Team Z, A Rapid Reaction Approach to Mission Operations System Design and Costing
This paper describes the team, its purpose, tools, status, and plans.
SEARCH · Search NASA
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
This paper describes the team, its purpose, tools, status, and plans.
The mission operations system is one of the more significant drivers of the cost of the mission operations and data analysis segment of missions. In large or long-lived projects, the MOS can also be a driver in total mission cost. Larger numbers of missions, together with an increasingly cost-conscious environment, dictate that future missions must more strictly control costs as they perform to their requirements. It is therefore prudent to examine the conduct of past missions for ways to conserve resources. In this paper we review inputs made to past projects' 'lessons-learned' activities, in which personnel from past projects (among other things) identified major cost drivers of MOS's and considered how economies were or might have been realized in both design and performance of their MOS. Common themes among four such reviews are summarized in an attempt to provide suggestions for cost reduction in future missions.
We present the most up to date advancements in production, design, and performance of the NexGen Micro-Shutter Array (NGMSA) for Multi-object Spectroscopy (MOS), intended for the future Habitable Worlds Observatory (HWO) Flagship. A microshutter array functions as a programmable slit mask, to generate slits corresponding to sparsely distributed sources in the field of view of a telescope. In contrast to the magnetic/electrostatic microshutter arrays used in the James Webb Space Telescope (JWST), the NGMSA is fully operated by electrostatics, simplifying overall system. Our small pilot array proved its capability from FORTIS sounding rocket mission in 2019. As we are switching to a larger HWO flight size array process, we encounter multiple processing related issues. Also, there has been individual shutter level issue that impairs operation and performance. We will discuss those problems and strategies to overcome the challenges to achieve an on/off contrast of >1e5 with near 100% shutter operability.
From a systems perspective, this paper examines the challenges of a single system to support multiple Jet Propulsion Laboratory (JPL) space exploration missions and the need for unitary responsibility for the system.
NASA's Gravity Recovery and Interior Laboratory (GRAIL) mission, to understand the internal structure and thermal evolution of the Moon, offered unique challenges to mission operations. From launch through end of mission, the twin GRAIL orbiters had to be operated in parallel. The journey to the Moon and into the low science orbit involved numerous maneuvers, planned on tight timelines, to ultimately place the orbiters into the required formation-flying configuration necessary. The baseline GRAIL mission is short, only 9 months in duration, but progressed quickly through seven very unique mission phases. Compressed into this short mission timeline, operations activities and maneuvers for both orbiters had to be planned and coordinated carefully. To prepare for these challenges, development of the GRAIL Mission Operations System began in 2008. Based on high heritage multi-mission operations developed by NASA's Jet Propulsion Laboratory and Lockheed Martin, the GRAIL mission operations system was adapted to meet the unique challenges posed by the GRAIL mission design. This paper describes GRAIL's system engineering development process for defining GRAIL's operations scenarios and generating requirements, tracing the evolution from operations concept through final design, implementation, and validation.
Currently: Ops Rev developed and maintains a framework that includes interface-specific language, patterns, and Viewpoints. Ops Rev implements the framework to design MOS 2.0 and its 5 Mission Services. Implementation de-couples interfaces and instances of interaction Future: A Mission MOSE implements the approach and uses the model based artifacts for reviews. The framework extends further into the ground data layers and provides a unified methodology.
Objective measures are ubiquitous in the formulation, design and implementation of deep space missions. Tour durations, flyby altitudes, propellant budgets, power consumption, and other metrics are essential to developing and managing NASA missions. But beyond the simple metrics of cost and workforce, it has been difficult to identify objective, quantitative measures that assist in evaluating choices made during formulation or implementation phases in terms of their impact on flight operations. As part of the development of the Europa Clipper Mission system, a set of operations metrics have been defined along with the necessary design information and software tooling to calculate them. We have applied these methods and metrics to help assess the impact to the flight team on the six options for the Clipper Tour that are currently being vetted for selection in the fall of 2021. To generate these metrics, the Clipper MOS team first designed the set of essential processes by which flight operations will be conducted, using a standard approach and template to identify (among other aspects) timelines for each process, along with their time constraints (e.g., uplinks for sequence execution). Each of the resulting 50 processes is documented in a common format and concurred by stakeholders. Process timelines were converted into generic schedules and workforce-loaded using COTS scheduling software, based on the inputs of the process authors and domain experts. Custom code was generated to create an operations schedule for a specific portion of Clipper's prime mission, with instances of a given process scheduled based on specific timing rules (e.g., process X starts once per week on Thursdays) or relative to mission events (e.g., sequence generation process begins on a Monday, at least three weeks before each Europa closest approach). Over a 5-month period, and for each of six Clipper candidate tours, the result was a 20,000+ line, workforce-loaded schedule that documents all of the process-driven work effort at the level of individual roles, along with a significant portion of the level-of-effort work. Post-processing code calculated the absolute and relative number of work hours during a nominal 5 day / 40 hour work week, the work effort during 2nd and 3rd shift, as well as 1st shift on weekends. The resultant schedules and shift tables were used to generate objective measures that can be related to both human factors and to operational risk and showed that Clipper tours which utilize 6:1 resonant (21.25 day) orbits instead of 4:1 resonant (14.17 day) orbits during the first dozen or so Europa flybys are advantageous to flight operations. A similar approach can be extended to assist missions in more objective assessments of a number of mission issues and trades, including tour selection and spacecraft design for operability.
