Search NASA⌕ Search

SEARCH · Search NASA

Results for “Marching learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

NASA/DOD Aerospace Knowledge Diffusion Research Project: Survey of Reader Preferences Concerning the Format of NASA Langley-Authored Technical Reports - Paper 58

The U.S. government technical report is a primary means by which the results of federally funded research and development (R&D) are transferred to the U.S. aerospace industry. However, little is known about this information product in terms of its actual use, importance, and value in the transfer of federally funded R&D. Little is also known about the intermediary-based system that is used to transfer the results of federally funded R&D to the U.S. aerospace industry. To help establish a body of knowledge, the U.S. government technical report is being investigated as part of the NASA/DOD Aerospace Knowledge Diffusion Research Project. In this paper, we summarize the literature on the U.S. government technical report and present the results of a survey of U.S. aerospace engineers and scientists that solicited their opinions concerning the format of NASA Langley Research Center (LaRC)-authored technical reports. To learn more about the preferences of U.S. aerospace engineers and scientists concerning the format of NASA LaRC-authored technical reports, we surveyed 133 report producers (i.e., authors) and 137 report users in March-April 1996. Questions covered such topics as (1) the order in which report components are read, (2) components used to determine if a report would be read, (3) those components that could be deleted, (4) the placement of such components as the symbols list, (e) the de-sirability of a table of contents, (5) the format of reference citations, (6) column layout and right margin treatment, and (7) and person and voice. Mail (self-reported) surveys were used to collect the data. The response rates for report producers (i.e., authors) was 68% and for users was 62%.

Pinelli, Thomas E.↗

NASA/DOD Aerospace Knowledge Diffusion Research Project. Paper 65: Survey of Reader Preferences Concerning the Format of NASA Langley-Authored Technical Reports

The U.S. government technical report is a primary means by which the results of federally funded research and development (R&D) are transferred to the U.S. aerospace industry. However, little is known about this information product in terms of its actual use, importance, and value in the transfer of federally funded R&D. Little is also known about the intermediary-based system that is used to transfer the results of federally funded R&D to the U.S. aerospace industry. To help establish a body of knowledge, the U.S. government technical report is being investigated as part of the NASA/DoD Aerospace Knowledge Diffusion Research Project. In this article, we summarize the literature on the U.S. government technical report and present the results of a survey of U.S. aerospace engineers and scientists that solicited their opinions concerning the format of NASA Langley Research Center (LaRC)-authored technical reports. To learn more about the preferences of U.S. aerospace engineers and scientists concerning the format of NASA LaRC-authored technical reports, we surveyed 133 report producers (i.e., authors) and 137 report users in March-April 1996. Questions covered such topics as: (a) the order in which report components are read; (b) components used to determine if a report would be read; (c) those components that could be deleted; (d) the placement of such components as the symbols list; (e) the desirability of a table of contents; (f) the format of reference citations; (g) column layout and right margin treatment; and (h) writing style in terms of person and voice. Mail (self-reported) surveys were used to collect the data. The response rates for report producers (i.e., authors) was 68% and for users was 62%.

Pinelli, Thomas E.↗

ISS Payload Operations Training Throughout the COVID-19 Pandemic: Impacts, Opportunities and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, training and certifying flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted during the pandemic. From orientation and introductory classes for new controllers, simulations, and advanced lessons, On the Job Training (OJT) and final evaluations; all aspects faced challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama were forced to become more efficient with trainees and resources to continue supporting ISS payload operations. The pandemic arrived in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem. However, instructors discovered lessons they were accustomed to delivering in a classroom environment often did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to Information Technology (IT) restrictions and public internet limitations. With simulations essentially halted, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found efficient techniques to provide realistic training experiences. Communication and coordination with management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper discusses the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, providing training to flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, simulations and advanced lessons, On the Job Training and final evaluations; all aspects faced new challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama, were forced to become more efficient with trainees and resources to continue supporting payload operations. The pandemic started in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100 percent remote learning. In the short term, this was not a problem. However, instructors discovered lessons that they were accustomed to delivering in a classroom environment did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to IT restrictions and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗

