SEARCH · Search NASA
Results for “Mining waste”
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Clean Energy Technology Applications on US Mine Land: Technical Analysis
As the United States transitions toward a clean energy economy, an opportunity exists for redeveloping the more than 17,000 mine land sites located across the nation with clean energy technologies, which have a combined potential for generating more than 85 GW of clean electricity. This report provides an overview of the potential of demonstrating and deploying clean energy projects on current and former mine land. Clean energy project refers to a project that demonstrates one or more of the following technologies: solar; microgrids; geothermal; direct air capture; fossil-fueled electricity generation with carbon capture, utilization, and sequestration; energy storage, including pumped storage hydropower and compressed air energy storage; and advanced nuclear technologies. The report discusses the following technologies and their potential for creating jobs and generating tax revenue that would result in direct and indirect benefits to the local economy: Solar photovoltaics (PV) is being developed on current and former mine land in various parts of the world, including the United States. This approach is attractive because it requires limited infrastructure investment and would utilize the bare surfaces of mines and tailing ponds. Solar resource availability may be greater in the southern regions, including the Interior and Appalachian Basins and the southwestern United States. However, since some mine land sites include areas of significant change in elevation, the deployment of PV on mine land may require sophisticated planning to account for shading and irradiance, or may require regrading of the areas. PV does not create significant environmental risks and generally does not face public resistance; Geothermal systems are often spatially and genetically associated with ore deposits, and in some cases, they have been discovered while in search for epithermal mineral resources. Numerous diverse geothermal applications have been employed at mine land around the world, including power generation, mineral extraction from geothermal brines, process heating, direct use for other mining operations, and direct use for non-mining operations and subsurface energy storage, including geothermal heat pumps. Case studies highlighting these applications provide key lessons relating to identifying drivers and barriers to geothermal resource deployment and can be used to create screening tools for identifying the types and locations of mine land most amenable to utilizing geothermal resources; Carbon capture, utilization, and sequestration technologies include direct air capture (DAC) and enhanced weathering. DAC technologies include air contactors, regeneration systems, and CO 2 compression systems. Captured CO 2 can be converted to valuable feedstocks or possibly injected into abandoned subsurface mines where it would be absorbed by alkaline rock waste and mine tailings or by the porous minerals along the walls of the mine. DAC systems can be coupled with energy sources such as wind, solar, grid, or geothermal. Many DAC systems require a source of water or steam; however, some are expected to be net producers of water. Local impacts of DAC systems are expected to be low, and are related to land footprint, material disposal, and upstream impacts of energy and material production; Compressed air energy storage is an established energy storage technology in salt caverns. It has the potential for implementation in underground mines by pressurizing and storing a large amount of air using electrical compressors when excess electricity is available. When a need for discharge emerges, the air is used to spin turbines and produce the necessary volume of electricity. Abandoned or unused mine openings, including shafts, adits, access tunnels, and mined workings of any orientation, offer potential for vast amounts of compressed air energy storage if the site characteristics meet operational requirements; Pumped hydropower storage can be implemented in surface and subsurface mines. In surface mine applications, both reservoirs may be located in a mine pit or artificial reservoirs made of excavated materials. In subsurface mines, the lower reservoir may be implemented by waterproofing and flooding mine shafts and tunnels. The water is then pumped from the lower reservoir to the upper reservoir during periods of low load and high production, and it is discharged through the turbines during periods of peak demand. The potential environmental damages associated with acidity of mine water or the presence of toxic chemicals incentivizes the development of closed-loop technologies, in which water circulates inside the pumped hydropower facility without being discharged into the external water basins; Advanced nuclear energy technologies include small modular reactors, which can be deployed locally to produce electricity and heat. Such units require seismic stability and a supply of cooling water, but population constraints may exist in some areas. Therefore, remote mine land could represent an optimal location for siting advanced nuclear energy technologies.