Future interferometric synthetic aperture radar (InSAR) systems require electronically scanned phased-array antennas, where the transmit/receive (T/R) module is a key component. The T/R module efficiency is a critical figure of merit and has direct implications on the power dissipation and power generation requirements of the system. Significant improvements in the efficiency of the T/R module will make SAR missions more feasible and affordable. The results of two high-efficiency T/R modules are presented, each based on different power amplifier technologies. One module uses a 30W GaAs Class-AlB power amplifier and the second module uses a 70W LD-MOS Class-ElF power amplifier, where both modules use a common low power section. Each module operates over an 80MHz bandwidth at L-band (1.2GHz) with an overall module efficiency greater than 58%. We will present the results of these two T/R modules that have been designed, built and tested.
Electronics designed for low temperature operation will result in more efficient systems than room temperature. This improvement is a result of better electronic, electrical, and thermal properties of materials at low temperatures. In particular, the performance of certain semiconductor devices improves with decreasing temperature down to ultra-low temperature (-273 'C). The Low Temperature Electronics Program at the NASA Glenn Research Center focuses on research and development of electrical components and systems suitable for applications in deep space missions. Research is being conducted on devices and systems for use down to liquid helium temperatures (-273 'C). Some of the components that are being characterized include semiconductor switching devices, resistors, magnetics, and capacitors. The work performed this summer has focused on the evaluation of silicon-, silicon-germanium- and gallium-Arsenide-based (GaAs) bipolar, MOS and CMOS discrete components and integrated circuits (ICs), from room temperature (23 'C) down to ultra low temperatures (-263 'C).
As part of a study funded by NASA headquarters, we are developing a probe-class mission concept called the Cosmic Evolution through UV Spectroscopy (CETUS). CETUS includes a 1.5-m aperture diameter telescope with a large field of view (FOV). CETUS includes three scientific instruments: a far ultraviolet (FUV) and near ultraviolet (NUV) imaging camera (CAM); a NUV multiobject spectrograph (MOS); and a dual-channel point/slit spectrograph (PSS) in the Lyman ultraviolet (LUV), FUV, and NUV spectral regions. The large FOV three-mirror anastigmatic (TMA) optical telescope assembly (OTA) simultaneously feeds the three separate scientific instruments. That is, the instruments view separate portions of the TMA image plane, enabling parallel operation by the three instruments. The field viewed by the MOS, whose design is based on an Offner-type spectrographic configuration to provide wide FOV correction, is actively configured to select and isolate numerous field sources using a next-generation micro-shutter array. The two-channel CAM design is also based on an Offner-like configuration. The PSS performs high spectral resolution spectroscopy on unresolved objects over the NUV region with spectral resolving power, R ~ 40,000, in an echelle mode. The PSS also performs long-slit imaging spectroscopy at R ~ 20,000 in the LUV and FUV spectral regions with two aberration-corrected, blazed, holographic gratings used in a Rowland-like configuration. The optical system also includes two fine guidance sensors, and wavefront sensors that sample numerous locations over the full OTA FOV. In-flight wavelength calibration is performed by a wavelength calibration system, and flat-fielding is also performed, both using in-flight calibration sources. We describe the current optical design of CETUS and the major trade studies leading to the design.
Aerospace electrical systems are required to withstand and adequately operate in extremely harsh environments that include, for example, high radiation exposure, temperature extremes, intense vibrational stress and drastic temperature cycling. The nature of aerospace electronics also demands high reliability since, with very few exceptions, there is no chance for hardware servicing or repairs. Common risk mitigation techniques for this type of situation are to perform a Reliability Analysis of the system throughout the development cycle, and to use electrical components that are regarded as “high reliability” because of additional controls and requirements applied in their design, manufacturing and testing. Unfortunately, studies have shown that even though these techniques are used, many systems fail to meet mission requirements well before the predicted lifetimes. This paper presents the analysis of failures of electrical parts, experienced during various stages of system development, at NASA Goddard Space Flight Center, Greenbelt MD, between the years 2001 and 2013. These components were subjected to qualification, screening and testing in which the goal was to ensure that the components would survive the stresses of the mission. The analysis categorizes failures by part type and failure mechanisms. One of the results of the analysis was the realization that a surprising proportion of failures experienced during system integration and testing were caused by human error (i.e. human induced defect). Further analysis included the determination of root failure mechanisms and any influencing factors contributing to these failures. The major causes of these defects were attributed to electrostatic damage (ESD), electrical overstress (EOS), mechanical overstress (MOS), and thermal overstress (TOS). Finally, the study proposes a risk analysis tool which incorporates these major causes for the failures, termed error-producing conditions (EPCs), and a proportionality factor representing the number of each type of failure that has occurred at the facility under study. These factors are quantified and used to communicate the risk of human induced defects for the assembly, integration and testing of space hardware based on the system’s electrical parts list. The new risk identification can trigger risk-mitigating actions more effectively, based on the presence of component categories or other hazardous conditions that have a history of failure due to human error.