Know Your Enemy - Implementation of Bioremediation within a Suspected DNAPL Source Zone Following High-Resolution Site Characterization at Contractors Road Heavy Equipment Area, Kennedy Space Center, Florida

The National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC), has adopted high-resolution site characterization (HRSC) sampling techniques during baseline sampling prior to implementation of remedies to confirm and refine the conceptual site model (CSM). HRSC sampling was performed at Contractors Road Heavy Equipment Area (CRHE) prior to bioremediation implementation to verify the extent of the trichloroethene (TCE) dense non-aqueous phase liquid (DNAPL) source area (defined as the area with TCE concentrations above 1% solubility) and its daughter product dissolved plume that had been identified during previous HRSC events. The results of HRSC pre-bioremediation implementation sampling suggested that the TCE source area was larger than originally identified during initial site characterization activities, leading to a design refinement to improve electron donor distribution and increase the likelihood of achieving remedial objectives. Approach/Activities: HRSC was conducted from 2009 through 2014 to delineate the vertical and horizontal extent of chlorinated volatile organic compounds (CVOCs) in the groundwater. Approximately 2,340 samples were collected from 363 locations using direct push technology (DPT) groundwater sampling techniques. Samples were collected from up to 14 depth intervals at each location using a 4-foot sampling screen. This HRSC approach identified a narrow (approx. 5 to 30 feet wide), approximately 3,000 square foot TCE DNAPL source area (maximum detected TCE concentration of 160,000 micrograms per liter [micro-g/L] at DPT sampling location DPT0225). Prior to implementation of a bioremediation interim measure, HRSC baseline sampling was conducted using DPT groundwater sampling techniques. Concentrations of TCE were an order of magnitude lower than previous reported (12,000 micro-g/L maximum at DPT sampling location DPT0225) at locations sampled adjacent to previous sampling locations. To further evaluate the variability in concentrations observed additional sampling was conducted in 2016. The results identified higher concentrations than originally detected within the previously defined source area and the presence of source zone concentrations upgradient of the previously defined source area (maximum concentration observed 570,000 micro-g/L). The HRSC baseline sampling data allowed for a revision of the bioremediation design prior to implementation. Bioremediation was implemented within the eastern portion of the source area in November and December 2016 and quarterly performance monitoring was completed in March and June 2017. Reductions in CVOC concentrations from baseline were observed at all performance monitoring wells in the treatment area, and by June 2017, an approximate 95% CVOC mass reduction was observed based on monitoring well sampling results. Results/Lessons Learned: The results of this project suggest that, due to the complexity of DNAPL source zones, HRSC during pre-implementation baseline sampling in the TCE source zone was an essential strategy for verifying the treatment area and depth prior to remedy implementation. If the upgradient source zone mass was not identified prior to bioremediation implementation, the mass would have served as a long-term source for the dissolved plume.

Chrest, Anne↗

Evaluating the Effectiveness of the 1998-1999 NASA CONNECT Program

NASA CONNECT is a standards-based, integrated mathematics, science, and technology series of 30-minute instructional distance learning (satellite and television) programs for students in grades 5-8. Each of the five programs in the 1998-1999 NASA CONNECT series included a lesson, an educator guide, a student activity or experiment, and a web-based component. In March 1999, a mail (self-reported) survey (booklet) was sent to a randomly selected sample of 1,000 NASA CONNECT registrants. A total of 401 surveys (351 usable) were received by the established cut-off date. Most survey questions employed a 5-point Likert-type response scale. Survey topics included: (1) instructional technology and teaching, (2) instructional programming and technology in the classroom, (3) the NASA CONNECT program, (4) classroom use of computer technology, and (5) demographics. About 68% of the respondents were female, about 88% identified "classroom teacher" as their present professional duty, about 75% worked in a public school, and about 67% held a master's degree or master's equivalency. Regarding NASA CONNECT, respondents reported that: (1) they used the five programs in the 1998-1999 NASA CONNECT series; (2) the stated objectives for each program were met (4.49); (3) the programs were aligned with the national mathematics, science, and technology standards (4.61); (4) program content was developmentally appropriate for grade level (4.25); and (5) the programs in the 1998-1999 NASA CONNECT series enhanced/enriched the teaching of mathematics, science, and technology (4.45).

