke and Grime 1996; Hobbs and Huenneke 1992; D’Antonio and Hobbie 2005; MacDougall et al. 2013; Reilly et al. 2020). The aforementioned benefits from invasive species management directly enable the LANL mission by ensuring compliance requirements are met and site-wide programs, such as the Vulnerability Assessment and Resilience Plan, are supported for a mutually beneficial outcome. An example for the LANL site specifically, controlling non-native annual plant species, for example, could reduce the costs associated with stabilizing soils during the stormwater pollution prevention compliance process. Roadway and utility right-of-way areas are another place where an integrated vegetation management strategy would promote low growing perennial plants in a way that is mutually beneficial to habitat and the institution through lowered maintenance costs. There is also an economic benefit to managing invasive species. In one nationwide study, invasive plants had an estimated impact cost of $190.45 billion (Fantel-Lepczyk et al. 2022). Investing in preventative measures and surveillance could help to offset future control and management costs of invasive species that have the potential to become established. The State of New Mexico has developed plant species lists and recommendations through the New Mexico Department of Agriculture’s Noxious Weeds Management Act, Article 7D (NM Statute § 76-7D-4 2021); however, effective invasive species management must rely on local knowledge of the site and region. Los Alamos County (LAC) has already compiled a target invasive plant species list and species-specific management objectives (Martin 2004). Therefore, the New Mexico Noxious Weed List and the LAC invasive plant species list, as well as management objectives from those documents, are integrated into LANL’s invasive plant species management plan.
ICESat (GLAS) Science Processing Software Document Series: Science Software Management Plan - Volume 1
This document provides the Software Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Terminal (IST) Software. For the I-SIPS Software, the SDS will produce Level 0, Level 1, and Level 2 data products as well as the associated product quality assessments and descriptive information. For the IST Software, the SDS will accommodate the GLAS instrument support areas of engineering status, command, performance assessment, and instrument health status.
ICESat (GLAS) Science Processing Software Document Series: Science Data Management Plan - Volume 2
This document provides the Data Management Plan for the GLAS Standard Data Software (SDS) supporting the GLAS instrument of the EOS ICESat Spacecraft. The SDS encompasses the ICESat Science Investigator-led Processing System (I-SIPS) Software and the Instrument Support Facility (ISF) Software. This Plan addresses the identification, authority, and description of the interface nodes associated with the GLAS Standard Data Products and the GLAS Ancillary Data.
FY 2018 - Stockpile Stewardship and Management Plan
NNSA's FY 2015 - Stockpile Stewardship and Management Plan