Search NASA⌕ Search

SEARCH · Search NASA

Results for “Marginal price”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 55 records · Page 3

Real-time Pricing Demand Response in Operations

Abstract—Dynamic pricing schemes have been implemented in commercial and industrial application settings, and recently they are getting attention for application to residential customers. Time-of-use and critical-peak-pricing rates are in place in various regions and are being piloted in many more. These programs are proving themselves useful for balancing energy during peak periods; however, real-time (5 minute) pricing signals combined with automation in end-use systems have the potential to deliver even more benefits to operators and consumers. Besides system peak shaving, a real-time pricing system can contribute demand response based on the locational marginal price of electricity, reduce load in response to a generator outage, and respond to local distribution system capacity limiting situations. The US Department of Energy (DOE) is teaming with a mid-west electricity service provider to run a distribution feeder-based retail electricity market that negotiates with residential automation equipment and clears every 5 minutes, thus providing a signal for lowering or raising electric consumption based on operational objectives of economic efficiency and reliability. This paper outlines the capability of the real-time pricing system and the operational scenarios being tested as the system is rolled-out starting in the first half of 2012.

Demand Response↗

Distribution Network Capacity Market Design: Marginal Distribution Capacity Pricing Mechanism for Efficient Investment and Cost Allocation

As electricity markets begin to shift from reliance on large, centralized power plants and towards distributed energy resources (DERs), there is a growing acknowledgement that more efficient planning, operations, and oversight is needed in the distribution system. This paper addresses one step in that direction by proposing an auction mechanism that uses a detailed distribution system planning model that allocates permits to end-used customers who request capacity to install new devices at their location and network upgrade contracts to utilities or 3rd-party companies who offer to upgrade system components. The resulting plan maximizes market surplus, that is, maximizes the total benefit to consumers minus the cost of network upgrades. We apply a marginal pricing scheme to the auction’s results such that the cost of each permits or contracts is differentiated by time and location, based on the Lagrangian multipliers of binding network constraints. These prices are shown to be no greater than the bid price of any awarded contract and no less than the offered cost of any awarded upgrade contract. Furthermore, the nonlinearity of power flows in the planning model result in an additional surplus that would be collected by the entity that hosts the auction, which could then be refunded to market participants or used to cover overhead costs of running the market. We provide four example auction results in a simple three-node distribution feeder to demonstrate the properties of the design. Results suggest that larger or more realistic case studies could be a promising next step.

24 POWER TRANSMISSION AND DISTRIBUTION↗

The Effect of Prosumer Duality on Power Market: The Effect of Market Regulation

Electricity prosumers are energy subsystems that not only consume, but also produce electricity. They are present in distribution level networks as traditional utility customers who have installed distributed energy resources. They are also present in transmission level networks as large conglomerates own both generation assets and large industrial loads. Previous work on the economics of prosumers has demonstrated that prosumers in a market have incentives to behave more competitively compared to producers and consumers in traditional markets. This paper further explores the behavior of prosumers and their response to market policies including the allocation of network losses and the impact of net metering. We extend a Cournot model of a dual prosumer and find that prosumers respond with higher supply quantities if network losses are allocated to demand base. They respond with lower supply quantities if network losses are allocated to supply base. Allocating network losses to demand base also causes equilibrium prices to decline. Markets where prosumers first satisfy their own load and then sell the balance of electricity to the grid have lower quantities and higher prices compared to markets where prosumers buy and sell at locational marginal price.