Pinelli, Thomas E.↗

Evaluating the Effectiveness of the 1999-2000 NASA CONNECT Program

NASA CONNECT is a standards-based, integrated mathematics, science, and technology series of 30-minute instructional distance learning (satellite and television) programs for students in grades 6-8. Each of the five programs in the 1999-2000 NASA CONNECT series included a lesson, an educator guide, a student activity or experiment, and a web-based component. In March 2000, a mail (self-reported) survey (booklet) was sent to a randomly selected sample of 1,000 NASA CONNECT registrants. A total of 336 surveys (269 usable) were received by the established cut-off date. Most survey questions employed a 5-point Likert-type response scale. Survey topics included (1) instructional technology and teaching, (2) instructional programming and technology in the classroom, (3) the NASA CONNECT program, (4) classroom use of computer technology, and (5) demographics. About 73% of the respondents were female, about 92% identified "classroom teacher" as their present professional duty, about 90% worked in a public school, and about 62% held a master's degree or master's equivalency. Regarding NASA CONNECT, respondents reported that (1) they used the five programs in the 1999-2000 NASA CONNECT series; (2) the stated objectives for each program were met (4.54); (3) the programs were aligned with the national mathematics, science, and technology standards (4.57); (4) program content was developmentally appropriate for grade level (4.17); and (5) the programs in the 1999-2000 NASA CONNECT series enhanced/enriched the teaching of mathematics, science, and technology (4.51).

Pinelli, Thomas E.↗

Evaluating the Effectiveness of the 2000-2001 NASA "Why?" Files Program

NASA 'Why?' Files, a research and standards-based, Emmy-award winning series of 60-minute instructional programs for grades 3-5, introduces students to NASA; integrates mathematics, science, and technology by using Problem-Based Learning (PBL), scientific inquiry, and the scientific method; and motivates students to become critical thinkers and active problem solvers. All four 2000-2001 NASA 'Why?' Files programs include an instructional broadcast, a lesson guide, an interactive web site, plus numerous instructional resources. In March 2001, 1,000 randomly selected program registrants participated in a survey. Of these surveys, 185 (154 usable) met the established cut-off date. Respondents reported that (1) they used the four programs in the 2000-2001 NASA 'Why?' Files series; (2) series goals and objectives were met; (3) programs met national mathematics, science, and technology standards; (4) program content was developmentally appropriate for grade level; and (5) programs enhanced/enriched the teaching of mathematics, science, and technology.

Pinelli, Thomas E.↗

Project KEWL: Kinect Engineering With Learning

Project KEWL is a joint project between NASA/JPL and NASA/JSC to stimulate interest of children in Science, Technology, Engineering and Math (STEM) and bring the NASA space exploration experience to the classroom, museum and ultimately the living room. Using the Kinect game controller KEWL allows children to engage in NASA s missions in a fundamentally new way. KEWL allows children to experiment with gravity on Mars and the Moon; navigate through the International Space Station; fix a torn solar array on the ISS; drive a robot on Mars; visit an Asteroid; learn about the differences in gravity on different planets and control Robonaut 2 using their body as the input device. Project KEWL complements NASA s outreach investments in television, mobile platforms and the web by engaging the public through the rapidly expanding medium of console gaming. In 2008, 97% of teenagers played video games and 86% played on a home gaming console. (source: http://pewresearch.org/pubs/953/) As of March 2011, there have been more than 10 million Kinects sold. (source: http://www.itproportal.com/2011/03/10/kinect-record-breaking-sales-figures-top-10-million/) Project KEWL interacts with children on a platform on which they spend much of their time and teaches them information about NASA while they are having fun. Project KEWL progressed from completely custom C++ code written in house to using a commercial game engine. The art work and 3D geometry models come from existing engineering work or are created by the KEWL development team. Six different KEWL applications have been demonstrated at nine different venues including schools, museums, conferences, and NASA outreach events. These demonstrations have allowed the developers the chance to interact with players and observe the gameplay mechanics in action. The lessons learned were then incorporated into the subsequent versions of the applications.