Electrochemically Enhanced Carbonate Precipitation into Building Materials: A Scalable Carbon Sequestration Strategy
Decarbonization goals across hard-to-abate industries have prompted an urgent need for advanced carbon capture and storage technologies. Sequestering CO2 into carbonate minerals is a scalable method of carbon management with the ability to produce value-added carbon negative materials from waste streams for the construction industry. Waste streams rich in Ca and Mg such as nickel mine tailings, iron/steel slag, and reverse osmosis brines can store 7.6 Mt CO2/year as minerals. Additionally, CO2 mineralization in acid-neutralization processes currently present in industrial waste treatment can eliminate associated CO2 emissions of lime processing by improving process circularity. The carbonate minerals formed from these waste sources are valuable as components of carbon-negative concrete, which have the potential to sequester 1.8 billion Mt of CO2/year. Electrochemical means of CO2 mineralization improves the kinetics of the thermodynamically favorable mineralization process, lessening or eliminating the high energy requirements of traditional methods. Here, we investigate benchtop scale electrochemical CO2 mineralization of alkaline mining waste, highlighting the effects of key constituents in mining waste on the mineralization process.
Integrated Life Cycle and Techno-Economic Assessments of Central Appalachian Legacy Mine Sites for Biomass Development and Waste Coal Utilization
This project, funded by the U.S. Department of Energy – National Energy Technology Laboratory (DOE-NETL) under award DE-FE0032212, evaluated how legacy coal mine lands and coal refuse piles in Central Appalachia (West Virginia and Pennsylvania) can be reclaimed and repurposed to support biomass development and beneficial utilization of waste coal, with the long-term goal of supporting net-zero or net-negative greenhouse gas (GHG) pathways. The project had two primary objectives: 1. Characterize legacy mine sites (including site conditions, waste coal/refuse resources, and soil/ecosystem indicators) and develop reclamation and best management practices (BMPs) for biomass cultivation; and 2. Conduct integrated machine learning (ML)-assisted life cycle assessment (LCA) and techno-economic analysis (TEA) to quantify environmental and economic outcomes for multiple biomass and waste-coal utilization pathways. Across West Virginia, the team identified ~625 coal refuse sites covering ~19,705 acres, and developed methods to estimate refuse pile volume using digital elevation models (DEMs) and geospatial workflows. A large subset of sites received volume estimates totaling ~1.6 billion m³.
Integrated CO 2 -facilitated Hydrometallurgical and Electrochemical Technology for Sustainable Mining and Recovery of Critical Elements from Wastes and Ashes
The availability of critical materials and other metals is very important for our national security and economic growth since they are widely used in defense and energy applications including batteries and wind turbines. Unfortunately, high grade ores have become scarce and their productions is dominated by limited countries. Thus, there is a strong need to obtain these materials from domestic sources. Municipal wastes are great candidates since they often contain high concentrations of metals. Since the metals in wastes and waste ashes are not in the form found in natural ores and contain a wide range of impurities, conventional extraction processes would not be effective. Thus, our project has developed an innovative MIDAS process based on the integrated CO2-facilitated hydrometallurgical and electrochemical technology that can effectively recover critical materials and metals from waste ashes while minimizing the environmental impacts. We have (i) characterized waste ashes to understand their physico-chemical properties, (ii) developed green solvent systems for hydrometallurgical extraction of critical elements and metals from waste ashes, (iii) explored electrochemical interfaces to refine the extracted metals.