Tsybina, Eve↗

Average Incremental Cost Pricing for the AC Unit Commitment Problem [Rev. 1]

Unit Commitment (UC) problems that consider the Alternating Current (AC) model of the transmission network have long been considered intractable to solve at scale by the power system community. Recently, the Grid-Optimization (GO) Competition held by the Advanced Research Project Agency-Energy (ARPA-E) has facilitated the development of the first algorithms to solve large-scale ACUC problems. This new capability opens a path towards the explicit consideration of the AC transmission network model in UC problems used to clear day-ahead electricity markets. This calls for the analysis of electricity market structures that accommodate both the continuous non-linearity of the AC transmission network and the discrete non-linearity of the UC problem simultaneously. This paper serves as an initial effort to do so by proposing an Average Incremental Cost (AIC) pricing structure that is designed around the ACUC problem. In particular, an AIC one-pass pricing problem is proposed that represents a continuously constrained variant of the ACUC problem and allows for the computation of Locational Incremental Prices (LIPs) for both real and reactive power as the local optimal Lagrange multipliers of the power balance constraints. To avoid degeneracy, the pricing problem includes a small parameter ϵ > 0. Under certain assumptions market participants are shown to realize profit that converges to a non-negative value as ϵ approaches zero, practically ensuring profitability for small values of ϵ. We additionally provide many simple and important examples that provide intuition and insights into the proposed prices. Examples illustrate the basic concept of AIC pricing, the derived profitability results, the existence of multiple LIPs, the importance of including reactive power in the dispatch and pricing problems, the need for reactive power prices, and the improved incentives exhibited by LIPs as compared to traditional Locational Marginal Prices (LMPs). We additionally indicate many directions for future work including analysis of larger test cases.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Smoothing out step changes of LMP

The locational marginal pricing methodology may lead to a step change when system load grows, creating higher financial risk, especially for small and medium-sized market participants. A proposed continuous LMP method is a straightforward solution to eliminate these step changes when load grows. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The Oak Ridge Competitive Electricity Dispatch (ORCED) Model Version 9

The Oak Ridge Competitive Electricity Dispatch (ORCED) model dispatches power plants in a region to meet the electricity demands for any single given year up to 2030. It uses publicly available sources of data describing electric power units such as the National Energy Modeling System and hourly demands from utility submittals to the Federal Energy Regulatory Commission that are projected to a future year. The model simulates a single region of the country for a given year, matching generation to demands and predefined net exports from the region, assuming no transmission constraints within the region. ORCED can calculate a number of key financial and operating parameters for generating units and regional market outputs including average and marginal prices, air emissions, and generation adequacy. By running the model with and without changes such as generation plants, fuel prices, emission costs, plug-in hybrid electric vehicles, distributed generation, or demand response, the marginal impact of these changes can be found.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Endogenous Interface Pricing for Consistent Transmission–Distribution Co-Optimization With Discrete Distribution Controls

This paper proposes an endogenous interface pricing model for day-ahead transmission–distribution co-optimization that co-determines the interface locational marginal price (LMP) and the transmission–distribution exchange, ensuring price–dispatch consistency while optimally scheduling discrete distribution controls. The formulation couples a DC optimal power flow (OPF) with a branch-flow AC OPF that schedules distributed energy resources (DERs), tap-changer settings, capacitor banks (CBs), and multi-period energy storage systems (ESSs) under feeder voltage and current limits, and is solved as a mixed-integer second-order cone program (MISOCP). In a T14–D33 system, coordinated device scheduling recovers about 90% of the distribution-to-transmission export achievable in a reference case that ignores distribution network (DN) limits, while satisfying a 1.05 p.u. voltage upper bound. In a T39–D34/D37/D123 system, a sequential decoupled benchmark produces interface LMP distortions up to 12.5% and a 7.28% mismatch in net export energy, whereas the proposed model removes these distortions and the associated settlement mismatches. Second-order cone (SOC) relaxation gaps remain below $10^{-3}$ in all cases.