Norris, Jeff↗

Commercial Space Policy in the 1980s: Proceedings of a Roundtable Discussion

The Space Business Archives and the NASA History Office signed a Memorandum of Understanding in March of 1999. The MOU outlines several opportunities for cooperative endeavors between the two agencies in historical programming. This oral history, and subsequently this publication, are the first products of that cooperation. In accordance with the purpose of the Space Business Archives--to provide an impartial forum for lessons learned in the development of the commercial space industry--the idea for this roundtable discussion seemed appropriate as the Archives first public program. With the combined resources of the Archives and the NASA History Office we were fortunate to assemble a panel of individuals that served in both industry and government during the 1980s, many working in both sectors during that time. When envisioning the focus of this oral history, we decided that it was appropriate to highlight space policy in the 1980s, with an emphasis on the emerging commercial industry. Panelists were sent several documents in preparation, such as the Land Remote Sensing Commercialization Act and the Commercial Space Launch Act of 1984, President Reagan's 1982 National Space Policy, and other memoranda and letters that outline important policy issues of the decade. This discussion, we think, fills in some of the gaps that would otherwise be left unfilled when simply reading through the documents themselves. Some of these gaps include: how were these policy directives, legislation and decisions introduced and developed, by whom, and at what political and financial cost? This transcript is meant to serve as a reference to some of the issues, organizations and individuals involved in the creation and development of space policy during the 1980s. It is also the result of the first of many future roundtable discussions aimed at providing an open exchange of ideas concerning past success and failure in order to provide a stronger base for future endeavors in governmental, civil and commercial cooperation in space.

Dahlstrom, Neil↗

A Chief Engineer's View of the NASA X-43A Scramjet Flight Test

This paper presents an overview of the preparation and execution of the first two flights of the NASA X-43A scramjet flight test project. The project consisted of three flights, two planned for Mach 7 and one for Mach 10. The first flight, conducted on June 2, 2001, was unsuccessful and resulted in a nine-month mishap investigation. A two-year return to flight effort ensued and concluded when the second Mach 7 flight was successfully conducted on March 27, 2004. The challenges faced by the project team as they prepared the first ever scramjet-powered airplane for flight are presented. Modifications made to the second flight vehicle as a result of the first flight failure and the return to flight activities are discussed. Flight results and lessons learned are also presented.

Marshall, Laurie A.↗

Integration of Automated Systems Test Campaign NC-IAS

NASA’s 2022 strategic plan included the goal to catalyze economic growth and drive innovation in the aviation industry, and to address challenges in air transportation and airspace management within the National Airspace System (NAS). The Aeronautics Research Mission Directorate (ARMD) specifically was tasked with leading aviation innovation to enable safe and sustainable air transportation through revolutionary vehicle advances and efficient flight operations. As a part of meeting these objectives and advancing air mobility concepts, NASA initiated the National Campaign (NC) in the Advanced Air Mobility (AAM) Project within the Airspace Operations and Safety Program (AOSP). The NC was designed to support operational demonstrations with industry as well as the research and development needed to support NASA-led research flight demonstrations. Within NC, the Integration of Automated Systems (IAS), an NC activity, tested and evaluated flight deck automation and airspace operations management functions needed to enable Urban Air Mobility (UAM) operations. This was accomplished through a partnership with Sikorsky Aircraft (specifically Sikorsky Innovations), a Lockheed Martin company, and DARPA (Defense Advanced Research Projects Agency), by leveraging two automation-enabled helicopters equipped with unique capabilities that enabled NASA to develop and test two-ship conflict encounters to demonstrate flight path management and hazard avoidance technologies. The enabler in this testing was NASA-developed “Middleware” (MW) software (also known as Expandable Variable Autonomy Architecture, or EVAA), which among other things allowed multiple algorithms to be incorporated into one software build that was hosted on the dissimilar-type Sikorsky helicopters. The IAS test campaign period of performance was from March 2022 through October 2023 and was structured as a phased, or spiral, approach that ultimately led to the first-ever demonstration of two-ship UAM/AAM operations designed to safely choreograph specific conflict encounters and mission scenarios to test the research algorithms for strategic and tactical aircraft deconfliction. Lessons learned are included in the body of the report. Data collected will be used to inform FAA and industry standards groups on the increasingly automated systems needed for future AAM operations. The test encounters developed for these flight tests were proven to be highly predictable, repeatable, and safely exercised flight path planning and Detect and Avoid (DAA) algorithms. These same test encounters should be leveraged by future flight test campaigns to verify that operational safety is not compromised as the AAM architecture matures. Next steps include repeating similar encounters using unmanned aircraft carrying DAA sensors in the National Airspace.