Rare earth element potential in coal and coal ash in the U.S. Gulf Coast
United States heavy reliance on imports of critical minerals (CMs), including rare earth elements (REEs), underscores the importance of development of domestic sources. The study objective was to quantify CM and REE concentrations in coal and coal ash in the US Gulf Coast region. CM and REE concentrations were measured for 118 samples from outcrops and 14 mines in the Gulf Coast. Results show that total REE + Yttrium (REY) concentrations (dry coal basis) are comparable to those of the upper continental crust (UCC) with localized hot spots, such as the Texas Gibbons Creek mine (REY ≤ ~ 2860 ppm). When normalized to UCC REY concentration (169 ppm, dry coal basis), REY to UCC ratios for Gulf Coast coal samples range from 0.1 to 17 (median ratio 0.6). REE extractability from lignites is high (median: 63%–93%) using environmentally benign weak acid. In addition to raw coal, coal ash from power plants could also serve as an REE source with a median ratio of REY in ash relative to coal of 4; however, extractability from coal ash is generally much lower (≤ 5% using the same weak acid as in coal). The median basket price for extracted REY as oxides from coal, assuming 70% extractability, is $\$3.2$ per tonne of coal and $\$186$ billion based on 58 billion metric tonnes of dry coal in the Gulf Coast. REEs important for magnets (Pr + Nd + Tb + Dy) account for ~ 80% of the total value. The corresponding median basket price for extracted REY as oxides from coal ash, assuming ~ 30% extractability, is ~$\$4.4$ per tonne of ash and $\$1.2$ billion based on 258 million tonnes of ash. REE production from coal would likely require co-products, such as activated carbon or humic acids, to attain economic viability. Production of REEs from coal ash could offset remediation costs related to potential water contamination. This reconnaissance study shows the potential for REE production from coal and coal ash in the Gulf Coast; however, carbon coproducts and/or societal benefits would likely be required for socioeconomic viability.
Sustainable Critical Minerals: Mining, Production, and Legacy
Critical minerals (CMs) are required in renewable energy systems, electric vehicles, electronics, and national defense. Global demand has increased rapidly due to energy and digital transitions, and the United States has become increasingly reliant on vulnerable supply chains. Geological scarcity, trade barriers, environmental hurdles, and processing challenges impede domestic CM production growth. Emerging strategies, including circular economy practices and advanced sustainable mining and processing techniques, can mitigate supply chain and economic risks. To advance these approaches, consistent research priorities, policy revisions, and technology investments are required to develop a resilient CM supply. Doing so with a focus on sustainability goals can simultaneously advance domestic economic and technological goals while limiting environmental impacts and supporting global environmental goals.
Membrane separations of f-block elements utilizing rhamnolipid-based chelants. A joint experimental and computational investigation.
Explore the source record for details and available documents.
Urban mining by flash Joule heating
Abstract Precious metal recovery from electronic waste, termed urban mining, is important for a circular economy. Present methods for urban mining, mainly smelting and leaching, suffer from lengthy purification processes and negative environmental impacts. Here, a solvent-free and sustainable process by flash Joule heating is disclosed to recover precious metals and remove hazardous heavy metals in electronic waste within one second. The sample temperature ramps to ~3400 K in milliseconds by the ultrafast electrical thermal process. Such a high temperature enables the evaporative separation of precious metals from the supporting matrices, with the recovery yields >80% for Rh, Pd, Ag, and >60% for Au. The heavy metals in electronic waste, some of which are highly toxic including Cr, As, Cd, Hg, and Pb, are also removed, leaving a final waste with minimal metal content, acceptable even for agriculture soil levels. Urban mining by flash Joule heating would be 80× to 500× less energy consumptive than using traditional smelting furnaces for metal-component recovery and more environmentally friendly.
Urban mining from biomass, brine, sewage sludge, phosphogypsum and e-waste for reducing the environmental pollution: Current status of availability, potential, and technologies with a focus on LCA and TEA
We discuss how rapid industrialization, improved standards of living, growing economies and ever-increasing population has led to the unprecedented exploitation of the finite and non-renewable resources of minerals in past years. It was observed that out of 100 BMT of raw materials processed annually only 10% is recycled back. This has resulted in a strenuous burden on natural or primary resources of minerals (such as ores) having limited availability. Moreover, severe environmental concerns have been raised by the huge piles of waste generated at landfill sites. To resolve these issues, ‘Urban Mining’ from waste or secondary resources in a Circular Economy’ concept is the only sustainable solution. The objective of this review is to critically examine the availability, elemental composition, and the market potential of the selected secondary resources such as lignocellulosic/algal biomass, desalination water, sewage sludge, phosphogypsum, and e-waste for minerals sequestration. This review showed that, secondary resources have potential to partially replace the minerals required in different sectors such as macro and microelements in agriculture, rare earth elements (REEs) in electrical and electronics industry, metals in manufacturing sector and precious elements such as gold and platinum in ornamental industry. Further, inputs from the selected life cycle analysis (LCA) & techno economic analysis (TEA) were discussed which showed that although, urban mining has a potential to reduce the greenhouse gaseous (GHG) emissions in a sustainable manner however, process improvements through innovative, novel and cost-effective pathways are essentially required for its large-scale deployment at industrial scale in future.