Noh, Seung-Gil↗

DSO+T: Transactive Energy Coordination Framework (DSO+T Study: Volume 3)

This report describes a transactive energy coordination scheme designed to integrate into existing day-ahead and real-time wholesale energy markets. This scheme was evaluated in the Distribution System Operator with Transactive (DSO+T) study to assess the engineering and economic performance of the transactive energy coordination of a large-scale deployment of distributed energy resources (DER). Transactive agents were developed for a range of DERs (heating, ventilation, and air conditioning units, water heaters, batteries, and electric vehicles) that optimize flexibility over a 48-hour horizon and adjust their strategy in response to changes in real-time prices. A transactive energy coordination scheme, executed by a DSO retail market operator, aggregates these DER bids from participating customers and clears them against a DSO supply curve using a double auction market mechanism. The process of constructing the price-quantity DSO supply curve includes distribution-level transportation constraints (for example, substation congestion limits) and forecast locational marginal price of the DSO’s connected transmission node. The resulting day-ahead and real-time quantities are then bid into a competitive wholesale market operated by an independent system operator. This report also details additional capabilities for proper marketplace simulation such as wholesale price, weather, and load forecasting. The report concludes with a discussion of lessons learned and key design features required to ensure successful operation.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Dual pricing algorithm in ISO markets

The challenge to create efficient market clearing prices in centralized day-ahead electricity markets arises from inherent non-convexities in unit commitment problems. When this aspect is ignored, marginal prices may result in economic losses to market participants who are part of the welfare maximizing solution. In this essay, we present an axiomatic approach to efficient prices and cost allocation for a revenue neutral and non-confiscatory day-ahead market. Current cost allocation practices do not adequately attribute costs based on transparent cost causation criteria. Instead we propose an ex post multi-part pricing scheme, which we refer to as the Dual Pricing Algorithm. Lastly, our approach can be incorporated into current dayahead markets without altering the market equilibrium.

97 MATHEMATICS AND COMPUTING↗

Electrolysis' Potential Value for Supporting the Electrical Grid

The H2@Scale concept includes a value proposition for electrolysis that benefits both hydrogen markets and the electricity system. Electrolysis has the potential to be an alternative low-cost hydrogen source by using low-price electricity that may be available for only a limited number of hours annually. It also has the potential to provide value to the grid through use of that low-cost electricity. By doing so, electrolysis can create a price floor which could support additional investment in low-cost, dispatch-constrained electricity (LDE) generation such as photovoltaic solar, wind, and nuclear. The rapid-response characteristics of low-temperature electrolysis enables it to also provide ancillary services to the grid such as operating reserves and frequency control. We evaluate the economic performance of water electrolysis in a selection of electricity markets - both current and potential future markets. To perform that evaluation, we collect locational marginal prices (LMPs) in each market, calculate levelized hydrogen costs, and compare them to cost estimates of producing hydrogen via steam methane reforming of natural gas. Those calculations also include electolyzer capital and operating costs. We perform the calculations across a range of capacity factors to identify the minimum levelized hydrogen cost in that range. We discuss the implications of that capacity factor for each market analyzed. For a couple of the analyzed electricity markets, we include the potential value of providing ancillary services in the calculation and discuss those impacts. LDE generation has been shown to suppress electricity prices because it generates electricity when the resource is available (i.e., the sun is shining, wind is blowing, nuclear heat is being produced) and the generation cannot be reduced without an economic penalty. Price suppression is likely to reduce investment in those technologies due to reductions in projected income of each marginal unit. If electrolyzers are willing to pay for the LDE, it could provide a price floor for electricity. We analyze how setting a price for LDE could impact the electricity generation fleet, the availability of LDE, and the potential levelized costs of producing hydrogen using that LDE. Among other results, we will present a set of supply curves showing potential production costs and availability for hydrogen produced from LDE in a future with high penetrations of renewable electricity on the grid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Analysis of Differential Financial Impacts of LWR Load-Following Operations. Revision 1