AAM↗

NASA Tech Briefs, March 2005

Topics covered include: Scheme for Entering Binary Data Into a Quantum Computer; Encryption for Remote Control via Internet or Intranet; Coupled Receiver/Decoders for Low-Rate Turbo Codes; Processing GPS Occultation Data To Characterize Atmosphere; Displacing Unpredictable Nulls in Antenna Radiation Patterns; Integrated Pointing and Signal Detector for Optical Receiver; Adaptive Thresholding and Parameter Estimation for PPM; Data-Driven Software Framework for Web-Based ISS Telescience; Software for Secondary-School Learning About Robotics; Fuzzy Logic Engine; Telephone-Directory Program; Simulating a Direction-Finder Search for an ELT; Formulating Precursors for Coating Metals and Ceramics; Making Macroscopic Assemblies of Aligned Carbon Nanotubes; Ball Bearings Equipped for In Situ Lubrication on Demand; Synthetic Bursae for Robots; Robot Forearm and Dexterous Hand; Making a Metal-Lined Composite-Overwrapped Pressure Vessel; Ex Vivo Growth of Bioengineered Ligaments and Other Tissues; Stroboscopic Goggles for Reduction of Motion Sickness; Articulating Support for Horizontal Resistive Exercise; Modified Penning-Malmberg Trap for Storing Antiprotons; Tumbleweed Rovers; Two-Photon Fluorescence Microscope for Microgravity Research; Biased Randomized Algorithm for Fast Model-Based Diagnosis; Fast Algorithms for Model-Based Diagnosis; Simulations of Evaporating Multicomponent Fuel Drops; Formation Flying of Tethered and Nontethered Spacecraft; and Two Methods for Efficient Solution of the Hitting- Set Problem.

Source record↗

Evaluating the Effectiveness of the 2001-2002 NASA "Why?" Files Program

This report contains the results of the evaluation conducted for the 2001-2002 NASA 'Why?' Files program that was conducted in March 2002. The analysis is based on the results of 139 surveys collected from educators registered for the program. Respondents indicated that (1) the programs in the series are aligned with the national mathematics, science, and technology standards; (2) the programs are developmentally (grade level) appropriate; and (3) the programs enhance and enrich the teaching and learning of mathematics, science, and technology.

Pinelli, Thomas E.↗

From Multi-Sensors Observations Towards Cross-Disciplinary Study of Pre-Earthquake Signals. What have We Learned from the Tohoku Earthquake?

The lessons we have learned from the Great Tohoku EQ (Japan, 2011) how this knowledge will affect our future observation and analysis is the main focus of this presentation.We present multi-sensors observations and multidisciplinary research in our investigation of phenomena preceding major earthquakes. These observations revealed the existence of atmospheric and ionospheric phenomena occurring prior to theM9.0 Tohoku earthquake of March 11, 2011, which indicates s new evidence of a distinct coupling between the lithosphere and atmosphere/ionosphere, as related to underlying tectonic activity. Similar results have been reported before the catastrophic events in Chile (M8.8, 2010), Italy (M6.3, 2009) and Sumatra (M9.3, 2004). For the Tohoku earthquake, our analysis shows a synergy between several independent observations characterizing the state of the lithosphere /atmosphere coupling several days before the onset of the earthquakes, namely: (i) Foreshock sequence change (rate, space and time); (ii) Outgoing Long wave Radiation (OLR) measured at the top of the atmosphere; and (iii) Anomalous variations of ionospheric parameters revealed by multi-sensors observations. We are presenting a cross-disciplinary analysis of the observed pre-earthquake anomalies and will discuss current research in the detection of these signals in Japan. We expect that our analysis will shed light on the underlying physics of pre-earthquake signals associated with some of the largest earthquake events