Low Cost Dewatering of Waste Slurries
The U.S. Bureau of Mines has developed a technique for dewatering mineral waste slurries which utilizes polymer and a static screen. A variety of waste slurries from placer gold mines and crushed stone operations have been successfully treated using the system. Depending on the waste, a number of polymers have been used successfully with polymer costs ranging from $0.05 to $0.15 per 1,000 gal treated. The dewatering is accomplished using screens made from either ordinary window screen or wedge wire. The screens used are 8 ft wide and 8 ft long. The capacity of the screens varies from 3 to 7 gpm/sq. ft. The water produced is acceptable for recycling to the plant or for discharge to the environment. For example, a fine grain dolomite waste slurry produced from a crushed stone operation was dewatered from a nominal 2.5 pct solids to greater than 50 pct solids using $0.10 to $0.15 worth of polymer per 1,000 gal of slurry. The resulting waste water had a turbidity of less than 50 NTU and could be discharged or recycled. The paper describes field tests conducted using the polymer-screen dewatering system.
Concept for Underground Disposal of Nuclear Waste
Packaged waste placed in empty oil-shale mines. Concept for disposal of nuclear waste economically synergistic with earlier proposal concerning backfilling of oil-shale mines. New disposal concept superior to earlier schemes for disposal in hard-rock and salt mines because less uncertainty about ability of oil-shale mine to contain waste safely for millenium.
"Mining" for Critical Minerals: Critical Minerals from Fossil Energy Waste Byproducts
NETL researcher Mengling Stuckman is an invited speaker for the panel discussion session of "Mining for Critical Minerals" at the Marcellus Shale Coalition event, "Shale 2.0: Learn the Facts about Upstream, Midstream and Downstream". Recent studies from DOE have shown that produced water and drill cuttings from the development of unconventional shale in Appalachia has a significant source of valuable critical minerals and will support bolstering America's supply chain security, putting Pennsylvania in a unique position to capitalize. The panel discussion facilitates obtaining an overview of pipeline capacity needs, downstream users for natural gas and effectively educating and engaging the public relevant to the Marcellus Shale community. The event also offers opportunities for local oil and gas industries, water and waste management companies to work with NETL and participate in FECM’s Critical Mineral program. Industrial feedbacks and participation as outcomes of this invited talk will accelerate the technology and knowledge transfer for the DOE’s Critical Mineral program and for DOE’s mission to unleash American Energy and lead in energy innovation.
WIPP Safety Significant Confinement Ventilation System (SSCVS) HEPA Filtration System - 20165
Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous High Efficiency Particulate Air (HEPA) filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The integrated system design provides for reducing the salt, clay and diesel particulates from the exhaust airflow from the mine, prior to full filtration using Nuclear Safety Significant HEPA filters. The SSCVS design and equipment provides for continuous HEPA filtration over a wide range of operating and environmental conditions. The new exhaust system connects to the existing underground exhaust shaft, and the exhaust air flows from the underground through Salt Reduction Units (SRUs) to protect the final filter banks from excessive moisture and rapid salt/dust buildup. Each of the six (6) SRUs consists of a demister to remove entrained moisture, a dry salt remover unit to filter approximately 90% of the entrained salt/dust, and an automated water treatment system to periodically clean the demisters and to remove salt from the SRU filters. At the maximum expected exhaust flowrate of 540,000 Cubic Feet per Minute (CFM) / 255 Cubic Meters per Second (m{sup 3}/s), five (5) salt removal units will be in operation with one unit in standby or maintenance. An in-line variable frequency drive booster fan will offset pressure losses through each SRU and reduce the relative humidity of the air exiting the SRUs. In the event of a high radiation alarm from the underground Continuous Air Monitors (CAMs), the SRUs will be automatically bypassed, which places the SRS and building outside of the Safety Significant confinement boundary. From the SRUs, the exhaust is directed to the HEPA filter banks located