This document reports the application of HERON (Holistic Energy Resource Optimization Network), a newly-developed RAVEN (Risk Analysis Virtual ENvironment) plugin for grid and capacity optimization, to a case study conducted in collaboration with Arizona Public Service (APS). The study is a work in progress; this report presents a description of current models and corresponding results for a particular consideration. APS is anticipating several operational challenges. The first is rapid growth of Variable Renewable Energy (VRE) sources such as wind and solar power providing energy to the grid in the APS service region. This creates challenges for baseload operation of the Palo Verde Generating Station (PVGS), a nuclear power plant co-owned and operated by APS. The second challenge for APS is a change in the cooling water acquisition contract with the Sub Regional Operating Group (SROG). The existing contract is expiring soon, and a renewal is only available for a significantly higher price of water. These two challenges represent a difficulty in maintaining profitability for PVGS as local area demand is highly fluctuant and water prices may increase. Furthermore, excess production at PVGS is currently traded on the Palo Verde energy Hub (PVH), which occasionally offers very low or negative locational marginal prices (LMP) for electricity. This analysis considers the potential benefits of occasional curtailment of PVGS as a method to mitigate unprofitable production hours. Similar to load following, optional daily curtailment would allow APS to elect curtailment of PVGS as low as 70% of its nominal operating level between the hours of 08:00 and 16:00 provided local area demand is met and it is profitable to do so. This document reports a stochastic differential analysis of the Net Present Value (NPV) of PVGS as operated by NPS as a result of optional curtailment operation. To model this differential case, HERON has been designed from previous efforts in this study as a generic tool to accelerate the design and execution of RAVEN workflows for technoeconomic analysis of grid energy systems. HERON leverages both RAVEN and the CashFlow plugin for RAVEN to stochastically explore or optimize a response surface with energy grid system production capacities as inputs and mean NPV as a goal function. HERON performs these evaluations by stochastically sampling market, weather, and demand events using RAVEN’s ARMA reduced-order model capability to generate boundary conditions for dispatch optimization. The algorithm performs the dispatch optimization for each of the synthetic scenarios. For this case, HERON designs workflows to simulate behavior of the PVH, wind, solar, and APS local area demand, and use these synthetic scenarios to stochastically evaluate the differential benefit of optional curtailment for each scenario. While this study finds optional curtailment to be a potential source of revenue, the magnitude of the differential NPV is sufficiently small that it is unlikely a priority for increasing the profitability of PVGS. Further, the differential NPV shrinks throughout the simulated years, suggesting the long-term benefit of such operation given current assumptions is negligible.

14 SOLAR ENERGY↗

Optimal Iterative Method for Network Utility Maximization with Intertemporal Constraints

Network utility maximization (NUM) has been widely used to solve the optimal resource allocation problem in wireless network and power systems. The network planner aims to allocate generation and demand over producers and consumers such that social welfare is maximized while supply and demand are balanced, and network constraints such as branch capacity constraints are satisfied. However, when taking into account dynamics of agents, such as ramp rate constraints on power output for suppliers and impact of cumulative prior consumption on current demand for consumers, a single-period formulation is not sufficient. We propose an iterative method for the multi-period NUM with intertemporal constraints based on dual decomposition. It features a price iteration scheme that achieves optimal social welfare, and the algorithm is guaranteed to converge if proper concavity condition holds. We illustrate the iterative algorithm by power system examples. It is shown that similar to locational marginal price (LMP) in power systems, time-varying congestion prices arise when there exists binding branch constraints. Simulation results also demonstrate that there is increase in social welfare compared to a single-period formulation.

Ma, Ke↗

A Computationally Efficient Algorithm for Computing Convex Hull Prices

Electricity markets worldwide allow participants to bid non-convex production offers. While non-convex offers can more accurately reflect a resource's capabilities, they create challenges for market clearing processes. For example, system operators may execute side payments when a participant’s cost is not covered through energy sale settlements from locational marginal pricing schemes, or when a participant incurs lost opportunity costs to follow the dispatch signal. Convex hull pricing minimizes these and other types of side payments while providing uniform (i.e., locationally and temporally consistent) prices. However, computing convex hull prices involves solving either a large-scale linear program - which in turn requires explicit descriptions of market participants’ convex hulls -or the Lagrangian dual of the corresponding non-convex scheduling problem. Here, we propose a computationally feasible and industrially scalable Benders decomposition approach to computing convex hull prices at least an order of magnitude faster than the current state-of-the-art while leveraging recent advances in convex hull formulations for thermal generating units.