Ouzounov, D.↗

Progress on LISA Colloid Microthruster Technology Development

Colloid microthrusters have been operated successfully in flight, providing drag-free and precision control for spacecraft that can be used for future applications such as gravity wave and exoplanet observatories. The Space Technology 7 Disturbance Reduction System (ST7- DRS) technology demonstration payload included eight Busek Colloid Micro-Newton Thrusters (CMNTs) as part of the Laser Interferometer Space Antenna (LISA) Pathfinder mission that launched in December of 2015. The CMNTs provided full attitude and precision drag-free control of the spacecraft with <10 nm/√Hz stability along the most sensitive axis during commissioning, nominal, and extended mission phases through April of 2017. Performance requirements (≤0.1 μN/√Hz) were met and models were validated based on on- orbit measurements of test mass motion and actuation during the 60-day nominal and 30-day extended missions. In 2018, the European Space Agency (ESA) selected LISA to be the agency’s next “large-class” mission, currently in Phase A, with a launch scheduled for 2034 and a 12.5-year duration, including the transfer (1.5 years), commissioning (1 year), nominal (4 or 6 years), and extended (6 or 4 years) phases of the mission, which sets the lifetime and consumables requirement. NASA is considering a significant contribution of hardware to the ESA-led mission, potentially including colloid microthrusters. In preparation, NASA is developing five technologies to TRL 5 and 6, including the colloid microthrusters, to be ready for infusion into LISA by the mission adoption review (MAR), currently scheduled for 2024. While ST7-DRS effectively brought the CMNTs to TRL 7, additional lower-TRL flow control components must be developed for full redundancy, reducing the system-level TRL back to 4. Key to the future of the colloid microthruster technology will be to use lessons learned and keep as much of the heritage from the ST7 design as possible while updating the system to support redundancy and lifetime requirements of a flagship-class mission. This paper describes the technology plan and progress to reach TRL 6 by the MAR, focusing on near- term plans to reach TRL 5 by the end of March 2022 for the LISA Colloid Microthrusters (CMTs). Work includes requirements development and sizing studies, breadboard and brassboard hardware developments at Busek, including relevant lifetime and environment testing, and lifetime modeling, verification and validation efforts at JPL, UCLA, and UCI.

Gamero-Castaño, Manuel↗

Looking at NGST Through the Eyes of DCATT

The first phase of the Developmental Characterized Active Telescope Testbed (DCATT) hardware system was integrated at Goddard Space Flight Center in early March of 1999 and has been operational for almost a year. Experiments are currently being conducted on the testbed to quantify and refine various methods and techniques in the baseline wavefront sensing and control process. This paper addresses the actual optical design of the Phase 0 hardware configuration and discusses the open loop system level performance of the system. Lessons learned for NGST during the buildup and characterization of the system are presented.

Davila, Pam↗

Aurora Detection From Nighttime Lights for Earth and Space Science Applications

This research leverages data from the Day/Night Band (DNB) of the Visible Infrared Imaging Radiometer (VIIRS) instrument onboard the Suomi National Polar-orbiting Partnership (S-NPP) satellite. We demonstrate the value of mining the VIIRS DNB for aurora and describe our use of unsupervised machine learning to create a binary mask for aurora occurrence. This mask can be used to flag aurora-contaminated observations for NASA's nighttime lights products for Earth science applications. The identification of auroral regions can also be used for Space Weather applications, for example, for comparison with aurora forecast model and with other satellite- or ground-based aurora observations. The DNB is a broadband channel that is sensitive to wavelengths from 500 to 900 nm, which covers most of the visible light spectrum, and as the name implies, captures light even at night with a sensitivity at the nanowatt level. This band is suitable for aurora observations since the light emitted by the aurora tends to be dominated by emissions from atomic oxygen, resulting in a greenish glow at a wavelength of 557.7 nm, especially at an altitude of 110 km. This study compares the global nighttime derived aurora regions for 17 and 18 March with the NOAA Space Weather Prediction Center's (SWPC) probability product for the St. Patrick's Day geomagnetic storm in 2015. VIIRS sensors are slated to be added to the next generation of polar-orbiting operational satellites. Our novel automated approach to aurora identification opens up an efficient way to leverage this unique data source.

Aurora↗