in the New Filter Building. The exhaust system is designed to provide continuous HEPA filtration prior to release to the exhaust stack. There are 22 HEPA filter banks rated at 27,000 CFM / 12.75 m{sup 3}/s each. Each filter bank has two stages of pre-filters and two stages of HEPA filters. The filtered air from each of the 22 filter banks discharges into a common concrete plenum, which is maintained under a negative pressure by the main exhaust fans. Six 1,000 HP variable frequency drive exhaust fans are provided on the south side of the plenum. At the maximum expected exhaust flow of 540,000 CFM, four exhaust fans and twenty filter banks will be in operation. The fans discharge vertically to a separate concrete exhaust plenum. The filtered exhaust is routed from the exhaust plenum to a 125-foot-tall exhaust stack via a 13-foot diameter duct. (authors)
Panel Session 116: Waste Management from Remediation of Legacy Sites or Unplanned Releases
Past experiences have shown that there is often a disconnect between Indigenous societies and Western society. This disconnect can be attributed to different value systems between these two group and is not limited to the USA and Canada but also extends into Australia, New Zealand, and the Central Asia Republics (the 'five Stans'). The intent of this Panel Session to give voice to representatives from Indigenous communities, the challenges presented in remediation processes, and potential solutions. Standard risk assessment assumptions developed for Western societies often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. This panel focused on the perspectives of Indigenous societies (e.g., Indian Tribes (US), First Nations (Canada)) related to risk assessment of environmental remediation challenges, including deep geological disposal of HLW and ILW, near-surface disposal of LLW and in-situ entombment of nuclear reactor components, and environmental remediation of abandoned uranium mines and historic wastes. Standard risk assessment assumptions often do not adequately address the cultural and spiritual values that may be unique to indigenous societies. Factoring those into a risk assessment that still meets regulatory requirements and policies such as reasonably anticipated land use at US EPA CERCLA sites can be challenging but has the potential to lead to a site or facility approach that is more accepted. Panelists with presentations: The U.S. Nuclear Regulatory Commission Regulatory Process - A Path for Indigenous Knowledge? (Francis Cameron); Local Community Perceptions and Remediation Projects (Michelle Roberts); Indigenous Perspectives on Risk Assessment (Bob Watts); Navajo Superfund Program: Fundamental Law and Traditional Ecological Knowledge (Dariel Yazzie); Risk Assessment: Two Indigenous Approaches (Whitney Fraser)
Infrastructure and resource development needs to support a significant expansion of US nuclear capacity
In December 2023, the United States pledged at a United Nations conference to triple nuclear energy by 2050. In May of 2025 a new administration announced plans to quadruple nuclear energy by 2025, setting a new target that requires understanding the key infrastructure and resources needed to achieve large-scale deployment. This study attempts to quantify “what it takes” to deploy an additional 200 GWe of nuclear capacity. It projects demand levels for workforce, fuel, uranium mining and enrichment, waste management, supply chain, land, licensing, and water. Demand growth is also contextualized. For example, the peak number of construction workers required is approximately 215,000, a 37 % increase in the current US utility construction workforce. Up to 80,000 MT/year of mined uranium will be needed, necessitating a 60-fold increase in US mining production or a doubling of global mining if sourced externally. Advanced reactor fuels, uranium mining, and nuclear-grade equipment production would need substantial expansion. Operational workforce, enrichment needs, and licensing submissions also face significant increases. Although water consumption may see relatively lower increases, securing water rights poses unique challenges. This study consolidates various demand metrics in a broad context, highlighting the necessity of early preparations, such as workforce training, to support a tripling of nuclear energy. While it outlines the demand-side requirements, it does not assess the difficulties of ramping up or other supply-side issues. The findings also shed light on the impact of reactor size and reactor technology on various demand metrics.
