Conceptual Design of the Package Handling System for the Deep Borehole Engineering Demonstration - 17064
Deep borehole disposal involves drilling one or more boreholes into crystalline basement rock to a depth of about 5 km, emplacing waste packages in the lower 2 km of the borehole, and sealing and plugging the upper 3 km. These depths are several times deeper than for typical mined repositories. A deep borehole field test (DBFT) is proposed to confirm the safety and feasibility of the deep borehole concept. The primary goals are to demonstrate the construction and characterization of deep boreholes, demonstrate the equipment and operations used for safe waste handling and emplacement downhole, study geologic controls on waste form stability and isolation, and evaluate the overall safety and practicality of the concept. The test will be conducted using simulated waste packages; no radioactive wastes will be handled at the deep borehole field test site. A key component of the DBFT is an engineering demonstration of the equipment and operations needed to transport waste packages to the site, move packages between the transportation and emplacement systems, and lower or retrieve packages into or out of the borehole. This paper describes the conceptualization of test package handling, from transportation and receipt through the interface with the borehole. It also describes the use of an integrated test facility to check out equipment prior to deployment at the DBFT site, and performance of the engineering demonstration at the DBFT site. (authors)