61 RADIATION PROTECTION AND DOSIMETRY↗

A computationally efficient algorithm for computing convex hull prices

Electricity markets worldwide allow participants to bid non-convex production offers. While non-convex offers can more accurately reflect a resource's capabilities, they create challenges for market clearing processes. For example, system operators may be required to execute side payments to participants whose costs are not covered through energy sales as determined via traditional locational marginal pricing schemes. Convex hull pricing minimizes this and other types of side payments while providing uniform (i.e., locationally and temporally consistent) prices. Computing convex hull prices involves solving either a large-scale linear program or the Lagrangian dual of the corresponding non-convex scheduling problem. Further, the former approach requires explicit descriptions of market participants' convex hulls. While linear programs for computing convex hull prices are large, their structure is naturally decomposable by generators. Here, in this work, we propose and empirically analyze a Benders decomposition approach to computing convex hull prices that leverages recent advances in convex hull formulations for thermal generating units. We demonstrate across a large set of test instances that our decomposition approach only requires modest computational effort, obtaining solutions at least an order of magnitude faster than the equivalent large-scale linear programming approach. Overall, we provide a computationally feasible method for computing convex hull prices for industrial scale market clearing problems, enabling the possibility of practical adoption of this advanced pricing mechanism.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Potential Arbitrage Revenue of Energy Storage Systems in PJM

The volatility of electricity prices is attracting interest in the opportunity of providing net revenue by energy arbitrage. We analyzed the potential revenue of a generic Energy Storage System (ESS) in 7395 different locations within the electricity markets of Pennsylvania-New Jersey-Maryland interconnection (PJM), the largest U.S. regional transmission organization, using hourly locational marginal prices over the seven-year period 2008–2014. Assuming a price-taking ESS with perfect foresight in the real-time market, we optimized the charge-discharge profile to determine the maximum potential revenue for a 1 MW system as a function of energy/power ratio, or rated discharge duration, from 1 to 14 h, including a limited analysis of sensitivity to round-trip efficiency. We determined minimum potential revenue with a similar analysis of the day-ahead market. We presented the distribution over the set of nodes and years of price, price volatility, and maximum potential arbitrage revenue. From these results, we determined the breakeven overnight installed cost of an ESS below which arbitrage would be profitable, its dependence on rated discharge duration, its distribution over grid nodes, and its variation over the years. We showed that dispatch into real-time markets based on day-ahead market settlement prices is a simple, feasible method that raises the lower bound on the achievable arbitrage revenue.

25 ENERGY STORAGE↗

Opportunities for Industry to Provide Flexibility While Increasing Profitability

Supply and demand flexibility will both be needed to ensure the electricity system functions properly as the share from variable renewable generation continues to grow. Industrial manufacturing currently consumes about a third of primary energy worldwide, and electricity is projected to supply an increasing share of this demand as the global economy decarbonizes. Therefore, the ability for industry to flex demand poses an enticing opportunity to enable grid flexibility. However, large capital outlays prevent industry from voluntarily altering demand. Here we show that as battery costs continue to fall, industry will soon be able to profitably alter demand in accordance with electricity price variations. Focusing on two established industries– chlor-alkali and electric arc furnaces – and two industries with large future potential – methane pyrolysis and atmospheric CO 2 capture, we use a linear program (LP) optimization to assess the technoeconomic feasibility of flexible industrial demand across both historical and future-looking wholesale day-ahead marginal prices for the Electricity Reliability Council of Texas (ERCOT). We find positive net present values (NPV) from $\$$400K to $\$$50M using projected 2050 battery prices for industrial purchase of behind-the-meter batteries, using only arbitrage as a source of value. These results indicate that, with projected battery prices, profit-seeking industrial players could voluntarily play a future role in stabilizing a high-renewables grid where electricity prices act as accurate signals of grid needs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