Living Filter Designs for In-Line Recovery and Sorting of Critical materials
This project explored “bio-mining” of critical materials from electronic waste (E-waste) streams by developing living filters arrays capable of recovering these materials, focusing on the platinum group metals (PGMs) and rare earth elements (REEs). While highly toxic, E-waste is considered a valuable “urban mine” as it contains critical materials such as PGMs and REEs with orders of magnitude higher purity than the richest ores. The aim of the project was to: (1) develop mechanically robust, silk-based biomaterial filtration membranes that can capture REEs from dilute aqueous waste; (2) design and build 3D bioprinted living filters containing encapsulated electrochemically active bacteria (EAB) capable of bio-reducing PGMs and recovering them from waste streams; and (3) constructing combined living filter arrays using both components to efficiently capture REE and PGM from the same waste stream. The developed silk-based filtration membranes were self-assembled using silk-nanofibrils (SNFs) derived from silkworm (Bombyx mori) cocoons in conjunction with recombinant silk-elastin-like proteins (SELPs), which contained lanthanide-binding peptide tags (LBTs) with a high affinity and specificity towards REEs. These 100% biodegradable protein-based membranes were capable of recovering up to 85% of model REE ions (Tb 3+ ) filtered through the membrane, with ~50% recovery achieved in the presence of high concentrations (100X) of common interfering metals (Ca 2+ , Cu 2+ , Fe 3+ , Zn 2+ ). REE captured by the membranes were easily recovered by applying a low pH desorption buffer. The membranes also demonstrated substantial reusability, with only a 30% loss in binding capacity after 4 cycles of REE binding and recovery. To recover the PGMs, we created a bottom-up assembling strategy to construct a living hydrogel composed of a seamlessly integrated living catalyst, Shewanella loihica PV-4 (PV-4), for metal reduction, and their structural and functional linkers, bio-reduced graphene oxide (B-rGO). This hydrogel demonstrated a close to 90% recovery of model metal ions, Pd, from a simulated e-waste leaching stream with minimum-to-no biomass production. It’s also worth noting that the Pd recovery is initiated immediately after the introduction of living hydrogel, compared to conventional biocarriers that required start-up times within hours to days. Overall, these living hydrogels demonstrated superior bioactivity, structural integrity, and agility over existing biocarriers, which offers extensive opportunities to advance the biological metal recovery with unparallel efficiency, reduced energy/material consumption, and minimal environmental impact.
WIPP Safety Significant Confinement Ventilation System (SSCVS) Quality Assurance Program - 20237
Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous HEPA filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The SSCVS project has proceeded with the awarding of CD-3A for Long Lead Procurements followed by CD-2/3 approval for the construction of the facilities. The SSCVS project team made the decision to increase the quality oversight throughout the complete project per the Project Quality Assurance Plan (PQAP) such that it can ensure the final products meet applicable NQA-1 requirements and general quality requirements, and that the project will proceed to operations without significant delays due to post installation quality concerns. The PQAP was established prior to approval of the project at the CD-2/3 milestone. The SSCVS project has 2 major long lead procurements which commenced with the awarding of CD-3A. These procurements include the HEPA filter housing assemblies and the Exhaust Fans. There are 22 HEPA filter assemblies for the SSCVS, which are designated Safety Significant for pressure boundary confinement, per the approved PDSA. The exhaust fans also have Safety Significant components to maintain the pressure confinement boundary. NWP made the decision to install resident Quality Inspectors at the fabrication facilities to ensure the documentation for each fabricated unit meets all the QA requirements as defined in the respective contract documents. For the construction of the SSCVS Salt Reduction Building (SRB) and New Filter Building (NFB), dedicated, on-site quality inspectors have been utilized to ensure that all work being performed will comply with quality requirements and the Special Inspections as defined in IBC-2015. At each stage of inspection, hold points are placed into the work packages to ensure NWP QA personnel are present to inspect and verify the installations are in accordance with the design specifications, codes and standards. With this level of oversight, NWP anticipates that the level of quality related issues, as seen on multiple other DOE complex site projects, will be avoided and that the commissioning, start-up and hot operations will progress in a timely fashion, as all documentation will be in place and approved prior to initiation of these activities. (authors)